HomeMy Public PortalAboutTHIRD ST_1 #5.pdfCity of Tybee Island • Community Development Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472 -5032 • Fax 912.786.9539
Permit No. Id- 004/02-.
Owner's Name 4.51-g/1
Date Requested 01/021/ 4
Date Needed
Nava
INTERNATIONAL
CODE COUNCIL
MEMBER
Gen. Contractor ),1'i Q S/ t app's Subcontractor
Contact Information �L'�I y 35C-143o
Project Address % //?j) c-51-
,)
Scope of Work Lt',K tIN1 6/1616f L g &
Inspector Date of Inspection
Inspection Pass El Fail El Fee
1/
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 01 -22 -2014
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
FIX LEAK UNDER GARAGE SLAB
1 THIRD ST 5
OWNER NAME CRAIG HESTON
ADDRESS 3 GHOST CRAB CT
CITY, ST, ZIP SAVANNAH GA 31411 -3111
PHONE NUMBER
CONTRACTOR NAME SOUTH SHORE BUILDERS INC
ADDRESS BARNEY PADEREWSKI
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION # 4- 0004 -20 -010
PROJECT VALUATION $ 750.00
PERMIT #: 140042
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Property Address:
/D STS
I,
City of Tybee Island, Georgia
912- 472 -5030 • Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
PIN: I'I- -DI a
❑ Single Family
❑ Duplex
❑ Multi- Family units
❑ * Commercial unit(s)
Check all that apply
❑ DiscoveryfTearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: n
( CC A ue
a SCE
tL.
, /
Estimated Cost of Construction: $ ;7 ) ) (materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: igap/ AyListed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Man. - • ent. I accept responsibility for any corrective actions
that may be necessary to restore drainage im,paj by this p: d construction.
Date:
ante
/I/ Signature:
Name of Applicant: e -i -FA c
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Sign
Date
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
50
Name
Address
Telephone
Owner l
S
t>�
____Mailing
U OSV CCa V)
Home: � 5-9e s� v�r "&:S
Cell: z
Architect or
Engineer
Office:
Cell:
Contractor
�`e l
Loc �(
Office: 91z ss 3v
CeII:
❑ Single Family
❑ Duplex
❑ Multi- Family units
❑ * Commercial unit(s)
Check all that apply
❑ DiscoveryfTearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: n
( CC A ue
a SCE
tL.
, /
Estimated Cost of Construction: $ ;7 ) ) (materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: igap/ AyListed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Man. - • ent. I accept responsibility for any corrective actions
that may be necessary to restore drainage im,paj by this p: d construction.
Date:
ante
/I/ Signature:
Name of Applicant: e -i -FA c
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Sign
Date
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
50
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for theyevill be installed with a separation that allows for the first one to fail (fall
over) without' ting the sec d one. The complete assembly and installation must be compliant; steel or
wood posts, o` sf spacin , e C or A.
.. 1 Z-Zi (Le
Signature for r- eipt o Lead Paint, Asbestos, and BMP notices Date
/
Printed Name
LOT 5 WINDCHASE TOWNHOMES SUB OF FORMER BEACH LOTS 24, 25 & THE
NORTHERN PORTION OF LOT 26 WARD 1 TYBEE ISLAND SMB 15S 92
Chatham County Board of Assessors: 2013 Property Record Card 4- 0004 -20 -010
2013 Chatham County Board of Assessors
Property Record Card
Page 1 of 2
4- 0004 -20 -010
1 3RD ST TYBEE ISLAND
APPRAISER AVMARCAN
LAST INSP 03/10/2011
APPR 000008
ZONE
HESTON W CRAIG &
CATHERINE C*
3 GHOST CRAB COURT
SAVANNAH GA 31411
CAMA ASMT
497,000 497,000 LAND 1
164,000 164,000 BLDG 1
OBXF 0
661,000 661,000 Cost -
MS
SALES BOOK/ INS VI QU RSN PRICE
PAGE
19 May 341M 0140 NA I U UR
2008
GRANTOR: HESTON W CRAIG & CATHERIN
GRANTEE:HESTON W CRAIG & CATHERIN
18 Nov 262B 0749 WD I Q 555,000
2003
GRANTOR:REMLER ROBERT B & TRACY S
GRANTEE:HESTON W CRAIG & CATHERIN
29 Jan 218M 0451 WD I Q 455,000
2001
GRANTOR:YOUMANS MICHAEL E & VICKI
GRANTEEREMLER ROBERT B & TRACY S
14 Aug 195Z 0233 NA I Q
1998
GRANTOR: REESE JAMES P & FRANCIS V
GRANTEE:YOUMANS MICHAEL E & VICKI
265,000
19 Sep
1997
GRANTOR:ATLANTIC OCEAN HOMES LL
GRANTEE:REESE JAMES P & FRANCES V
09 May 178Q 372 QC V U UQ
1996
GRANTOR:TYBEE ISLAND REALTY,INC.
GRANTEEATLANTIC OCEAN HOMES, LL
188A 0538 WD I Q 214,000
PERMITS TYPE DATE AMOUNT
120676 WO 21 Dec 2012 Issued 2,000
120351 19 Jun 2012 Issued 3,000
090228 12 May 2009 Issued 250
97 -00206 11 Aug 1997 Issued 207,360
COMMENTS:
08 Mar 2010
03 Mar 2009
16 Jul 2008
22 Jan 2004
16 Sep 2003
24 Mar 2003
16 Sep 2002
30 May 2002
09 Mar 1999
29 Oct 1996
TY10 RET VAL ENTERED
TY09 RET VAL ENT 3/2/09
APW
*TY09 TENANTS IN COMMON
ONLY
* TY04 SURVS
FOR SALE 09/12/03 4575,000
IN- CLUDES FURNITURE.
TY03 ADD CHG PER LTR 3-24 -
03S1
FOR SALE 09/13/02 $525,000
ADD CHG PER CARD 5 -30 -02
SYI
ADD CHG 3 -9 -99 BS PER P/0
1997 NEW PIN; SPLIT OUT OF
4- 4 -20 -1 10/29/96
[Click for larger picture]
SAGIG
Chatham County
Tax Commissioner
Property Tax Statement
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA 0004 Tybee Island
NBHD 020285.00 T285 TYBEE
WINDCHASE
EXEMPTIONS
HISTORY LAND IMPR TOTAL
2012 501,500 143,500 645,000 Over
2011 501,500 143,500 645,000 Over
2010 612,500 143,500 756,000 MAV
2010 501,500 143,500 645,000 Over
2009 612,500 143,500 756,000 Over
2008 612,500 143,500 756,000 Cama
2007 612,500 141,000 753,500 Cama
2006 612,500 141,000 753,500 Cama
2005 455,000 141,000 596,000 Cama
2004 350,000 141,000 491,000 Cama
2003 245,000 172,000 417,000 Cama
2002 245,000 172,000 417,000 Cama
2001 125,000 163,500 288,500 Cama
2000 125,000 163,500 288,500 Cama
1999 234,500 A/C
1998 50,000 178,500 228,500 Cama
1997 50,000 50,000 Cama
LAND
ID# USE DESC FRONT DEPTH UNITS / TYPE
109138 CONDOS 0 0 1.00 -UT
PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
350000.00 C1 DW42 497000
http: // boa. chathamcounty. org/ DesktopModules /ChathamCountyBoardofAssessors /Propert... 1/22/2014
Chatham County Board of Assessors: 2013 Property Record Card 4- 0004 -20 -010 Page 2 of 2
2013 Chatham County Board of Assessors
Property Record Card
4- 0004 -20 -010
1 3RD ST TYBEE ISLAND
BUILDING SECTION
84865 -1 -2013
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE
Residential 192,934 1997 MS
PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
15.00 0.00 0.00 0.00 15.00
163,994 164,000
s
w.r
[Click for larger picture]
BEACH FRONT.
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
1 - Main
1548
4 - Town House, Inside Unit
1 - Stud Frame
2 - Two Story
5.00
3.00
0
3/3.00
COMPONENTS
R1 108 Frame, Siding, Wood
R2 214 Metal, Preformed
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 602 Plumbing Rough -ins ( #)
R6 622 Raised Subfloor (% or SF)
R7 701 Attached Garage (SF)
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
Units
11.00
1.00
752.00
128.00
128.00
25.00
128.00
QUAL
100.00
100.00
100.00
100.00
http: //boa. chathamcounty .org/DesktopModules / ChathamCounty /BoardofAssessors /Propert... 1/22/2014