HomeMy Public PortalAboutChange Order No. 16 to Contract No. 95-2014 - Metro - INDOT (R35686) Consultant - Rundell Ernstberger - Starr Gennentt area redevelopmentContract No:R -35686 Change Order No.: 016 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -35686 Letting Date:12/10/2014 District:GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Pending Change Order Information Change Order No.: 016 EWA: Y or Force Acct: N Date Generated: 03/16/2016 Date Approved: 00/00/0000 Reason Code: ERRORS & OMISSIONS, Utility Related Description: Electrical Original Contract Amount $ 2,648,720.86 Current Change Order Amount $ 4,366.12 Percent: 0.165 % Total Previous Approved Changes $ 91,211.36 Percent: 3.444 % Total Change To -Date $ 95,577.48 Percent: 3.609 % Modified Contract Amount $ 2,744,298.34 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SCE:. DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -35686 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 016 Page: 2 AE: DCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M--)(—GT$2M--) ( 50 SS days ) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days) Y ! N If Y, by Date Issued Y / N If Y, Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y / N If Y, Date to LPA Date Returned FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -35686 INDIANA Change Order No:016 Department of Transportation Contract: R -35686 Project: 0810267 - State:0810267 Change Order Nbr: 016 Change Order Description: Electrical Reason Code: ERRORS & OMISSIONS, Utility Related Date:03/1612016 Page: 3 CLN PCN PLN Item Code Unit Unit Price CO city Comment Amount Change 0116 0810267 0116 607-06796 EACH 4,366.120 1.000 C Amounl:$ 4,366.12 Item Description: ELECTRIC Supplemental Oescriptionl: electrical service to Building Architectural Type B Supplemental Description2: Total Value for Change Order 016 = $ 4,366.12 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation This change order Icnludes the cost to place 3 each, number 3 AWG copper wires in 1-114 inch rigid conduit, buried from the power pole with the transformer adjacent of the Veterans Park restroom to a meter base provided and placed as part of this change order and provide cable and conduit for Richmond Power and Light to make the connection to the transformer and to the meter base since this type of work is not inicuded in the Richmond Power and Light service Installation and there were no quantities inducted in the bid proposal that Included this service connection. Change Order Explanation for Spectfic Line Item klNNMlMtneNlHHtHH<NfN•kfMtHNHNdNklleMkNlOi NkMf H.MHIttYlkklHiAH#riRiN}IrlMNftt N<fs NikkYflfl Nkkfk It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor. 1, 44 G It S Signed By: Date: r+, J / 7 l .H..H.......H.7............. NN...NN.NN.N.NHN<..NNH.Nt.....,..N.N......t...H.,H.N.H..tH.«,. NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract NOR -35686 INDIANA Change Order No:016 Department of Transportation APPROVED FOR LOCAL PUBLIC AGENCY (TITLE) /nd;'.. — (TITLE) ( J SUBMITTED FOR CONSIDERATION PE/S �i, y f `�C G 1-L, L� Date:03/16/2016 Page: 4 (DATE) 3-3/-/L (DATE) APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status Project Engineer/Supervisor Newkirk, Eric 00/00/0000 Action Pending