HomeMy Public PortalAbout20-9794 Agreement with EAC Consulting, Inc. for Sanitary Sewer Evaluation Survey for Lift Stations 4, 5, 7, and 8Sponsored by: City Manager RESOLUTION NO. 20-9794 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH EAC CONSULTING, INC. FOR CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES TO PERFORM A SANITARY SEWER EVALUATION SURVEY (PHASE III) FOR LIFT STATIONS 4, 5, 7, AND 8, PURSUANT TO RFQ NO. 20- 0324200; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on June 10, 2020, the City Commission of the City of Opa-Locka ("Commission') accepted bid proposals from several firms for continuing professional architectural and engineering consulting services pursuant to RFQ No. 20-0324200. The Commission further authorized the City Manager to enter into multiple agreements for architectural and engineering consulting services as provided therein; and WHEREAS, more specifically, the City Commission approved entering an agreement with EAC Consulting, Inc. for civil engineering, landscape architectural, structural engineering, traffic engineering, land surveying, construction testing and inspections, utilities engineering services and general consulting engineering services; and WHEREAS, the City of Opa-Locka ("City") desires to have a Sanitary Sewer Evaluation Survey (Phase III) for Lift Stations 4, 5, 7, and 8 performed. These four collection basins include 121 manholes, 25,371 linear feet of smoke testing and three consecutive nights of flow testing to determine compliance with 5,000 gallons per day - inch -mile (gpdim) standard for Inflow & Infiltration (I&I) as specified in the Miami Dade County Code; and WHEREAS, the City further desires to enter into an agreement with EAC Consulting, Inc., pursuant to the proposal attached hereto as Exhibit "A", to perform a Sanitary Sewer Evaluation Survey (Phase III), including flow testing, smoke test, manhole inspection and Report for Lift Stations 4, 5, 7, and 8 within the City, to not exceed an amount of Forty -Four Thousand, Sixty Five Dollars and Fifty Cents(S44,065.50); and WHEREAS, the City Commission finds that it is in the best interest of the City and its residents to enter into an agreement with EAC Consulting, Inc. for Continuing Professional Architectural and Engineering Consulting Services as set forth herein. Resolution No. 20-9794 NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA LOCKA, FLORIDA: Section 1. RECITALS ADOPTED. The recitals to the preamble herein are incorporated by reference. Section 2. AUTHORIZATION The City Commission of the City of Opa-Locka hereby authorizes the City Manager to enter into an agreement with EAC Consulting, Inc. for continuing professional architectural and engineering consulting services to perform a Sanitary Sewer Evaluation Survey (Phase III) for Lift Stations 4, 5, 7, and 8, pursuant to RFQ No. 20- 0324200. SECTION 3. SCRIVENER'S ERRORS. Sections of this Resolution may be renumbered or re -lettered and corrections of typographical errors which do not affect the intent may be authorized by the City Manager, or the City Manager's designee, without need of public hearing, by filing a corrected copy of same with the City Clerk. Section 4. EFFECTIVE DATE. This Resolution shall be effective immediately upon adoption hereof and approval by the Governor of the State of Florida or Governor's designee. PASSED and ADOPTED this 20th day of August, 2020. ATTEST: a Flores, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIEN , Burnadette Norris -Weeks, P.A. City Attorney 2 Matthew A. Pigatt, Mayor Resolution No. 20-9794 Moved by: COMMISSIONER BURKE Seconded by: VICE MAYOR DAVIS VOTE: 5-0 Commissioner Bass YES Commissioner Burke YES Commissioner Kelley YES Vice -Mayor Davis YES Mayor Pigatt YES 3 City of Opa-Locka Agenda Cover Memo Department Director: Airia Austin Department Director Signature: dil, „:"... City Manager: John E. Pate CM Signature: i nc Commission Meeting Date: 08/20/2020 Item Type: (EnterXin box) Resolution 46rdinance Other X Fiscal Impact: (EnterXin box) Yes No Ordinance Reading: (EnterXin box) 1st Reading 2nd Reading x $44,065.50 Public Hearing: (EnterXin box) Yes No Yes No x x Funding Source: Account# : 35-535340 (Enter Fund & Dept) Ex: Advertising Requirement: (EnterXin box) Yes No x Contract/P.O. Required: (Enter X in box) Yes No RFP/RFQ/Bid#: x Strategic Plan Related (EnterXin box) Yes No Strategic Plan Priority Enhance Organizational Bus. & Economic Dev Public Safety Quality of Education Qual. of Life & City Communication Area: • Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) x • • • Image • C] Sponsor Name City Manager Department: City Manager Short Title: Sanitary Sewer Evaluation Survey Phase III for Lift Stations 4, 5, 7 & 8 Staff Summary: A Resolution from the City Commission of the City of Opa-locka, Florida, requesting approval for the City Manager to enter into an Agreement with EAC Consulting, Inc. to perform Sanitary Sewer Evaluation Survey Phase III for Lift Stations 4, 5, 7, and 8. These four collection basins include 121 manholes, 25,371 linear feet of smoke testing and three consecutive nights of flow testing to determine compliance with 5,000 gallons per day -inch -mile (gpdim) standard for Inflow & Infiltration (I&I) as specified in the Miami Dade County Code. Financial Impact Account Description Available Project Remaining Balance 35-535340 Other Contracted Services $179,035.89 $44,065.50 $134,970.39 Proposed Action: Staff recommends approval of this resolution. EAC Consulting, Inc. was one of the selected engineering firms resulting from RFQ 20-0324200. Attachment: 1. Agenda 2. Proposal from EAC Consulting Inc Ark for EAC Consulting, Inc. July 28, 2020 Mr. Airia Austin, Public Works Director City of Opa-locka 780 Fisherman Street, 4th Floor Opa-Locka, FL 33054 Re: City of Opa-Locka Engineering Consulting Services Agreement Sanitary Sewer Evaluation Survey (SSES) Phase III Scope and Fees for Lift Stations 4, 5, 7 and 8 EAC Project No. 20022.WW01-04 Dear Mr. Austin, EAC Consulting Inc. is pleased to submit the following scope and fees to provide Engineering Consulting Services for the development of the City of Opa-locka's Sanitary Sewer Evaluation Survey Phase III reports for Lift Stations (LS) 4, 5, 7, and 8. Our services on this project will be supported by our subconsultant— • C&I Construction and Design, Inc. - Flow Testing, Smoke test, Manhole inspection and Report Sanitary Sewer Evaluation Survey (Phase III) All sanitary sewer collection and transmission systems are required to complete a Sanitary Sewer Evaluation Survey (SSES) according to the guidelines published in the U.S EPA's Sewer System Infrastructure Analysis and Rehabilitation Handbook (1991), EPA/625/6-91/030. The SSES is carried out in three phases. Phase I is an evaluation of the wastewater collection and transmission system to determine the amount of existing Infiltration and Inflow. (I/1). Phase II is the plan for upgrading the collection system to meet or exceed the minimum I/1 standards. Phase III is the implementation of the plan developed in Phase II and includes remeasurement to prove that the collection system is operating at an acceptable level with respect to level of infiltration and inflow (I/1). EAC previously prepared Phases I and II SSES reports for the City of Opa-locka's lift stations and it is our understanding that the City has undertaken the recommended improvements of sewer rehabilitation in the collection basins for LS 4, 5, 7 and 8. The City desires to continue providing reliable wastewater collection services for new development and to enhance their existing collection system and has requested that EAC perform a Phase III SSES for these four (4) collection basins which includes 121 manholes, 25,371 linear feet of smoke testing, and three consecutive nights of flow testing to determine compliance with 5,000 gallons per day -inch -mile (gpdim) standard for 1/1 as specified in the Miami Dade County Code. Please find enclosed the following attachment to this fee proposal letter: Attachment 1 Fee Proposal Attachment 2 Sub Consultant Fee Proposal As part of this, the City is expected to provide access throughout the project for field visit accompaniment. 5959 BLUE LAGOON DRIVE • SUITE 410 • MIAMI, FL 33126 • 305.265.5400 eacconsult.com The following activities will be performed under this task for each of the four collection basins: A. Smoke Testing. The EAC team will include a professional vendor for this task. Smoke testing will involve testing the existing gravity sewer mains using a high -volume blower along with smoke canisters or liquid smoke to generate the smoke. Smoke will be non -toxic odorless and non- staining. B. Night Flow Measurement (3 consecutive nights). C. Manhole Inspections D. Compilation of Inspection Findings and Reports (Phase III Report). The following information will be required for us to commence engineering services. Written authorization to proceed with services. Please feel free to call me at 305-265-5444 with any questions you may have. Sincerely, EAC Consul ' g, Inc Mic ael Adeife, P.E. Senior Vice President cc: File, Donna Grace, P.E. Page 2 of 4 ATTACHMENT 1 FEE PROPOSAL Page 3 of 4 Professional Project Number: 20022.WW01-04 City of Opa-Iocka General Engineering Services Agreement Sanitary Sewer Evaluation Survey (SSES) Phase III ' for Lift Stations 4, 5, 7 and 8 Staffhour Estimate and Fee Computation Summary Date: 7/28/2020 Project Name Consultant Name EAC Consulting, Inc C&I Construction and Design, Inc. Staff Category/Classification Employee Billing Rates Contract Principal $325.00 Project Manager $250.00 QA/QC „ Engineer $275.00 Project Engineer $165.00 Admin $75.00 TOTALS Task No. & Description Staff hours Distribution 11.111111MIERM Hours Fe , A mo e es mg 2 2 $12,685.50 4 $13,515.50 B Nightime Flow Measurement 4 24 $8,400.00 28 $13,360.00 C Manhole Inspections (121) 2 2 $4,840.00 4 $5,670.00 D Phase III Report 2 4 1 8 1 $8,200.00 16 $11,520.00 Totals 52 $44,065.50 2 12 I 1 I 36 1 I 1 $9,940.00 $34,125.50 Relmbursables / Other Subconsultant Services ODC & Printing Reprography S500 00 Grand Total $44,565.50 ATTACHMENT 2 SUB -CONSULTANT FEE PROPOSAL Page 4 of 4 C&I CONSTRUCTION AND DESIGN INC. PROPOSAL/CONTRACT General Contractor 14031 SW 143rd Court Unit #6 Miami, Florida 33186 Phone: (305) 255-6067 Fax. :(786) 430-1747 Email: info@cicdinc.com Web: cicdinc.com Proposal Submitted to: EAC Consulting, Inc. DONNA GRACE, P.E. Senior Project Manager Job Name Flow Test and Smoke Test Opa-Locka Pump Station 4, 5, 7, and 8 Phone: Fax: Cell No: Date: 954.714.2000 954.599.3710 7/27/20 Scope of Work: We propose hereby to provide labor and equipment for the following work: Cost Proposal for Flow Test — City of Opa-Locka Pump Station: PS 4,5,7 and 8 A Flow Test (Three Nights) B Smoke Test C Manhole Inspection Calculation and Conversion D Readings E Report Total Cost Unit Cost Amount Cost $2,100.00 4 $ 8,400.00 $ 0.50 25,371 $ 12,685.50 $ 40.00 121 $ 4,840.00 $1,200.00 4 $ 4,800.00 $850.00 4 $3,400.00 $ 34,125.50 Exclusion: Re -testing, repairs, corrections of report after repairs, PAYMENT TERMS: Based upon Applications for Payment, submitted to the Owner/Agent by the Contractor, the Owner/Agent shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in this Proposal. Therefore, the Owner/Agent shall make payments to the Contractor as follows: Final retentions of the balance owed are not allowed. Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the following rate: any balance past thirty (30) days will be subject to 1-2% per month (18% per annual) finance charge with the Owner/Agent paying for all attorneys' fees should collection be necessary. This proposal may be withdrawn by C&I Construction and Design Inc. if not accepted within 30 days. We .ro.ose hereb to furnish material and labor com.lete in accordance with above s.ecifications, for the sum of: $34,125.50 (Thirty Four Thousand One Hundred Twenty Five dollars and 50/100) All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specification involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tomado and other necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. Authorized Signature: Carlos Maldonado Note: This proposal may be withdrawn by us if not accepted within 30 days. Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature Date of acceptance 1