HomeMy Public PortalAbout11-0577 MichaudCity of 1 ,ee Island • Community Develop _mt Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786A573 ext. 114 - Fax 912.786.9539
rilk%
Inanal4
INTERNATIONAL
CODE COUNCIL
MEMBER
Permit No. i /-. OS / i Date Requested ,
Owner's Name /11 / .1) '9 Date Needed
Gen. Contractor il, 74 i... ; -y- . NJZ, Subcontractor
Contact Information - (-,-
Project Address ; 2/ .
-
Scope of Work __ 7_,?___ - ,_......:_ _, /
Inspector / / Date of Inspection
Inspection / * Pass
Fail Fee
Inspection Pass 1:1 Fail Fee
Inspection Pass Fail EJ Fee
Inspection Pass Fail Fee
DATE ISSUED: 10 -19 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIR LEAKING METAL ROOF
1213 SIXTH AVE
JAMES& MARY BET MICHAUD
3644 REGENCY TRAIL
RICHFIELD OH 44286
773 - 935 -1754
ACE ROOFING & REMODELING INC
5256 HWY 80 E
ELLABELL GA 31308
P
$ 70.00
$2,100.00
PERMIT #: 110577
TOTAL BALANCE DUE: $ 70.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
PI&
ACE ROOFING
—0S-77
Location: Location: 1 1C2 PUQ- PIN #
9127283945
912 786 9539 P 111
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
J
NAME
ADDRESS
TELEPHONE
Owner
_ , ` Gl
f� 1:3 V�J
05- S;V -WS
Architect
or Engineer
Building
Contractor
A ��u, i 9'
.1' eji r4
T3 I� t toil L Y •
;? Ltd', , N l 4 , 5 13J�-
3 5 t ] - 3 1
(Check all that apply)
❑ Repair
❑ Renovation
0 Minor Addition
❑ Substantial Addition
❑ Other
Details of Project:
L - Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
❑ Footprint Changes
❑ Discovery
❑ Demolition
Estimated Cost of Construction: $ (9l ) OD,
Construction Type i (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert?
Setbacks: Front Rear
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
2011 -10 -19 14:02 ACE ROOFING
9127283945 » 912 786 9539
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provi
Construction debris will be disposed by nom,,' ( `i rby means o
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinance& FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: , Signature of Applicant:
Note: A permit normally takes 7 to 10 days toprocess.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
P 1/1
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
ACE ROOFING 9127283945 >>
912 786 9539 P 1/1
Permit Acknowledgement of
Asbestos/Environmental Notification to Georeia. E 1) for
Protects Involving Demolition., Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos it Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
pr ject.
qojoqL (Ifleet Undersigned
f rtia q 1)0,1/Act? e
Printed Name
1o1 i81 i
Date
Office Use Only:
Project Address:
Permit Number:
2011 -10 -19 14:09
ACE ROOFING 9127283945 »
912 786 9539 P 1/1
LEAD -BASED PAINT
Adapted from blip / /www eLa 00v/lead/pubs/renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child - Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre-1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
Information pamphlet Renovate Right; important Lead Hazard lnforma(ron fur fdrrrilir 5, Child Care Pore
oncl .Schools, Owners of these rental properties must document compliance with this requirement. EPA's sample
pm-renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an ovoiks,tion trrr rirrri
rtdicat,on and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices,
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the 5einpi crdkeepl.oq .checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the FPA .Small Fntitv Compliance _Guide to Renovate Right.
Read about how to use lead -safe work practices In EPA's Steps to Lead Safe Renovation, 12uu,nr ,,rid Painting,
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living In a pre-1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate,Rrgbt: important Ltad NazardIrjformation for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1.800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead-based paint.
Information for Tenants and Families of Children under Age 6 In Child Care Faeilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or In the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form which Indicates that the tenant received the Renovate Right lead hazard Information
pamphlet.
Beginning In December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre-1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: lrru,ortant t earl Hi,/i1111 lnformotinn for r,7rnrh6ti, Child
Care Providers, and Schools lead hazard Information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre-1978 housing and child - occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard Information pamphlet Renovate Right: Nnpor nt Lad Haza,cl Informatipo_Lsi_r_f_amilLua.
Child Care provide. and Schools. Contractors must document compliance with this requirement. EPA's pre renov,ltiun disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See' ADDiicetipn for firm
ccrtilicat cal, The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• l'ind a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour Initial course from an accredited training provider to become a
certified renovator. click here fur a '1St ut kiigiUk' c011rge5.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010,
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample rec,Q,riker'Diny checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule In the EPA Small Entity Compliance Guide C Rt(120.[e_aiOht,
Rea about how to lead -safe work practices in EPA's S ,s_.to 1 , i .5 to Renovation, Revak dad P,urrqu .
I Poi; FE r,7T
ISTURWNC
JUST SIX
SQUARE FEET
BiG TIME.
-mature
oat(
Date