Loading...
HomeMy Public PortalAbout20-9802 300 Engineering for Cairo LaneSponsored by: City Manager RESOLUTION NO. 20-9802 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH 300 ENGINEERING GROUP, P.A. FOR CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES FOR COMPLETION OF THE CAIRO LANE, NW 127TH STREET AND ALEXANDRIA DRIVE PROJECT IMPROVEMENTS; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on June 10, 2020, the City Commission of the City of Opa-Locka ("Commission") accepted bid proposals from several firms for continuing professional architectural and engineering consulting services pursuant to RFQ No. 20-0324200. The Commission further authorized the City Manager to enter into multiple agreements for architectural and engineering consulting services as provided therein; and WHEREAS, more specifically, the City Commission approved entering into an agreement with 300 Engineering Group, P.A. for Civil Engineering, landscape architectural, structural engineering and traffic engineering services; and WHEREAS, the City now desires to enter into an agreement with 300 Engineering Group, P.A., pursuant to the proposal attached hereto as Exhibit "A", to provide engineering services for the assessment and evaluation of the Cairo Lane, NW 127th Street and Alexandria Drive Project improvements, including the verification of the design proposed by the previous Contractor, and to develop the basis of design for the completion of the stormwater, force main, water system, and roadway improvements within the City, in an amount not exceed One Hundred Fifty -Nine Thousand, Two Hundred Ninety -Six Dollars ($159,296.00); and WHEREAS, the City Commission finds that it is in the best interest of the City and its residents to enter into an agreement with 300 Engineering Group, P.A. for continuing professional architectural and engineering consulting services as set forth herein. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA LOCKA, FLORIDA: Section 1. RECITALS ADOPTED. The recitals to the preamble herein are incorporated by reference. Section 2. AUTHORIZATION 1 Resolution No. 20-9802 The City Commission of the City of Opa-Locka hereby authorizes the City Manager to enter into an agreement with 300 Engineering Group, P.A. for continuing professional architectural and engineering consulting services to provide engineering services for the assessment and evaluation of the Cairo Lane, NW 127th Street and Alexandria Drive Project improvements within the City, in an amount not exceed One Hundred Fifty -Nine Thousand, Two Hundred Ninety -Six Dollars ($159,296.00) and in a contract form to be approved by the City Manager. SECTION 3. SCRIVENER'S ERRORS. Sections of this Resolution may be renumbered or re -lettered and corrections of typographical errors which do not affect the intent may be authorized by the City Manager, or the City Manager's designee, without need of public hearing, by filing a corrected copy of same with the City Clerk. Section 4. EFFECTIVE DATE. This Resolution shall be effective immediately upon adoption hereof and approval by the Governor of the State of Florida or Governor's designee. PASSED and ADOPTED this 9th day of September, 2020. ATTEST: a Flores, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY: ri. for Burnadette Norris -Weeks, P.A. City Attorney Moved by: Vice Mayor Davis Seconded by: Commissioner Kelley Matthew A. Pigatt, Mayor 2 Resolution No. 20-9802 VOTE: 5-0 Commissioner Bass YES Commissioner Burke YES Commissioner Kelley YES Vice -Mayor Davis YES Mayor Pigatt YES 3 City of Opa-Locka Agenda Cover Memo Department Director: City Manager: Commission Meeting Date: Fiscal Impact: (EnterX in box) Funding Source: Account# : Contract/P.O. Required: (EnterX in box) Strategic Plan Related (Enter X in box) Sponsor Name Airia Austin John E. Pate 09/09/2020 Yes x $159,296.00 No (Enter Fund & Dept) Ex: 75-5356315 Yes Yes City Manager No No x Item Type: (EnterX in box) Ordinance Reading: (Enter X in box) Public Hearing: (EnterX in box) Department Director Signature: CM Signature: Resolution Advertising Requirement: (Enter X in box) RFP/RFQ/Bid#: Strategic Plan Priority Area: Enhance Organizational n Bus. & Economic Dev Public Safety Quality of Education El Qual. of Life & City Image El Communication Department: 41, (7,1"6. (7,Da.ty, dinance Other 1st Reading Yes Yes No x 2nd Reading No x No Yes x Strategic Plan Obj./Strategy: (list the specific objective/strategy this item will address) City Manager Short Title: Engineering and Assessment Services to the Cairo Lane, NW 127th Street and Alexandria Drive Project Staff Summary: A Resolution from the City Commission of the City of Opa-locka, Florida, requesting approval for the City Manager to enter into an Agreement with 300 Engineering Group P.A. to conduct an Assessment and provide Engineering Evaluation Services to the existing and inactive project of Cairo Lane & NW 127th Street for Roadway and Drainage Improvement, including verification of the design proposed by the previous contractor, Intercounty Engineering, and to develop the basis of design for the completion of the stormwater, force main, water system and roadway improvement. Financial Impact Account Description Available Project Remaining Balance 75-5356315 Cairo Lane $300,000 $159,296 $140,704 Proposed Action: Staff recommends approval of this resolution as 300 Engineering Group P.A. was one of the selected engineering firms resulted from the RFQ 20-0324200. Attachment: 1. Agenda 2. Proposal from 300 Engineering Group P.A. City of Opa-Locka RFQ 20-0324200 Cairo Lane, 127th Street and Alexandria Drive Project — Engineering and Assessment Services SCOPE OF WORK August 24, 2020 Prepared for: City of Opa-Locka Public Works Department Attn: Airia Austin Public Works and CIP Director City of Opa Locka 780 Fisherman Street Opa-locka, FL 33054 Prepared by: 300 Engineering Group, P.A. 3850 Bird Road, Suite 601 Miami, Florida 33146 Table of Contents INTRODUCTION 2 DESCRIPTION OF SERVICES 6 100 Project Management 6 200 Site Investigation 7 300 Stormwater System Assessment and Development of Basis of Design 8 400 Force Main System Assessment and Development of Basis of Design 9 500 Fire Hydrants & Water Valves Assessment and Development of Basis of Design 9 600 Roadway Reconstruction Assessment and Development of Basis of Design 10 SCHEDULE 11 INVOICING 11 COMPENSATION 11 ASSUMPTIONS 11 1 City of Opa-Locka RFQ 20-0324200 Cairo Lane, NW 127th Street and Alexandria Drive Project — Engineering and Assessment Services SCOPE OF WORK INTRODUCTION The City of Opa-Locka (City) owns, operates and maintains a water distribution system, a wastewater collection & transmission system and a stormwater management system within its service area. Cairo Lane, NW 127th Street and Alexandria Drive are within an industrial area located in the south west portion of the City, south of NW 135th Street and east of the Douglas/Le Jeune Road Connector. The project area was once part of a 50-acre lake fill known as Milton's Dump that operated from 1966 to 1981. In 2015, the City issued the Request for Proposal (RFP) No: 15-2904100 to conduct improvements to the water, wastewater, stormwater systems and roadway reconstruction at Cairo Lane, NW 127th Street and sections of Alexandria Drive. The project seeks to address the non- existing drainage system in the area and provide for improved roadway conditions. The project was procured as a Design -Build project and the contract was awarded to Intercounty Engineering Inc. on May 13, 2015. Based on the design plans provide by the City on July 1, 2020, the project included the following: Cairo Lane, from the NW 127th Street Canal to NW 135th Street: • Installation of a new 3-Inch HDPE force main (FM), thirty-four (34) service connections to the property line for the connection of privately owned grinder pump stations and interconnection with an existing force main along NW 135th Street. Grinder pumps stations shall be designed and installed by the property owners • Installation of new drainage system, including twenty (20) catch basins, trunk drainage pipping, nutrient removal treatment system at the south end of Cairo Lane and outfall to discharge to the 127th street canal • Installation of a new section of 12-Inch PVC water main • Roadway reconstruction NW 127th Street, from Cairo Lane to NW 32nd Avenue: • Installation of new drainage system, including thirteen (13) catch basins and trunk drainage pipping • Installation of a new 12-Inch PVC water main and five (5) fire hydrants • Roadway reconstruction Alexandria Drive, from NW 127th Street to approximately NW 131' Street: • Installation of a new 3-Inch HDPE FM and service connections to the property line for the connection of privately owned grinder pump stations. Grinder pumps stations shall be designed and installed by the property owners • Installation of a new section of 12-Inch PVC water main 2 The construction began in February 2016 and due to financial constraints and unforeseen conditions the construction was stopped in July 2019. Based on progress reports provided by the City on July 1st, 2020 and a site visit conducted with the City on July 10th, 2020, the following infrastructure was installed: • 3-Inch HDPE FM along Cairo Lane and five (5) service connections, not including the NW 135th Street crossing and connection to the existing force main • South section of the trunk drainage pipe along Cairo Lane (up to catch basin 10), eighteen (18) catch basins and the stormwater treatment structure (without the filters) • 12-Inch PVC water main section along Cairo Lane • Trunk drainage line along NW 127th Street and thirteen (13) catch basins • 12-Inch PVC water main along NW 127th Street and four (4) fire hydrants • 3-Inch HDPE FM along Alexandria Drive and six (6) service connections • 12-Inch PVC water main section along Alexandria Drive Per the City, the construction progress has been summarized in the following figures and tables: Cairo Lane Project Progress Legend Installed Treatment System Installed Force Main Force Main Pending Roadway Reconstruction Pending Installed Stormwater Trunk Stormwater Trunk Pending Installed Stormwater Structure Stormwater Structure Pending Installed Stormwater Junction Installed Water Main Fire Hydrant Pending for Verification Z Figure 1. Cairo Lane Project 3 t,—..., egoi • 1 rii 't, i -1,.: . . . ..., •,-• . .,_.14.' :4'..,.."- .40.4.•.,: • I .. . - ... CS 3. yIS:22 a' . ,,-1,--X.•:•• ...,..cott,,,4,-.„ R.24 .FH.$? 41 SfiliVori#3 EL ,....7 rt !:Pri.R,::'2•'--f•----s--:--.1:1,.. )17,:-.2)78t71:11:k.F.1944WINWT:441."''''''..:—.111(• .P...-4" . -."'''''''eal.. - ' `.-. i ' • ,....,-.-.':",, .4.•'-4‘ ' ''' ' • ..C.I.V.I.':?..g..1„,. ..,F4‘,, • ••.,.,',.g14,11111.1 ' -ri 3/4„.6,16or,, i '...!::: '.2 • ' T.- ..._ - • . : . •_ , iI- • ''''.: 300-- NW 127th Street Project Progress Figure 2. NW 127th Street Project • • 'AK , - • ;!'' +a • • r...;•1` • hr- spr,,p:51; Alexandria Drive Project Progress Figure 3. Alexandria Drive Project 4 —1 N A Legend Installed Force Main Installed Water Main Table 1. Stormwater Improvements Status per the City Road Estimated LF of Stormwater Trunk Number of Stormwater Catch Basins Installed Pending Installed Pending Cairo Ln 1,226 1,546 18 2 NW 127th St 1,987 - 13 - Table 2. Force Main Improvements Status per the City Road Estimated LF of Force Main Laterals Installed Pending Installed Pending Cairo Ln 2,449 165 5 29 Alexandria Dr 967 - 6 5 Table 3. Water Distribution Improvements Status per the City Road Estimated LF of Water Main Installed Number of new FH in the design Cairo Ln 715 2 NW 127th St 1,680 5 Alexandria Dr 275 - Table 4. Roadway Reconstruction Status per the City Road Estimated LF of Pending Roadway Reconstruction Cairo Ln 2,640 NW 127t`' St 2,071 The City has selected 300 Engineering Group, P.A. (300 Engineering) as a professional firm to provide engineering services for the assessment and evaluation of the Cairo Lane, NW 127th Street & Alexandria Drive Project, including the verification of the design proposed by the previous Contractor, and to develop basis of design for the completion of the stormwater, force main, water system, and roadway improvements. 5 DESCRIPTION OF SERVICES 300 Engineering is hereby presenting a scope of services to provide the City with Cairo Lane, NW 127th Street and Alexandria Drive Project — Engineering and Assessment Services. 300 Engineering intends to undertake this project on a Lump Sum fee basis. This project has been divided into the following tasks: Task Description 100 Project Management 200 Site Investigation 300 Stormwater System Assessment and Development of Basis of Design 400 Force Main System Assessment and Development of Basis of Design 500 Fire Hydrants & Water Valves Assessment and Development of Basis of Design 600 Roadway Reconstruction Assessment and Development of Basis of Design 100 Project Management 300 Engineering will provide project management services for the duration of the project. These services will include the following: a. Kick-off and Coordination Meetings • Prepare for and attend to the project kickoff meeting to be held at the City's offices or via teleconference with representatives from the City. The purpose of this meeting is to confirm project objectives, review project timeline, define roles & responsibilities, and discuss communication plan • Prepare for and attend to the project monthly coordination meetings. 300 Engineering staff will attend these meetings in person at the City's facilities or by teleconference. For the purpose of estimating the level of effort associated with this activity, three (3) coordination meetings have been budgeted • For each meeting conducted under this project, 300 Engineering will prepare an agenda and meeting minutes b. Project Progress Reports 300 Engineering will prepare monthly progress reports that will be issued to the City along with the monthly invoices. Monthly progress reports will include: overall status of the project, work performed during the work period, estimated completion of tasks and major sub -tasks, and current challenges/issues. Deliverables The following deliverables will be submitted to the City as part of Task 100: • Meeting agendas and minutes (One (1) kick-off meeting and three (3) coordination meetings) • Monthly progress reports (Four (4) monthly progress reports) 6 200 Site Investigation As part of the verification of the previous project design, 300 Engineering will provide site investigation services, that will include field visits to identify and assess the conditions of installed infrastructure, such as valves, catch basins, grate inlets, fire hydrants, manholes; and identification of possible utility conflicts and identification of deviations from the original design plans. 300 Engineering will identify utilities through coordination with Sunshine 811 for the extent of the project. Based on the information provided in this design ticket, 300 Engineering will request as - built data from utilities identified in the area, if needed. 300 Engineering will also include topographic survey and geotechnical investigations under Task 200. The City shall clear the project area of debris and garbage and uncover buried structures before the execution of field investigation activities. This will be necessary to locate and assess existing infrastructure. All the deliverables described in this scope of work are contingent upon the City removing debris and clearing the project site. 210 Topographic Survey 300 Engineering shall contract the services of a licensed State of Florida Surveyor to conduct a topographic survey of the project site (Cairo Lane and 127th Street). The topographic survey will include elevations, easements, right of way limits, edges of pavement, visible utilities, and other surface features. The licensed State of Florida Surveyor will investigate records and deeds of the Right of Way ROW) strips and of abutting properties for determining ROW width on Cairo Lane and NW 127th Street and compare records with any field evidence. For ROW establishment, the survey will use as reference the Route Topographic Survey (Cairo Ln.) and Specific Purpose Survey (NW 127 St) provided by the City and prepared by Premiere Design Solutions (PDS), dated 08/15/2014 and signed in 11/10/2014 by Fernando Fernandez, PLS. The survey will locate all the existing aboveground improvements and occupational evidences within the ROW. The survey will also establish vertical control run level loop from official benchmarks and set project TBM's, take spot elevations at high and low points, cross -sections at every 100 feet, elevations on top of utilities and determine invert elevations for any existing drainage and gravity sewer system, including pipe size, directions and materials to the extent possible. The survey will also determine approximate height above grade for overhead cables and wires. In addition, and as requested by the City, the topographic survey will include underground utility location at three (3) locations: • Intersection of Cairo Lane and NW 135th St • TMR's crossing conduit for future use on Cairo Lane • Crossing concrete conduit on Cairo Lane by TMR's scale 220 Geotechnical Investigation 300 Engineering shall contract the services of a Professional Geotechnical Engineer to perform Standard Penetration Test (SPT) borings at the project site in accordance with the American Society of Testing Materials (ASTM) D-1586. A total of twelve (12) soil borings are estimated, 7 which shall be spaced at maximum of 500 feet. Excavation clearances shall also be provided under this task. The geotechnical investigation will provide information on the quality of the soils in the area for pipeline installation (along Cairo Lane) and for the roadway reconstruction along Cairo Lane and 127th Street. Deliverables The following deliverables will be submitted to the City as part of Task 200: • Field Assessment Report. One (1) electronic copy • Topographic Survey. One (1) signed and sealed electronic copy • Geotechnical Report. One (1) signed and sealed electronic copy 300 Stormwater System Assessment and Development of Basis of Design 300 Engineering will conduct an assessment of the stormwater system. This assessment will include the following activities: • Evaluate the design parameters defined by Intercounty Engineering in the response to the RFP No: 15-2940110 "Cairo Lane and NW 127th Street Roadway, Drainage, Water, and Wastewater Improvements" dated May 1st, 2015 • Assess the built infrastructure (visible structures such as catch basins, grate inlets, manholes) and identify deviations from the original design along Cairo Lane and NW 127th Street • Evaluate the designed system capacity to handle the stormwater runoff generated at the project site and the discharge to the NW 127' Street Canal • Evaluate the capacity and adequacy of the stormwater treatment system installed by Intercounty Engineering at Cairo Lane • Evaluate the need for a stormwater pump station for the discharge of the treated runoff • Identification of permitting requirements for the completion of the stormwater system improvements Based on the assessment results, 300 Engineering will prepare a Basis of Design Technical Memorandum that will include the design criteria to be used to complete the stormwater system improvements in Cairo Lane and NW 127th Street. This assessment may result in the use of already installed infrastructure or the need of a complete redesign and construction of new infrastructure. Deliverables The following deliverables will be submitted to the City as part of Task 300: • Draft Stormwater System Basis of Design Technical Memorandum. One (1) electronic copy • Final Stormwater System Basis of Design Technical Memorandum. One (1) signed and sealed electronic copy 8 400 Force Main System Assessment and Development of Basis of Design 300 Engineering will conduct an assessment of the force main system. This assessment will include the following activities: • Evaluate the design parameters defined by Intercounty Engineering in the response to the RFP No: 15-2940110 "Cairo Lane and NW 127th Street Roadway, Drainage, Water, and Wastewater Improvements" dated May 1st, 2015. 300 Engineering will not provide alternatives evaluation for the sanitary sewer system since the City indicated that a force main system is the preferred alternative due to the contaminated soils in the project area • Assess the built infrastructure (visible infrastructure such as valves and service connections) and identify deviations from the design developed by Intercounty Engineering as indicated in the design plans provided by the City on July 1st, 2020 • Estimation of the pressure at the point of connection (POC) with the existing force main at NW 135th Street. The estimation of the pressure at the POC will be conducted based on the data available at the Miami -Dade County Regulatory and Economic Resources' (RER) database for the connected pump stations, as reported by the City • Verify the required number of service connections along Cairo Lane and Alexandria Drive • Identify the location of installed service connections along Cairo Lane and Alexandria Drive • Define the installation method for the pending service connections along Cairo Lane and Alexandria Drive • Define the installation method for the pending force main section crossing NW 135th Street and the connection to the exiting force main along NW 135th Street • Identification of permitting requirements for the completion of the force main system improvements Based on the assessment results, 300 Engineering will prepare a Basis of Design Technical Memorandum that will include the design criteria to be used to complete the force main system improvements in Cairo Lane and Alexandria Drive. This assessment may result in the use of already installed infrastructure or the need of a complete redesign and construction of new infrastructure. Deliverables The following deliverables will be submitted to the City as part of Task 400: • Draft Force Main System Basis of Design Technical Memorandum. One (1) electronic copy • Final Force Main System Basis of Design Technical Memorandum. One (1) signed and sealed electronic copy 500 Fire Hydrants & Water Valves Assessment and Development of Basis of Design 300 Engineering will conduct an assessment of the fire hydrants and water system valves. This assessment will include the following activities: • Evaluate the design parameters defined by Intercounty Engineering in the response to the RFP No: 15-2940110 "Cairo Lane and NW 127th Street Roadway, Drainage, Water, and Wastewater Improvements" dated May 1st, 2015 9 " Assess the built infrastructure (visible structures such as valves, fire hydrants, and meters) and identify deviations from the original design " Verify fire protection coverage as per Miami -Dade Fire Department requirements " Define possible locations of missing fire hydrants " Define if adjustments are required for installed fire hydrants " Identify valves for the interconnection of the existing water main, new water main and abandoned lines adjacent to 13070 Cairo Lane. This activity shall be executed with the assistance of the City's Public Works Department Based on the assessment results, 300 Engineering will prepare a Basis of Design Technical Memorandum that will include the design criteria to be used to complete the installation of fire hydrants and water system valves along Cairo Lane and NW 127th Street. This assessment may result in the use of already installed infrastructure or the need of a complete redesign and construction of new infrastructure. Deliverables The following deliverables will be submitted to the City as part of Task 500: " Draft Fire Hydrants and Water Valves Assessment Basis of Design Technical Memorandum. One (1) electronic copy " Final Fire Hydrants and Water Valves Assessment Basis of Design Technical Memorandum. One (1) signed and sealed electronic copy 600 Roadway Reconstruction Assessment and Development of Basis of Design 300 Engineering will conduct an assessment of the roadway reconstruction. This assessment will include the following activities: " Evaluate the design parameters defined by Intercounty Engineering in the response to the RFP No: 15-2940110 "Cairo Lane and NW 127th Street Roadway, Drainage, Water, and Wastewater Improvements" dated May 1st, 2015 " Evaluate the suitability of soils & fill materials, along Cairo Lane and NW 127th Street " Verify the applicability of the design criteria, as defined by Intercounty Engineering in the response to the RFP No: 15-2940110 "Cairo Lane and NW 127th Street Roadway, Drainage, Water, and Wastewater Improvements" dated May 1st, 2015, of the roadway based on current road conditions along Cairo Lane and NW 127th Street " Define the best construction method for the installation of concrete pavement that will allow minimum disruption to the traffic in the area " Evaluation of the design proposed by Intercounty Engineering for the opening of the median at NW 32nd Ave, as indicated in the design drawings provided by the City on July 1st, 2020 " Identification of permitting requirements for the completion of the roadway improvements Based on the assessment results, 300 Engineering will prepare a Basis of Design Technical Memorandum that will include the design criteria to be used for the roadway reconstruction of Cairo Lane and NW 127th Street. This assessment may result in the use of already installed infrastructure or the need of a complete redesign and construction of new infrastructure. 10 Deliverables The following deliverables will be submitted to the City as part of Task 600: • Draft Roadway Reconstruction Basis of Design Technical Memorandum. One (1) electronic copy • Final Roadway Reconstruction Basis Design Technical Memorandum. One (1) signed and sealed electronic copy SCHEDULE The Project Schedule is approximately four (4) months from NTP. INVOICING Invoicing will be monthly as per the Contract between 300 Engineering and the City of Opa-Locka. Invoices shall be paid within thirty (30) days of invoice receipt. COMPENSATION The services described herein will be performed on a fixed lump sum fee basis, as per the Contract between 300 Engineering and the City of Opa-Locka, in the amount shown in Appendix A as CONTRACT GRAND TOTAL. Miles, reproduction, and other reimbursable expenses are to be paid as presented and approved. ASSUMPTIONS This Scope of Services is based on the following assumptions: • All requested information will be made available to 300 Engineering by the City • When available, the City will provide 300 Engineering with any requested AutoCAD information in electronic format • The City's staff will be available to attend meetings and assist 300 Engineering with site visits • City of Opa-Locka's police might be required to accompany 300 Engineering's staff and its subconsultants during site investigation activities. The cost of the police officers must be paid by the City • The City shall clear the project area of debris and garbage and uncover buried structures before the execution of field investigation activities. This will be necessary to locate and assess existing infrastructure. All the deliverables described in this scope of work are contingent upon the City removing debris and clearing the project site • The assessments and basis of designs developed under this scope of work may result in the use of already installed infrastructure or the need of a complete redesign and construction of new infrastructure • For ROW establishment, the topographic survey will use as reference the Route Topographic Survey (Cairo Ln.) and Specific Purpose Survey (NW 127 St) provided by the City and prepared by Premiere Design Solutions (PDS), dated 08/15/2014 and signed in 11/10/2014 by Fernando Fernandez, PLS. 11 " The City shall provide 300 Engineering with the as-builts of the infrastructure in Alexandria Drive. Per the City, the as-builts of Alexandria Drive are currently under development by others and will be provided to 300 Engineering before the completion of this assessment (Task 1). Thus, survey of Alexandria Drive is not included in this project (Task 1). " 300 Engineering will assist in the location of water valves in coordination with the Public Works Department's staff. 300 Engineering shall not operate valves as this will be the responsibility of the City's staff " 300 Engineering will not provide alternatives evaluation for the sanitary sewer system since the City indicated that a force main system is the preferred alternative due to the contaminated soils in the project area " The estimation of the pressure at the point of connection (POC) of the force main will be conducted based on the data available at the Miami -Dade County Regulatory and Economic Resources' (RER) database for the connected pump stations, as reported by the City. This information shall be provided by the City " 300 Engineering shall not be responsible for any delays in the project caused by response times from the City and/or utility owners " Design services are not included in this scope of work " 300 Engineering shall not be held liable for the integrity, proper functioning and adequate installation of infrastructure installed by Intercounty Engineering " The evaluation of the integrity of installed pipelines would require cleaning of such pipelines. Pipeline cleaning and evaluation shall be conducted by the City and is not included in this scope of work " 300 Engineering shall not be liable for any malfunction or damage to the City's roadways, water distribution system, drainage system, force main, and/or consumer lines " The City shall provide 300 Engineering with the contact information of the property owners within the project site " The City shall provide 300 Engineering with the contact information, if available, of utility owners that were involved during the Design -Build project conducted by Intercounty Engineering " In consideration of this Project, unrestricted access to data and information sources is made available to 300 Engineering. 300 Engineering shall comply fully with all security procedures, and shall not divulge to third parties all confidential Data Information obtained from the City of Opa-Locka while performing consulting services, including, but not limited to, security procedures, business operations information or proprietary information in the possession of the City of Opa-Locka. 300 Engineering shall not be required to keep confidential information or material that is publicly available through no fault of 300 Engineering, material that 300 Engineering developed independently without relying on the State's or Customer's confidential information, or material that is otherwise obtainable under State Law as a public record 12 " /C:w i-,1 City of Opa-Locka RFQ No. 20-0324200 Task # 1 "Cairo Lane, NW 127th Street and Alexandria Drive Protect  Engineering and Assessment Services" Fee Schedule Rate, $IHr Principal $215.00 Project Manager $190.00 Operations Supoort $160.00 Senior Engineer $160.00 Projec Engineer $140.00 Inspector $90.00 Total Hours Labor Subtotal Subtaek 100 Project Management 4 10 0 4 14 0 32 $5,360.00 $5,360.00 200 Site Investigation 0 15 24 12 48 40 139 $18,930.00 $18,930.00 300 Stormwater System Assessment end Development of Bola of Design 2 16 10 72 72 0 172 $26,670.00 $26,670.00 400 Force Main System Assessment and Development of Basis of De,Ign 2 12 19 32 72 0 137 $20,950.00 $20,950.00 500 Fire Hydrants Assessment and Development of Basis of Design 1 8 24 12 48 0 93 $14,215.00 $14,215.00 600 Roadway Reoonstruction Assessment end Development of Basis of Design 2 16 18 38 104 0 178 $26,990.00 $26,990.00 Total (Hours) 11 77 95 170 358 40 751 Sub -Total Labor Fee $113,115.00 ODC'a (Mileage, Reproduction 8, Reimbursable) Topographic Survey' $39,750.00 Geotechnical Investigation ' $6,431.00 Sub Total ODC'a (Mileage, Reproduction & Reimbursable) $46.181.00 Sub -Total Labor FeeIODC $159,296.00 %Utilization 1.46% 10.25% 12.65% 22.64% 47.67% 5.33% 100.00% Total ($) $2,365.00 $14,630.00 $15,200.00 $27,200.00 $50,120.00 $3,600.00 $159,296.00 Notes: 1. Detailed proposal tn., the Professional Lend Surveyor Is Included In the Appendd 2. Detailed proposal from the Professional Gedechnical Engines Is Included In this Appends Page 1 u BELLO BELLO Land Surveying - Mapping Sciences August 21, 2020 Ms. Ana C Dvorak, ENV SP. 300 ENGINEERING GROUP, P.A. 3850 Bird Road, Suite 601 Miami, Florida 33146 OFF: 305-602-4602 I TEL: 786-781-2689 I FAX: 305-675-2373 via email to: acdvorak@300engineering.com RE: REVISED PROPOSAL FOR ROUTE TOPOGRAPHIC AND AS -BUILT SURVEY Dear Ana, Based on our previous conversation and on our understanding of the requirements, Bello and Bello (BB) is pleased to present the attached proposal for your consideration and acceptance. Upon approval, please return a signed copy of this proposal to us. The work will be performed by fully insured personnel and under the supervision of a Florida registered Professional Land Surveyor and Mapper. Certificates of Insurance will be provided upon request. We appreciate the opportunity to provide this proposal and look forward to working with you on this project. Should you have any questions do not hesitate to contact us. Very Truly Yours, odayis Odalys C. Bello, PSM President LAND SURVEYING AND MAPPING SCIENCES 12230 SW 131 Avenue, Suite 201 - Miami, Florida 33186 - Ph: 305.251.9606 www.bellolandsurveying.com Page 1 of 3 N BELLO BELLO Land Surveying - Mapping Sciences PROJECT NAME: • Opa-locka — Cairo Lane ROW Improvements PROJECT LOCATION (Reference) • Address: 13200 Cairo Lane, Opa-locka, FL 33054 • Folio: 08-2128-003-0540 • Legal Description: Section 28-52-41 Miami -Dade Co. FL PROJECT SIZE • +/- 2,640' LF along Cairo Lane • +/- 2,056' LF along N.W. 127th Street • Total: +/- 4696 LF SCOPE OF SERVICES Task # 1 Route Topographic Survey to include: • Sub Task #1.1: Investigate records and deeds of the R/W strips and of abutting properties for determining ROW width on Cairo Lane and NW 127th Street. Compare records with any field evidence. For ROW (s) establishment this firm will use as reference the Route Topographic Survey (Cairo Ln.) and Specific Purpose Survey (NW 127 St) provided by City prepared by Premiere Design Solutions (PDS), dated 08/15/2014 and 11/10/2014 signed by Fernando Fernandez, PLS. • Sub Task # 1.3: Location and survey all the existing aboveground improvements and occupational evidences. location of all improvements within R/W • Task # 1.4: Establish Vertical Control run level loop from official benchmarks and set project TBM's, take spot elevations at high and low points, take cross -sections at every 100 ft., elevations on top of utilities and determine invert elevations for any existing drainage and gravity sewer system, determine pipe size, directions and materials to the extent possible. Determine approximate height above grade for overhead cables and wires. Note that cleaning of the structures might be necessary. Task # 2 SUE (Underground Utility Location): Bello & Bello will perform SUE (Subsurface Utility Engineering) Quality Level "A" Utility Designation including softdigs accordance with the American Society of Civil Engineers ASCE CI-38-02. Area subject to SUE will be the following: 1. Intersection of Cairo Lane and NW 135th St. This section Does require the underground utility location for the force main tie-in. 2. TMR's crossing conduit for future use on Cairo Lane. 3. Crossing concrete conduit on Cairo Lane by TMR's scale. LAND SURVEYING AND MAPPING SCIENCES 12230 SW 131 Avenue, Suite 201 - Miami, Florida 33186 - Ph: 305.251.9606 www.bellolandsurveying.com Page 2 of 3 BELLO BELLO Land Surveying - Mapping Sciences Softdigs Steps • Sub Task # 2.1: Performing Vac Truck Softdigs and restauration are time consuming activities that will partially block the right of ways and require special MOT. Bello & Bello will design and perform Temporary Traffic Control (TTC/MOT) plan as required for work within non FDOT right of way(s) in compliance with FDOT policies and applicable MUTCD - Index 600. • Sub Task # 2.2: Prior to the excavations, B&B will generate a coordinate sheet for proposed excavation based on WASD's instructions. A Survey field crew will mark the area with white paint — tolerance of approximately 5 feet around the proposed location. The SUE Designation crew will perform Ground Penetrating Radar (GPR) designation survey to accurately identify the utility and pinpoint the location in order to avoid wrongful excavation. The vacuum truck crew will do the actual excavation and the survey crew will take the required information: horizontal coordinates, grade elevation on top, elevation of top of pipe, determining pipe size/material and confirm the type of utility. Upon completion of site survey area will be restored to its original condition. • Sub Task 2.3: SUE data processing. Comparing findings with data depicting on the Topographic Survey, updating the survey accordingly, preparing the Utility Map and the Certified Softdigs Report. PROVISIONS Horizontally: Georeferenced to Florida State Plane Coordinate System, NAD'83/2011 adjustment. Vertically: Elevations will be referenced to NGVD'29. Completion time depends on weather conditions, however we estimate 60 business days DELIVERABLES Six (6) certified copies of each survey prepared in compliance with Miami -Dade County survey standards and the standards of practice as set forth by the Florida Board of Professional Surveyors and Mappers in applicable provisions of Chapter 5J-17, Florida Administrative Code, pursuant to Section 472.027, Florida Statutes. A pdf copy and a drawing file in AutoCAD CiviI3D 2018 or earlier version. SUE Certified Utility Report and Mapping: One (1) certified sketch with depiction of softdigs (including horizontal coordinates, grade elevations and utility information as determined in the field). FEES Task # 1: $ 36 000.00 Lump Sum Task # 2: $ 1250.00 per soft Dig THIS AGREEMENT IS HEREBY ACKNOWLEDGED AND ACCEPTED. I understand and agree that by signing below I APPROVE AND ACCEPT this proposal as a legal binding contract. By: Date: Signature: Title: LAND SURVEYING AND MAPPING SCIENCES 12230 SW 131 Avenue, Suite 201 - Miami, Florida 33186 - Ph: 305.251.9606 www.bellolandsurveying.com Page 3 of 3 GFA International, Inc. Florida's Leading Engineering Source Ms. Ana C Dvorak 300 Engineering Group, P.A. 3850 Bird Road, Suite 601 Miami, FL 33146 Phone: (305) 602-4602 Email: acdvorak@300engineering.com Proposal for Geotechnical Exploration Opa-Locka Cairo Lane Project Along Cairo Lane & 127th Street, Opa-Locka, FL Proposal No. 20-1931.00 July 31, 2020 A Universal Engineering Sciences Company A Universal Engineering Sciences Company Geotechnical Engineering I Construction Materials Testing and Inspections Building Code Compliance I Environmental, Health & Safety I Facilities Consulting Ms. Ana C Dvorak 300 Engineering Group, P.A. 3850 Bird Road, Suite 601 Miami, FL 33146 Phone: (305) 602-4602 Email: acdvorak@300engineering.com RE: Proposal for Geotechnical Exploration Opa-Locka Cairo Lane Project Along Cairo Lane & 127th Street, Opa-Locka, FL Proposal No. 20-1931.00 Dear Ms. Dvorak: LOCATIONS Atlanta, GA Buford, GA Chantllty, VA Charlotte, NC Clewiston, FL Daytona, FL Delray Beach. FL Douglasville, GA Fort Myers, FL Fort Pierce, FL Gainesville. FL Hagerstown. MD Irvine, CA Jacksonville, FL Kennesaw, GA Las Vegas, NV Miami, FL Ocala. FL Orlando, FL Palm Coast. FL Panama C1ty, FL Pelham, AL Pensacola, FL Port St. Lucie, FL Reno, NV Rockledge. FL Sarasota, FL St Petersburg, FL Tampa. FL Tifton. GA West Palm Beach, FL July 31, 2020 GFA International, Inc. (GFA) appreciates the opportunity to become a part of your project team. Our team of professionals are dedicated to making this project a success, both on schedule and within budget. We are proud of our commitment to maintaining the highest levels of customer service and client satisfaction, and respectfully submit the following for your consideration. PROJECT INFORMATION It is GFA's understanding that this project is to consist of stormwater, roadway improvements, and force main installation along Cairo Lane and 127th street in Opa-Locka, FL. GEOTECHNICAL EXPLORATION Exploration is to consist of twelve (12) Standard Penetration Test (SPT) borings within the proposed structure for this geotechnical study. The borings will be completed with a truck or track -mounted drilling equipment. The depths are needed to evaluate the nature of the subsurface soils and general subsurface conditions for the proposed development. The borings will be performed to depths of 15 feet below grade. Underground utility clearance will be required prior to commencing the drilling of the SPT borings. Therefore, GFA will contact "Sunshine One -Call" Service to obtain underground public utility clearance. We request to be notified of the location of any existing private underground utilities and/or structures in the exploratory area prior to our field work. We will not be responsible for private and/or public underground utilities and/or structures not identified to our field crews. We have assumed that our field work can be performed during normal business hours. GFA will subcontract the performance of the Maintenance of Traffic (MOT) and the preparation of a MOT plan. These items will be needed for GFA to perform borings within the roadways as requested. Right of Way (ROW) and MOT permits will be responsibility of the client. GFA International, Inc. 11215 Wallace Drive, Delray Beach, FL 33444 I ph 561-347-0070 I teamgfa.com Page 2 of 5 Opa-Locka Cairo Lane Project July 31, 2020 Project No. 20-1931.00 PURPOSE The purpose of the services on this project is to explore the subsurface soil/rock conditions and provide roadway and pavement recommendations, including soil engineering parameters, soil parameters, soil classification, anticipated settlements, allowable bearing capacity, fill materials and compaction requirement to be used in evaluation of the site for the proposed construction. PROPOSED SCOPE OF SERVICES The geotechnical exploration and report shall include the following at a minimum: ➢ Perform twelve (12) standard penetration test (SPT) borings. The borings will be completed to depths of 15 feet below existing grade, utilizing a truck or track -mounted drilling equipment. The SPT borings will be used as an investigative tool. ➢ Two (2) days of Maintenance of Traffic (MOT) and MOT plan for the borings to be performed on the roadways. ➢ A software -generated and plotted log of each boring will be prepared. ➢ Prepare a site plan showing the approximate test locations. ➢ Summarize the activities on this project in the form of a Geotechnical Report which will include test procedures used, data collected, evaluation of subsurface soil conditions, and engineering recommendations for the proposed construction. ➢ Provide recommended site preparation procedures and imported fill requirements. An estimated LUMP SUM for the scope of services detailed above is $6,431.00. Please Note: This estimate is based on the site being accessible to a truck or track -mounted drilling equipment. If this is not the case, revisions will need to be made to this estimate to accommodate mobile drilling equipment or heavy -equipment to access boring locations. Estimate also assumes work to be completed in two (2) 8-hour days during regular hours. GFA will not exceed the fee stated above unless the encountered soils are significantly different than those anticipated, the site is not accessible to truck mounted drilling equipment and/or if the report will require additional hours for engineering analysis due to the encountered soils being significantly different than those anticipated. The additional services and its cost shall be negotiated. CONDITIONS AND QUALIFICATIONS GFA's terms are C.O.D. (credit cards are accepted) unless a credit application has been approved or credit has been previously established. If credit is established, the terms will be 2/10/net-30days. The pricing contained herein is subject to change if this proposal is not authorized within 90 days from the date of this proposal. If more than 90 days have passed since the date of this proposal, please contact us for an updated proposal. Additional items not listed in this proposal will be quoted upon request. A digitally signed and sealed .pdf report will be provided at no charge. Hard copies of reports can be provided upon request, at a unit rate of $75.00 per report. AUTHORIZATION All services will be conducted in accordance with this proposal and attached Terms and Conditions. To initiate services, please complete and return the included Proposal Acceptance Agreement form. The Terms and Conditions are part of this agreement. The signed proposal acceptance agreement form must be received by GFA via fax or email prior to any work being performed, and an original copy must be received before completed reports can be distributed. GFA International, Inc. 11215 Wallace Drive, Delray Beach, FL 33444 I ph 561-347-0070 I teamgfa.com Page 3 of 5 Opa-Locka Cairo Lane Project Project No. 20-1931.00 July 31, 2020 CLOSING GFA appreciates the opportunity to submit this proposal and looks forward to working with you as a member of the project team. Please contact the undersigned at 561.347.0070 if you have any questions or comments. From our team to yours, GFA International, Inc. CA#4930 Carlos Mercado, M.S., P.E. Branch Manager Kalli Krivdo Business Development Representative EA)tat. L„ir. Estela G. Leon Aguilar, M.S, P.E. Geotechnical Department Manager Attachments: Exhibit "A" — GFA International Inc.'s Standard Terms & Conditions Exhibit "B" — Report Distribution Information Request Form GFA International, Inc. 11215 Wallace Drive, Delray Beach, FL 33444 1 ph 561-347-0070 1 teamgfa.com Page 4 of 5