HomeMy Public PortalAbout2019-24 Approving a change order to the Corradino Group for West Mashta Bridge repairsRESOLUTION NO. 2019.24
A RESOLUTION OF THE VILLAGE COT]NCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING A
CHANGE ORDER TO THE WORK ORDER ISSUED TO
THE CORRADINO GROUP' INC. TO PERFORM
STRUCTURAL ANALYSIS AND DESIGN SERVICES F'OR
WEST MASHTA DRIVE BRIDGE REMEDIAL REPAIRS;
PROVIDING FOR AUTHORIZATION; AND PROVIDING
FOR AN EFFECTIVE DATE.
\ilHEREAS, the Village of Key Biscayne (the "Village") issued Request for
Qualifications No. 2016-02-09 (the "RFQ") for continuing professional engineering services;
and
WHEREAS, pursuant to the RFQ, the Village Council selected the Corradino Group,
Inc. (the 'oConsultant") as one of the consultants to provide continuing professional services
relating to general civil engineering, transportation planning and engineering, environmental
engineering, and landscape architecture, and authorized the Village Manager to execute an
agreement with Consultant; and
\ilHEREAS, on October 19, 2018, the Village Council approved the issuance of a Work
Order to Consultant to perform Structural Analysis and Design Services for West Mashta Drive
Bridge Remedial Repairs (the "Project"); and
WHEREAS' an underwater inspection of the V/est Mashta Drive Bridge needs to be
performed in order for Consultant to complete the Project; and
WHEREAS, the Consultant has provided a proposal, attached hereto as Exhibit "4," (the
"Change Order") for the underwater inspection; and
WHEREAS, the Village Council desires to approve the Change Order; and
WHEREAS, the Village Council finds that this Resolution is in the best interest and
welfare of the residents of the Village.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF'
THE VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS:
Section 1. Recitals Adopted. That each of the above-stated recitals are hereby
adopted, confirmed, and incorporated herein.
Section 2.Chanse Order Approved. That the V illage Council hereby approves the
Change Order attached hereto as Exhibit'0A."
Section 3. Authorization. That the Village Manager is hereby authorized to execute
the Change Order attached hereto as Exhibit o'A" and take any and all action necessary to
implement the purposes of this Resolution.
Section 4. Effective Date. That this Resolution shall take effect immediately upon
adoption.
PASSED and ADOPTED this 30th day of April, 2019.
I
/1,/
V/. DAVEY, MA
A
MEDINA, CMC
CLERK
APPROVED AS FORM AND LEGAL
VILLAGE ATTORNEY
Y:
2
oz
o
M.
u.o
U
EXHIBIT ''A''
THE CORRADINO GROUP TNC.
ENGINEIRS . PLANNERS . PRC}GRÂMMANAGERS . €NVIRONMENTALSCIENTISIs
April 10, 2019
Jake Ozyman, MSCM, PE, ENV SP
Director of Public Works
Village of Key Biscayne
Public Works Department
88 West Mclntyre Street
Key Biscayne, FL 33149
Re: West Mashta Drive Bridge (Bridge No. 878400) Remedial Repairs _ Additional
Services for Underwater lnspection (REV)
Dear, Mr. Ozyman,
As discussed, The Corradino Group, lnc. (CORRADINO) is pleased to present this letter scope
and fee estimate to perform Undenruater lnspection Services for the above referenced project.
SCOPE OF SERVICES
The Village of Key Biscayne requires the following additional scope of services for the above-
mentioned structure which include.
a Conduct underwater inspection services (see attached scope by lndustrial Divers
Corporation "Exhibit A")
SCHEDULE
The scope of work is anticipated to be completed within three (3) weeks from your notice to
proceed.
COMPENSATION
CORRADINO agrees to provide the scope of services above for the lump sum compensation of
$ $ 12,874.24, based on a Lump Sum contract. This proposal includesthe servicesfor lndustrial
Divers Corporation for unden¡vater inspection services (see attached scope). Additional work not
anticipated in this proposalwill be billed as additionalservices as a negotiated lump sum. Written
authorization will be required prior to the commencement of additional services.
CORRADINO appreciates your consideration of our firm for this project. To formally authorize us,
kindly indicate so by returning a signed copy of our proposal. We look forward to working with you
on thís project. lf you have any questions or if you require additional information, please do not
hesitate to contact Cecilia Villoria at (305) 594-0735.
4055 \W 97 lii \yí \.:T i. \{.t.1.¡: lrirt .ù1l,A.v-ll. t_1. jjI7g
í I I l{í}lr 887 jii I i05 594 0735
i:AX i05.594.07,i5
\À' \À'\\'.( o R tì.,\ D I \l O.C O t/t
Attachments
Exhibit A
Presented by:
Mike Ciscar, P.E.
VP of Engineering and Planning
The Corradino Group, lnc.
April 10, 2019
Accepted by
Jake Ozyman, MSCM, PE, ENV SP
Director of Public Works
Village of Key Biscayne
Date
J:\4383 Key Biscayne\Two #9 Mdhta Bridge\TWO 9_ Mæhta Bridge_Additional Services,rev 04 l0 l9.docx
TI{DUSTRIAL DIVERS CORPORATION
2901 SW 3rd Ave STE #5
Fort Lauderdale, FL 33315
(954) 523-2906 Office (954) 525-6521 Fax
idc@bellsouth.net
Name / Address
The Corradino Group
Attn: Mike Cisdar, PE
4055 NW 97th Ave.
Miami, FL 33178
Project Address
Mike Ciscar, PE
305-975-3171 Office
cvilloria@CORRADINO. com
The above terms and conditions are herby accepted.A finance charge of I l/2% per month
whichisanannual percentagerateoflSToischarged. Purchasershallbeliabteforall the
cost olcollection including reasonable attomey's fee.
Pro¡ect Name / Job No.Terms
Mashta Bridge Net 30
Date Submitted by
a a
t/25/2019 A. Delgado
Description Qtv Rate Total
Level I underwater inspection of the W Mashta Drive Bridge at Village of Key
Biscayne
Industrial Divers Corporation (lDC) will provide a three diver team surface
supplied with communications equipped diving helmets for a diver and standby
diver.
Rates: (Non-Prevailing Wage Determination)
. 3 Diver Team Straight Time: $250.00/Hour "door to door" Monday - Friday
0600 hrs. to 1800 hrs.
. 3 Diver Team Overtime: $325.00/Flour "door to door" weekends, holidays and
nighr shift 1800 - 0600 hrs.
Mileage: Round trip from Fort Lauderdale, FL @ 50.58/ mile
Equipment:
. Hydraulic powered underwater tools: hydraulic power heads with concrete
grinding and de-scaling whirl away heads with portable hydraulic power pack,
and 200'ofduplex hydraulic hose @ $350.00/day.
. 3K PSI water blaster @ $150.00/ day
. Closed Circuit video system with lights and/or HD Camera in BlueFin housing
with lights for HD video and digital still photos @$250.001 day
. Cygnus underwater ultrasonic thickness gauge: $150.00/ day
Vessel
Total
Signature Print Name & Title
Page 1
Date
INDUSTRIAL DIVERS CORPORATIOI{
2901 SW 3rd Ave STE #5
Fort Lauderdale, FL 33315
(954) 523-2906 Office (954) 525-6521 Fax
idc@bellsouth.net
Name / Address
The Corradino Group
Attn: Mike Cisdar, PE
4055 NW 97th Ave.
Miami, FL 33178
Project Address
Mike Cisdar, PE
305-975-3171 Office
vi I loria@CORRADINO.com
The above terms and conditions are herby accepted.A finance charge of I ll2Vo per month
which is an annual percentage rate of I 8olo is charged. Purchaser shall be liable for all the
cost ofcollection including reasonable attorney's fee.
Project Name / Job No.Terms
Mashta Bridge Net 30
Submitted by
a
Date
t/25/2019 A. Delgado
Description Qtv Rate Total
36' x 1 1' aluminum twin engine barge with A-Frame $850.00/ day
Marina Fee: $150.00/ night
Project Estimate:
Mobilization Lump Sum $1,000.00
3 Diver Team: 2.5 days (12 hours per day) 30 hours @ $250.00/Hour.
36' x I I' aluminum twin engine barge with A-Frame 2 days @ $850.00/ day
Hydraulic powered underwater tools: 1 day @ $350.00/day.
3K PSI water blaster 2 days @ $150.00/ day
Closed Circuit video system with lights and/or HD Camera in BlueFin housing
with lights for HD video and digital still photos @5250.001 day
Cygnus underwater ultrasonic thickness gauge: I day @ $150.00/ day
Written report with DVD copies of HD Video and photo documentation: $250.00
Mileage: Round trip from Fort Lauderdale, FL 128 miles @ $0.58/ mile
Marina Fee: 2 nights @ $150.00/ night
Demobilization Lump Sum $1,000.00
Proposal e-mailed to Cecilia Villoria <cvilloria@CORRADINO.com>
30
2
2
I
I
t28
2
1
r,000.00
250.00
850.00
350.00
150.00
250.00
150.00
250.00
0.58
150.00
1,000.00
I,000.00
7,500.00
1,700.00
350.00
300.00
250.00
150.00
250.00
74.24
300.00
I,000.00
Total s12,874.24
Signature Print Name & Title
Page 2
Date