HomeMy Public PortalAboutWILSON AV_3.pdfDATE ISSUED: 01 -31 -2014
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REROOF - SHINGLES
3 WILSON AVENUE
OWNER NAME SHARON F. HOSTI
ADDRESS PO BOX 531
CITY, ST, ZIP TYBEE ISLAND GA 31328 -0531
PHONE NUMBER
CONTRACTOR NAME EASLEY ROOFING
ADDRESS 1419 PINE BARRON ROAD
CITY STATE ZIP POOLER, GA 31322
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 98.00
PROPERTY IDENTIFICATION # 4- 0002 -03 -026
PROJECT VALUATION $6,600.00
PERMIT #: 140061
TOTAL BALANCE DUE: $ 98.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
Cr
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
ApAt
Property Property Address:
City of Tybee Island, Georgia
912- 472 -5030 • Fax 912- 786 -9539
APPLICATION FOR BUILDING PERMIT
all {t ,soA1
PIN: Mod - o,_q-off
❑ Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
LI Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project:
e/1"114('44/,
Estimated Cost of Construction: $ .j (d Q
(materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of thenw�ork,,ttwo sets of construction drawings and /or a site plan may be required.
Year Built: I'N/ List d on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: 14' Signature:
Tint- • Name of Applicant: J /Je faS /e
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure m cb »oongee 6n . (_ F e m P.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager I
('pV; ra oC h. a. r4ov`'
Signat
C. mPVart-4- .
Date
-14
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
Mailing Address
Telephone
Owner
ilc, ZA:
�'�
Home:
Cell:
Architect or
Engineer
Office:
Cell:
Contractor
" "�' ""
""`/
Office:
Cell:
ld- 547-734 q
❑ Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
LI Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project:
e/1"114('44/,
Estimated Cost of Construction: $ .j (d Q
(materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of thenw�ork,,ttwo sets of construction drawings and /or a site plan may be required.
Year Built: I'N/ List d on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: 14' Signature:
Tint- • Name of Applicant: J /Je faS /e
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure m cb »oongee 6n . (_ F e m P.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager I
('pV; ra oC h. a. r4ov`'
Signat
C. mPVart-4- .
Date
-14
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
Signature for receipt of Lead Paint, Asbestos, and BMP notices Date
sl e y
Printed Name
OZ/
Chatham County Board of Assessors: 2013 Property Record Card 4- 0002 -03 -026
2013 Chatham County Board of Assessors
Property Record Card
Page 1 of 3
4- 0002 -03 -026
3 WILSON AVE TYBEE ISLAND
APPRAISER MWTHOMAS
LAST INSP 04/14/2011
APPR ZONE 000008
LOT LETTERS B, C & G SUB OF LOT 5 BLOCK 1 TYBEE FORTWD PRB 42P
13
HOSTI SHARON F
PO BOX 531
TYBEE ISLAND GA 31328-
0531
CAMA ASMT
142,700 142,700 LAND 2
128,100 128,100 BLDG 2
600 600 OBXF 1
271,400 271,400 Cost -
MS
SALES
BOOK / INS VI QU RSN PRICE
PAGE
COMMENTS:
23 Sep 2011
TY2012 E &R 2011 TO APPLY
HS
13 Apr 2011 TY2011 NEW PIN;
COMBINATION OF 4 -0002 -03-
(006 & 023) OWNERS
REQUEST
EXTRA FEATURES
ID# BLDG # SYSTEM DESC
179539 Lw Cpt Flat /Shed Rf
[Click for larger picture]
a SAG'S,,,
CODES
PROPERTY
USE
UTA
NBHD
0006 RESIDENTIAL
0004 Tybee Island
020270.00 T270 TYBEE
SCREVEN
EXEMPTIONS L1 L9 S1 L8
HISTORY LAND IMPR TOTAL
2012 160,900 126,100 287,000 Cama
2011 211,400 87,200 298,600 Cama
2011 211,400 87,200 298,600 Cama
DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE
20 20 400.00 L 7.00 2,800 1990 1990 2R 560 600
LAND
ID# USE DESC
139359 SINGLE FAMILY RES
139360 SINGLE FAMILY RES
FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
0 0 7,000.00 -SF 19.00 R1 133000
2,047.00 -SF 19.00 SZ -75 9700
7Zo yx4A7:6,g4;niz
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 1/31/2014
Chatham County Board of Assessors: 2013 Property Record Card 4- 0002 -03 -026 Page 2 of 3
2013 Chatham County Board of Assessors
Property Record Card
4- 0002 -03 -026
3 WILSON AVE TYBEE ISLAND
BUILDING SECTION
109151 -1 -2013
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 125,008 1983 1990 MS 23.00 0.00 0.00 0.00 23.00 96,256 105,900
32
[Click for larger picture]
RRO6
SECTION TYPE 1 - Main
AREA 1560
TYPE 1 - Single- family Residence
FRAME 1 - Stud Frame
STYLE 1 - One Story
QUALITY 3.00
CONDITION 3.00
# UNITS 0
# OF BEDS / BATHS 3 /2.00
COMPONENTS Units % QUAL
R1 108 Frame, Siding, Wood 100.00
R2 208 Composition Shingle 100.00
R3 352 Heat Pump 100.00
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #) 8.00
R6 602 Plumbing Rough -ins ( #) 1.00
R6 622 Raised Subfloor (% or SF) 100.00
R11 904 Slab Porch (SF) with Roof 32.00
R11 904 Slab Porch (SF) with Roof 40.00
R11 909 Enclosed Porch (SF), Solid Walls 80.00
http: //boa.chathamcounty. org/DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 1/31/2014
Chatham County Board of Assessors: 2013 Property Record Card 4- 0002 -03 -026 Page 3 of 3
2013 Chatham County Board of Assessors
Property Record Card
4- 0002 -03 -026
3 WILSON AVE TYBEE ISLAND
BUILDING SECTION
109163 -1 -2013
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 38,117 1980 MS 47.00 0.00 0.00 0.00 47.00 20,202 22,200
20 ' • 100 2
Base Living Area Slab Po
480
24 '
h Roof
[Click for larger picture]
SECTION TYPE 1 - Main
AREA 480
TYPE 1 - Single- family Residence
FRAME 1 - Stud Frame
STYLE 1 - One Story
QUALITY 2.00
CONDITION 3.00
# UNITS 0
# OF BEDS / BATHS 1 / 1.00
COMPONENTS Units % QUAL
R1 107 Frame, Siding, Vinyl 100.00
R2 208 Composition Shingle 100.00
R3 309 Forced Air Furnace 100.00
R4 402 Automatic Floor Cover Allowance
R5 502 Automatic Appliance Allowance
R6 601 Plumbing Fixtures ( #) 5.00
R6 602 Plumbing Rough -ins ( #) 1.00
R6 621 Slab on Grade (% or SF) 100.00
R11 904 Slab Porch (SF) with Roof 80.00
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 1/31/2014