Loading...
HomeMy Public PortalAboutRIVER OAK LN_6 2OF4.pdfJ idence \TYBEE RESIDENCE2 O co Jam ID SITE PLAN 3/16" = 1'-0 LOT J 15'- 5 5/18- PROPERTY LINE n. LOT H S 38 DEG 2400- E 2.00' 10' BUILD NG SETBACK .;1 1 IP e li I� L �!J en I I .n. n. . .n I C b- u 20' IIIIILDING SETBACK 19' EAEMENT ACCESS, DRAINA E, AND UTILITY EASEMENT RIVER OAK LANE HYDRO VENT DETAIL PROPERTY LINE m N41 DEG 34'40 "W 10837 0 \ .p MARSH Smart VENT 877 - 441- 8368 www.smartvent.com SILICONE/POLYURETHANE LYURETHANE (FLANGE) VENT DOOR VENT FRAME FIGURE 2 Side View 8 1/4" R/O STRAPS INSTALLED TWO ST TOP TWO ON BOTTOM DETAIL DIAGRAM MODEL 1540 -520 FLOOD VENT INSULATED 16 1/4" R/O STRAP DETAIL. 80' TEETH MUST CLICK IN TIGHT TO INSURE SECURE INSTALLATION RENO PAST SW FOR SPRING BACK FIGURE 1 Front View STRAP SLOTSUSE TWO TOP AND TWO BOTTOM FIGURE 3 FlNALL Side View SMART VENT. 377 441' co.9 460.1.0r SAI•22B FLOOD VENT INSULATED MODEL 1540 -520 1540-520 1 1/2"=1'-O" Smart VENT 877 - 441- 8368 www.smartventcom INSTALLATION INSTRUCTIONS & DETAILS MODEL 1540 -520 FLOODVENT INSULATED INSTALLATION INSTRUCTIONS° REV. 5 -15-09 I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out) 2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X 1 block high) for each vent. Ensure the bosom of the rough opening is no more than 12" above the finished grade. 3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the vent frame. (FIG. 2) 4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL) 5. Insert the top straps into the top two strap slots about two clicks. 6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall. Push the frame tight against the face of the wall. Ensure the frame is flush and square in the opening. (FIG. 3) 7. Reach through the vent opening and click the two straps in while holding the front of the vent against the wall face. The sharp point of the straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place. 8. Re-check that frame is square and slots are clear of debris, and caulk. 9. Install the door into frame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame and rotate until it is latched. 10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning. MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY FEMA, NFIP, ICC, & ASCE SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(0)(5), ASCE 24-05 ICC EVALUATION N ESR -'1174 Wubbena Architectural Design and Development James Wubbena, AIA 35 Barnard St., Ste. 300 Savannah, GA. 31401 P- 9126605438 F- 9125253088 i D lA RE 4.2Z -13 evra 1 TyBEE ISLAND, GEORGIA REVISIONS SHEET TITLE SITE PLAN Of ORAWIWA m.u«a.r..aw PC w emue.o--". 00.1.• der*orn Rename doimismn 4orionio..lonna Webs.. tap.. ' User ...sonson"�ntheAra.alorten".a ..-w cloaca PROJECT N'r'vw 1307 DATE 2/52013 DRAWN ED, Author CHECKED BY: Checker SCALE As Indicated SHEET NO C1.1 FLOAT SLOTS �� \\ -._ , STRAP DETAIL. 80' TEETH MUST CLICK IN TIGHT TO INSURE SECURE INSTALLATION RENO PAST SW FOR SPRING BACK FIGURE 1 Front View STRAP SLOTSUSE TWO TOP AND TWO BOTTOM FIGURE 3 FlNALL Side View SMART VENT. 377 441' co.9 460.1.0r SAI•22B FLOOD VENT INSULATED MODEL 1540 -520 1540-520 1 1/2"=1'-O" Smart VENT 877 - 441- 8368 www.smartventcom INSTALLATION INSTRUCTIONS & DETAILS MODEL 1540 -520 FLOODVENT INSULATED INSTALLATION INSTRUCTIONS° REV. 5 -15-09 I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out) 2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X 1 block high) for each vent. Ensure the bosom of the rough opening is no more than 12" above the finished grade. 3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the vent frame. (FIG. 2) 4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL) 5. Insert the top straps into the top two strap slots about two clicks. 6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall. Push the frame tight against the face of the wall. Ensure the frame is flush and square in the opening. (FIG. 3) 7. Reach through the vent opening and click the two straps in while holding the front of the vent against the wall face. The sharp point of the straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place. 8. Re-check that frame is square and slots are clear of debris, and caulk. 9. Install the door into frame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame and rotate until it is latched. 10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning. MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY FEMA, NFIP, ICC, & ASCE SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(0)(5), ASCE 24-05 ICC EVALUATION N ESR -'1174 Wubbena Architectural Design and Development James Wubbena, AIA 35 Barnard St., Ste. 300 Savannah, GA. 31401 P- 9126605438 F- 9125253088 i D lA RE 4.2Z -13 evra 1 TyBEE ISLAND, GEORGIA REVISIONS SHEET TITLE SITE PLAN Of ORAWIWA m.u«a.r..aw PC w emue.o--". 00.1.• der*orn Rename doimismn 4orionio..lonna Webs.. tap.. ' User ...sonson"�ntheAra.alorten".a ..-w cloaca PROJECT N'r'vw 1307 DATE 2/52013 DRAWN ED, Author CHECKED BY: Checker SCALE As Indicated SHEET NO C1.1 N: \Wubbena AD \1307 -tybee residence \TYBEE RESIDENCE2.rvt LOT J EROSION CONTROL PLAN LOT G LOT H 1 1 I I LINE OF SWALE 4 SILT FENCE LINE. C_ G I r 1 r \ LCUJ ?Iln I 1 ' 11r_ I t.$14 tg I I \ 1 1 � 1' I m A 1 I. I 1 1 - 1 I 1/8" = 1' -0" 6 ❑ n/ EMI FQ UP 5 IJ IIl�III u 93 S] C2 `Q RIVER OAK LANE CONSTRUCTION ENTRANCE if LOT N LINE -O SWALE— — — DRAINAGE FLOW PROPERTY LINE z U Z 0 B HAY BALES TYP. NOTE: ALL DETAILS IN 'MANUAL FOR ERROSION AND SEDIMENT CONTROL IN GEORGIA' WHICH ARE APPLICABLE TO THIS PROJECT SHALL BE CONSIDERED PARRT OF THE REQUIREMENTS TO CONTROL ERROSION AND SEDIMENT ISSUES ON THIS PROEJCT. LOT 0 MARSH HAY BALES TYP. SIDE VIEW mss. o.c FRONT VIEW NOTE: lls• 36' D.O.T. approved Isbrb. Use wood Of steel posts. SILT FENCE - TYPE A W • hi Architectural Design and Development James Wubbena, AIA 35 Barnard St., Ste. 300 Savannah, GA. 31401 P - 912 660 5438 F - 912 525 3088 Parr A should be Newman port B PROPER PLACEMENT OF STRAW BALE BARRIER IN DRAINAGE WAY MIL Embed hay balsa a minimum o14 inches CROSS - SECTION OF A PROPERLY INSTALLED STRAW BALE TyBEE ISLAND, GEORGIA REVISIONS SHEET TITLE EROSION CONTROL PLAN PROJECT MISBER -. 1307 DATE 2/52013 DRAWN BY Author CHECKED BY: Checker SCALE 118" = SHEET NO C1.2 \TYBEE RESIDENCE2.ry O a a 18 LOTJ SITE PLAN ■ 11 15'- 5 5/18' O J I: 0 PROPERTY LINE n. S 38 DEG 2450" E 10' BUILD G SETBACK -- .11. In. ice A 55' -ece 111 r;' r 9ze--- --Oe LOT H 19' E ENT ACCESS, DRAINA E, AND UTILITY EASEMENT 8 RIVER OAK LANE 0 II d /I PROPERTY LINE N41 DEG 34'40"W 106.3T 3/16" = 1'-0" HYDRO VENT DETAIL 1 1/2" = 1' -0" Smart VENT 877 - 441- 8368 www.smartvent.com 8 1/4" R/O STRAPS INSTALLED: TWO ON TOP TWO ON BOTTOM FRAME FIGURE 2 Side View DETAIL DIAGRAM MODEL 1540 -520 FLOOD VENT INSULATED 161 /4" RIO FIGURE 1 Front View STRAP SLOTS USE TWO TOP ANO TWO BOTTOM T FIGURE 3 FNULORAOE Side View STRAP DETAIL. TEETH MUST CUCK m TIGHT TO INSURE SECURE INSTALIATON. STRAPS SMART VENT. 877 441 3365 WARIne, Liu PM ON171 FLOOD VENT INSULATED MODEL 1540 -520 1540 -520 RECEIVED s -g -� MARSH INSTALLATION INSTRUCTIONS Smart VENT & DETAILS 877 - 441- 8368 MODEL 1540 -520 www.smartvent.com FLOODVENT INSULATED REV. 5 -15-09 la INSTALLATION INSTRUCTIONS° I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out) 2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X I block high) for each vent. Ensure the bottom of the rough opening is no more than 12" above the finished grade. 3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the cent dame. (FIG. 2) 4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL) 5. Insert the top straps into the top two strap slots about two clicks. 6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall. Push the frame tight against the face of the wag. Ensure the baton is flush and square in the opening. (FIG. 3) 7. Reach through the vent opening and click the two snaps in while holding the front of the cent against the wall face. The sharp point of the straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place. 8. Re-check that frame is square and slots are clear of debris, and caulk. 9. Install the door into fame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame and rotate until it is latched. 10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning. MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY: FEMA, NFIP, ICC, & ASCE SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(CX5), ASCE 24-05 ICC EVALUATION A ESR -2074 WUbb na Architectural Design and Development James Wubbena, AIA 35 Barnard St., Ste. 300 Savannah, GA. 31401 P- 9126605438 F- 9125253088 DIANEBELITSKLIS TyBEE ISLAND, GEORGIA REVISIONS SHEET TITLE SITE PLAN COMIGHT w Pr.n.a.+. rw.nww MD C sm. ns,..m..a....e" L..m..a.Vona co....A.Ar m aan:a. cal. PROJECT NUMBER 1307 DATE 2/52013 DRAWN m': Author CHECKED BY: Checker SCALE As i dic.t.d SHEET NO C1.1 LOTN f e FLOAT SLOTS 0...„.- FIGURE 1 Front View STRAP SLOTS USE TWO TOP ANO TWO BOTTOM T FIGURE 3 FNULORAOE Side View STRAP DETAIL. TEETH MUST CUCK m TIGHT TO INSURE SECURE INSTALIATON. STRAPS SMART VENT. 877 441 3365 WARIne, Liu PM ON171 FLOOD VENT INSULATED MODEL 1540 -520 1540 -520 RECEIVED s -g -� MARSH INSTALLATION INSTRUCTIONS Smart VENT & DETAILS 877 - 441- 8368 MODEL 1540 -520 www.smartvent.com FLOODVENT INSULATED REV. 5 -15-09 la INSTALLATION INSTRUCTIONS° I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out) 2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X I block high) for each vent. Ensure the bottom of the rough opening is no more than 12" above the finished grade. 3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the cent dame. (FIG. 2) 4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL) 5. Insert the top straps into the top two strap slots about two clicks. 6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall. Push the frame tight against the face of the wag. Ensure the baton is flush and square in the opening. (FIG. 3) 7. Reach through the vent opening and click the two snaps in while holding the front of the cent against the wall face. The sharp point of the straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place. 8. Re-check that frame is square and slots are clear of debris, and caulk. 9. Install the door into fame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame and rotate until it is latched. 10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning. MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY: FEMA, NFIP, ICC, & ASCE SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(CX5), ASCE 24-05 ICC EVALUATION A ESR -2074 WUbb na Architectural Design and Development James Wubbena, AIA 35 Barnard St., Ste. 300 Savannah, GA. 31401 P- 9126605438 F- 9125253088 DIANEBELITSKLIS TyBEE ISLAND, GEORGIA REVISIONS SHEET TITLE SITE PLAN COMIGHT w Pr.n.a.+. rw.nww MD C sm. ns,..m..a....e" L..m..a.Vona co....A.Ar m aan:a. cal. PROJECT NUMBER 1307 DATE 2/52013 DRAWN m': Author CHECKED BY: Checker SCALE As i dic.t.d SHEET NO C1.1 "RR6 ,•k II _�on/_JSigqnit /Ca+�f anele l ci /r�ras. to 6¢ "-ermouec/ True# Dia rjpe / 6" 014 2 /2" Pme (& /4" Oak h 8241,r Octk 9'r' PaTi /. rrre �s, ts; r!:F'ccart ,/dot.�e� 7 20" P.',; e B /6" Pine y /9" Pir7<z (4 Zr Pure /! 6" ef/selt r / Oc ee* O:c. Tipp¢ /2 /3 /4 /5 /8 r9 Z2 23 24 % E 5Lf /v1M4 > ?Y' 7Z Oa/. Z0' Pine to; 5;145 Irt...1 k5 1.4" Pin=?. 24" ooh G" Ook pine /2" oak //" oak /!'' Pine /5 "Pine /0" Pine. 6'Oak Treece b; . Typat ZG /l" Palm 27 G" Ota k 28 22" Oa /; 2,9 /9" oak :• 30 20" Oak , 2 6r' Oak 33 /0" Palm 34 lo" Pa /rn 3f /D " Oak Ski Z4 Palm 37 /5''Piire 38 /71' Pine 39 /" Pine ¢� ZZ "/dine 4/ /51. P1174 77J >'Q( A.' Z1 7u /1: :. 72ee i/ L3ril.::,pe 4Z 43 44 45 46 47 4,5 49 JO 52 53 54 55 /4" a'ne e3" Ohre 25" pi,7 /2" Lo:-.-7 a_ i 22" /5" Pine /0" Oak y'" Prr,z /3 "Pine / . 'P,' r e ZI "Pne (5" Pine cl" i2 ham' 20'Pir: 2.0 "Pi /7.: g"' Pour/ 26" P/17,:! Zd'OaK /A/V /o3 o 147 • r 1 N 1 Qcc�rina 4, caw :'/?71' ,0,7e 4.k5. _ / /c .. - 1 O 5'0 , \ /oc . __� -1 I - 4 E i F t--1 ' cg4P /ffL' S Ai , i6 Ft, ,o+. /%Cord i rc i n F.' /- >'.: �? 67- {= 756 [[' Zono 77-wit D:o. 7 y pe. 6 / /6" Oak 62 t1 pine G3 /:)" /rr: 64 !',O.` Fine. E5 Z/ ..r 4�" Oik 6'6 /4" Oak 6 i /3" 67?1: 66 76'' Qar. - lC`' n zk 7a ' ?rte 7/ fa"C 6 -; n,.'„2 L 7(8" On /5 ; /o'' ''/0"61.ak 75 /J'" ".. / sr) 4P/two V.O 8 Y Ty8E6- 15L AND -04 ZOniry .dn'ri I/ G. "1.7 :7 F<>� 4v / L,. NOTC . W d iz SNeEr W / Ti! 0Nk.E 3,116-ET 3 /`J M4r th Line ti` S /10 titfI 7 r- j r , 7 1 i ,,, o4_1 t s ;vi -0 50) ' 11 vi9 r.\ JrufE'o� � 52 /.0%/12 /4(9dr. Qrikeleff , 1 LL c_.r�:� /h:: �' Are o .1•' /pro r_ /., /_'(7��s� r� J:L�.��:� ";s .C�Q.�+•t'.7/ oil srrr'{/ ^• r .�..i"`��T� 7 "�"c/ Apr r / 11 / I _' i jN ?.t,, !../: 7 ft 6 - 6 3.) 11-(1-83 3 2 n•7Q:���u,/r�e:,i 3, jr'� 0. J /4: �•S 71,17,.4t 5:f # u' i. j . r c?; i l :' / = , 5 r , 4 1.(2-'3/',7/c r . ►'c ZC) 41, p • �'. . i It 0 /,i A ce7t? s 7'f ee /JC <rt/o,t iir S� r'r 3 •l ": re -Cer /o r 1 7(/e: 5 s6 e,: /J1' •_7'�? .•V•••. fir;' JUr':$S f-,'c es6.? 6/i 67. 00 .6e, �:r'.:L <�':: r l• 5. .77%fCj' P r1' CZ �1�.- :'.i.'i:? �..�.' %i ^ /•;� , r �. 0t',f -.t'! .'1f R.e.Sin 4r.'•' - < / ' „ i c(0711-2.,J 02 • h'r7i� i,. ri.eur,:o ri +les..! CI Alm -OVEN ES Sta,,O/ ✓r'sio,v ors• Lo <J ? ) /(ORSE IU!,V 1414,.//11:10 /"olr'7- l' A CANT i.-3Z Y. L 4v' -- f I c.)..r P.:6? I- iz ' G- 02 --Ot -.— TAV- LOR,ST w 4 250 MAP SCALE 1" = 500' 0 500 1000 FEET I METEF • • • ::.y•. T ' *•i.•A': _ _••�• • •• :•:"1 • • • IIITi niummill El I P PANEL 0213F 11a1 I't ®I 1. • ... 'I 111111 LU tij 1Zi II " Q 1 .d 11,,,, 0 Z1 11111111 CIII •• I ®I kJ °I IIIIIICommunity J II,,.. -1 Im... Z1 ' ®,I I"�' I 11 °"' 11,`) 111111 FIRM FLOOD INSURANCE RATE MAP CHATHAM COUNTY, GEORGIA AND INCORPORATED AREAS PANEL 213 OF 455 (SEE MAP INDEX FOR FIRM PANEL LAYOUT) CONTAINS' COMMUNITY NUMBER PANEL SUFFIX CHATHAM COUNTY 130030 0213 F TYBEE ISLAND, CITY OF 135184 0213 F Notice to User: The Map Number shown below should be used when placing map orders; the Number shown above should be used on insurance applications for the subject community. trAnr� MAP NUMBER 4).9, 13051CO213F EFFECTIVE DATE 4ND SS SEPTEMBER 26, 2008 Federal Emergency Management Agency This is an official copy of a portion of the above referenced flood map. tt was extracted using F -MIT On -Line. This map does not reflect changes or amendments which may have been made subsequent to the date on the title block. For the latest product information about National Flood Insurance Program flood maps check the FEMA Flood Map Store at www.msc.fema.gov