Loading...
HomeMy Public PortalAboutFORT AV_5 (5).pdfFax Transmission Result Rep Page [1] of [1] Date /Time : 01 -21 -2014 09:31 AM Model Name CLX -9352 Machine Serial Number Z94UB1ED500022H Linel City of Tybee Linel Name 9127869539 Line2 is not available Line2 Name is not available Job Destination Start Time Duration Mode Job Type Page User Result 6070 Georgia Power rele01 -21 -2014 09:30 01'00" G3 H -Tx 1/1 LocalUser OK ase/1 88885 1441 1 AM Tybee Island, GA GEORGIA POWER RELEASE FOR ELECTRIC SERVICE PHONE: 1- 888 - 748 -6843, Press 1, Extension 32855 or 32856 FAX: 1- 888 -851 -4411 Location Address: i IaaTglaa eleaseDate: 1)2414 Type of Release: _ Temporary Permanent Permit # 13-073P: 1 �o13b�2 Electrician: �'l2_ Y.I W J .i e. Phone # 3t-i 9Z9(r Builder: Ilve.Z5 6433> eAmpb000,iD Phone # 1n(e -2rW -845 -7 Owner: 675 Phone # Location Address: Release Date: Type of Release: _Temporary _ Permanent Permit # Electrician: Phone # Builder: Phone # Owner. Phone # Planning and Zoning Jerris Bryant 912472.5033 H -Rx: Host Rx H -Tx: Host Tx M -S: Memory Save P -Rx: Poll Rx D -Tx: Delay Tx S -Rx: Secure Rx P -Tx: Poll Tx BC -Tx: BroadCast Tx Tybee Island, GA GEORGIA POWER RELEASE FOR ELECTRIC SERVICE PHONE: 1- 888 - 748 -6843, Press 1, Extension 32855 or 32856 FAX: 1- 888 - 851 -4411 Location Address: A1)1 Xt-SLCZSTS4 Selease Date: Type of Release: Temporary Permanent Permit # 13 -t'73 Electrician: ..12f L� l fu P4. hone # 'J1- ,oZ94 cigzi Builder: IZVV.Z3 )31> eirh ?G,ou,AA. Phone # -7r — 2citi-f3 S -7 Owner: (, .3 vr% 47 i Phone # Location Address: Release Date: Type of Release: Temporary Permanent Permit # Electrician: Phone # Builder: Phone # Owner: Phone # Planning and Zoning Jerris Bryant 912 - 472 -5033 City of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 inTAI INTERNATIONAL CODE COUNCIL MEMBER Permit No. /3 -073e Date Requested a//i4 // Owner's Name eirY1P 1Y5&7 Date Needed 0/ / / % //V Gen. Contractor GA t,cr.)fe. Subcontractor Contact Information efbe1S Jf/Op,� Project Address 5 F-0i2r A116 Scope of Work 4-00 P . ` W € 6 /0I rz LEI'S Inspector 7k1 Date of Inspection Inspection f /' rI AL Pass E Fail Fee (//c6-7-ak-f.t '\ / \ 1.- , f--2 ) (-,z-ss-,g, Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail 01/16/2014 THU 12:36 FAX 912 233 7872 Braddy Electric CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 Fax (912) 786 -9539 0/001 /001 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date /—/ / y Location of work (street address) Contractor /2 t` /i:r Address of Contractor fA�L�r t %New Work ft>A- _ Replacement i :' Telephone (7/ 2-- 2-3-3/..)-64 Property Owner 4 7 � r Date work will be ready for inspection, if known Estimated cost of construction G s Telephone .7c4. Y! 73 -- J —•" /4.4/ ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of i eu.p ncy must be issued by the City of Tybee Island prior to any occupancy. 4. The • ner . • contract are hereby held responsible for any violations of this policy. A violation of this pal m. resul " onnection of the electrical service until all violations and deficiencies are corrected. it •ntractor Signature' Date . / if ,, rack/ Owner /Contractor Printed Name • APPROVAL Fee Building Official Date A/C Unit and Heat Pump V Attic Ventilation Fan Bell Transmitter — low voltage Border /Outline Lighting Building Saw V Exit Lights — life safety Heat Pump Meter Box Motor(s): hp Outlets —110 volts circuit Parking Lot Lights 1,...r Pool Lights — grounding Range — commercial ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of i eu.p ncy must be issued by the City of Tybee Island prior to any occupancy. 4. The • ner . • contract are hereby held responsible for any violations of this policy. A violation of this pal m. resul " onnection of the electrical service until all violations and deficiencies are corrected. it •ntractor Signature' Date . / if ,, rack/ Owner /Contractor Printed Name • APPROVAL Fee Building Official Date Range Hood — commercial V Service: ye v amps 0 Sign Circuit - wattage Smoke Detector — low voltage Spa or Tub — grounding V Special Outlet -T h)84- Swimming Pool rounding Water Heater Welder — 220 volts circuit Well Pump — grounding y -ray 1,...r Other 40..- 5..c:, /1•10 fF C ' • 24:04 /r 0 a,r, :,: r/i ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of i eu.p ncy must be issued by the City of Tybee Island prior to any occupancy. 4. The • ner . • contract are hereby held responsible for any violations of this policy. A violation of this pal m. resul " onnection of the electrical service until all violations and deficiencies are corrected. it •ntractor Signature' Date . / if ,, rack/ Owner /Contractor Printed Name • APPROVAL Fee Building Official Date DATE ISSUED: 11 -22 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT 400 AMP SERVICE / OUTLETS 5 FORT AVE CITY OF TYBEE - CAMPGROUND TYBEE ISLAND GA 31328 GEORGIA POWER 3102 KILOWATT DRIVE SAVANNAH, GA 31405 P $ 0.00 4- 0021 -06 -002 PROJECT VALUATION $9,000.00 PERMIT #: 130738 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 41_,06-t -06 -oa,2 CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date ic b /A3 '- New Work Replacement Location of work (street address) ' "Z/Frz:5 i L iripc$ u, ,� % i'v'rie/4, JEr?: /4,e.E TYPE /6z-4"1- Contractor .geoh,r1 ,,Jr =;z 6-0;z6 'TAr'isi&, Di 3. Eve Telephone 9 /a. Sc "6. aia9 Address of Contractor ' 3i:.1 '%3S� ©� 3/02 kr�,�:�,r- J7,2:VE, 5,41✓4,4.44,4, �!� 3740 .5— Property Owner Cary e /5z.» Telephone 9i2 7 ,. 6'.5"/ Date work will be ready for inspection, if known Estimated cost of construction q , Permit Number /3 -01 ' ALL wiring, service included, must be COPPER. NO aluminum allowed. Means shall be provided to disconnect all conductors from the service - entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy a rein disconnection of the electrical service until all violations and deficiencies are corrected. Owner/i,.ntractor Signature I�ItOC�l P//iLL Owner /Contractor Printed Name • Date APPROVAL Building Official c))t �j L Fee a T6 prcjU Date (('Z( -'13 A/C Unit and Heat Pump Attic Ventilation Fan Bell Transmitter — low voltage Border /Outline Lighting Building Saw Exit Lights — life safety Heat Pump Meter Box Motor(s): hp ✓( 3) Outlets — 110 volts circuit Parking Lot Lights Pool Lights — grounding Range — commercial Permit Number /3 -01 ' ALL wiring, service included, must be COPPER. NO aluminum allowed. Means shall be provided to disconnect all conductors from the service - entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy a rein disconnection of the electrical service until all violations and deficiencies are corrected. Owner/i,.ntractor Signature I�ItOC�l P//iLL Owner /Contractor Printed Name • Date APPROVAL Building Official c))t �j L Fee a T6 prcjU Date (('Z( -'13 Range Hood — commercial Service: .100) amps Sign Circuit - wattage Smoke Detector — low voltage Spa or Tub — grounding Special Outlet Swimming Pool — grounding Water Heater Welder — 220 volts circuit Well Pump — grounding X -ray Other -5E_t ,,,r: se.•: -�,..> •/ i.• r i e.- 4-4 'It) fi - 'sir, - 0.i. e 47) Permit Number /3 -01 ' ALL wiring, service included, must be COPPER. NO aluminum allowed. Means shall be provided to disconnect all conductors from the service - entrance conductors. NEC 230.70 APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy a rein disconnection of the electrical service until all violations and deficiencies are corrected. Owner/i,.ntractor Signature I�ItOC�l P//iLL Owner /Contractor Printed Name • Date APPROVAL Building Official c))t �j L Fee a T6 prcjU Date (('Z( -'13 Dianne Otto From: Woody Hemphill Sent: Thursday, November 21, 2013 1:02 PM To: Dianne Otto Cc: Chris Shook Subject: FW: Utility Easement for River's End Campground & RV Park Diane, Please see the attached email from Bubba inquiring about the utility easement at the Campground in preparation for the installed infrastructure to coincide with the campsite renovation project (FY14). Chris Tatusko, the GA Power Engineer, is also aware of this, as well. This should be the final step prior to making application for the building permit for this project? (The tree permit was completed previously, and the mitigation plan submitted to you via email, this AM.) If not, please advise. Woody From: Jan LeViner Sent: Tuesday, November 19, 2013 5:00 PM To: Woody Hemphill Subject: FW: Address Janet LeViner Clerk of Council City of Tybee Island PO Box 2749 Tybee Island, GA 31328 912.472.5080 (direct dial) 912.596.6401 (cell) From: Bubba Hughes [mailto:BHughes @cbrhlaw.com] Sent: Tuesday, November 19, 2013 5:01 PM To: Jan LeViner Subject: RE: Address NO easement is needed. Ga Power is aware.... From: Jan LeViner [ mailto :jleviner @cityoftybee.orq] Sent: Tuesday, November 19, 2013 4:57 PM To: Bubba Hughes Subject: RE: Address Bubba, Woody is in my office and would like to know the status of the easement for the campground. You pulled it from the agenda or Thursday. Thanks Jan Janet LeViner 1