Loading...
HomeMy Public PortalAbout12-0467 StollerCity of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 Permit No. /a?- 1017- b / Date Requested / /7/W Owner's Name % DtZ Date Needed Gen. Contractor J 4J ` 4 refAC TJ7c'$j Subcontractor Contact Information '(:44 vi Sd41 ,e_.. Project Address 6-/a Scope of Work 66//IP L3•- & /LKflF,4D Inspector ' Inspection t'' /n/AC.. INTERNATIONAL CODE COUNCIL MEMBER Date of Inspection Pass E Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee CITY OF TYBEE ISLAND BUILDING PERMIT ALL WORK MUST BE DONE WITH HAND TOOLS ONLY DATE ISSUED: 12 -26 -2012 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION REPL SECTIONS BULKHEAD/ROOF 510 SEVENTH ST DAVID/LYNDA STOLLER 228 THE SOUTH CHACE NE ATLANTA GA 30328 DA 228 AT PERMIT #: 120467 /LYNDA TOLLER J ea ✓` 4-rQ 44-o r 5 TH CHACE NE T GA 30328 TH P $ 138.00 $8,500.00 TOTAL BALANCE DUE: $ 138.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org City of Tybee Island, Georgia 912 - 472 -5033 or 912- 472 -5031 - Fax 912- 786 -9539 APPLICATION FOR BUILDING PERMIT Property Address: Si 0 -4" S f , ® Single Family ❑ Duplex ❑ Multi - Family units ❑ Commercial units Details of Project: (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes - new square feet heated/cooled ❑ Demolition of Structure ® Other replace n.a,n't' R e pfetct_ re 414 sc.c.-h » 5 c t L. hec4 Gi -i- r R\a;ce Ot.tk lots . Estimated Cost of Construction: $ If applicable, attach a copy of the cerfffied elevation certifirate anrirn the scope of the work, two sets of construction (materials + labor + profit/overhead) Year Built: Listed on National Historic * Buildings older than 50 years may be eligible to be may be eligible to take advantage of various tax inc * Also see the Tybee Island Land Development Cod During construction: On -site restroom facilities will be provided through ■ by 4v4,rle, by means of damage control, building, fire, shore protection and ■ regulations. I realize that I must ensure the adequac adversely affected as required by Article 16, Stormy% may be necessary to restore drainage impaired by t j - rm Date: 12.12401_ UltS -p.Z-- ho 0 ✓r is b ✓I. r Ci irvc.tr of tYhc nrnnCrhr r tancnrlinn ur.nn a -2 6 -12 qcY- vcr ;Sex proposa d 7 warv,., :+ base. or, b N (:cetnr(z o r ?r'o _ e - ? f P clop' • Signature of Applicant: S. Printed Name DA" l D Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm/Drainage City Manager cons s 1( D t.,,`.1+ Qad . y ___r...,...p...,..o.vnny ILA arty GUI(ecuve acton inai ion. S4u(.e✓• Cyygre Date 1easc. acid A-o B}� : „+ll� L r; rnu54 fie, I41 too l- `4.STex ill, 000 FEES Permit 1460 3g Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL '; 13(3. Name Mailing Address Telephone Home: Cell: (,7t433 (4381 Owner D44 t O ( t PA S+O if rj t o 4 {`1 Sk,.t. t- ,Ty Lei Afw G Ft 3 132. e Architect or Engineer Contractor Home: Cell: ® Single Family ❑ Duplex ❑ Multi - Family units ❑ Commercial units Details of Project: (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes - new square feet heated/cooled ❑ Demolition of Structure ® Other replace n.a,n't' R e pfetct_ re 414 sc.c.-h » 5 c t L. hec4 Gi -i- r R\a;ce Ot.tk lots . Estimated Cost of Construction: $ If applicable, attach a copy of the cerfffied elevation certifirate anrirn the scope of the work, two sets of construction (materials + labor + profit/overhead) Year Built: Listed on National Historic * Buildings older than 50 years may be eligible to be may be eligible to take advantage of various tax inc * Also see the Tybee Island Land Development Cod During construction: On -site restroom facilities will be provided through ■ by 4v4,rle, by means of damage control, building, fire, shore protection and ■ regulations. I realize that I must ensure the adequac adversely affected as required by Article 16, Stormy% may be necessary to restore drainage impaired by t j - rm Date: 12.12401_ UltS -p.Z-- ho 0 ✓r is b ✓I. r Ci irvc.tr of tYhc nrnnCrhr r tancnrlinn ur.nn a -2 6 -12 qcY- vcr ;Sex proposa d 7 warv,., :+ base. or, b N (:cetnr(z o r ?r'o _ e - ? f P clop' • Signature of Applicant: S. Printed Name DA" l D Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm/Drainage City Manager cons s 1( D t.,,`.1+ Qad . y ___r...,...p...,..o.vnny ILA arty GUI(ecuve acton inai ion. S4u(.e✓• Cyygre Date 1easc. acid A-o B}� : „+ll� L r; rnu54 fie, I41 too l- `4.STex ill, 000 FEES Permit 1460 3g Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL '; 13(3. 12/10/2012 13:30 FAX 110001 /0002 City of Tybee Island, Georgia 912 -472 -5033 or 912 - 472 -5031 - Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT Property Address: Single Family ❑ Duplex ❑ Multi - Family units ❑ Commercial units (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — new ____ square fget heated/cooled Oat r 6 J1 k hs20� ❑ Demolition of Structure ❑ Other Details of Project: e_ vv. Nit. oe.a ii c ,p k iGGe rr e i sL.a.c' 'too -C oR dock -- a,eproV d2 'K i 2 Vv r i { JS2 ,2etti Sleek 4- S.t v,y\rs %t 5-(1^,\ • (a Cj 3 - C7 -I ti.ct -c- l Estimated Cost of Construction: $ (materials + labor + profit/overhead) (6eV°1414) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: 1 Q 1 O Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. "Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: N (A On -site restroom facilities will be provided through . Construction debris will be disposed by by means of . I understand that I must comply with zoning, flood damage control, building, fire shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Storrnwater I, - nagement. 1 accept responsibility for any corrective action that may be necessary to restore drainage impaired by thi �.. - itt-. �str tion. Date: 12 —I o- 12- Signature of Applicant: �an�i�� �1.• Printed Name DA.t ry S T o LL e yz_ Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager Signature 0 Date FEES Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL Name Mailing Address Telephone Owner iku(o a Lyncic, --\ "O Re if 5 to -Ty 6ea_ ' sf sta„,P , Home: Cell: 6 70 524 c2,,36 Architect or Engineer h /(■ Contractor N /A Home: CeII: Single Family ❑ Duplex ❑ Multi - Family units ❑ Commercial units (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — new ____ square fget heated/cooled Oat r 6 J1 k hs20� ❑ Demolition of Structure ❑ Other Details of Project: e_ vv. Nit. oe.a ii c ,p k iGGe rr e i sL.a.c' 'too -C oR dock -- a,eproV d2 'K i 2 Vv r i { JS2 ,2etti Sleek 4- S.t v,y\rs %t 5-(1^,\ • (a Cj 3 - C7 -I ti.ct -c- l Estimated Cost of Construction: $ (materials + labor + profit/overhead) (6eV°1414) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: 1 Q 1 O Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. "Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: N (A On -site restroom facilities will be provided through . Construction debris will be disposed by by means of . I understand that I must comply with zoning, flood damage control, building, fire shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Storrnwater I, - nagement. 1 accept responsibility for any corrective action that may be necessary to restore drainage impaired by thi �.. - itt-. �str tion. Date: 12 —I o- 12- Signature of Applicant: �an�i�� �1.• Printed Name DA.t ry S T o LL e yz_ Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager Signature 0 Date FEES Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http:// www. gaswcc .org /docs /field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) wi - • t imp- ing the second one. The complete assembly and installation must be compliant; steel or wood v -osts po . spacing, Type C or A. 12- 27 -(2. Signature for receipt of Lead Paint, Asbestos, and BMP notices. Date DLL) k ° SID LA- 13. Printed Name GEORGIA DEPARTMENT OF NATURAL RESOURCES COASTAL RESOURCES DIVISION MARK WILLIAMS A.G. "SPUD" WOODWARD COMMISSIONER DIRECTOR JUN 2 6 2012 David G. Stoller 510 7th Street Tybee Island, GA 31328 pRoximani gti NC262011 BY: dko RE: Revocable License — Previously Permitted & Existing Bulkhead and Single - Family Residence, Private Recreational Dock, Horse Pen Creek tributary, Chatham County, Georgia (GPS- 32.006368 °N /- 80.848376 °W) Dear Mr. Stoller: This letter is in reference to your application requesting a State Revocable License and authorization pursuant to the Department of the Army Permit to maintain a bank stabilization. Staff of the Coastal Management Program reviewed the above referenced application pursuant to Section 404 of the Clean Water Act and /or Section 10 of the River and Harbors Act of 1899 for consistency with the Georgia Coastal Management Program (GCMP). The Program concurs with the applicant's consistency certification. This ensures that the proposed project has been designed to comply with the applicable enforceable policies of the GCMP. Please find enclosed a fully executed revocable license for the maintenance of 61.95 + /- linear feet of bulkhead on the bank of the Horse Pen Creek tributary. Bank stabilization projects cannot contain trash, debris, car bodies, asphalt, concrete containing reinforcing steel rebar, painted material, etc. Material used for construction must be free from toxic pollutants (Contact the Army Corps of Engineers for information). The approval is based upon the description and plans that were submitted to the extent that no more than one cubic yard of riprap may be placed below ordinary high water per linear foot of bank. This license serves as authorization to utilize state owned tidal water bottoms for your bank stabilization project as per the dimensions and configuration depicted in your application for such license. Any change in the use, location, dimensions, or configuration of the approved project, without prior notification and approval from this office, could result in the revocation of this license and in required removal of the materials and related structures. The law affords protections against nuisances and detriments inflicted by others. It is incumbent upon the licensee to ensure that this project does not interfere with the legal rights of others. A licensee that builds in conformity with all applicable regulations may still be found to have built a structure that constitutes a nuisance to its neighbors and may be liable for damages. The license for bank stabilization does not authorize interference with the use and enjoyment of an adjacent property owner's land. The license for bank stabilization only authorizes the licensee to make use of state owned lands as may be proper and needful. During the course of planning and construction the licensee must use ordinary care and take reasonable precautions to sustain the adjoining land. In considering the question of reasonable precautions, each case must stand on its ONE CONSERVATION WAY I BRUNSWICK, GEORGIA 31520 -8686 912.264.7218 1 FAX 912.262.3143 1 WWW.COASTALGADNR.ORG Stoller Dock & Bank Stabilization JUN 2 6 2012 Page 2 own facts depending upon the nature of the land and watercourse, and the natural and probable consequences to adjoining lands as a result of the structure. We strongly encourage you to employ design and construction technologies for this project to avoid and minimize adverse impacts to adjacent properties and waters of the state. All designs should be properly engineered and incorporate specific design features that ensure minimization of adverse impacts outside the construction footprint. You should modify or reengineer this bank stabilization project if increased erosion on adjacent properties can be directly attributed to the project. This authorization does not relieve you from obtaining any other required federal (Army Corps of Engineers), state, or local permits. For further information regarding bulkheads and riprap contact Mr. Richard Morgan, Army Corps of Engineers (COE), 1- 800 - 448 -2402. You must obtain a county or municipal building permit prior to beginning construction. The tidal water bottoms and marshlands of coastal Georgia are public trust lands controlled by the state, except for such lands that a validated Crown Grant or State Grant exists. In response to your application for a Department of the Army Programmatic General Permit PGP0083 (960009050) for a private, single - family residence, recreational dock facility, please find enclosed a fully executed Revocable License for the maintenance of a private, single - family residence, recreational dock facility. This license serves as authorization to utilize state -owned tidal water bottoms for your dock facility as per the location, dimensions, and configuration depicted in your application for such license. Your existing structure consists of a 4' x 170' walkway to a 12' x 12' fixed deck with a 3' x 20' ramp to an 8' x 12' floating dock. The dock is constructed approximately 13'from the extended property line to the left and approximately 20' from the extended property line to the right of the structure. The entire project extends approximately 8' into the waterway at a point where the waterway is approximately 34' wide at mean low water. There is no cover existing or proposed for this facility. Any change in the use, location, dimensions, or configuration of the approved facility, without prior notification and approval from this office, could result in the revocation of this license and in required removal of the facility. Based on the information and plans submitted with your application, it has been determined that the dock facility, if constructed as proposed, will comply with the terms and requirements outlined in the PGP0083. No construction materials or debris may be placed, disposed of, or stored in jurisdictional areas. Any incidental impacts associated with this project must be rectified by fully restoring areas to their pre- construction topographic and vegetative states. Stoller Dock & Bank Stabilization JUN 2 6 2012 Page 3 All activities performed under this permit must meet the conditions stated in the enclosed copy of the PGP0083. This dock facility must be constructed precisely to the approved location, dimension, and configuration as depicted in the drawings and description provided. If dock corridors exist, please ensure that this dock facility is constructed in such a fashion that the entire structure fits between the extended property lines. The facility, for which these authorizations are issued, shall not be used at any time for business or commercial purposes. Prohibited uses include, but are not limited to, leasing of the permitted dock space; docking a commercial fishing vessel of any type; and utilization of the dock facility in any tour or charter boat fishing activities. The use of this facility for other than private, single family residence, recreational purposes will result in the immediate revocation of the license and in required removal of the entire facility from state -owned property. and possible criminal and civil penalties as provided by law. This agreement is not transferable with ownership interest in the upland property. These authorizations do not relieve you from obtaining any other required federal, state, or local permits. You must obtain a county or municipal building permit prior to beginning construction of the dock facility. The tidal water bottoms and marshlands of coastal Georgia are public trust lands controlled by the state, except over such lands where a validated Crown or State Grant exists. This license authorizes use of lands assumed to be under the control of the state. You may proceed with construction of this project with the knowledge and understanding that this license agreement could be rendered invalid should another person produce a validated Crown Grant or State Grant. Please contact Karl Burgess at 912 - 264 -7218 should you require more information. Sincerely, Brad Gane Chief of Ecological Services Enclosure Cc: U.S. Army COE- PGP0083 Local County Building Inspector File # 050212.1200pm STATE OF GEORGIA 3 -YEAR REVOCABLE LICENSE REQUEST APPLICANTS NAME(S): 'Oct (< CI G. S 4- es (l it ✓' + % Is1h cl &Q 3 12 z 8 MAILING ADDRESS: S � � � � S� • � at (Street) (City) (State) (Zip) PROJECT ADDRESS/LOCATION: 5 to "4` '4-s S'• I y 6ee. ld &c '3 l 3 2 e, COUNTY: C h" ^L• WATERWALIT- Y: t r•' L,s�"a►.f I He r`$ L Ce(.DATE: 3-2_4-11 LOT, BLOCK & SUBDIVISION NAME FROM DEED: P _ A. G. "Spud" Woodward, DIRECTOR Georgia Department of Natural Resources Coastal Resources Division One Conservation Way Brunswick, Georgia 31520 -8687 Dear Mr. Woodward: I am making application for a permit with the U.S. Department of the Army, Corps of Engineers, Savannah District. I understand that the issuance of such a permit will not relieve me of the obligation to obtain authorization from the State of Georgia since the proposed project would constitute an encroachment on the beds of tidewaters which are State -owned property. Accordingly, I hereby request that I be granted a revocable license from the State of Georgia. Attached hereto and made a part of this request is a copy of the plans and description of the project that will be the subject of such a license. I certify that all information submitted is true and correct to the best of my knowledge and understand that willful misrepresentation or falsification is punishable by law. I understand that if permission from the State is granted, it will be a revocable license and will not constitute a license coupled with an interest. I acknowledge that this revocable license does not resolve any actual or potential disputes regarding the ownership of, or rights in, or over the property upon which the subject project is proposed, and shall not be construed as recognizing or denying any such rights or interests. I further acknowledge that such a license would relate only to the property interests of the State and would not obviate the necessity of obtaining any other State license, permit or authorization required by State law. 1 recognize that 1 waive my right of expectation of privacy and I do not have ' rmission of the State of Georgia to proceed with such project until the Commissioner of DNR has signed a copy oft req_ue t By: By• Attachment erely, (Applj:,ant), title if applicable (Appl ant), title if applicable • NiO �� = e-'? **,**.1 **:k **-.:.**-rt * ** *irk * *** * ** ' * * ** * ** ** * * ** The State of Georgia hereby grants you a revocable license not coupled with an interest as provided in your request. This area may now or in the future be utilized by boats employing power drawn nets under the provisions for commercial or sport bait shrimping. In its occupancy and use of the premises, licensee shall not discriminate against any person on the basis of race, gender. color, national origin, religion, age, or disability. This covenant by licensee may be enforced by termination of this license, by injunction, and by any other remedy available al law to the Department. The project proposed for this license must be completed within 3 years of the date of issuance of the license and must be maintained in serviceable condition. Otherwise, action will be initiated to revoke this license and all structure must be removed inunediately al the licensee's expense. STATE OF GEORGIA Office of the Governor By: For: Mark hili rs CoJhq+jssioner -DNE DATE: Vl� ( 0 cL 1...■ ". • ." IJ 1 rti „ys (Jcc-1*€- L. 1/ ( awr' I.( VAZ: 1 "10 ' ) ..••• K/A L w St I J. iC04`" 1C00 STATE OF GEORGIA CHATHAM COUNTY 1/4.5 C141216TINE /3 R. A I) Y c.m. F. i go ,D(S 69(i' 4i-2o E 15, I.. 4 Lu MARVIN ct o JOH146014 - • 24.17( . I 5 S. 6,1 z5' WIPE ACC E55 EMEMEA.17" s,•47- Su- - 3` 148.29' 11/41 69*-i:1-V-301114J /- CHAR-LES MAP-T1N LOT 1-19 /- I.R. F. tlj:.'30, 5 EV EMT H 14\ STTZE Er LL. , 47,0 1.P.. F. IN DircH L 0.T t80 PLAT OF A FOTZ.7)01\1 OFTHE E,RADY PiZOF'ER..,TX • LOCATED AT THE ,JEST EiNID OP 5EVEI-J7-1--1 STREET, WARD /10, 2, TY&E ISL_AkID, FOR _ HE,V,TZ)/ DATE 0 G r 05E2- -lo, 1487 SCALE: I o Cxo' 110' p■Iwomi■I BARRETT-LAND-SURVEYING, INC. SAVANNAH, GEORGIA. EO.C. FIELD --gERRORIPOINT ADJ. METHOD E.O.C. PLAT 20" TRANSIT 100' TAPE E.D.M. v Dianne Otto From: Dianne Otto Sent: Wednesday, December 26, 2012 1:52 PM To: 'Lynda' Cc: Jerris Bryant; 'Deb Barreiro' Subject: RE: building permit - Stoller Attachments: Stoller building permit application.pdf Mr. and Ms. Stoller, The paperwork has been forwarded to Jerris Bryant for entry. She will contact you when the permit is ready for pickup. You have indicated you are doing the work yourselves. All work must be done with hand tools. If that is not agreeable then we need to have further discussions about the use of a contractor and /or heavy equipment. The permit will include both the bulkhead repair and the dock roof replacement. The permit fee for the $8,000 bulkhead is $135. With the $500 roof replacement, the permit fee is $138. I believe the comment on page 2 of the DNR license about there not being a cover on the dock is an error. Therefore a permit for both projects will be issued based on the pending confirmation from Deb Barreiro that the dock roof may be replaced. Due to the difference being so small, payment of $138 now will eliminate the need to process a $3 payment later. Please let me know if you have any questions. Dianne K. Otto, CFM City of Tybee Island dotto @cityoftybee.org phone 912.472.5031 fax 912.786.9539 From: Lynda [mailto:stollertyb@gmail.com] Sent: Wednesday, December 26, 2012 11:00 AM To: Dianne Otto Subject: Re: building permit - Stoller Thanks, If I can't get to talk to Deb before Thurs, I will stop by in the morning to pay for the bulkhead permit, and wait on the dock roof until DNR can send clarification. David Stoller Sent from my iPad On Dec 26, 2012, at 10:06 AM, Dianne Otto <Dotto @cityoftybee.org> wrote: Ms. Stoller- 1 Thank you for the addition of the bulkhead work to you permit application. Please ask the DNR to submit clarification that the dock roof exists and can be replaced. The Tybee permit will be issued once that has been received. Thank you, Dianne K. Otto, CFM City of Tybee Island dotto@cityoftybee.org phone 912.472.5031 fax 912.786.9539 From: Lynda [mailto:stollertvb@agmail.com] Sent: Wednesday, December 26, 2012 9:53 AM To: Dianne Otto Subject: Fwd: building permit - Stoller Sent from my iPad Begin forwarded message: From: George Stoller <gstoller(agmail.com> Date: December 26, 2012, 9:40:15 AM EST To: Parentals <stollertyb@gmail.com> Subject: building permit - Stoller George Stoller GStoller@gmail.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e -mail. Please notify the sender immediately by e -mail if you have received this e -mail by mistake and delete this e -mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 <Stoller building permit application.pdf> 2 Dianne Otto From: Deb Barreiro [Deb.Barreiro @dnr.state.ga.us] Sent: Wednesday, December 26, 2012 3:01 PM To: Dianne Otto; 'Lynda' Cc: Jerris Bryant Subject: RE: building permit - Stoller Thank you for coping me on this email. I apologize for any confusion. Maintenance to the existing roof is authorized. From: Dianne Otto [mailto:Dotto@cityoftybee.orq] Sent: Wednesday, December 26, 2012 1:52 PM To: 'Lynda' Cc: Jerris Bryant; Deb Barreiro Subject: RE: building permit - Stoller Mr. and Ms. Stoller, The paperwork has been forwarded to Jerris Bryant for entry. She will contact you when the permit is ready for pickup. You have indicated you are doing the work yourselves. All work must be done with hand tools. If that is not agreeable then we need to have further discussions about the use of a contractor and /or heavy equipment. The permit will include both the bulkhead repair and the dock roof replacement. The permit fee for the $8,000 bulkhead is $135. With the $500 roof replacement, the permit fee is $138. I believe the comment on page 2 of the DNR license about there not being a cover on the dock is an error. Therefore a permit for both projects will be issued based on the pending confirmation from Deb Barreiro that the dock roof may be replaced. Due to the difference being so small, payment of $138 now will eliminate the need to process a $3 payment later. Please let me know if you have any questions. Dianne K. Otto, CFM City of Tybee Island dotto @cityoftybee.org phone 912.472.5031 fax 912.786.9539 From: Lynda [mailto:stollertyb@agmail.com] Sent: Wednesday, December 26, 2012 11:00 AM To: Dianne Otto Subject: Re: building permit - Stoller Thanks, If I can't get to talk to Deb before Thurs, I will stop by in the morning to pay for the bulkhead permit, and wait on the dock roof until DNR can send clarification. David Stoller 1 Sent from my iPad On Dec 26, 2012, at 10:06 AM, Dianne Otto <Dotto(&,,cityoftybee.org> wrote: Ms. Stoller — Thank you for the addition of the bulkhead work to you permit application. Please ask the DNR to submit clarification that the dock roof exists and can be replaced. The Tybee permit will be issued once that has been received. Thank you, Dianne K. Otto, CFM City of Tybee Island dottopcityoftybee.org phone 912.472.5031 fax 912.786.9539 From: Lynda [mailto:stollertyb©gmail.com] Sent: Wednesday, December 26, 2012 9:53 AM To: Dianne Otto Subject: Fwd: building permit - Stoller Sent from my iPad Begin forwarded message: From: George Stoller <gstoller@gmail.com> Date: December 26, 2012, 9:40:15 AM EST To: Parentals <stollertyb @gmail.com> Subject: building permit - Stoller George Stoller GStoller @gmail.com This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e -mail. Please notify the sender immediately by e -mail if you have received this e -mail by mistake and delete this e -mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 <Stoller building permit application.pdf> 2 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 3