Loading...
HomeMy Public PortalAbout11-0533 Gann_1of3City of 'I , .,ee Island • Community Develop._.ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. 1/- Owner's NameAik.) Date Requested Date Needed / ! 11 111% sLa =* INTERNATIONAL CODE COUNCIL MEMBER Gen. Contractor /----1 ?70/ s Subcontractor Contact Information _.;T %.. 27- & Z.. /i Project Address / % l- 1 ij1 -4" Scope of Work J (-Gt.-7=03,32> E' 1R C7 v / Inspector '%%=') Date of Inspection Inspection ? . -' 1 I i' n' - Pass Fee Inspection Pass U Fail ® Fee Inspection Pass EJ Fail El Fee Inspection Pass ❑ Fail ❑ Fee City of - gee Island • Community Develop -_.ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 menace® INTERNAT!ONAL CODE COUNCIL MEMBER Permit No. /1 - J ;3_:) Date Requested � i3 Owner's Name ' ),Jtj Date Needed /x;77 / / Gen. Contractor -4 >J Subcontractor Contact Information 11 r / ---z:. _ '--i - U[_/ / Project Address I / 7 1:7:7-412'.:-; !U a + Scope of Work t ;.) G--(1,J7 i --,=> i Inspector /(1 Date of Inspection 4 Inspection / ` _ E ; f-r J4 / - Pass Er \..63kifi D Fee Inspection ,v) / /17, JA I- R r \ ) '�� r� lid G.. L -. _ 1?_.. -4-t? Pass Fair Fee Inspection Pass U Fail Fee Inspection Pass ❑ Fail ❑ Fee USC 441(elZ Dianne Otto From: Dianne Otto Sent: Wednesday, November 02, 2011 3:33 PM To: '1 DEMETRE @GMAIL.COM' Cc: 'Downer Davis'; 'Tina Gann' Subject: FW: Tina Gann's pool at Eagles Nest Attachments: Tybee Island - Wilmington- 20111024- 00023.jpg; Tybee Island - Wilmington- 20111024- 00022.jpg; Erosion Control for Home Builders.pdf Demetre, The City's consulting engineer did a routine erosion and sedimentation control inspection at 117 Eagles Nest / Tina Gann on October 24, 2011. Downer Davis' comments are below and attached are two photographs. Your client was extremely cooperative with the City in resolving the deficiencies. Compliance with erosion control measures and protection of state waters is mandatory. Please be aware that non - compliance at a future project within the City of Tybee Island by Architectural Pools and Spas will not be tolerated. I strongly encourage you to seek training from the Georgia Soil and Water Conservation Commission (GSWCC). Information on education and certification is available at the link below: htto: / /gaswcc.aeorgia.gov /portal/ site /SWCC /menuitem.2f54fa407984c51 e93f35eead03036a0 / ?vgn extoid= fc9531 d3b0c45210VgnVCM100000bf01020aRCRD The attached "Erosion Control for Home Builders" brochure provides basic information about the state law and the methods used for compliance. Please let me know if you have any questions. Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 From: Downer Davis fmailto:dkdbus@gmail.comj Sent: Monday, October 24, 2011 9:12 PM To: Dianne Otto Cc: Tina Gann; Steele Knudson Subject: Tina Gann's pool at Eagles Nest This site requires immediate attention. This evening as I visited this site and found the representation of BMP's to be of no value for protection of state waters. 25 1) The Sediment Barrier (Sdl) appears to be installed in and not upstream of the 25' state waters buffer. 2) The Sediment Barrier (Shc) does is not properly installed. It is not trenched in anywhere. 3) The Sediment Barrier (Shc) was installed only on the south side. The downstream west end has no BMP's to control sediment from entering state waters. I met with the residents and discussed this matter. It is my understanding that Tina is going to your office in the morning to obtain one more copy of the permit drawings. As the Contractor has not exhibited and ability to install and maintain BMP's properly, Tina advised she would take control of this. 1 At this point, with the pool and deck installed and completion nearing, Tina and I agreed to the following: a) Install a Sediment Barrier located upstream of the 25' buffer. b) After establishing proper grading elevations, provide a mulch cover over all disturbed areas in the 25' buffer. c) Provide a mulch cover over all remaining disturbed areas. d) Commence with establishment of permanent grassing within 6 months. This appears to be the most expedient method of bringing the site into compliance. As I will not be available after mid afternoon Wednesday afternoon until Thursday morning, I will discuss with you and Steele the follow -up inspection schedule tomorrow morning. 2 Dianne Otto From: Downer Davis [dkdbus @gmail.com] Sent: Monday, October 24, 2011 9:12 PM To: Dianne Otto Cc: Tina Gann; Steele Knudson Subject: Tina Gann's pool at Eagles Nest This site requires immediate attention. This evening as I visited this site and found the representation of BMP's to be of no value for protection of state waters. 25 1) The Sediment Barrier (Shc) appears to be installed in and not upstream of the 25' state waters buffer. 2) The Sediment Barrier (Shc) does is not properly installed. It is not trenched in anywhere. 3) The Sediment Barrier (Sdl) was installed only on the south side. The downstream west end has no BMP's to control sediment from entering state waters. I met with the residents and discussed this matter. It is my understanding that Tina is going to your office in the morning to obtain one more copy of the permit drawings. As the Contractor has not exhibited and ability to install and maintain BMP's properly, Tina advised she would take control of this. At this point, with the pool and deck installed and completion nearing, Tina and I agreed to the following: a) Install a Sediment Barrier located upstream of the 25' buffer. b) After establishing proper grading elevations, provide a mulch cover over all disturbed areas in the 25' buffer. c) Provide a mulch cover over all remaining disturbed areas. d) Commence with establishment of permanent grassing within 6 months. This appears to be the most expedient method of bringing the site into compliance. As I will not be available after mid afternoon Wednesday afternoon until Thursday morning, I will discuss with you and Steele the follow -up inspection schedule tomorrow morning. 0 -2 S -ll 4-o 5.�'il Eras:o#- Co..r' 1 h ay.cl ova' Co p l v= dra:.,0.pSf)14,-, E(nn C op y 1 10/24/2011 Gann City of _ _ aee Island • Community Develok. _.ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. 11 3 533 Owner's Name Date Requested IQ-12 Date Needed IC- (3 ` ( 1 INTERNATIONAL CODE COUNCIL MEMBER Gen. Contractor 6A ` PO 0 [3 Subcontractor Contact Information vyn.e_ 4 r ei 4 _O cc I Project Address 1i 7 . Q j n s 1\)e-C+ Scope of Work 6 (kJ ■ m VYr : r\ po-ol Inspector -2/ 4 Date of Inspection V ..:7:/i Inspection Oro J nd C,.). re) Pass F Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass El Fail El Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 09 -21 -2011 WORK DESCRIPTION WORK LOCATION CITY OF TYBEE ISLAND BUILDING PERMIT SWIMMING POOL/FENCE - RESIDENTL 117 EAGLES NEST OWNER NAME TINA GANN ADDRESS PO BOX 929 CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME ARCHITECTURAL POOLS & SPAS ADDRESS 1370 E HWY 80 STE L CITY STATE ZIP POOLER GA 31322 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 413.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $28,500.00 PERMIT #: 110533 TOTAL BALANCE DUE: $ 413.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 •403 Butler Ave., Tybee Island, GA 31328 Phone (9 1 2) 786 -4573 • Fax (912) 786 -9539 Swimming Pool, Spa and Hot Tub Permit Application * *OWNER & CONTRACTOR SIGNATURES REQUIRED ** Location of work (street address) / / 7 /I b L E S nits T OR/ I/E ARcgi Tee rue") P0/, F SFAS Contractor Permit Number 1 1-053 3 Address of contractor ! 3 7 0 E. A s T ii WY 7O Su, TE L /oOLER, G/4 3/ 3 Lt. Contact name & telephone number of contractor 0 f M e iR C K r / 4 COS 7 tr- OC C o 22q-04,11 Name of property owner 7 /4/Fl 0 6A /VA/Q p �y Mailing address of property owner Po /. O >< ! L 7 rrEEE L,Sta/✓I) i7't 3/.3 Z p Telephone number of property owner �(Z 6 6 / 0 Z ?4 91Z 736 670‘ Details of project /NSTA ALA Tlon/ or IN GR ogNO Fig FR 6-1A$5 5w/4fr',/Y6 Pool Residential Commercial Estimated cost of construction ATTENTION PROPERTY OWNER: All swimming pool, spa and hot tub installations are required by law to have a final inspection. Do not make final payment to the contractor without first requiring a copy of the final inspection to assure the work is complete and code compliant. Do not use the pool, spa or hot tub until it has passed fmal ' spection. ttpth.. f/ z�l Owner{ signature Date 7A a el*V Owner prin Cure • 5 name is Iol.t� Contractor printe name Submittals required with application: • 1 copy of survey depicting locations of pool/spa/hot tub, equipment, fencing, etc. • 2 sets of specifications of the equipment servicing the pool/spa/hot tub • 3 sets of post - construction drainage plan, if applicable • 3 sets of soil erosion/sediment control plan • $250 Plan Review Deposit (fee applied to permit; forfeited if project is abandoned Date CEIVED Inspection requirements: 1. Electrical Rough -in (minimum of one inspection; multiple inspections if applicable) 2. Electrical Final 3. Project Final (includes inspection of required barrier, access gates, self - latching devices, door alarms, etc., as applicable) 'IEPi..%'.A....1 r -05 %.n Cora r o I h &ncic'4' Land Development Code, Article 3, General Provisions . 1 3 Section 3 -190. Swimming pool requirements and placement. e r & • 11 All swimming pools, spas, and saunas shall comply with the following requirements: t ..1.13 (A) Application for a permit to construct a swimming pool, spa, or sauna must be submitted to the building official. The structural plans must be approved by the building official prior to the issuance of a permit and the beginning of construction and/or excavation. A drainage plan prepared by a registered professional engineer will be required unless the city staff determines that due to the size, method of construction, location, or other characteristics of the proposed swimming pool, spa, or sauna, a drainage plan is unnecessary under the circumstances. (B) Swimming pools, spas, and saunas and supporting electrical and mechanical equipment may be located in either the side or rear yard and shall be at least five feet from the property line. (C) Swimming pool, spa, and sauna construction must meet all requirements of the codes adopted by the City of Tybee Island. (D) Once a swimming pool, spa, or sauna and its accessories have passed a final inspection it shall be a violation of this ordinance to remove or alter any of the equipment that is required by: the International Residential Code — Appendix G, the International Building Code — Section 3109, the National Electrical Code, and the Georgia State Amendments. Failure to maintain the safety related and/or electrical equipment in good and working order shall constitute a violation of this ordinance. (E) No swimming pools, spas, or saunas shall be placed across, on, or beneath any utility easements nor shall any utility easement be granted which bisects a swimming pool, nor be located within five (5) feet of any marsh buffers as delineated by the Georgia Department of Natural Resources. (F) When a swimming pool, its deck, or other accessory to a swimming pool is proposed for construction on a site that has already been improved, the swimming pool plans and permit application will be reviewed by the City Engineer. (a) If there is an approved drainage plan for the site the City Engineer will review the plans for the swimming pool, deck and accessory structure to ensure that the proposed improvements will not materially affect the drainage of the site. If they will materially affect the drainage of the site the applicant will have to have a drainage plan prepared by a design professional before a permit for the swimming pool, deck or accessory will be issued. (b) If the site was improved without a drainage plan, the City Engineer will review the pool plans and permit application to ensure that the swimming pool, deck or accessory structure will not increase the amount of run -off leaving the site. (G) Any permit for a swimming pool is required to contain a soil and erosion plan for the proposed site prior to the issuance of a permit and commencement of any construction related activity. (Code as amended 10/28/2010) DAVIS ENGINEERING, INC. 636 Stephenson Avenue, Suite C Savannah, Georgia 314 Tel. (912) 355 -7262 Fax (912) 352 -7787 davisenoinc(@.bellsouth.net INVOICE S' September 22, 2011 Invoice #21103801 Diane Otto City of Tybee Island P.O. Box 2749 Phone (912) 786 -4573 Fax: (912) 786 -9539 RE: 210002 NPDES Consulting Tybee Island, GA 31328 09 -14 -11 0.5 Site visit and plan review. 09 -20 -11 0.5 Final plan review and concurrence n.c. Additional site visits and meetings with staff 1.0 hours @ $175 = $175 Total Due This Invoice c 22 -II • aczgeci 40 II-o6-33 • 40 AP S SOIL EROSION /STORM -WATER CONTROL PLAN 117 EAGLES NEST DRIVE TINA GANN, Owner DEMETRE KYRIACOS, Contractor Proposed work shall be completed at 117 Eagles Nest Drive, Lot 13 Fort Ward, Tybee Island, Georgia in order to accommodate the installation of an in- ground fiberglass pool on the side yard adjacent to 119 Eagles Nest Drive. Work to be performed shall be in compliance with DNR as well as City of Tybee regulations. Visual site inspection and consultation with City Engineer, suggests there is minimal risk of soil erosion and disruption of current storm -water drainage patterns associated with 117 Eagles Nest Drive, Tybee Island Georgia. Work shall begin on or about September 1, 2011 and will be completed no later than December 30, 2011. No construction entrance shall be required. Contractor shall use the existing concrete driveway in order to access the property. 117 Eagles Nest Drive is a previously improved lot. The existing topography of the lot is as follows: High ground exists in the front and rear of the property. The proposed pool site it located in the middle or "Valley" of the property. Pool shall be placed in- ground approximately 2 to 3 feet above the current grade as to allow rainwater to flow around the pool rather than into the pool. This should not alter the current drainage of the property. Great care shall be taken to ensure that any minimal grading of the lot will not change the current drainage patterns of the property and all storm -water runoff will continue to flow towards the mosquito ditch. In order to protect the adjacent lot, 119 Eagles Nest Drive, from any potential soil erosion or runoff, a temporary silt fence shall be erected along the property line. A buffer zone of 5 feet between the silt fence and work site shall be maintained so that adjacent lot will not be disturbed. After construction is complete, a small berm approximately 3' feet high will be created along the property line in order to ensure that future runoff will not impact the neighboring property. Berm will be constructed with soil excavated from the pool site and landscaped with native vegetation. Contractor will remove any soil remaining from the pool excavation from the work site. Dianne Otto From: diane_sch @yahoo.com Sent: Sunday, September 18, 2011 5:36 PM To: Dianne Otto; Diane Schleicher Cc: 'Downer Davis' Subject: Re: 117 Eagles Nest Dr. Dianne, As long as the pool itself is outside of 5 foot if the marsh buffer per the code and the decking or path around the pool meets the current buffer code, I am fine with this newest submittal. Thanks, Diane Sent from my Verizon Wireless BlackBerry From: Dianne Otto <Dotto @cityoftybee.org> Date: Sun, 18 Sep 2011 17:10:08 -0400 To: Diane Schleicher <dschleicher @cityoftybee.org> Cc: 'Downer Davis' <dkdbus @gmail.com> Subject: FW: 117 Eagles Nest Dr. Diane, Many of the issues related to permitting a swimming pool at 117 Eagles Nest Drive have been resolved. An issue related to the marsh buffer remains open to interpretation. Section 3- 190(E) of the swimming pool ordinance (see the bottom of the attached "pool appl) states, "No swimming pools...shall be...located within 5 feet of any marsh buffers as delineated by the DNR." As shown on the attached site plan" pavers for the proposed pool would be within 5 feet of the buffer. The actual swimming pool would be 5 -feet off the buffer. Rather than concrete decking, these are porous pavers and they would not be structurally connected to the pool. Would these porous pavers in the buffer violate the intent of Section 3- 190(E)? Please advise, Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 From: Downer Davis jmailto:dkdbusOgmail.com] Sent: Friday, September 09, 2011 4:50 PM To: Dianne Otto Subject: Re: 117 Eagles Nest Dr. Diane, Thanks for attempting to assist the applicant in unnecessary delays. Downer On Fri, Sep 9, 2011 at 4:41 PM, Dianne Otto <Dotto @cityoftybee.org> wrote: Dear Demetre, While processing the application for a swimming pool at 117 Eagles Nest Drive it came to our attention that Architectural Pools & Spas has not registered for 2011. Attached is a 2 -page registration application. Both pages are required. Please attach a copy of your 2011 City of Pooler business license. The fee is $20. Attached are the submittals regarding drainage and soil erosion control. The survey and the drainage plan diagram must show the DNR marshline and the 25 -foot DNR buffer. It is our understanding that the property owner has a more recent survey that includes this required information. To avoid unnecessary fees the plan review stopped when it was discovered that this information was not provided. Plan review will resume when the requested information has been provided. Please let me know if I can be of assistance. Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 ............................................................................................ ............................... This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 2 Dig Specs of Marathon 7'6 "x33' 33 ft. 33 ft. 1 1 Scale:' /4 " =1' E= o QL__CQ_ [M-M ci 33 ft. 1 1 Scale:' /4 " =1' cl HAYWARD® _ �-i: ViL' FOR C.ci COMPLIANC Every !;; has � ° !.. tfcrt ,� I",e;t rZ�d� �:, �erttlfy code vloiatidn3,' r,o oversjIh "ry the revimer shall be c on3true:a "ws authority to violate, ci ce;, & iayr or se aside any applicable code or online review and permit should net, be ys a warranty or guarantee. Pr-flawed By g All i:":ie.,: r', aJ hate!! comp :y with The Na. t;ode_ D& "diti (J! (=ecr a r.Drnply with The Zoo L E ck.o:pin ! rn i All C,'ttYUCaoI . ' cornt.D•, Stand:n: Svl r ; : •oi Cod 0+ . 12C 6o /47- tra r -,�11 Z ,vi I M Apnrovntd 5et G7yisMust Remain on ,eb Fite at A;l' inb3E" Swi mCLearTM QUAD- CLUSTER CARTRIDGE FILTERS High performance. Operational convenience. Hayward SwimClear reaches new horizons in cartridge filter technology. A cluster of four reusable polyester cartridge elements provides a choice of 225, 325, 425 and now 525 ft.' of heavy -duty, dirt- holding capacity and extra -long filter cycles. SwimClear filter tanks are made from a reinforced co- polymer material for the ultimate in strength, durability and long life — even for the toughest applications and environmental conditions. Discover the crystal clear results and reliable performance of SwimClear by Hayward — the first choice of pool professionals. Total System: Pumps I Filters I Heating I Cleaners I San 'talfion at on 1 tightTng t °- - Goods Manual Air Relief is a high capacity, rapid release manual air relief valve that bleeds air with a quick quarter turn of the lever. Top Manifold provides excellent filtration and hydraulic performance. Heavy -Duty. Tamper - Proof, One -Piece Clamp securely fastens tank top and bottom.together and allows quick access to all internal components without disturbing piping or connections. Combination Pressure and Cleaning - Cycle - Indicator Gauge gives visual indication when cartridge filter elements need cleaning. Quad- Cluster Cartridge Elements provide 225, 325, 425 or 525 ft.' of filter area and extra dirt - holding capacity for long filter cycles. Precision - engineered core provides extra strength and superior flow. High- Strength Filter Tank is made from durable, glass reinforced co- polymer to meet the demands of the toughest applications and environmental conditions, including in -floor cleaning systems. Uniform Low - Profile Tank Base Design makes removal of cartridge elements fast and simple. Full -Size 111" Integral Drain provides fast clean -out and flushing. SPECIFICATIONS — SWIMCLEAR QUAD- CLUSTER CARTRIDGE FILTERS FILTER TYPE FILTER TANK Quad - Cluster cartridge elements: 225, 325, 425 and 525 ft? total (20.9, 30.2, 39.5 and 48.0 m2) Injection - molded glass reinforced co- polymer FILTER ELEMENTS Reinforced Polyester PERFORMANCE RANGE / to 3 HP (30 to 150 GPM) .37 to 2.24 kW (114 to 568 LPM) DIMENSIONS C2030 — 23" W x 32 W H (58 cm x 81 cm) C3030 — 23" W x 34 12" H (58 cm x 87 cm) C4030 — 23" W x 40 W' H (58 cm x 102 cm) C5030 — 23" W x 46 1/2" H (58 cm x 117 cm) PERFORMANCE DATA MODEL NUMBER C2030 C3030 C4030 C5030 EFFECTIVE FILTRATION AREA DESIGN FLOW RATE 1 GALLONS TURNOVER KILOLITERS 8 hrs. 101115, 225 325 425 525 20.9 30.2 39.5 48.8 84* 122* 150** 150** 318 462 568 568 40,320 58,560 72,000 72,000 50,400 73,200 90,000 90,000 153 222 273 273 191 277 341 341 'Based on NSF recommended rate for commercial use at .375 GPMEft.a --Determined by pump size and piping system hydraulics; 2' piping is recommended for flow rates equal to or greater than 90 GPM (341 LPM). Hayward doesn't recommend flow rates above 150 GPM. 8 Hayward and Hayward Energy Solutions are registered trademarks and SvnmOear and Noeyl are trademarks of Hayward Industries, Inc. 02010 Hayward Industries, Inc. To take a closer look at Hayward Filters, go to www.hayward- pooicom or call 1- 888 - HAYWARD el HAYWARD 620 Dlvislon Street I Elizabeth. NJ 072C1 Self- Aligned Tank Top and Bottom make access to servicing Quad - Cluster cartridge elements quick and easy. CPVC Union Coupling Connection provides plumbing options of 2" or 2W piping with 2" full flow internal piping for maximum performance. Noryl Bulkhead Fittings for extra strength and heat resistance. CPVC Union Connections Pressure and Cleaning Gauge LnSWC10 Exclusive, Swing - Away Hand Knobs make strainer cover removal easy. No tools required... no loose parts... no clamps. Super -Size Housing and diffuser ensure rapid priming See Through Strainer Co lets you see when basket needs cleaning and eliminates guesswork. Special self - adjusting seal ensures dependable sealing. All Components Molded of Corrosion - Proof Thermoplastic for extra durability and long life. Heavy -Duty, High - Performance Motor with air -flow ventilation for quieter, cooler operation. Heat - Resistant, Industrial - Size Ceramic Seal is long-wearing and drip proof. For fresh or saltwater use. Mounting Base provides stable, stress -free support, plus versatility for any installation requirement. Adapts 48- and 56 -frame motors. Corrosion -Proof Impeller has smooth, wide openings to prevent fouling or clogging. Energy-efficient design produces more flow at equivalent horsepower. OVERALL DIMENSIONS MODEL Motor Power Pipe Size Dimension "A" Total HP HP Service KW Factor inches inches mm Standard Efficiency Max -Rated Single Speed SP2600X5. SP2605X7 SP2607X10 SP2610X15 SP2615X20 SP2621X25 0.60 1/2 0.37 1.20 131/4 0.75 3/4 0.56 1.00 13 7/a 1.10 0.75 1.10 141/4 362 1.50 11/2 1.00 153/8 391 2.00 2 1.50 1.00 2 15 7/8 403 2.50 210 D 1.00 2 163/8 416 Standard Efficiency Max -Rated Dual Speed SP2607X102S SP2610X152S SP2615X202S 1.00 1 1.50 11/2 El ° 1.00 2 13 330 1.00 2 13 3/4 349 2.00 2 1.50 1.00 2 141/4 362 100.00 90.00 a80.00 70.00 60.00 2 50.00 0 40.00 30.00 20.00 10.00 0.00 SUPER PUMP ---.. FLOW VS. TOTAL HEAD - `--_ ^, i 0P261051525 (1.ow _ "-__ "- ►`\\�� ` .• -_ -`a . 5P261' SP2607X30 SP2615X20Z51 \ L SP2621A25 0P2615520 SP260751025 I .. • 5 200 40.0 6R0 800 FLOW (GPM) 100.0 1900 Hayward and Super Pump are registered Vademarks of Hayward Industries. Inc. 0 2008 Hayward Industries, Inc. www.haywardnet.com 1- 888- HAYWARD Service -Ease Design gives simple access to all internal parts. Motor and entire drive group assembly can be removed, without disturbing pipe or mounting connections, by disengaging just four bolts. Super -Size 110 - Cubic -Inch Basket has extra loafhalding capacity and extends time between cleanings. Rigid construction with loc eutandor rubbing ansulIros fraa- flawing operaffon for hcav� dcbrim loads. Super Pump Series Pump. are Bait.] HAYWARD"Pool Produc One source. Every poc Dig Specs of Marathon 7'6 "x33' 33 ft. 33 ft. J Scale:1/4" =1' E= c La _ __ [m-n cii= 33 ft. J Scale:1/4" =1' SOIL EROSION /STORM -WATER CONTROL PLAN 117 EAGLES NEST DRIVE TINA GANN, Owner DEMETRE KYRIACOS, Contractor Proposed work shall be completed at 117 Eagles Nest Drive, Lot 13 Fort Ward, Tybee Island, Georgia in order to accommodate the installation of an in- ground fiberglass pool on the side yard adjacent to 119 Eagles Nest Drive. Work to be performed shall be in compliance with DNR as well as City of Tybee regulations. Visual site inspection and consultation with City Engineer, suggests there is minimal risk of soil erosion and disruption of current storm -water drainage patterns associated with 117 Eagles Nest Drive, Tybee Island Georgia. Work shall begin on or about September 1, 2011 and will be completed no later than December 30, 2011. No construction entrance shall be required. Contractor shall use the existing concrete driveway in order to access the property. 117 Eagles Nest Drive is a previously improved lot. The existing topography of the lot is as follows: High ground exists in the front and rear of the property. The proposed pool site it located in the middle or "Valley" of the property. Pool shall be placed in- ground approximately 2 to 3 feet above the current grade as to allow rainwater to flow around the pool rather than into the pool. This should not alter the current drainage of the property. Great care shall be taken to ensure that any minimal grading of the lot will not change the current drainage patterns of the property and all storm -water runoff will continue to flow towards the mosquito ditch. In order to protect the adjacent lot, 119 Eagles Nest Drive, from any potential soil erosion or runoff, a temporary silt fence shall be erected along the property line. A buffer zone of 5 feet between the silt fence and work site shall be maintained so that adjacent lot will not be disturbed. After construction is complete, a small berm approximately 3' feet high will be created along the property line in order to ensure that future runoff will not impact the neighboring property. Berm will be constructed with soil excavated from the pool site and landscaped with native vegetation. Contractor will remove any soil remaining from the pool excavation from the work site.