HomeMy Public PortalAboutRIVER OAK LN_6 2OF4.pdfJ
idence \TYBEE RESIDENCE2
O
co
Jam
ID
SITE PLAN
3/16" = 1'-0
LOT J
15'- 5 5/18-
PROPERTY LINE
n.
LOT H
S 38 DEG 2400- E
2.00'
10' BUILD NG SETBACK
.;1
1
IP
e li
I� L
�!J
en
I I
.n.
n. . .n
I C
b-
u
20' IIIIILDING SETBACK
19' EAEMENT ACCESS, DRAINA
E, AND UTILITY EASEMENT
RIVER OAK LANE
HYDRO VENT DETAIL
PROPERTY LINE
m
N41 DEG 34'40 "W 10837
0
\ .p
MARSH
Smart VENT
877 - 441- 8368
www.smartvent.com
SILICONE/POLYURETHANE
LYURETHANE
(FLANGE)
VENT
DOOR
VENT
FRAME
FIGURE 2
Side View
8 1/4"
R/O
STRAPS INSTALLED TWO
ST TOP
TWO ON BOTTOM
DETAIL DIAGRAM
MODEL 1540 -520
FLOOD VENT INSULATED
16 1/4" R/O
STRAP DETAIL. 80'
TEETH MUST CLICK IN TIGHT TO INSURE
SECURE INSTALLATION
RENO PAST SW FOR
SPRING BACK
FIGURE 1
Front View
STRAP SLOTSUSE TWO
TOP AND TWO BOTTOM
FIGURE 3 FlNALL
Side View
SMART VENT.
377 441' co.9
460.1.0r SAI•22B
FLOOD VENT INSULATED
MODEL 1540 -520
1540-520
1 1/2"=1'-O"
Smart VENT
877 - 441- 8368
www.smartventcom
INSTALLATION INSTRUCTIONS
& DETAILS
MODEL 1540 -520
FLOODVENT INSULATED
INSTALLATION INSTRUCTIONS°
REV. 5 -15-09
I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out)
2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X 1 block high) for each vent. Ensure the bosom of the
rough opening is no more than 12" above the finished grade.
3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the vent frame. (FIG. 2)
4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL)
5. Insert the top straps into the top two strap slots about two clicks.
6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall.
Push the frame tight against the face of the wall. Ensure the frame is flush and square in the opening. (FIG. 3)
7. Reach through the vent opening and click the two straps in while holding the front of the vent against the wall face. The sharp point of the
straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place.
8. Re-check that frame is square and slots are clear of debris, and caulk.
9. Install the door into frame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame
and rotate until it is latched.
10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning.
MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY
FEMA, NFIP, ICC, & ASCE
SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(0)(5), ASCE 24-05
ICC EVALUATION N ESR -'1174
Wubbena
Architectural Design
and Development
James Wubbena, AIA
35 Barnard St., Ste. 300
Savannah, GA. 31401
P- 9126605438
F- 9125253088
i
D lA RE
4.2Z -13
evra 1
TyBEE ISLAND, GEORGIA
REVISIONS
SHEET TITLE
SITE PLAN
Of ORAWIWA
m.u«a.r..aw PC w emue.o--". 00.1.• der*orn Rename doimismn 4orionio..lonna Webs.. tap.. ' User ...sonson"�ntheAra.alorten".a ..-w cloaca
PROJECT N'r'vw 1307
DATE
2/52013
DRAWN ED,
Author
CHECKED BY: Checker
SCALE
As Indicated
SHEET NO
C1.1
FLOAT SLOTS
�� \\ -._
,
STRAP DETAIL. 80'
TEETH MUST CLICK IN TIGHT TO INSURE
SECURE INSTALLATION
RENO PAST SW FOR
SPRING BACK
FIGURE 1
Front View
STRAP SLOTSUSE TWO
TOP AND TWO BOTTOM
FIGURE 3 FlNALL
Side View
SMART VENT.
377 441' co.9
460.1.0r SAI•22B
FLOOD VENT INSULATED
MODEL 1540 -520
1540-520
1 1/2"=1'-O"
Smart VENT
877 - 441- 8368
www.smartventcom
INSTALLATION INSTRUCTIONS
& DETAILS
MODEL 1540 -520
FLOODVENT INSULATED
INSTALLATION INSTRUCTIONS°
REV. 5 -15-09
I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out)
2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X 1 block high) for each vent. Ensure the bosom of the
rough opening is no more than 12" above the finished grade.
3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the vent frame. (FIG. 2)
4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL)
5. Insert the top straps into the top two strap slots about two clicks.
6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall.
Push the frame tight against the face of the wall. Ensure the frame is flush and square in the opening. (FIG. 3)
7. Reach through the vent opening and click the two straps in while holding the front of the vent against the wall face. The sharp point of the
straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place.
8. Re-check that frame is square and slots are clear of debris, and caulk.
9. Install the door into frame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame
and rotate until it is latched.
10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning.
MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY
FEMA, NFIP, ICC, & ASCE
SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(0)(5), ASCE 24-05
ICC EVALUATION N ESR -'1174
Wubbena
Architectural Design
and Development
James Wubbena, AIA
35 Barnard St., Ste. 300
Savannah, GA. 31401
P- 9126605438
F- 9125253088
i
D lA RE
4.2Z -13
evra 1
TyBEE ISLAND, GEORGIA
REVISIONS
SHEET TITLE
SITE PLAN
Of ORAWIWA
m.u«a.r..aw PC w emue.o--". 00.1.• der*orn Rename doimismn 4orionio..lonna Webs.. tap.. ' User ...sonson"�ntheAra.alorten".a ..-w cloaca
PROJECT N'r'vw 1307
DATE
2/52013
DRAWN ED,
Author
CHECKED BY: Checker
SCALE
As Indicated
SHEET NO
C1.1
N: \Wubbena AD \1307 -tybee residence \TYBEE RESIDENCE2.rvt
LOT J
EROSION CONTROL PLAN
LOT G
LOT H
1
1 I I LINE OF SWALE
4 SILT FENCE LINE. C_
G
I r
1 r
\ LCUJ
?Iln
I
1 ' 11r_
I t.$14
tg
I I \ 1
1 � 1'
I m A
1 I.
I 1 1
-
1 I
1/8" = 1' -0"
6 ❑
n/
EMI
FQ
UP 5
IJ IIl�III u
93 S] C2 `Q
RIVER OAK LANE
CONSTRUCTION ENTRANCE
if
LOT N
LINE -O SWALE— — —
DRAINAGE FLOW
PROPERTY LINE
z
U
Z
0 B
HAY BALES TYP.
NOTE:
ALL DETAILS IN 'MANUAL FOR ERROSION AND SEDIMENT
CONTROL IN GEORGIA' WHICH ARE APPLICABLE TO THIS
PROJECT SHALL BE CONSIDERED PARRT OF THE
REQUIREMENTS TO CONTROL ERROSION AND SEDIMENT
ISSUES ON THIS PROEJCT.
LOT 0
MARSH
HAY BALES TYP.
SIDE VIEW
mss. o.c
FRONT VIEW
NOTE:
lls• 36' D.O.T. approved Isbrb.
Use wood Of steel posts.
SILT FENCE - TYPE A
W •
hi
Architectural Design
and Development
James Wubbena, AIA
35 Barnard St., Ste. 300
Savannah, GA. 31401
P - 912 660 5438
F - 912 525 3088
Parr A should be Newman port B
PROPER PLACEMENT OF STRAW BALE BARRIER IN DRAINAGE WAY
MIL Embed hay balsa a minimum o14 inches
CROSS - SECTION OF A PROPERLY INSTALLED STRAW BALE
TyBEE ISLAND, GEORGIA
REVISIONS
SHEET TITLE
EROSION CONTROL
PLAN
PROJECT MISBER -. 1307
DATE
2/52013
DRAWN BY Author
CHECKED BY: Checker
SCALE 118" =
SHEET NO
C1.2
\TYBEE RESIDENCE2.ry
O
a
a
18
LOTJ
SITE PLAN
■
11
15'- 5 5/18'
O
J
I:
0
PROPERTY LINE
n.
S 38 DEG 2450" E
10' BUILD G SETBACK
--
.11. In.
ice A 55' -ece
111
r;'
r 9ze--- --Oe
LOT H
19' E ENT ACCESS, DRAINA E, AND UTILITY EASEMENT
8
RIVER OAK LANE
0
II
d
/I
PROPERTY LINE
N41 DEG 34'40"W 106.3T
3/16" = 1'-0"
HYDRO VENT DETAIL
1 1/2" = 1' -0"
Smart VENT
877 - 441- 8368
www.smartvent.com
8 1/4"
R/O
STRAPS INSTALLED: TWO
ON TOP TWO ON BOTTOM
FRAME
FIGURE 2
Side View
DETAIL DIAGRAM
MODEL 1540 -520
FLOOD VENT INSULATED
161 /4" RIO
FIGURE 1
Front View
STRAP SLOTS USE TWO
TOP ANO TWO BOTTOM
T
FIGURE 3 FNULORAOE
Side View
STRAP DETAIL.
TEETH MUST CUCK m TIGHT TO INSURE
SECURE INSTALIATON.
STRAPS
SMART VENT.
877 441 3365
WARIne, Liu
PM ON171
FLOOD VENT INSULATED
MODEL 1540 -520
1540 -520
RECEIVED
s -g -�
MARSH
INSTALLATION INSTRUCTIONS
Smart VENT & DETAILS
877 - 441- 8368 MODEL 1540 -520
www.smartvent.com FLOODVENT INSULATED
REV. 5 -15-09
la
INSTALLATION INSTRUCTIONS°
I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out)
2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X I block high) for each vent. Ensure the bottom of the
rough opening is no more than 12" above the finished grade.
3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the cent dame. (FIG. 2)
4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL)
5. Insert the top straps into the top two strap slots about two clicks.
6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall.
Push the frame tight against the face of the wag. Ensure the baton is flush and square in the opening. (FIG. 3)
7. Reach through the vent opening and click the two snaps in while holding the front of the cent against the wall face. The sharp point of the
straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place.
8. Re-check that frame is square and slots are clear of debris, and caulk.
9. Install the door into fame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame
and rotate until it is latched.
10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning.
MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY:
FEMA, NFIP, ICC, & ASCE
SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(CX5), ASCE 24-05
ICC EVALUATION A ESR -2074
WUbb na
Architectural Design
and Development
James Wubbena, AIA
35 Barnard St., Ste. 300
Savannah, GA. 31401
P- 9126605438
F- 9125253088
DIANEBELITSKLIS
TyBEE ISLAND, GEORGIA
REVISIONS
SHEET TITLE
SITE PLAN
COMIGHT w Pr.n.a.+. rw.nww MD C sm. ns,..m..a....e"
L..m..a.Vona co....A.Ar m
aan:a. cal.
PROJECT NUMBER 1307
DATE
2/52013
DRAWN m':
Author
CHECKED BY: Checker
SCALE
As i dic.t.d
SHEET NO
C1.1
LOTN
f
e
FLOAT SLOTS
0...„.-
FIGURE 1
Front View
STRAP SLOTS USE TWO
TOP ANO TWO BOTTOM
T
FIGURE 3 FNULORAOE
Side View
STRAP DETAIL.
TEETH MUST CUCK m TIGHT TO INSURE
SECURE INSTALIATON.
STRAPS
SMART VENT.
877 441 3365
WARIne, Liu
PM ON171
FLOOD VENT INSULATED
MODEL 1540 -520
1540 -520
RECEIVED
s -g -�
MARSH
INSTALLATION INSTRUCTIONS
Smart VENT & DETAILS
877 - 441- 8368 MODEL 1540 -520
www.smartvent.com FLOODVENT INSULATED
REV. 5 -15-09
la
INSTALLATION INSTRUCTIONS°
I. Remove vent door from vent frame. (Turn upside down, rotate bottom of door outward and slide out)
2. Prepare a CLEAN 16.25" wide by 8.25" high rough opening (approx. I block wide X I block high) for each vent. Ensure the bottom of the
rough opening is no more than 12" above the finished grade.
3. Apply a bead of silicone or polyurethane caulk around the back of the flange on the cent dame. (FIG. 2)
4. Bend the 4 steel straps to the thickness of the wall measuring from the end with the teeth (see STRAP DETAIL)
5. Insert the top straps into the top two strap slots about two clicks.
6. Insert the vent frame in the cut opening. The bent strap ends go in then up behind the inside of the wall.
Push the frame tight against the face of the wag. Ensure the baton is flush and square in the opening. (FIG. 3)
7. Reach through the vent opening and click the two snaps in while holding the front of the cent against the wall face. The sharp point of the
straps should not extend past the front of the vent face. Install the two remaining bottom straps and click into place.
8. Re-check that frame is square and slots are clear of debris, and caulk.
9. Install the door into fame by grasping the bottom of door (with float pins down) and front (weld marks back). Slide door into frame
and rotate until it is latched.
10. To open the door insert two credit cards into the float slots as shown in the diagram This will unlatch the door for removal and cleaning.
MEETS THE REQUIREMENTS FOR ENGINEERED OPENINGS AS SET FORTH BY:
FEMA, NFIP, ICC, & ASCE
SUPPORTIVE DOCUMENTS, TB 1 -08, 44CFR 60.3(CX5), ASCE 24-05
ICC EVALUATION A ESR -2074
WUbb na
Architectural Design
and Development
James Wubbena, AIA
35 Barnard St., Ste. 300
Savannah, GA. 31401
P- 9126605438
F- 9125253088
DIANEBELITSKLIS
TyBEE ISLAND, GEORGIA
REVISIONS
SHEET TITLE
SITE PLAN
COMIGHT w Pr.n.a.+. rw.nww MD C sm. ns,..m..a....e"
L..m..a.Vona co....A.Ar m
aan:a. cal.
PROJECT NUMBER 1307
DATE
2/52013
DRAWN m':
Author
CHECKED BY: Checker
SCALE
As i dic.t.d
SHEET NO
C1.1
"RR6 ,•k
II
_�on/_JSigqnit /Ca+�f
anele l ci /r�ras.
to 6¢ "-ermouec/
True# Dia rjpe
/ 6" 014
2 /2" Pme
(& /4" Oak
h
8241,r Octk
9'r' PaTi
/. rrre
�s, ts; r!:F'ccart ,/dot.�e�
7 20" P.',; e
B /6" Pine
y /9" Pir7<z
(4 Zr Pure
/! 6" ef/selt r /
Oc
ee* O:c. Tipp¢
/2
/3
/4
/5
/8
r9
Z2
23
24
% E
5Lf /v1M4 > ?Y'
7Z Oa/.
Z0' Pine
to; 5;145 Irt...1 k5
1.4"
Pin=?.
24" ooh
G" Ook
pine
/2" oak
//" oak
/!'' Pine
/5 "Pine
/0" Pine.
6'Oak
Treece b; . Typat
ZG /l" Palm
27 G" Ota k
28 22" Oa /;
2,9 /9" oak
:• 30 20" Oak
, 2 6r' Oak
33 /0" Palm
34 lo" Pa /rn
3f /D " Oak
Ski Z4 Palm
37 /5''Piire
38 /71' Pine
39 /" Pine
¢� ZZ "/dine
4/
/51. P1174
77J >'Q( A.' Z1
7u /1: :.
72ee i/ L3ril.::,pe
4Z
43
44
45
46
47
4,5
49
JO
52
53
54
55
/4" a'ne
e3" Ohre
25" pi,7
/2" Lo:-.-7 a_ i
22"
/5" Pine
/0" Oak
y'" Prr,z
/3 "Pine
/ . 'P,' r e
ZI "Pne
(5" Pine
cl" i2 ham'
20'Pir:
2.0 "Pi /7.:
g"' Pour/
26" P/17,:!
Zd'OaK
/A/V /o3
o
147
• r
1 N
1 Qcc�rina 4, caw :'/?71'
,0,7e 4.k5. _ / /c .. - 1
O 5'0 , \ /oc
. __� -1 I - 4 E i F t--1 '
cg4P /ffL' S Ai , i6 Ft, ,o+.
/%Cord i rc i n F.' /-
>'.: �?
67-
{= 756
[['
Zono
77-wit D:o. 7 y pe.
6 / /6" Oak
62 t1 pine
G3 /:)" /rr:
64 !',O.` Fine.
E5 Z/ ..r 4�" Oik
6'6 /4" Oak
6 i /3" 67?1:
66 76'' Qar.
- lC`' n zk
7a ' ?rte
7/ fa"C 6 -; n,.'„2
L
7(8" On
/5 ; /o'' ''/0"61.ak
75 /J'" ".. /
sr)
4P/two V.O 8 Y
Ty8E6- 15L AND
-04
ZOniry .dn'ri I/ G. "1.7 :7 F<>�
4v / L,.
NOTC . W d iz
SNeEr W / Ti!
0Nk.E 3,116-ET 3 /`J
M4r th
Line
ti`
S /10 titfI
7
r- j r ,
7 1 i
,,, o4_1
t s ;vi -0
50) '
11
vi9 r.\
JrufE'o� �
52 /.0%/12 /4(9dr.
Qrikeleff ,
1 LL c_.r�:� /h:: �' Are o .1•' /pro r_ /., /_'(7��s� r� J:L�.��:� ";s
.C�Q.�+•t'.7/ oil srrr'{/ ^• r .�..i"`��T� 7 "�"c/
Apr r / 11 / I _' i jN ?.t,, !../: 7 ft 6 - 6 3.) 11-(1-83
3
2 n•7Q:���u,/r�e:,i
3, jr'� 0. J /4: �•S 71,17,.4t 5:f # u' i. j . r c?; i l :' / = , 5
r ,
4 1.(2-'3/',7/c r . ►'c ZC) 41, p • �'. .
i It
0 /,i A ce7t? s 7'f ee /JC <rt/o,t
iir S� r'r 3 •l ": re -Cer /o
r 1
7(/e: 5 s6 e,:
/J1' •_7'�? .•V•••. fir;' JUr':$S f-,'c
es6.? 6/i 67. 00 .6e, �:r'.:L <�':: r l•
5. .77%fCj' P r1' CZ �1�.- :'.i.'i:? �..�.' %i ^ /•;� , r �. 0t',f -.t'! .'1f R.e.Sin 4r.'•'
-
< / ' „ i c(0711-2.,J 02 • h'r7i�
i,.
ri.eur,:o ri +les..!
CI Alm
-OVEN ES
Sta,,O/ ✓r'sio,v ors• Lo <J ? ) /(ORSE IU!,V 1414,.//11:10
/"olr'7- l' A CANT i.-3Z Y. L 4v' --
f I c.)..r P.:6? I- iz ' G- 02 --Ot
-.— TAV- LOR,ST w
4
250
MAP SCALE 1" = 500'
0 500
1000
FEET
I METEF
•
• • ::.y•.
T '
*•i.•A': _ _••�•
•
•• :•:"1 • •
•
IIITi
niummill
El I
P
PANEL 0213F
11a1
I't ®I
1. • ...
'I
111111
LU
tij
1Zi
II "
Q
1 .d
11,,,,
0
Z1
11111111
CIII
•• I
®I
kJ
°I
IIIIIICommunity
J
II,,.. -1
Im...
Z1
' ®,I
I"�' I 11 °"'
11,`)
111111
FIRM
FLOOD INSURANCE RATE MAP
CHATHAM COUNTY,
GEORGIA
AND INCORPORATED AREAS
PANEL 213 OF 455
(SEE MAP INDEX FOR FIRM PANEL LAYOUT)
CONTAINS'
COMMUNITY NUMBER PANEL SUFFIX
CHATHAM COUNTY 130030 0213 F
TYBEE ISLAND, CITY OF 135184 0213 F
Notice to User: The Map Number shown below
should be used when placing map orders; the
Number shown above should be
used on insurance applications for the subject
community.
trAnr�
MAP NUMBER
4).9, 13051CO213F
EFFECTIVE DATE
4ND SS SEPTEMBER 26, 2008
Federal Emergency Management Agency
This is an official copy of a portion of the above referenced flood map. tt
was extracted using F -MIT On -Line. This map does not reflect changes
or amendments which may have been made subsequent to the date on the
title block. For the latest product information about National Flood Insurance
Program flood maps check the FEMA Flood Map Store at www.msc.fema.gov