INDIANA Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -35686 Letting Date:12/10/2014
District:GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Pending
Change Order Information
Change Order No.: 016
EWA: Y or Force Acct: N
Date Generated: 03/16/2016
Date Approved: 00/00/0000
Reason Code: ERRORS & OMISSIONS,
Utility Related
Description: Electrical
Original Contract Amount
$ 2,648,720.86
Current Change Order Amount
$ 4,366.12
Percent: 0.165 %
Total Previous Approved Changes
$ 91,211.36
Percent: 3.444 %
Total Change To -Date
$ 95,577.48
Percent: 3.609 %
Modified Contract Amount
$ 2,744,298.34
Time Extension Information
Date Initiated 00/00/0000 Date Completed 00/00/0000
Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
Time Element Description:
Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00
Previous Time Approved SS Days by AE: DCE: SCE:. DDCM:
SS Days SP Days Value $
Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -35686
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Change Order No.: 016
Page: 2
AE: DCE: SCE: * DDCM:
(-LE$250K-)(-LE$750K-)(--LE$2M--)(—GT$2M--)
( 50 SS days ) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days)
Y ! N If Y, by Date Issued
Y / N If Y, Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM Date Returned
Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date
If N,Resolution: Approved Disapproved
Resolved by Date
LPA Signatures Required? Y / N If Y, Date to LPA Date Returned
FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned
* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Contract No:R -35686 INDIANA
Change Order No:016 Department of Transportation
Contract: R -35686
Project: 0810267 - State:0810267
Change Order Nbr: 016
Change Order Description: Electrical
Reason Code: ERRORS & OMISSIONS, Utility Related
Date:03/1612016
Page: 3
CLN PCN PLN Item Code Unit Unit Price CO city Comment Amount Change
0116 0810267 0116 607-06796 EACH 4,366.120 1.000 C Amounl:$ 4,366.12
Item Description: ELECTRIC
Supplemental Oescriptionl: electrical service to Building Architectural Type B
Supplemental Description2:
Total Value for Change Order 016 = $ 4,366.12
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
This change order Icnludes the cost to place 3 each, number 3 AWG copper wires in 1-114 inch rigid conduit, buried from the power pole with the
transformer adjacent of the Veterans Park restroom to a meter base provided and placed as part of this change order and provide cable and
conduit for Richmond Power and Light to make the connection to the transformer and to the meter base since this type of work is not inicuded in
the Richmond Power and Light service Installation and there were no quantities inducted in the bid proposal that Included this service connection.
Change Order Explanation for Spectfic Line Item
klNNMlMtneNlHHtHH<NfN•kfMtHNHNdNklleMkNlOi NkMf H.MHIttYlkklHiAH#riRiN}IrlMNftt N<fs NikkYflfl Nkkfk
It is the intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged.
Contractor. 1, 44 G It S Signed By:
Date: r+, J / 7 l
.H..H.......H.7............. NN...NN.NN.N.NHN<..NNH.Nt.....,..N.N......t...H.,H.N.H..tH.«,.
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Contract NOR -35686 INDIANA
Change Order No:016 Department of Transportation
APPROVED FOR LOCAL PUBLIC AGENCY
(TITLE)
/nd;'.. —
(TITLE)
( J SUBMITTED FOR CONSIDERATION
PE/S �i, y f `�C G 1-L, L�
Date:03/16/2016
Page: 4
(DATE)
3-3/-/L
(DATE)
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION
Approval Level Name of Approver Date Status
Project Engineer/Supervisor Newkirk, Eric 00/00/0000 Action Pending