HomeMy Public PortalAbout20-9792 Roofing Repair for the Public Works Fleet Management FacilitySponsored by: City Manager
RESOLUTION NO. 20-9792
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE
CITY MANAGER TO PIGGYBACK REGION 4 ESC/
NATIONAL INTERGOVERNMENTAL PURCHASING
ALLIANCE (NATIONAL IPA) AND RL NATIONAL
ROOFING PARTNERS, LLC (D/B/A NATIONAL
ROOFING PARTNERS `NRP') NOW OMNIA PARTNERS
CONTRACT #180901-FL-015 FOR QUALIFIED
PROFESSIONAL SERVICES FOR ROOFING REPAIR
RELATING TO THE PUBLIC WORKS FLEET
MANAGEMENT FACILITY TO BE PERFORMED BY
PROVINCIAL SOUTH, INC. (PSI ROOFING) IN AN
AMOUNT NOT TO EXCEED FORTY-ONE THOUSAND,
SIX -HUNDRED TWENTY-FIVE DOLLARS AND
TWENTY-FIVE CENTS ($41,625.25); PROVIDING FOR
INCORPORATION OF RECITALS; PROVIDING FOR
AN EFFECTIVE DATE.
WHEREAS, the City of Opa-Locka ("City") seeks to perform maintenance work
at the Fleet Management Facility of Public Works, located at 12950 NW 42nd Avenue,
Opa-Locka, FL 33054; and
WHEREAS, National Intergovernmental Purchasing Alliance ("National IPA")
(now OMNIA Partners) is "the nation's largest and most experienced cooperative
purchasing organization for the public sector". Their purchasing power and suppliers
have produced an extensive portfolio of cooperative contracts and partnerships, making
OMNIA Partners "the most valued and trusted resource for organizations nationwide";
and
WHEREAS, all contracts in National IPA's portfolio are competitively solicited
and publicly awarded by a lead agency (government entity/educational institution),
using a competitive solicitation process consistent with applicable procurement laws
and regulations. Region 4 Education Service Center ("Region 4 ESC"), one of National
IPA's lead agencies, was established in 1967 by the State of Texas under Chapter 8 of the
Texas Education Code; and
Resolution No. 20-9792
WHEREAS, Region 4 Education Service Center/National IPA considered the bid
submitted by RL National Roofing Partners, LLC dba National Roofing Partners
("NRP") ("Contractor") on July 26, 2018 in response to its RFP# 18-09; and
WHEREAS, the Region 4 Education Service Center has awarded NRP a contract
(Contract #R180901) to provide a wide range of roofing products, services and job -
order -contracting (JOC). The agreement is available to thousands of government
agencies nationwide through OMNIA/ National IPA Partners; and
WHEREAS, on September 6, 2018, National IPA awarded NRP a contract for
roofing products, services, and job -order -contracting services (attached hereto as
Exhibit "A"). The contract became effective March 1, 2019 and will expire on February
28, 2021, with the ability to renew; and
WHEREAS, this current proposed project with Contractor NRP, attached hereto
as Exhibit "B", will allow the City to remove the existing (14) skylights and curbs, repair
the structural decking and repair the roofing system. National Roofing Partners (NRP)
and its local partner, PSI Roofing, Inc. have developed the pricing proposal for the Fleet
Management Facility- Skylight Removal project; and
WHEREAS, pursuant to Section 2-318 (3) of the City's Purchasing Code allows
for purchases and acquisitions under contracts of the federal government, the State of
Florida or its political subdivisions and also municipal co-operative purchasing
organizations and programs. The City Manager has determined that the prices of the
original contract are competitive and reasonable; and
WHEREAS, the City Commission finds that it is in the best interest of the City to
piggyback on the Region 4 Education Service Center/ National IPA contract with RL
National Roofing Partners, LLC d/ b/ a National Roofing Partners (NRP), in order to
benefit from already negotiated rates and enter into an agreement with local provider
Provincial South Inc. (PSI Roofing), to remove the existing (14) skylights and curbs,
repair the structural decking and repair the roofing system, in an amount not to
exceed Forty One Thousand Six Hundred Twenty Five Dollars and Twenty Five
Cents ($41,625.25).
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION
OF THE CITY OF OPA-LOCKA, FLORIDA:
Section 1. Adoption of Representations. The above recitals are true and correct and
are incorporated into this Resolution by reference.
2
Resolution No. 20-9792
Section 2. Authorization. The City Commission hereby authorizes the City Manager
to piggyback the Region 4 ESC/ National Intergovernmental Purchasing Alliance
(National IPA) And RL National Roofing Partners, LLC (d/b/a National Roofing
Partners (NRP), now Omnia Partners Contract #180901-F1-015 for qualified professional
services to be provided by Provincial South Inc. (PSI Roofing), for roofing repair for
the Fleet Management Facility of Public Works in an amount not to exceed Forty -One
Thousand, Six -Hundred Twenty -Five Dollars And Twenty -Five (S41,625.25)
Section 3. Scrivener's Errors. Sections of this Resolution may be renumbered or re -
lettered and corrections of typographical errors which do not affect the intent may be
authorized by the City Manager, or the City Manager's designee, without need of
public hearing, by filing a corrected copy of same with the City Clerk.
Section 5. Effective Date.
This Resolution shall take effect immediately upon adoption and is subject to the
approval of the Governor or his designee.
PASSED and ADOPTED this 20th day of August, 2020.
EST:
1A„
a Flores, City Clerk
Moved by: COMMISSIONER BURKE
Seconded by: COMMISSIONER BASS
3
Matthew A. Pigatt, Mayor
APPROVED AS TO FORM AND
LEGAL SUFFICIENCY:
Laii/et rsq rot-
Burnadette Norris- eeks, P.A.
City Attorney
Resolution No. 20-9792
VOTE: 5-0
Commissioner Bass YES
Commissioner Burke YES
Commissioner Kelley YES
Vice -Mayor Davis YES
Mayor Pigatt YES
4
City of Opa-Locka
Agenda Cover Memo
Department
Director:
Airia Austin
Department
Director
Signature:
cji
' .
City
Manager:
John E. Pate
CM Signature:
9eie.C-P-
Commission
Meeting
Date:
08/20/2020
Item Type:
(EnterX in box)
Resolution
0 dinance
Other
X
Fiscal
Impact:
(EnterX in box)
Yes
No
Ordinance Reading:
(Enter X in box)
1st Reading
2nd Reading
x
$41,625.25
Public Hearing:
(Enter X in box)
Yes
No
Yes
No
x
x
Funding
Source:
Account# :
001-39-
541461
(Enter Fund & Dept)
Ex:
PW- Building
Maintenace
Advertising Requirement:
(Enter X in box)
Yes
No
x
Contract/P.O.
Required:
(Enter X in box)
Yes
No
RFP/RFQ/Bid#:
x
Strategic
Plan Related
(Enter X in box)
Yes
No
Strategic Plan Priority
Enhance Organizational
Bus. & Economic Dev
Public Safety
Quality of Education
Qual. of Life & City
Communication
Area:
•
Strategic Plan Obj./Strategy:
(list the specific objective/strategy this
item will address)
x
•
0
Image •
•
Sponsor
Name
City Manager
Department:
City Manager
Short Title:
Roofing Repair for the Fleet Management Facility of Public Works.
Staff Summary:
This request is to piggyback an existing contract with Region 4 Education Service Center/National IPA, for
qualified professional services for roofing repair for the Fleet Management Facility of Public Works. The scope
of this project includes removal of the existing 14 skylights and curbs, repair the structural decking and repair
the roofing system.
Sec. 2-318. Exceptions to competitive procurement requirement.
The following are exempt from the requirements of formal competitive procurement:
(3)
Purchases and acquisitions under contracts of the federal government, the State of Florida or its
political subdivisions and also municipal co-operative purchasing organizations and programs.
Purchases of supplies or contractual services under the provisions of local, state, and federal
purchasing contracts as well as municipal co-operative purchasing organizations and programs shall
be exempt from the competitive procurement requirements, provided that the following criteria are
all satisfied:
a. The terms and conditions of the original contract by federal, state, local government or municipal
co-operative purchasing organization or program are satisfactory to the city and such terms and
conditions are extended to other governmental bodies.
b. The original contract by the federal, state, local government or municipal co-operative purchasing
organization or program for supplies purchases or procurement of contractual services is
current and in effect at the time of the proposed purchase of supplies or services by the city.
c. The City Manager has determined that the prices of the original contract are competitive and
reasonable.
d. The City Commission must authorize such procurement when the cost of the supplies or
contractual services exceeds twenty-five thousand dollars ($25,000.00).
Financial Impact
Account
Description
Available
Project
Remaining
Balance
39-541461
Building Repair &
Maintenance
$52,440.13
$41,625.25
$10,814.88
Proposed Action:
Staff recommends approval of this resolution.
Attachment:
1. Agenda Cover Memo
2. Proposal from National Roofing Partners (NRP)/PSI Roofing
3. Piggyback existing Award and contract price with Region 4 Education Service Center/National IPA
4. Executive Summary National Roofing Partners
5. Oridinance 2020-07 - Purchasing
6. Proposed Contract Agreement between the City and PSI Roofing, Inc
June 29, 2020
Airia Austin
City of Opa-Locka
780 Fisherman Street, 4th Floor
Miami, FL 33054
Re: Fleet Management Facility- Skylight Removal, 12950 NW 42nd Avenue, Opa Locka, FL 33054
NRP CPN#: 180901-FL-015
Ms. Austin:
National Roofing Partners (NRP) and its local partner, PSI Roofing, Inc. have developed the following pricing
proposal for the Fleet Management Facility- Skylight Removal project. This pricing proposal was developed in
compliance with NRP's contract number 180901 with OMNIA Partners and includes the total cost to remove the
existing (14) skylights and curbs, repair the structural decking and repair the roofing system.
Attached is the Proposal & Scope of Work and OMNIA Partners Line Item Estimate which defines the work that PSI
Roofing, Inc. proposes to complete.
Based on this scope of work, pricing to complete the Fleet Management Facility- Skylight Removal project is
$41,62525. This pricing is compliant with the OMNIA Partners' unit pricing.
All material is guaranteed to be as specified. All work will be completed in a workmanlike manner according to
standard roofing practices and in accordance with manufacturers specifications.
If this proposal is accepted, please see instructions for purchase order:
1. The purchase order will be with PSI Roofing, Inc.
2. The purchase order should be clearly marked "Per OMNIA Partners Contract #180901-FL-015"
3. E-mail the purchase order and tax-exempt certificate, if applicable, in PDF format to:
a. PSI Roofing, Inc. AGleiser@PSI-Roofing.com
b. Cc:OMNIAPartners@NationalRoofingPartners.com
4. Once we receive a P.O., a notice to proceed will be issued and work can begin at the member's discretion.
If you have any questions or need additional information, please contact our office.
Best Regards,
Amanda Gleiser
PSI Roofing, Inc.
792 NE 45th Street
Oakland Park, FL 33334
Enclosures:
1) Line Item Estimate
NRP
NATIONAL ROOFING PARTNERS
June 29, 2020
Project Name:
City of Opa Locka- Fleet Management Facility - Skylight Removal
Project Address:
12950 NW 42nd Avenue
Opa Locka, FL 66035
NRP
LINE ITEM PRICE ESTIMATE
OMNIA Contract No.
180901
NRP CPN No. 180901-FL-015
Scope of Work
1. Remove 14 skylights and their curbs.
2. Install a 16 ga. 6" x 1-1/2" x 6" Z mount to the 4 sides of the resulting opening.
3. Inlay 22 gauge B Deck and fasten to the Z mount.
4. Infill sufficient polyiso and cover board to a thickness flush to the existing roof.
5. Install one ply of modified base sheet to the cover board and carry the ply 6" beyond the area of repair.
6. Install one ply of modified cap sheet over the previous ply and carry the cap an additional 6" beyond the outside edge of the repair.
7. Haul away all trash and dispose of it at a proper dumping facility.
8. The Owner is to receive a One Year PSI Roofing Superior Guarantee for Workmanship.
Detailed Line Item Breakdown
Item No. I Description
UOM
Price
Qty
Total
Water Resistant Roofing
-
$ -
Insulation
$ -
Roof Tiles and Shingles
-
$ -
Roofing and Roof Restoration
-
$ -
Masonry
$
Metal Work
-
$ -
Woodwork
-
$
Standing Seam Metal Roof System
-
$ -
Roof Specialties and Accessories
$ -
Roof Services
48a
Additional and occasional services Roofing supplies Discount off Retail
% of Discount
5%
$ 5,217.32
$ 4,956.45
$
56
Labor Rate for Roofer
Per Hour
93.60
350
$ 32,760.00
General Cost Factors
-
$ -
Additional Line Items
19-42
Equipment; fork lift
%
25%
$ 1,500.00
$ 1,875.00
Dumpster and Portable Toilet
-
$ -
19-45
Equipment; other
%
25%
$ 1,705.00
$ 2,131.25
19-46
Multiplier; project safety and fall restriction
%
7%
$ 41,722.70
$ 2,920.59
Grand Total
$ 44,643.29
-Purchase Order will be issued to PSI Roofing, Inc.
-Purchase Order should be clearly marked "Per OMNIA Partners Contract #180901-FL-015"
-E-mail the Purchase Order and tax-exempt certificate, if applicable, in PDF format to:
Amanda Gleiser - Agleiser@PSI-Roofing.com
CC: OMNIAPartners@NationalRoofingPartners.com
Discount to Member
3,018.04
Proposed Price
$
41,625.25
Roofing Products, Services, and
Job -Order -Contracting Services
Solicitation No. 18-09
National Roofing Partners
'Superior Service, National Coverage, Single Source"
Tab 3 — Company Profile (Appendix F)
As an organization, the combined number of sales persons employed by NRP and its partners
exceed 150. NRP has a direct sales team of 4 individuals that work with our Partner Sales
Representatives across the country.
6. List the number and location of offices, or service centers for all states being offered in
solicitation. Additionally, list the names of key contacts at each location with title,
address, phone and e-mail address.
National Roofing Partners' has sales personnel nationally. The key location and key contacts are
provided in Table 3-1.
Table 3-1. Number and location of offices or service centers.
Number
1
NRP Office/Service Location
Address
3790 Schacht St
City
Fairbanks
State
AK
Interior Alaska Roofing, Inc
2
Consolidated Enterprises
688 E 81st Avenue
Anchorage
AK
3
'Weatherguard INC
On File
AK
4
Ben Hill Roofing
On File
AL
5
Maxwell Roofing & Sheet Metal, Inc.
1226 Putman Dr NW
Huntsville
AL
6
Harness Roofing
On File
AL
7
Hayden Building
On File
AL
8
Thomas Roofing
550 St. Michael
Mobile
AL
9
Ben Hill Roofing
On File
AR
10
MidArk Roofing
PO Box 983
Mabelvale
AR
11
National Roofing Partners
On File
AR
12
Harness Roofing
415 S. Main
Harrison
AR
13
Best Contracting
On File
AZ
14
Diversified
2015 W Mountain View Rd
Phoenix
AZ
15
Diversified Roofing
On File
AZ
16
Star Roofing
9201 N. 9th Ave.
Phoenix
AZ
17
Star Roofing
On File
AZ
18
Kodiak
1905 Aviation Blvd
Lincoln
CA
19
Best Contracting Services, Inc. (Union/Nonl
19027 S. Hamilton Ave.
Gardena
CA
20
OM Roofing. Inc
18000 Studebaker Rd Ste 700
Cerritos
CA
21
Divereified Roofing
On File
CA
22
Summit Roofing Services
705 Industrial Park Drive
Manteca
CA
23
Douglass Colony
5901 E. 58th Ave.
Commerce City
CO
24
Greenwood Industries
On File
CT
25
Hayden Building
On File
CT
26
Houck & Co
On File
DE
27
J. Register Company
4265 Eldridge Loop
Orange Park
FL
28
Advantage Roofing and Restoration
2480 NW 17th Lane, Unit 2
Pompano Beach
FL
29
Kelly Roofing (Service Only. See comment)
9930 Channel 30 Drive
Bonita Springs
FL
30
Ben Hill Roofing
On File
FL
31
Crowther Roofing
2543 Rock Fill Rd.
Fort Myers
FL
32
PSI Roofing
792 Northeast 45th St.
Oakland Park
FL
33
Roofed Right
On File
FL
34
Diversified Roofing Soluhons
1194 Old Dixie Highway
Lake Park
FL
35
Springer -Peterson Roofing & Sheet Metal
4410 Main Ave.
Lake Land
FL
36
Harness Roofing
On File
FL
37
The Roof Depot
On File
FL
38
Harrell Roofing
3125 W. Tharp St.
Tallahassee
FL
39
Ben Hill Roofing
6811 W Bankhead Highway
Douglasville
GA
www.nationalroofingpartners.com
Page 3 - 03
State
FL
State Multiplier
1.04
Number
Description of Cost Factors
Water Resistant Roofing
Unit of Measure
Offeror% Bid
1
Pressure cleaning, vertical walls
SF
$0.15
2
Pressure cleaning, horizontal surfaces
SF
$0.31
3
Roof scanning to identify wet or substandard room components to
be removed
SF
$0.03
4
Asphalt emulsion coating, waterproofing, brush
applied, per coat
SF
$0.32
5
Rubberized coating waterproofing, brush applied, per
coat
SF
$0.40
6
Vinyl/acrylic resin, dampproofing, brush applied per
coat.
SF
$0.65
7
Non -pigmented synthetic resin, waterproofing, one
coat sprayed on
SF
$0.36
8
Caulking: remove existing, clean and prime joint
LF
$0.37
9
Caulking, epoxied urethane compound, 2 component, 1/4" x 1/4", in
place
LF
$1.02
10
Caulking, polyurethane, 1 component, 1/4" x 1/4", in place
LF
$1.09
11
Caulking, polyurethane, 1 component, 1/2" x 1/2", in place
LF
$2.36
12
Caulking, silicone rubber, 1 component, 1/4" x 1/4", in place
LF
$0.90
13
Caulking, epoxied urethane compound, 2 component, 1/4" x 1/4", in
place
LF
$1.81
14
Caulking, silicone rubber, 1 component, 3/4" x 3/8", in place
LF
$1.29
15
Backer rod, polyethylene, 3/8" diameter, installed in prepared
opening
LF
$0.20
16
Backer rod, polyethylene, 1/2" diameter, installed in prepared
opening
LF
$0.32
17
Backer rod, polyethylene, 3/4" diameter, installed in prepared
opening
LF
$0.35
18
Backer rod, polyethylene, 1" diameter, installed in prepared
opening
LF
$0.41
19
Building paper, asphalt felt sheathing paper, 1 ply, 15#, in place
SF
$0.19
20
Building paper, asphalt felt sheathing paper, 1 ply, 40#, in place
SF
$0.16
21
Building paper, red rosin paper, 5 square rolls, 4#, in place
SF
$0.11
22
Vapor retarder adhered, 2 ply inorganic, glass Type 15, applied in
Type IV (or appropriate type) asphalt, in place
SF
$0.43
23
Vapor retarder, 2 ply organic, Type 15 pound, applied in Type
IV asphalt (or appropriate type), in place
SF
$0.42
24
Vapor retarder; 2-ply inorganic, glass, Type IV, applied in cold
adhesive to 4' x 8' x 1/4" glass -mat embedded, water resistant
gypsum core panel mechanically fastened
SF
$0.88
Insulation
1
Demolition of roof insulation, per inch of depth
SF
$0.50
2
Demolition of lightweight cementitious fills, per inch
of depth
SF
$0.27
3
Roof deck insulation, lsocyanurate in 4' x 4' or 4' x 8' sheets with
fiberglass facers, 1" thick, R-6.6, applied Type IV asphalt
3a
Hot applications
SF
$0.67
Number
Description of Cost Factors
Cold applications
Unit of Measure
SF
Offeror's Bid
$0.77
3b
4
Roof deck insulation, Isocyanurate in 4' x 4' or 4' x 8' sheets with
fiberglass facers, 1 1/2" thick, R-10.0, applied Type IV asphalt
;
4a
Hot applications
SF
$0.79
4b
Cold applications
SF
$0.99
5
Roof deck insulation, Isocyanurate in 4' x 4' or 4' x 8' sheets, 1"
thick, R-6.6, mechanically fastened
SF
$0.79
6
Roof deck insulation, Isocyanurate in 4' x 4' or 4' x 8' sheets with
fiberglass facers, 1 1/2" thick, R-10.0, mechanically fastened
SF
$1.28
7
Roof deck insulation, fiberboard in 4' x 4' sheets, 1/2"
thick, R-1.39, applied Type IV asphalt
7a
Hot applications
SF
$0.69
7b
Cold applications
SF
$0.79
8
Roof deck insulation, fiberboard in 4' x 8' sheets, 25/32" thick, R-
2.4, installed hot/cold or mechanically attached coated six sides
8a
Hot applications
SF
$0.59
8b
Cold applications
SF
$0.73
8c
Mechanically attached
SF
$0.65
9
Roof deck insulation, fiberboard in 4' x 4', 1" thick, R-2.78, applied
Type IV asphalt (or appropriate as- phalt), coated six sides
9a
Hot applications
SF
$0.57
9b
Cold applications
SF
$0.79
10
Roof deck insulation, fiberboard in 4' x 4' sheets, 1/2"
thick, R-1.39, mechanically fastened, coated six sides
SF
$0.71
11
Roof deck insulation, fiberboard in 4' x 4', 1" thick,
R-2.78, mechanically fastened, coated six sides
SF
$0.60
12
Roof deck insulation, lightweight cellular wire rein- forced concrete
fill, R- value depending on thickness, per inch of depth
SF
$0.54
13
Roof deck insulation, vermiculite at 1/8:12, R-value depending on
thickness, per inch of depth
SF
$2.09
14
Roof deck insulation, vermiculite at 1/4:12, R-value depending on
thickness, per inch of depth
SF
$2.61
15
Roof deck insulation, gypsum panels, 3" thick
SF
$4.25
16
Roof deck insulation, Isocyanurate (black facer only), tapered, 1/8"
per foot slope, Type IV asphalt, per inch of depth
SF
$1.06
17
Roof deck insulation, Isocyanurate (black facer only), tapered, 1/4"
per foot slope, Type IV asphalt, per inch of depth
SF
$1.21
18
Cold insulation adhesive
SF
$0.75
19
CDX Gypsum, 1/4" x 4' x 8'
19a
Mechanically attached
SF
$0.80
19b
Set into adhesive
SF
$1.30
20
CDX Gypsum, 1/2" x 4' x 8'
20a
Mechanically attached
SF
$1.03
20b
Set into adhesive
SF
$1.60
21
CDX Gypsum with fiberglass, facer: 1/4" x 4' x 8'
21a
Mechanically attached
SF
$0.51
21b
Set into adhesive
SF
$0.80
22
CDX Gypsum with fiberglass facer: 1/2" x 4' x 8'
22a
Mechanically attached
SF
$0.64
Number
Description of Cost Factors
Unit of Measure
Offeror's Bid
22b
Set into adhesive
Roof Tiles and Shingles
SF
$0.91
1
Remove composition shingles and felts to decking
SF
$0.51
2
Test for asbestos prior to removal
SF
$0.08
3
Remove clay, concrete, or slate roof tiles to decking
SF
$0.74
4
Remove wood shingles and felts to decking
SF
$0.40
5
Shingles, fiberglass, Class A, 25-year strip shingles,
slopes 3:12 or greater
SF
$1.90
6
Shingles, fiberglass, Class A, 30-year, premium lami- nated
multilayered
SF
$2.10
7a
Replace clay or concrete roof tiles
Each
$13.95
7b
Replace/repair other shingles
Each
$7.95
8
Self -adhering ice and water shield membrane for shingles, tiles,
metal waterways, penetrations, valleys, ridges, edges, etc.
SF
$1.80
Roofing and Roof Restoration
1
Remove built-up roof, multi -ply aggregate, non-asbes- tos, 1" thick
or less
SF
$0.83
2
Remove single -ply roof: ballast, and membrane only
SF
$1.01
3
Remove single -ply roof, membrane partially or fully adhered
SF
$1.01
4
Remove single -ply roof, membrane mechanically attached
SF
$1.15
5
Remove copper sheet roofing
SF
$0.38
6
Base sheet, 3-ply fiberglass, Type IV (or appropriate
type) asphalt (17 year roof)
SF
$1.81
7
Base sheet, 4-ply fiberglass, mechanically attached
(17-year roof)
SF
$1.71
8
Fiberglass cap finishing membrane
SF
$0.71
9
Base sheet with 2 ply, fiberglass felts, Type IV asphalt
(or appropriate type)
SF
$1.64
10
Base sheet with 3 ply, fiberglass felts, Type IV asphalt
(or appropriate type)
SF
$1.77
11
Base sheet mechanically attached with 4 ply, Type VI
fiberglass felts, Type IV (or appropriate type) asphalt
SF
$1.78
12"
Nail base sheet, 3 ply Type VI fiberglass felts, fiber- glass cap,
Type IV (or appropriate type) asphalt.
SF
$1.74
13
Base sheet with 4 ply; 2 polyester and 2 fiberglass felts, Type IV
(or appropriate type) asphalt (20 year roof)
SF
$1.83
14
Built-up roof, base sheet with 3 ply polyester roofing sheet, Type IV
(or appropriate type) asphalt (20 year roof)
SF
$1.60
15
Built-up roof, base sheet with 3 ply Type GS fiber- glass, cold
process adhesive (20 year roof)
SF
$2.74
16
Built-up roof base sheet plus 4 ply Type G2 fiberglass,
cold process adhesive (30 year roof)
SF
$2.75
17
Built-up roof, base sheet, 1 ply Type VI fiberglass, 1 ply modified
bitumen sheet, fire rated, Type IV asphalt (15 year roof)
SF
$3.45
18
Built-up roof, base sheet, 2 ply polyester roofing sheet, 1 ply
modified bitumen sheet, fire rated, Type IV asphalt (or appropriate
type) (20 year roof)
SF
$0.55
19
Built-up roof, base sheet, G-2, 33 lb., mechanically attached
SF
$0.55
20
Built-up roof, base sheet, G-2, 33 lb., Type IV asphalt
SF
$0.61
Number
Description of Cost Factors
Built-up roof, premium asphalt, added cost per ply per square foot
Unit of Measure
SF
Offeror's Bid
$0.11
21
22
Built-up roof, modified bitumen adhesive, added cost
per ply per square foot
SF
$0.19
23
Built-up roof, surface with cold asphaltic surfacing adhesive and
gravel
SF
$1.48
24
Built-up roof, surface with emulsion and granules
SF
$0.99
25
Built-up roof, surface with emulsion and aluminum coating
SF
$1.06
26
Built-up roof, surface with emulsion and white elasto- meric coating
SF
$1.11
27
Built-up roof, surface with aluminum coating or paint
SF
$0.88
28
Built-up roofing, surface with high solids white elasto- meric coating
SF
$2.78
29
Built-up roofing repairs; fibered asphalt mastic, brush grade, with
fiberglass mesh.
SF
$2.72
30
Built-up roofing repairs; pitch -based mastic, with fiberglass mesh
SF
$2.72
31
Built-up roofing repairs; elastomeric mastic, with fiberglass mesh
SF
$3.71
32
Built-up roofing restoration, coal tar pitch roofs
SF
$0.89
33
Built-up roofing restoration, odorless, coal tar pitch or
asphalt roofs
SF
$0.92
34
Single -ply roof, CSPE, 45 mils reinforced, asbestos free,
mechanically fastened
SF
$2.18
35
Single -ply roof, CSPE, 60 mils reinforced, asbestos free,
mechanically fastened
SF
$2.45
36
Single -ply roofing repairs (CSPE, PVC, and EPDM)
36a
CSPE
SF
$2.15
36b
PVC
SF
$2.15
36c
EPDM
SF
$1.91
37
Flashing membrane, 2 ply, Type IV or Type VI fiber- glass
SF
$1.23
38
Flashing membrane, 1 ply polyester and 1 ply modified
bitumen
SF
$2.47
39
Flashing membrane, 2 ply, polyester
SF
$1.23
40
Flashing membrane, CSPE
SF
$1.45
41
Flashing membrane, CSPE with aluminum coating
SF
$1.73
42
Polyurethane foam roofing
SF
$3.30
43
Additional Polyurethane foam coating
SF
$2.21
44
Single -ply roof, EDPM, 45 mils reinforced, mechani- cally fastened
SF
$2.29
45
Single -ply roof, EDPM, 60 mils fully adhered
SF
$2.69
46
Built-up roof, base sheet with 3 ply trilaminate ply, cold process
adhesive (25 year roof)
SF
$2.74
47
Built-up roof, surface with premium asphalt, and gravel.
SF
$0.48
48
Built-up roof, surface with Fire Retardant Aluminum coating or
paint, single coat
SF
$0.88
49
Modified Bitumen roof, base sheet, cap sheet, cold Modified
Bitumen Adhesive
SF
$3.59
50
Built-up roof, 3 ply fiberglass felts, Type IV asphalt
SF
$2.09
51
Single ply Roof, 45 mils fully adhered with bonding adhesive
SF
$3.84
52
Single ply roof, TPA Fleece Back, 45 mils fully ad- hered with hot
asphalt
SF
$3.84
53
Single ply roof, 45 mils mechanically attached
SF
$3.01
Number
Description of Cost Factors
Unit of Measure
Offeror's Bid
54
Base sheet mechanically attached with 3 ply fiber- glass felts, Type
1 - Coal Tar Pitch
SF
$1.78
55
Base sheet mechanically attached with 3 ply Organic felts, Type 1 -
Coal Tar Pitch
SF
$1.82
56
Built-up roof, 4 ply Fiberglass felts, Type 1 Coal Tar Pitch
SF
$1.88
57
Build-up roof, 4 ply Organic felts, Type 1 Coal Tar Pitch
SF
$1.88
58
Built-up roof, surface with hot Coal Tar Pitch and gravel
SF
$1.58
59
Single ply repairs using 2 coat polyurethane, elasto- meric coating
system
SF
$3.39
60
Single ply repairs at laps or defects using 2 coats elastomeric
coating system with reinforcement
SF
$3.63
61
Single ply roof, TPA fleece back, 60 mils fully adhered
with hot asphalt
SF
$4.54
62
Single ply roof 60 mils fully adhered with bonding adhesive
SF
$4.54
63
Built-up roof, 1 ply Trilaminate, 1 ply Modified Bitumen Sheet, fire
rated
Masonry
SF
$2.01
1
Brick, remove and reset, 1 to 50 sq ft
SF
$21.79
2
Brick, remove and reset, over 50 sq ft
SF
$17.61
3
Block, remove and reset
SF
$18.35
4
Coping stones, remove and reset
Each
$42.99
5
Brick, block or coping removal
Each
$17.19
6
Brick, block and brick exterior wall maintenance, repair and
application of protective coatings.
6a
Selective Demolition of Concrete Block Masonry Units (CMU) with
perimeter saw cutting- swingstage 4", 6" and 8" block (high-rise)
Each
$10.52
6b
Selective Demolition of Brick Masonry Units with pe- rimeter saw
cutting - swingstage one, two, and three wythe (high-rise)
SF
$37.75
6c
Selective Demolition of Brick Masonry Units with perimeter saw
cutting - scaffolding one, two and three wythe (low-rise)
SF
$26.81
7
Selective Demolition of Mortar Joint with Perimeter Sawcutting -
Swingstage (high-rise)
SF
$4.85
7a
Removal of existing mortar (A" wide by %" depth)
7b
"Removal of existing mortar ('/," wide by
%" depth)"
SF
$6.08
7c
Removal of existing mortar ('/:" wide by 1%" depth)
SF
$6.68
7d
Removal of existing mortar (%" wide by 1%" depth)
SF
$8.51
8
Selective Demolition of Mortar Joint with Perimeter Sawcutting -
Scaffolding (low-rise)
8a
Removal of existing mortar ('A" wide by %" depth)
SF
$3.63
8b
"Removal of existing mortar (%" wide by
' " depth)"
SF
$4.85
8c
Removal of existing mortar ('h" wide by 1'/" depth)
SF
$5.75
8d
Removal of existing mortar (%" by 1%' depth)
SF
$7.59
9
New Pointing Work - Swingstage (high- rise)
9a
Furnish and install new mortar (A" wide by %" depth)
SF
$7.29
9b
Furnish and install new mortar (%" wide by %" depth)
SF
$8.27
9c
Furnish and install new mortar (A" wide by 1 A" depth)
SF
$8.02
9d
Furnish and install new mortar (%" wide by 1 %" depth)
SF
$9.49
Number
Description of Cost Factors
Unit of Measure
Offeror's Bid
10
New Pointing Work - Scaffolding (low- rise)
10a
Furnish and install new mortar ('/d" wide by %" depth)
SF
$5.83
10b
Furnish and install new mortar ('/," wide by'/." depth)
SF
$6.56
10c
Furnish and install new mortar (%" wide by 1 '/" depth)
SF
$6.79
10d
Furnish and install new mortar (' " wide by 1'A" depth)
SF
$7.79
11
Removal of Roof Parapets - Swingstage (high-rise)
11 a
Removal of 3 wythe brick parapet wall (24" high)
SF
$61.51
11b
Removal of 3 wythe brick parapet wall (42" high)
SF
$61.69
11c
Removal of 2 wythe brick parapet wall (24" high)
SF
$51.51
11d
Removal of 3 wythe brick parapet wall (42" high)
SF
$54.15
12
Removal of Roof Parapets - Scaffolding (low-rise)
12a
Removal of 3 wythe brick parapet wall (24" high)
SF
$41.51
12b
Removal of 3 wythe brick parapet wall (42" high)
SF
$42.85
12c
Removal of 2 wythe brick parapet wall (24" high)
SF
$35.01
12d
Removal of 3 wythe brick parapet wall (42" high)
SF
$39.99
13
Reconstruction of Brick Masonry Roof Parapets - Swingstage (high
rise)
13a
New brick masonry parapet w/stone coping and flash- ings (3 wythe
- 24" high)
SF
$181.51
13b
New brick masonry parapet w/stone coping and flash- ings (3 wythe
- 42" high)
SF
$131.01
13c
New brick masonry parapet w/stone coping and flash- ings (2 wythe
- 24" high)
SF
$134.99
13d
New brick masonry parapet w/stone coping and flash- ings (2 wythe
- 42" high)
SF
$96.01
14
Reconstruction of Brick Masonry Roof Parapets - Scaffolding (low-
rise)
14a
New brick masonry parapet w/stone coping and flash- ings (3 wythe
- 24" high)
SF
$115.99
14b
b) New brick masonry parapet w/stone coping and
flashings (3 wythe - 42" high)
SF
$89.99
14c
c) New brick masonry parapet w/stone coping and
flashings (2 wythe - 24" high)
SF
$82.99
14d
d) New brick masonry parapet w/stone coping and
flashings (2 wythe - 42" high)
SF
$68.99
15
New Throughwall Flashings - Swingstage (high-rise)
15a
Removal of 4 courses 1 wythe brick wall w/Temporary Shoring
SF
$95.95
15b
Removal and replacement of steel lintel
SF
$47.95
15c
Furnish and install new flashings (Bituthane)
SF
$14.95
15d
Furnish and install new flashings (Lead coated copper)
SF
$26.95
15e
Parging and waterproofing of back-up wall
SF
$20.95
16
New Throughwall Flashings - Scaffolding (low-rise)
16a
Removal of 4 courses 1 wythe brick wall w/Temporary Shoring
SF
$76.95
16b
Removal and replacement of steel lintel
SF
$44.95
16c
Furnish and install new flashings (Bituthane)
SF
$11.95
16d
Furnish and install new flashings (Lead coated copper)
SF
$23.95
16e
Parging and waterproofing of back-up wall
SF
$16.99
17
Brick Masonry/Stone Stabilization
SF
$20.99
17a
Drilling and installation of new friction pins with mortar cap
17b
Drilling and installation of new friction pins for lime stone with
mortar cap
Description of Cost Factors
Limestone Removal and Replacement.
SF
$32.95
Offeror's Bid
Unit of Measure
Number
18
18a
Removal of existing deteriorated architectural lime- stone
SF
$74.99
18b
Furnish and install new limestone replacement.
SF
$217.99
18c
Replacement of stone with lightweight polymer resin to match
SF
$86.99
18d
Minor patching of existing stone to match
SF
$138.99
19
Terra Cotta Removal and Replacement.
SF
$74.99
19a
Removal of existing deteriorated architectural Terra Cotta
19b
Furnish and install new Terra Cotta replacement.
SF
$241.99
19c
Replacement of stone with lightweight polymer resin to match
SF
$87.05
19d
Minor patching of existing stone to match
SF
$139.95
20
Roof Coping Stones.
20a
Removal of existing roof coping stones (16 inches)
SF
$62.55
20b
Removal and parging of existing substrate
SF
$16.99
20c
Furnish and install new lead coated copper flashings
SF
$23.95
20d
Drilling and epoxy grouting stainless steel pins
SF
$21.95
20e
Reinstallation of existing stones with cleaning
SF
$43.95
20f
Furnish and install new coping stones
SF
$99.95
20g
Furnish and install new sealants between coping stones.
SF
$7.68
20h
Cleaning and coating of existing stones.
SF
$7.98
21
CMU Backup Wall Repair and Waterproofing.
21a
Replacement of Deteriorated CMU Back-up
SF
$50.95
21b
Parging of CMU back-up wall
SF
$12.95
21c
Waterproofing of back-up wall
SF
$6.95
22
Brick Masonry Piers
22a
Isolated repair of existing masonry piers (removal and replacement)
SF
$136.95
22b
Reconstruction of isolated areas of pier
SF
$122.95
22c
Construction of new masonry piers.
SF
$98.95
23
Crack Repair
23a
Drill and install new stainless steel pins.
Each
$21.95
23b
Grouting of open cracks
SF
$14.95
23c
Replacement of cracked bricks
SF
$29.95
24
Concrete Removal
24a
Perimeter sawcutting
SF
$1.49
24b
Removal of existing concrete (2" depth).
SF
$20.95
24c
Removal of existing concrete (3.5" depth).
SF
$26.95
25
New Concrete and Coating
25a
Placement of new high strength patching mortar (2" depth)
SF
$75.95
25b
Placement of new high strength patching mortar (3.5" depth).
SF
$84.95
25c
Cleaning and coating of concrete surface.
SF
$6.99
25d
Sidewalk Bridging.
SF
$7.25
25e
26
Temporary Roof Protection
Metal Work
SF
$1.50
26a
Number
Remove standard metal decking
Description of Cost Factors
Install metal decking; 1-1/2" deep, 20 gauge, standard
profile
SF
Unit of Measure
SF
$1.91
Offeror's Bid
$3.98
26b
27
Install steel plate, two sizes
SF
$3.71
27a
10 Gauge, standard application
SF
$1.88
27b
Extra heavy-duty 1/4th inch
SF
$1.98
28
Remove metal counterflashing
LF
$1.78
28a
Counterflashing, galvanized, 24 gauge, 6" width
LF
$3.45
28b
Counterflashing, copper, 16 oz., 6" width
LF
$7.95
29
Remove metal edge, gravel stop, eave strip, or coping
LF
$1.48
29a
Metal edge raised, galvanized steel fascia/eave drip;
6" face, hemmed, continuous cleat, 3" deck flange
LF
$4.92
29b
Gravel stop, galvanized steel, 24 gauge, 6" face
LF
$5.59
30
Remove metal gutter
LF
$2.59
30a
Gutter, galvanized steel, ASTM 526, with 12.5oz./ square foot
galvanized coating, 24 gauge, 5" box or ogee style, joints and end
caps shall be soldered
LF
$14.98
30b
Gutter, aluminum, .050" thick 5" box or ogee, painted,
Kynar finish
LF
$18.99
30c
Gutter, copper, 16 oz, half round, 5" wide
LF
$13.95
30d
Gutter, copper, 16 oz, half round, 6" wide
LF
$16.39
31
Remove metal downspouts
LF
$2.20
31a
Downspouts, aluminum, .024" thick, 3" x 4", painted, installed
LF
$11.98
31b
Downspouts, GI, 24 gauge 3" x 4" installed
LF
$14.98
31c
Downspouts, GI, 24 gauge, 4" round, installed
LF
$14.51
31d
Downspouts, copper, 16 oz., 6" round, installed
LF
$15.69
31e
Downspouts, strainer
Each
$1.45
31f
Metal flashing, apron flashing, 9" wide
LF
$4.01
31g
Metal flashing, step flashing
Each
$6.97
31h
Metal splash pan, 16 oz.
Each
$15.57
31i
Metal trim, aluminum, .032" thick, painted
SF
$2.77
31j
Metal storm collar
Each
$19.95
31k
Metal coping, galvanized steel, 24 gauge, standing seam
SF
$11.95
31 L
Metal coping, galvanized steel, 24 gauge, with butt plate
SF
$11.98
31m
Resolder joints in sheet metal
LF
$1.18
31n
Metal edge, aluminum, 0.50 thick 6" face painted
SF
$14.97
31 n
Metal edge, aluminum, free floating fascia system
SF
$20.49
310
Parapet wall metal
SF
$9.28
31p
Metal edge, anodized finished aluminum, free floating
fascia system 8 inches
SF
$37.15
31q
Metal edge, high performance fluorocarbon finished aluminum, free
floating fascia system 8 inches
SF
$16.84
31r
Metal edge, anodized finished aluminum, free floating
fascia system 6 inches
SF
$14.95
31s
Metal edge, high performance fluorocarbon finished aluminum, free
floating fascia system 6 inches
SF
$13.05
32
New Aluminum Metal Cladding
32a
Furnish and install new uninsulated aluminum wall cladding
SF
$16.09
32b
Furnish and install new insulated aluminum wall cladding
SF
$35.39
32c
Furnish and install new insulated aluminum wall clad- ding panels
(Architecture
SF
$47.99
Number
Description of Cost Factors
Cladding of roof parapet walls with copings.
Unit of Measure
SF
Offeror's Bid
$31.99
32d
33
New Exterior Insulation and Finish System (EIFS)
33a
New Exterior Insulation and Finish System (EIFS)
SF
$21.51
33b
New Exterior Insulation Finish System (EIFS) w/o insulation
SF
$13.51
33c
New Metal Copings.
SF
$11.98
34
Surface Preparation
34a
Cleaning of existing steel and surface.
SF
$6.95
34b
Coating of existing reinforcement
SF
$8.95
34c
35
Exterior rated gypsum board sheathing and substrate
SF
$2.74
Woodwork
35a
Demolition of plywood or standard 1" x 6" decking
SF
$0.39
35b
Demolition of standard 2" x 6" tongue and groove decking
SF
$0.47
35c
Plywood decking, CDX, 1/2" thick (or 15/32" optional)
SF
$0.93
35d
Plywood decking, CDX, 5/8" thick
SF
$1.14
35e
Plywood decking, CDX, 3/4" thick
SF
$1.23
35f
Standard 1" x 6" decking, tongue and groove
SF
$1.43
35g
Standard 2" x 6" tongue and groove decking
SF
$1.88
35h
Cants, wood fiber, trapezoidal, 1 1/2" x 5 5/8"
LF
$0.59
35i
Cants, SBX treated wood, 4" x 4" diagonal
LF
$2.05
35j
Nailer, SBX treated wood, 1" x 4"
LF
$0.88
35k
Nailer, SBX treated wood, 2" x 4"
LF
$1.14
36
Nailer, SBX treated wood
36a
2" x 6"
LF
$1.91
36b
2" x 8" optional
LF
$2.03
36c
Curbing, SBX treated wood, 2" x 12"
LF
$3.49
37
Joist, fir
37a
2" x 6"
LF
$3.45
37b
2" x 8" optional
LF
$3.79
38
Joist, fir
38a
2" x 10"
LF
$3.91
38b
39
2" x 12" optional
Standing Seam Metal Roof System (SSMRS) Price
Each Specification Using Line Items
LF
$4.63
39a
Pre -Engineered SSMRS, products (20- year roof)
SF
$3.98
39b
Subpurlins
LF
$5.35
39c
Roof panel installation
SF
$2.98
39d
Field forming of panels
SF
$1.79
39e
Concealed anchor clips
Each
$1.49
39f
Vapor retarder installation
SF
$1.22
39g
Insulation installation
SF
$3.74
39h
Gutters (SSMRS only)
LF
$13.98
39i
Gutter liners
SF
$11.62
39j
Flashing
LF
$8.35
39k
Expansion joints
LF
$20.18
40
Finishing touches (no additional cost in contract)
40a
Snow retention assemblies
LF
$1.25
Number
Description of Cost Factors
Unit of Measure
Offeror's Bid
40b
41
Self -adhering ice and water shield membrane for shingles, tiles,
metal waterways, penetrations, valleys, ridges, edges, etc.
Roof Specialties and Accessories
LF
Each
$1.84
$97.99
41a
Remove roof hatch
41b
Roof hatch, aluminum, 2'6" x 3'0"
Each
$523.99
41c
Roof hatch, aluminum, larger sizes
SF
$42.95
41d
Remove existing roof drain, except plumbing
Each
$257.99
41e
Install new roof 4" drain, except plumbing
Each
$1,144.99
41f
Install new roof 6" drain, except plumbing
Each
$1,144.99
41g
Reflash existing roof drain
Each
$157.99
41h
Plumbing stack, 4# lead flashing
Each
$68.99
41i
Scupper, sheet steel, 24 gauge ASTM A 526, match
existing configuration
Each
$124.89
41j
Remove existing walkway, built-up roofs
SF
$0.42
41k
Walkway, built-up roofs, desert tan fiberglass
LF
$0.49
41L
Walkway, built up roofs, non skid
LF
$0.49
42
Walkway, single ply roof
42a
30" wide roll goods, tape attached
LF
$2.59
42b
30" wide roll, hot asphalt attached
LF
$2.38
42c
30" wide roll, adhesive attached
LF
$2.98
42d
Roof ventilators
Each
$114.99
42e
Roof ladder, steel, bolted to concrete, up to 20 feet, without cage
LF
$70.95
42f
Roof ladder, steel, bolted to concrete, 20 feet and up, with cage;
with intermediate landings as required by Code
LF
$86.95
42g
Roof ladder, security ladder guard
Each
$115.99
42h
Termination bar, aluminum, 1/4" x 1"
LF
$0.98
42i
Pitch pocket, 24 gauge, GI, 6" x 6", with storm collar hemmed to
outside, soldered corners and seams
Each
$99.95
42j
Pitch pocket, 24 gauge, GI, 8" x 8", with storm collar, hemmed to
outside, soldered corners and seams
Each
$108.95
43
Pitch pocket, resurface top only
43a
8" x 8"
Each
$4.75
43b
12" x 12"
Each
$5.75
43c
Expansion joint, butyl or neoprene bellows, galvanized flange
LF
$17.95
43d
Expansion joint, CSPE reinforced
LF
$15.95
43e
Repair kit for dry repairs
Each
$47.95
43f
Repair kit for wet repairs
Each
$47.95
44
Skylights (price each size and lens combination)
44a
Standard 3' x 5', 4' x 4', 4' x 8' with single clear lenses
SF
$11.78
44b
Standard 3' x 5', 4' x 4', 4' x 8' with clear double lenses
SF
$17.48
44c
Skylight lens replacement only, clear
SF
$10.64
44d
Skylight lens replacement only, double clear
SF
$16.69
45
Security/fall bars for skylights
45a
3' x 5'
Each
$344.99
45b
4' x 4'
Each
$343.99
45c
4' x 8'
Each
$501.99
45d
Number
46
Special sizes
SF
$17.99
Description of Cost Factors
Roof Services
Unit of Measure '
" `
""
" ° ,
Offeror's Bid
. .......
pK,..H
3
46a
Asbestos core testing and patch of existing roof surface
Each
$71.95
46b
Core analysis, 14" x 14" and patch of existing roof surface
Each
$325.00
46c
Non destructive roof scan, up to 50,000 sq ft, full service each
Each
$1,450.00
46d
Additional foot over 50,000 sq ft
SF
$0.02
46e
Non destructive roof scan, up to 50,000 sq ft, limited service
Each
$1,400.00
46f
Additional foot over 50,000 sq ft
Each
$0.02
46g
Roof inspection services (visual inspection of roofing
service/membrane, flashings, counterfiashings, copings, parapets,
trims, hatches, penetrations, curbs, roof -mounted equipment, etc.
with a written report of findings and recommendations
Day
$600.00
46h
Field/shop drawings, up to 10,000 sq ft
SF
$0.03
46i
Field/shop drawings, 10,000-50,000 sq ft
SF
$0.03
46j
Field/shop drawings, over 50,000 sq ft
SF
$0.03
46k
Prime contractor's warranty, restoration, less than 10,000 sq ft,
minimum charge
Per Project
$500.00
46L
Prime contractor's warranty, restoration, over 10,000 sq ft,
minimum charge
SF
$0.05
46m
Prime contractor's warranty, re -roof, total system, 15 year, less than
10,000 sq ft, minimum charge (Stamdard)
SF
$0.10
46n
"Prime contractor's warranty, re -roof, total system, 15 year, less
than 10,000 sq ft, minimum charge (includes 2, 5, 7,
10, 15 year inspections)"
SF
$0.15
46o
Prime contractor's warranty, re -roof, total system, 15 year, more
than 10,000 sq ft, minimum charge (Standard)
SF
$0.09
46p
"Prime contractor's warranty, re -roof, total system, 15 year, more
than 10,000 sq ft, minimum charge (includes 2, 5, 7,
10, 15 year inspections)"
SF
$0.15
46q
Per diem rate per worker per 24 hour period of time
Per Day
$50.00
46r
Prime contractors per diem/costs for asbestos abate- ment
planning
Day
$55.00
46s
Asbestos abatement activities, BUR removal and disposal of waste
SF
$1.50
46t
Project site is located 65 or more miles from the con-
tractor's/subcontractor's yard/home location.
SF
$1.45
46u
Asbestos site monitoring
Day
$385.00
47
Annual or semi-annual roof housekeeping -per location
47a
Cost once a year per location if less than 20,000 sq. ft.
SF
$0.12
47b
Cost per Sq.ft. per year per location if greater than 20,000 sq.ft.
SF
$0.08
47c
Cost semi-annual per location if less than 20,000 sq. ft
SF
$0.14
47d
Cost per Sq.ft. semi annual per location if greater than 20,000 sq.ft.
SF
$0.12
47e
Roof leak investigation
Day
$450.00
47f
Minor roof repair calls
Day
$700.00
47g
Difficult access or fall restriction; surcharge
Each
$0.14
47h
umber
Excessive hauling
Description of Cost Factors
Work in secured areas or compounds surcharge
Each
Unit of Measure
Each
$100.00
Offeror's Bid
$0.10
47i
48
Additional and occasional supplies, materials, equip- ment and
services
% of Discount
0.05
48a
Additional and occasional services Roofing supplies
Discount off Retail Price List
48b
Alternative Methods of Costing - percent of overhead/
markup and profit added to cost
% of 0/P
0.25
48c
Discounts Offered Off Alternative Costing Methods
(cost plus profit and overhead) Less Rate of Discount
% of discount
0.05
48d
"Multiplier/factor to be applied to the
R.S. Means costs."
% to be applied
See Table 6-1 - Coefficient
49
Deducts and add-ons for in lieu products (Place behind Tab 6)
50
Special Rental Equipment (Priced based on 9.11.2 above)
NC
51
Cold and bad weather storage identify extra cost if any
Day
52
Hourly Services Rates
53
Structural Analysis/engineering services
Per Hour
$175.00
54
Architect/design professional services
Per Hour
$170.00
55
Roofing Consultant
Per Hour
$125.00
56
57
Labor Rate for Roofer
General Cost Factors
Per Hour
$90.00
57a
Mileage rate
Per Mile
$0.60
57b
Performance and payment bond - bonding rate (per-
cent of project)
Percent
$0.02
57c
Bonding capacity - total amount of capacity available
Dollar Amount
Varies by market
Additional Line Items
Number
NRP1
Description of Cost Factors
NRP Asset Management Program < 50,000 sq. ft.
Unit of Measure
Offeror's Bid
$1,200.00
Each
NRP2
NRP Asset Management Program > 50,000 sq. ft.
SF
$0.05
NRP3
NRP PM Program < 50,000 sq. ft.
Each
$2,400.00
NRP4
NRP PM Program > 50,000 sq. ft.
SF
$0.08
NRPS
NRP Warranty Extension / Renewal < 50,000 sq. ft.
Each
$3,500.00
NRP6
NRP Warranty Extension / Renewal > 50,000 sq. ft.
SF
$0.12
NRP7.1
Snow Load Management and Removal
Hour
$90
NRP7.2
Snow Load Management and Removal - After Hours
Hour
$130
NRP7.3
Snow Load Management and Removal - Holidays
Hour
$180
NRP7.4
Measurement of snow and assessment - Value Add
Each
$1,000.00
19-1
Sweep roof surface
SF
$0.40
19-2
Spud embedded aggregate
SF
$0.69
19-3
Wet vacuum loose ballast/aggregate
SF
$0.54
19-4
Vapor barrier; self -adhered
SF
$2.15
19-5
Ice and water shield
SF
$2.00
19-6
Roof insulation, HD polyisocyanurate in 4' x 8' or 4' x 4' sheets, 1/2"
thick, mechanically fastened
SF
$0.72
19-7
Roof insulation, installation of new polyisocyanurate insulation
19-7a
mechanically attached
BF
$1.40
19-7b
fully adhered
BF
$1.90
19-8
Single ply roof system; EPDM, 45mi1
19-8a
mechanically attached
SF
$3.31
19-8b
fully adhered
SF
$4.01
19-8c
ballasted
SF
$3.72
19-9
Single ply roof system; EPDM, 60mi1
19-9amechanically
attached
SF
$3.53
19-9b
fully adhered
SF
$4.29
19-19c
ballasted
SF
$3.99
19-10
Single ply roof system; EPDM membrane upcharge, 90mi1
SF
$0.50
19-11
Single ply roof system; PVC, 50mi1
19-11a
mechanically attached
SF
$3.01
19-11 b
fully adhered
SF
$3.84
19-12
Single ply roof system; PVC, 60mi1
19-12a
mechanically attached
SF
$3.25
19-12b
fully adhered
SF
$4.10
19-13
Single ply roof system; PVC membrane upcharge, 80mi1
SF
$0.50
19-14
Single ply roof system; TPO, 45mi1
19-14a
mechanically attached
SF
$3.01
19-14b
fully adhered
SF
$3.95
19-15
Single ply roof system; TPO, 60mi1
19-15a
mechanically attached
SF
$3.49
19-15b
fully adhered
SF
$4.15
19-16
Single ply roof system; TPO membrane upcharge, fleece back
SF
$0.25
19-17
Single ply roof system; TPO membrane upcharge, 80mi1
SF
$0.50
19-18
Single -ply roof system; protection mat
SF
$0.30
19-19
Single ply roof; seam tape, 3" wide
LF
$3.15
19-20
Single ply roof; cover strip tape, 6" wide
LF
$3.15
19-21
Single ply roof; self -adhered RUSS strip, 6" wide
LF
$4.50
19-22
Single ply roof system; pipe boot
Ep,
$35.00
19-23
Single ply roof system; pitch pocket w/pourable sealer
Ep,
$50.00
19-24
Roof restoration coating; primer coat, 1 coat
SF
$1.12
19-25
Roof restoration coating; base coat, 1 coat; acrylic elastomeric
SF
$2.35
19-26
Roof restoration coating; top coat, 1 coat; acrylic elastomeric
SF
$2.24
19-27
Roof restoration coating; base coat, 1 coat; silicone
SF
$2.38
19-P8
Roof restoration coating; top coat, 1 coat; silicone
SF
$2.14
19-P9
Roof restoration coating; base coat, 1 coat; urethane
SF
$2.75
19-30
Roof restoration coating; top coat, 1 coat; urethane
SF
$2.38
19-31
Roof restoration coating; top coat, 1 coat; aluminum coating
SF
$1.24
19-32
Roof restoration coating; full reinforcement; fiberglass or polyester
mat
SF
$0.45
19-33
Roof restoration coating; prep, 3-course repairs; mastic &
mesh/fabric
SF
$4'98
19-34
Manufacturer's warranty, re -roof, 15 year
SF
$0.28
19-35
Manufacturer's warranty, re -roof, 20 year
SF
$0.32
19-36
Manufacturer's warranty, re -roof, 30 year
SF
$0.40
19-37
Manufacturer's warranty, restoration, 10 year
SF
$0.11
19-38
Manufacturer's warranty, restoration, 15 year
SF
$0.17
19-39
Manufacturer's warranty, restoration, 20 year
SF
$0.23
19-40
Interior protection; plastic, tarps, sweeping, vacuuming
DAY
$1,000.00
19-41
Material;additional freight charges
%
2%
19-42
Equipment; fork lift
%
25%
19-43
Equipment; crane, truck mounted
%
25%
19-44
Equipment; crane, less than 150 ft tall
%
25%
19-45
Equipment; other
%
25%
19-46
Multiplier, project safety and fall restriction
%
7%
19-47
Multiplier, prevailing wage surcharge (labor only)
%
30%
19-48
Multiplier, roof areas with large quantity of penetrations or
obstructions
%
10%
19-49
Multiplier, roof with slope > 4:12 or non-standard architecture
%
25%
19-50
Multiplier, total roof area < 5,000 sq ft
%
24%
19-51
Multiplier, total roof area < 10,000 sq ft
%
18%
19-52
Multiplier, total roof area < 20,000 sq ft
%
14%
19-53
Multiplier, roof height > 2 story but < 5 story
%
18%
19-54
Multiplier; roof height > 5 story but < 10 story
%
20%
19-55
Multiplier, roof height > 10 story
%
25%
19-56
Diagnostics <10,000 sq ft (minimum, per roof level)
EA
$750.00
19-57
Diagnostics 10,001 sq ft to 30,000 sq ft (minimum, per roof level)
EA
$800.00
19-58
Diagnostics 10,001 sq ft to 30,000 sq ft
SF
$0.04
19-59
Diagnostics 30,001 sq ft to 49,999 sq ft (minimum, per roof level)
EA
$1,100.00
19-60
Diagnostics 30,001 sq ft to 49,999 sq ft
SF
$0.04
19-61
Diagnostics >50,000 sq ft
SF
$0.04
19-62
1 year RCA Program (non-renewable)
SF
$0.28
19-63
Items resulting from/after purchase of Diagnostics or RCA Program
19-63a
Roof repairs; minimum
SF
$0.25
19-63b
Roof repairs; maximum
SF
$3.60
19-63c
Roof restoration; minimum
SF
$2.00
19-63d
Roof restoration; maximum
SF
$9,P5
19-63e
Roof replacement; minimum
SF
$4.10
19-63f
Roof replacement; maximum
SF
$25.50
State
AL
State Multiplier
1.01
AK
1.28
AZ
1.05
AR
1.0
CA
1.24
CO
1.0
CT
1.27
DC
1.24
DE
1.24
FL
1.04
GA
1.14
HI
1.28
ID
1.19
IL
1.19
IN
1.15
IA
1.07
KS
1.12
KY
1.0
LA
1.04
ME
1.27
MD
1.11
MA
1.18
MI
1.0
MN
1.19
MS
1.04
MO
1.17
MT
1.22
NE
1.04
NV
1.09
NH
1.18
NJ
1.27
NM
1.0
NY
1.24
NC
1.01
ND
1.15
OH
1.09
OK
1.04
OR
1.09
PA
1.24
PR
1.27
RI
1.18
SC
1.02
SD
1.15
TN
1.05
TX
0.90
UT
1.17
VA
1.16
VT
1.18
WA
1.24
WV
1.07
WI
1.17
WY
1.21
State
Alabama
rroposea
Regular Hours
Coefficient
0.88
rricing (.;oerricient
After Hours
Coefficient
1.35
(s)
State
Missouri
Reg. Hours
Coefficient
1.03
After Hours
Coefficient
1.55
Alaska
1.49
2.4
Montana
0.98
1.45
Arizona
0.88
1.15
Nebraska
0.93
1.41
Arkansas
0.8
1.21
Nevada
1.07
1.61
California
1.19
1.8
New Hampshire
1.04
1.57
Colorado
0.93
1.41
New Jersey
1.11
1.65
Connecticut
1.1
1.66
New Mexico
0.89
1.34
Delaware
1.03
1.56
New York
1.28
1.94
District of Co- lumbia
0.93
1.41
North Carolina
0.85
1.25
Florida
0.92
1.39
North Dakota
0.86
1.29
Georgia
0.86
1.27
Ohio
1.07
1.61
Hawaii
1.20
1.80
Oklahoma
0.86
1.25
Idaho
1.18
1.78
Oregon
1.0
1.51
Illinois
1.19
1.53
Pennsylvania
1.13
1.69
Indiana
1.01
1.51
Rhode Island
1.08
1.63
Iowa
0.97
1.45
South Carolina
0.88
1.31
Kansas
0.97
1.45
South Dakota
0.87
1.3
Kentucky
0.97
1.45
Tennessee
0.88
1.27
Louisiana
0.86
1.28
Texas
0.85
1.27
Maine
0.98
1.46
Utah
0.87
1.3
Maryland
0.94
1.42
Vermont
0.93
1.39
Massachusetts
1.19
1.79
Virginia
0.94
1.39
Michigan
1.05
1.58
Washington
1.23
1.85
Minnesota
1.15
1.73
West Virginia
0.95
1.43
Mississippi
0.82
1.25
Wisconsin
1.07
1.61
Wyoming
0.85
1.27
Note: Provide coefficients for the state(s) that you would like to be awarded. Region 4 ESC is
looking for proposers that can provide service in multiple states.
Provide markup percentage on non -pre- priced items 15% .
--A--
ATIONALI PA
EXPERIENCED * FOCUSED * TRUSTED
Roofing Products, Services, and Job -Order -Contracting Services
Executive Summary
Lead Agency: Region 4 ESC
RFP Issued: June 21, 2018
Response Due Date: July 26, 2018
Solicitation: 18-09
Pre -Proposal Date: July 9, 2018
Proposals Received: 6
Awarded to: RL National Roofing Partners, LLC dba National Roofing Partners 'NRP'
Region 4 ESC issued RFP 18-09 on June 21, 2018, to establish a national cooperative contract for roofing
products, services, and job -order -contracting services.
The solicitation included cooperative purchasing language in Section A.1- Background:
Region 4 Education Service Center ("Region 4 ESC" herein "Lead Public Agency") on behalf of itself and all state,
local governments, school districts, and higher education institutions in the United States of America, and other
government agencies and non-profit organizations (herein "Participating Agencies") solicits proposals from
qualified Offerors to enter into a Vendor Contract ("contract") for the goods or services solicited in this proposal.
Contracts are approved and awarded by a single governmental entity, Region 4 ESC, and are only available for use
and benefit of all entities complying with state procurement laws and regulations (public and private schools,
colleges and universities, cities, counties, non -profits, and all governmental entities). These types of contracts are
commonly referred to as being "piggybackable."
Region 4 ESC's purchasing cooperative was established in 1997 as a means to increase their economic and
operational efficiency. The purchasing cooperative has since evolved into a National Cooperative used to assist
other government and public entities increase their economical and operational efficiency when procuring goods
and services.
Notice of the solicitation was sent to potential offerors, as well as advertised in the following:
• Region 4 ESC website
• National IPA website
• USA Today, nationwide
• Arizona Business Gazette, AZ
• San Bernardino Sun, CA
Page 1 of 2
• Honolulu Star -Advertiser, HI
• The Advocate — New Orleans, LA
• New Jersey Herald, NJ
• Times Union, NY
• Daily Journal of Commerce, OR
" T h e S t a t e , S C " R i c h m o n d T i m e s , V A
" H o u s t o n C o m m u n i t y N e w s p a p e r s , C y C r e e k " S e a t t l e D a i l y J o u r n a l o f C o m m e r c e , W A
M i r r o r , T X " H e l e n a I n d e p e n d e n t R e c o r d , M T
" D e s e r e t N e w s , U T
O n J u l y 2 6 , 2 0 1 8 p r o p o s a l s w e r e r e c e i v e d f r o m t h e f o l l o w i n g o f f e r o r s :
" F . H . P a s c h e n , S . N . N i e l s e n &