Loading...
HomeMy Public PortalAboutr 12-016�Rezvhl vu of foe Poroug4 of (arteret, N �1 No. I — I h Date of Adoption Jay 19, 2012 RESOLUTION AUTHORIZING A PROFESSIONAL SERVICES CONTRACT FOR ENGINEERING SERVICES WITH T &bI ASSOCIATES — CARTERET PARK 2012 GREEN ACRES IMPROVEMENTS PROJECT DESIGN PHASE SERVICES WHEREAS, the Borough of Carteret is in need of design phase services in regard to the 2012 Green Acres Improvements Project; and WHEREAS, the Borough's Consulting Engineers, T &bI Associates, possess the requisite skill and expertise for said services; and WHEREAS, T &M Associates has submitted a proposal to provide said engineering services at a total cost not to exceed $67,000.00; and WHEREAS, the Mayor and Council have reviewed said proposal; WHEREAS, the Chief Financial Officer has certified that funds are or will be available for said purpose. NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough of Carteret, County of Middlesex, State of New Jersey, as follows: 1. That the proposal from T&Mi Associates for design phase services related to the Carteret Park 2012 Green Acres Improvements Project at a total cost not to exceed $67,000.00 at the rate set forth in T &M's existing contract with the Borough is hereby approved. 2. That annexed hereto is a copy of said proposal. J. That this action is approved as an award of a professional services contract ptusuant to N.J.S.A. 40A:11- 5(1)(a) in accordance with the Borough's Fair and Open Process as authorized by law. 4. That a copy of this resolution be forwarded to the Borough's Purchasing Department and'f &bI Associates. Adopted this 19" day of January, 2012 and certified as a true copy of the original on January 20, 2012. KATHLEEN N1. BARNEY, NDAC Municipal Clerk RECORD OF COUNCIL VOTE BELL LNO DIAZ DI NASCIO X - Indicate Vole An - Absent NV - Not Voting XOR- Indicates Vote to Overrule Veto Adopted at a meeting of the Jfunicipal Council , Jat U91y 19 2012 c: <v 373 BROAD STREET SUITE 306 CLIFTON NJ 07013 -4231 ' ®L (973) 614 -D005 *tax (973) 614 - 0025 tflridmassociates.com AS CART-GI 101 November 9, 2011 Revised November 30, 2011 Mayor Daniel Reiman `r / Borough of Carteret Y A Municipal Building c � 61 Cooke Avenue Carteret, New Jersey 07008 Re: Carteret Park 2010 Green Acres Improvements` a' t Design Phase Services �� 1 Dear Mayor Reiman: C'tN As requested, we are providing herein a summary of the Carteret Park Improvements engineering scope of services and fee estimate. Scope of Improvements Based on the Green Acres 2010 Development Application recently approved, the improvements to Carteret Park include the following: • Installation of new 8' wide concrete walkway from the center plaza to the existing 9 -11 Memorial; • Installation of new 8' wide concrete walkway from the center plaza to an existing covered bench; • Removal and replacement of existing asphalt walkways along the Cypress Street side of the park with new 6' wide concrete walkways; e Installation of new 6' wide concrete walkway between the existing tot lot and the walkway along Cypress Street; • Installation of a new non - recirculating water spray park adjacent to the existing tot lot. The water spray park will be themed; • Installation of a new 6' wide concrete walkway from the existing tot lot to the existing walkway at the existing pond. This walkway will also provide a connection to the water spray park; • Removal and replacement of the existing concrete curb along the park frontage on Cypress Street; • Installation of new site lighting to match the fixtures installed as part of the pond upgrades. Provisions will be made to provide for electrical outlets at the fixtures; • Installation of a wooden park gate at the Louis Street entrance near Jersey Street; • Drainage upgrades to the picnic area northwest of the building; and • Installation of additional landscaping throughout the park. • Installation of new head on parking along Carteret Avenue in front of the site from Cypress Street to Sullivan Field in accordance with concept plans previously provided. The estimated construction cost for the improvements noted above is nearly $1,000,000. Upon authorization from the Borough, we are prepared to proceed with the design phase work for the Carteret Park Improvements, as described below ENGINEERS ° PLANNERS "LANDSCAPE ARCHITECTS * ENVIRONMENTAL SCIENIISTS * SURVEYORS CIVIL ' CL CCTR ICAL ' EN`." RO NMENTAL ° M1. ECWJI CAL ` MUNICIPAL . SIT SOLID WASTE ' STRUCI ORAL ' TRAFFIC ' TRANSPORTATION C.OH °OHAI L IL AJ GUARTLH!: N I Wo 61 UkMl RI ('110I1Ai OFFICLS. R')? IS RI' /ER. tL 4I G0HEST01'v.4 NJ; NORMTO ^.N_ PA, anc SAV' .�l Wlt, ?UEHTO RICO ASSOCIATES Le; Mayor Daniel Reiman Borough of Carteret Re: Carteret Park 2010 Green Acres Improvements Professional Services Scope of Services Civil Design Services CART -G1101 November 9, 2011 Revised November 30, 2011 Page 2 Based on the previously mentioned scope of improvements, we will provide the following design services for this project: 1, We will work with the Borough and a water spray park equipment vendor to research and develop a theme for the water spray park. The size and extent of the water spray park will be consistent with concepts previously provided to date, 2. We will provide topographic field survey of the areas included as part of the proposed improvements. Horizontal and vertical data will be tied into the datum used for previous projects at the park, 3. We will prepare base maps for the project by compiling the survey noted above, previous surveys and the Borough of Carteret aerials. 4. Once the base maps are prepared, we will conduct field investigations to verify the mapping and note conditions of existing features. Utility locations and available electrical service will be reviewed and located. 5. We will prepare preliminary plans and a preliminary construction cost estimate for the proposed improvements for review and approval by the Borough prior to proceeding with final design, 6. Upon approval of the preliminary plans, we will prepare final construction plans for the proposed improvements. 7. Specifications will be based on the 2007 NJDOT Standard Specifications and will be prepared in T &M Associates' format. 8. Upon completion of final engineering documents, a construction cost estimate will be prepared. 9. Upon completion and approval of the final design documents, T &M Associates will print and distribute specifications to prospective contractors. Cost of printing will be offset by the purchase price of the plans and specifications. 10. T &M Associates will answer any questions that arise during the bidding phase of the project from prospective bidders. — 111111111111111111111M CART -G1101 ASSOCIATES November 9, 2011 Revised November 30, 2011 Le: Mayor Daniel Reiman Page 3 Borough of Carteret Re: Carteret Park 2010 Green Acres Improvements Professional Services 11. T &M Associates will attend the bid opening with the appropriate Borough Officials. 12. We will received the bids received and make a recommendation of award to the Borough. Summary of Fees and Schedule We can provide the services outlined above for a not to exceed fee of $g3 0 to be billed monthly utilizing our current billing rate schedule. Upon authorization, we will initiate the field services and design for this program. If you have any questions concerning the information provided herein or require additional information, please call. Very truly yours, DJN:kim cc: Patrick DeBlasio, Chief Financial Officer John DuPont, Director of Engineering T &M A SOCIATES DONALD J. NORBUT, P.E., C.M.E. CARTERET BOROUGH ENGINEER H:\TMOH \Gl 101\ Civil \Adlnin\Dtvlantlick \CART\2011 Carteret Park\MayorReim m_D7N_Green Acres Improvements Proposal.doc OFFICE OF "r.LEEN M. BARNEY, RMC /C )qC i""MCTPAL CLERK A Q_L J El (,✓U.-+- to -Gf MIOOLESEX COUNTY e Nefr �ersev Date: Lb' 19, 2012 TO: Patrick DeBlasio, Treasurer Borough of Carteret REQUEST FOR CERTIFICATION OF AVAILABLE FUNDS: For: AUMORIMEC A FWEESSICML SEWICES OaffWr FOR EMIME M Name of Account: MSOLUITCiN #12 - /o / AMOUNT TO BE ENCUMBERED!mTAL =I rTo imm) $67,000.00 KATHLEEN M. DAR Municipal Clerk CERTIFICATION OF. AVAILABILITY OF FUNDS I, Treasurer of the Borough of Carteret, do hereby there are sufficient funds available in the current b enable the Municipal Council to authorize the enterin Contract between the Borough of Carteret and: get to e, into a The funds available for this contract are in the Budget, in the account of : ?'� a, '„, V.+.� C.�oy _l d<- /o /•'',,2,>/ _ in the amount o£: "7 ' `T By this certification, I have hereby encumbered the above named account for the amount of the contract pending Council action, Pat�eBlasio, Treasurer DATE: �9-N BOROXHOFCARTERET AFFIDAVIT OF PUBLICATION The following is a true copy of an Ordinance or Resolution of the Borough of Carteret that has appeared in the Home News Tribune, a newspaper which is printed in Freehold, New Jersey and published in Neptune, in said County and State and of general circulation in said county. One 1 time(s), once in each issue as follows: March 3, 2012 Notary Public of New Jersey Sworn and subscribed before me thisP,6A day of cv� LINDA A. RIVERA NOTARY PUBLIC OF NEW JERSEY MY COMMISSION EXPIRES MAY 2, 2016 Kathleen M. arney, MMC ; Municipal Clerk BOROUGH OF CARTERET :E OF CONTRACT AWARDED 104" of Carteret has awarded a whout competitive bidding as a rat service pursuant to N.J.S.A. i (ll (a). This contract and the res- ilhorizing it are available for public t in the office of the Municipal to: T & M Associates Engineerinz Services, :ret Park 2012 Green Acres Inn- is Project Design Phase Services n *1216 al not weed $67,000.00 'et forth In T &M's existing contract N lerk M. BARNEV, MMC C 493561 Borough of Carteret 20 Cooke Avenue Carteret, New Jersey 07008 -2602 THIS AGREEMENT: made thisl9th January of 2012 By and between: T &M Associates 1373 Broad Street, Suite 306 Clifton, NJ 07012 And the Borough of Carteret a municipal Corporation having it's Principal Office at the Borough Hall, 61 Cooke Avenue, Cartret, New Jersey, As per Resolution Number 12 -16, THE CONTRACTOR does hereby agree to perform the following: PROFESSIONAL SERVICE FOR DESIGN PHASE SERVICES IN REGARD TO THE 2012 GREEN ACRES IMPROVEMENTS PROJECT. NOT TO EXCEED: $67,000,00 According to the terms set forth in the Resolution. THE BOROUGH does hereby agree to pay the Contractor the sum set forth in the Resolution. IN WITNESS WHEREOF, the parties hereto have here under set their hands and seals or caused these presents to be signed by their proper corporate officers and their corporate seals to be hereto affixed, the day and year written above. WITNESSETH BY: For thg qor oratio . By: G� Title: ............- -n.