Loading...
HomeMy Public PortalAboutBUTLER AV_411B.pdfCity of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 INTERNATIONAL CODE COUNCIL MEMBER Permit No. /3- " 064 Date Requested /.2 44 1/3 Owner's Name FG0,43-kT Date Needed 1,1"/a0 43 "` " f /T y Subcontractor Gen. Contractor ;` F; a �� ,� Contact Information Project Address 411-8 &cry fKJ/ t Scope of Work Inspector Date of Inspection Ten-) o c ,K/ ie f *AJ Inspection f/ try Pass ® Fail I I Fee Inspection: ' % Pass Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee MAIM mult emirazi INTERNATIONAL CODE COUNCIL MEMBER Permit No. City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 Date Requested Owner's Name Date Needed Gen. Contractor '7.2 t- / Subcontractor Contact Information / Project Address 41%1 L) t304 -�!=; :- Scope of Work elf- ,1 -IvA L-; Tom: Inspector Date of Inspection Inspection Pass El Fail Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee 6/7-14-ti, ,z; 4 City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 Fax 912.786.9539 Permit No. 1.3 e966 0.2., Date Requested /)/ ig/% Owner's Name wog er Date Needed 44. 3 Gen. Contractor r .c- errs Subcontractor Onisanii INTERNATIONAL CODE COUNCIL MEMBER Contact Information /M/r_ Hi7 L 5 -h - 2' 79 Project Address Scope of Work Inspector 1) 1 Date of Inspection :,/ • :'. Inspection L Pass El Fail ❑ Fee 411-13 3u-aeE tii L , err( ‘s"./t/ /6L4.e Mgc.. rig s 4)L _Lt.•_ L.. C%i.)0 -�.. < :_ (�� �v') z i- ( r 1_'.ts tf itif41) i • C :.»S4- 1 -%i'F` Zi -(Z. vJ t t ` Cil Z:JE' (''4" Inspection Pass ❑ Inspection Fail ❑ Fee Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 10 -21 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT REMODEL KITCHEN /ELEC /PLBG 411 -B BUTLER AVE COLIN &SHANNON STEWART 126 GRAND VIEW DR POOLER GA 31322 -4042 912 -596 -7096 FIRST CITY ENTERPRISES PO BOX 1016 TYBEE ISLAND GA 31328 P $ 130.00 4- 0004- 21 -OO1C PROJECT VALUATION $10,500.00 PERMIT #: 130662 TOTAL BALANCE DUE: $ 130.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: g44- P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org Property Address: i /! ` A !JTIQ}Q iAv ve- City of Tybee Island, Georgia 912 - 472 -5030 Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT PIN: Li-- 0004-z(-001c, ❑ Single Family ® Duplex ❑ Multi - Family units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: RQMOck \ 1tL�JJ — KM') cI }J'l 1'OOjat j J I Na% (1.0 21CM of umk, ►� co),. -�) J9 p, �)�fii� Estimated Cost of Construction: $ /0, SOO 0 0 / If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation (materials + labor + profit/overhead) During construction: On -site re troo facilities will be provided through IQ)e.. . Construction debris will be disposed by Co —I a( by means of Clip 41 Pe r . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage im.aired by this .ermitted co, struction. Date: Signature: Name of Applicant: DNAS Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager `Signatur Date t10tg -(3 FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL Name Mailing Address Telephone Owner COId ,dJ F .S CAAM . I Home: Cell: Architect or Engineer NA Office: Cell: Contractor �� rigs i & /QrPr �., �- l b 1 b 'l j -� /'h �,l�r t�/`` cell: O CeIL• mil? � • - � 6. 3�'� �. ❑ Single Family ® Duplex ❑ Multi - Family units ❑ * Commercial unit(s) Check all that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: RQMOck \ 1tL�JJ — KM') cI }J'l 1'OOjat j J I Na% (1.0 21CM of umk, ►� co),. -�) J9 p, �)�fii� Estimated Cost of Construction: $ /0, SOO 0 0 / If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation (materials + labor + profit/overhead) During construction: On -site re troo facilities will be provided through IQ)e.. . Construction debris will be disposed by Co —I a( by means of Clip 41 Pe r . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage im.aired by this .ermitted co, struction. Date: Signature: Name of Applicant: DNAS Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager `Signatur Date t10tg -(3 FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wo • • • ts, post spacing, T pe C : r A. Signature for r ipt of Lid aint, sbestos, and BMP notices Date r 5 J J� Printed Name l6/18/13 7,hatham County Board of Assessors: 2013 Property Record Card 4- 0004- 21 -001C Page 1 of 2013 Chatham County Board of Assessors Property Record Card APPRAISER MWTHOMAS LAST INSP 12/20/2011 APPR ZONE 000008 4- 0004 -21 -001( 511 -B BUTLER AVE TYBEE ISLAM NW CORNER BUTLER & 5TH ST SALES BOOK / INS VI QU RSN PRICE PAGE 09 Sep 355F 749 WD I U FS 253,345 2009 GRANTOR: DEUTSCHE BANK NATIONAL TRUST GRANTEE:STEWART COLIN E & SHANNON H* 02 Jun 352P 655 NA 1 U FC 238,950 2009 GRANTOR:DEVIVO PAUL Ill & PAULA Y* GRANTEE: DEUTSCHE BANK NATIONAL TRUST 09 Nov 217A 0382 WD 1 Q QW 225,000 2000 GRANTOR:SMITH STACYE C GRANTERDEVIVO PAUL 111 & PAULA Y 30 Aug 206J 0059 QC I U UN 1999 GRANTOR:SMITH STACYE C GRANTEE:SMITH STACYE CORBITT 05 Mar 184C 0568 QC 1 U U8 1997 GRANTOR:SMITH W LANCE GRANTEE:SMITH STACYE C PERMITS TYPE DATE AMOUNT 080370 HT 20 Dec 2011 Comp 2,800 080083 20 Dec 2011 Comp 2,000 10 -0527 EL 20 Dec 2011 Comp 1,200 10 -0496 WO 20 Dec 2011 Comp 5,100 03 -219 RN 07 Jan 2004 Comp 4,000 98 -00178 07 Jan 2004 Comp 800 COMMENTS: 31 Oct 2012 COA PER FORM FM OWNER 20 Jan 2010 *TY10 SURVS 27 Feb 2009 TY09 10S REM PER HS APP ON 1- 0045 -12 -008 2/27/09 LHN 13 Apr 2005 ADD HCG PER FORM 04/13/05 JLM TY05 10S ENT 04/13/05 JLM 29 Sep 2004 HS ON 10045 - 12008 /SHOW NO APPL FOR HS ON THIS ADDRESS 29 Jan 2001 *TY01 PROP ADD CHGE PER DEED 16 May 2000 FOR SALE 5/12/00 $219,000 22 Feb 2000 FOR SALE 2/18/2000 $234,000 18 Nov 1999 ADD CHG P/O 11 -18 -1999 SSB 10 Feb 1998 ADD CHG 2 -10 -98 LF PER T/C OFF 22 Jul 1997 QC /D 184C568 3 -6 -97 LAND ID# USE DESC 109255 SINGLE FAMILY RES STEWART COLIN E & SHANNON H* CAMA ASMT 126 GRAND VIEW DRIVE 70,000 70,000 LAND 1 POOLER GA 31322 166,700 166,700 BLDG 1 OBXF 0 236,700 236,700 Cost - MS H a n n,ii�lniunl'�il�ul1111 I.' [Click for larger picture] Chatham County Tax Commissioner Property Tax Statement CODES PROPERTY 0006 RESIDENTIAL USE UTA 0004 Tybee Island NBHD 020216.00 T216 TYBEE BTL WEST EXEMPTIONS HISTORY LAND IMPR TOTAL 2012 70,000 158,600 228,600 Calm: 2011 70,000 148,700 218,700 Cam 2010 121,700 114,000 235,700 Camp 2009 121,500 188,500 310,000 Over 2008 121,500 188,500 310,000 Cam 2007 121,500 186,500 308,000 Can 2006 166,500 183,000 349,500 Camp 2005 71,000 183,000 254,000 Cam 2004 71,000 136,000 207,000 Can 2003 71,000 94,000 165,000 Can 2002 56,000 94,000 150,000 Cam 2001 34,500 126,000 160,500 Cam 2000 16,000 75,500 91,500 Can 1999 16,000 75,500 91,500 Can 1998 16,000 75,000 91,000 Can 1997 16,000 70,500 86,500 Cam 1996 74,640 NC 1995 7,660 86,650 94,310 Cam 1994 7,660 68,220 75,880 Cam 1993 7,660 60,730 68,390 Over 1992 7,660 60,730 68,390 Over FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 31 60 1,860.00 -SF 89.60 R2 70000 http: //boa.chathamcounty. org/DesktopModules /ChathamCounty /BoardofAssessors /Property RecordCard. as... 10/18/20: Chatham County Board of Assessors: 2013 Property Record Card 4- 0004- 21 -001C Page 2 of 2013 Chatham County Board of Assessors 4- 0004- 21 -001C Property Record Card 511 -B BUTLER AVE TYBEE ISLANE BUILDING SECTION CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL 84975 -1 -2013 Residential 166,346 1985 MS 31.00 0.00 0.00 0.00 31.00 114,779 1.10 166,700 24' 12 20 ' • 701 Attached Garage Base L▪ iving Area 1232 • 908 Enclosed Porch Knee Walls w/ Glass 90 [Click for larger picture] SECTION TYPE AREA TYPE FRAME STYLE QUALITY CONDITION # UNITS # OF BEDS / BATHS 1 - Main 1296 1 - Single- family Residence 1 - Stud Frame 2 - Two Story 4.00 3.00 0 3/2.00 COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 352 Heat Pump R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 622 Raised Subfloor (% or SF) R6 642 Single 2 -Story Fireplace ( #) 1:17 701 Attached Garage (SF) R11 903 Wood Deck (SF) R11 904 Slab Porch (SF) with Roof R11 908 Enclosed Porch (SF), Knee Walls w/ Glass R11 908 Enclosed Porch (SF), Knee Walls w/ Glass Units % QUAL 100.00 100.00 100.00 10.00 1.00 1.00 616.00 288.00 64.00 90.00 90.00 100.00 http: // boa. chathamcounty. org /De sktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. as... 10/18/20: