Loading...
HomeMy Public PortalAboutSEVENTH ST_6tL F 4167- City`of Tybee Island • Planning & Zoniny Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472.5032 • Fax 912.786.9539 Permit No. / 3 " X1 2 / Date Requested Owner's Name ;' ` Date Needed G' - ) /13 is1a..- sanallk INTERNATIONAL CODE COUNCIL MEMBER Gen. Contractor r/<)41- err y Subcontractor ` 0/7/ -5 ( 7- ia2 e Contact Information Project Address S N/ Scope of Work D %!a/ LL / X/1/3aLA -1 /04 Inspector Date of Inspection Inspection Pass 4=l Fail El Fee .tlD Gvn,L eode.ot's Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 02 -25 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT R &R DRYWALL CEILING/INSULATE 6 SEVENTH ST — PIN #4- 0005 -09 -003 W. & P. PERSSE 346 OXFORD DR SAVANNAH GA 31405 -5467 FIRST CITY ENTERPRISES PO BOX 1016 TYBEE ISLAND GA 31328 P $ 23.00 PROJECT VALUATION $2,500.00 PERMIT #: 130121 TOTAL BALANCE DUE: $ 23.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org J3 -oia Property Address: City of Tybee Island, Georgia 912- 472 -5033 or 912 - 472 -5031 - Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT 6 7 Slke:2-:r- Single Family ❑ Duplex ❑ Multi - Family units ❑ Commercial units Details of Project: (Check all that apply) ❑ Discovery /Tearout ❑ Footprint Changes — new square feet heated /cooled ❑ Demolition of Structure El Other en/QAD,QCQc )GCQ)� > %Q 0Al4S1 /a � f644,4 atem Estimated Cost of Construction: $ j0a_ 00 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site ro acilities will be provided through 0 , . Construction debris will be disposed by by means of W! . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by t 's permitted constr tio, Date: - 25 13 Signature of Applicant: Printed Name Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager 1"5"1" Signatures � Date 2.25 -1.5 Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. FEES ,73, 00 cLs ery sr — So I3 -oo TOTAL Sir 02,3 , 0 0 Name I? rsse Mailing Address Telephone Owner FAT 2,1ClP, `12XSSQ._, Home: Cell: Architect or Engineer Contractor �)(LS� Ci 1 IatiDY/ ' P.., 0 ..e `Joi (0 U �QQ�11 6 Office50'7-70Z12 Cell: Single Family ❑ Duplex ❑ Multi - Family units ❑ Commercial units Details of Project: (Check all that apply) ❑ Discovery /Tearout ❑ Footprint Changes — new square feet heated /cooled ❑ Demolition of Structure El Other en/QAD,QCQc )GCQ)� > %Q 0Al4S1 /a � f644,4 atem Estimated Cost of Construction: $ j0a_ 00 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site ro acilities will be provided through 0 , . Construction debris will be disposed by by means of W! . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by t 's permitted constr tio, Date: - 25 13 Signature of Applicant: Printed Name Note: A permit normally takes 7 to 10 days to process Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager 1"5"1" Signatures � Date 2.25 -1.5 Permit Inspections Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. FEES ,73, 00 cLs ery sr — So I3 -oo TOTAL Sir 02,3 , 0 0 LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http:// www. gaswcc .org /docs /field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or woo • • •sts, post spacing, Ty. - C or A. idiJa PA\ gnature for r ' eipt o Le. Writ, Asbestos, and BMP notices. Rfp- TillAPAS Printed Name 15 ate :hatham County Board of Assessors: 2 2 Property Record Card 4- 0005- 09 -00" !012 Chatham County Board of Assessors ' roperty Record Card APPRAISER LESTEPH AST INSP 06/17/2010 \PPR ZONE 000008 Page 1 of 4- 0005- 09 -0W 6 7TH ST TYBEE ISLANE CAMA ASMT 433,000 850,000 LAND 2 86,200 87,900 BLDG 1 12,100 12,100 OBXF 4 531,300 950,000 OVERRIDE PTS OF LOTS G1 + G2 WARD 2 TYBEE ISLAND PERSSE PATRICIA AS TRSUTEE ET AL* 346 OXFORD DR SAVANNAH GA 31405 -5467 ;ALES BOOK / INS VI QU RSN PRICE PAGE 9 Oct 2007 333F 0163 NA I U UR GRANTOR:PERSSE PATRICIA AS TRSTE* GRANTEE:PERSSE PATRICIA AS TRSTE* 17 May 325H 0549 NA I U UE !007 GRANTOR :PERSSE WINNIFRED ET AL* GRANTEE :PERSSE PATRICIA AS TRSTE* 12 Jan 2004 264B 0159 NA I U UG GRANTOR:PERSSE WINNIFRED ET AL GRANTEE:PERSSE PATRICK J ET AL 1 Jan 2003 246J 0427 NA I U UG GRANTOR:PERSSE WINNIFRED ET AL GRANTEE :PERSSE WINNIFRED ETAL '.0 Dec 244S 182 NA I U UG !002 GRANTOR :PERSSE WINNIFRED ET AL GRANTEE:PERSSE WINNIFRED ET AL 'ERMITS TYPE DATE AMOUNT 100010 RF 17 Jun 2010 Comp 4,000 )90203 GM 03 Feb 2010 Comp 1,800 ;OMMENTS: 13 Aug 2010 )5 Jan 2010 16 Nov 2007 )5 Sep 2007 ?9 Jun 2004 )4 Feb 2004 TY11 361N/787: 1% INT GIFT DEEDED FM PATRICIA TO PATRICK (SEE DEED FOR INTERESTS) TY2010 RET VAL ENT *TY08 PATRICIA (27 %), PATRICK (15.54 %), CECILIA (15.54 %), MARGARET (11.909 %) & TRUST 30% *TY08 TRUST U/W *TY05 SEE DEED FOR INT 264B1596/29/4 MB *PATRICK J PERSSE, CECILIA PER )4 Feb 2004 * TY04 EACH ET AL 2/55 INT CORR GIFTDEED 263N360 2/4/4 MB 13 Aug 2003 STIN UNDIVIDED (2/55) 244S182 TY04 SEE DEED FOR INT 246J427 25 Feb 2003 SSE AUBLE & MARGARET PERSSE AU [Click for larger picture] 0q- 0213 �'.c Chatham Cour~ty lax Commissioner +rte, i+�� , (: -,- r goo I0•DO10 9owe, 13-0044 loo boo° 13- 2, Soo g/5 MAO IQ(09 se rJ.CC p9ra.ck' r.roo CODES PROPERTY 0006 RESIDENTIAL USE UTA NBHD EXEMPTIONS 0004 Tybee Island 020213.00 T213 TYBEE BTL BEACH HISTORY LAND IMPR TOTAL 2011 850,000 100,000 950,000 2010 914,700 100,000 1,014,700 2010 850,000 100,000 950,000 2009 1,732,500 108,500 1,841,000 2009 1,296,750 108,500 1,405,250 2008 1,732,500 112,500 1,845,000 2008 1,841,000 2007 806,500 120,500 927,000 2006 806,500 120,500 927,000 2005 927,000 2004 425,000 125,000 550,000 2003 425,000 125,000 550,000 2002 550,000 2001 228,000 80,500 308,500 2000 228,000 74,500 302,500 1999 184,000 80,500 264,500 1998 184,000 81,000 265,000 1997 261,500 1996 66,840 86,820 153,660 1995 66,840 110,780 177,620 1994 66,840 91,010 157,850 1993 66,840 67,160 134,000 1992 66,840 67,160 134,000 Over Cam Over Over Over Cam( NC Over Over A/C Over Over NC Cam. Cam. Cam. Cam NC Cam. Cam Cam Over Over XTRA FEATURES D# BLDG # SYSTEM DESC 137841 85085 WOOD DECK AV 137842 85085 Solid Wall /Slab AV 137843 85085 AV CPT FLAT /SHED RF 137844 85085 Roof Scr Por /Slab AV DIM 1 DIM 2 UNITS QL UNIT PRICE 0 0 184.00 A 10.76 0 0 96.00 A 31.62 0 0 361.00 A 8.43 0 0 544.00 A 18.40 RCN AYB EYB DT ECON FUNC SP SP% RCNLD 1,980 1985 1985 2R 396 3,036 1985 1985 IR 2,216 3,043 1985 1985 IR 2,221 10,010 1985 1985 IR 7,307 MKT VALUE 400 2,200 2,200 7,300 AND D# USE DESC 109402 SINGLE FAMILY RES FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 0 0 8,000.00 -SF 40.00 R2 320000 ittp: //boa. chathamcounty. org /DesktopModules /ChathamCounty/ BoardofAssessors /PronertvRecordCard.asp... 2/25/20: Chatham County Board of Assessors: ' ' 2 Property Record Card 4- 0005 -09 -0C Page 2 of 1109403 SINGLE FAMILY RES 0 0 5,650.00 -SF 40.00 R2 RE -50 113000 httn: //boa. chathamcounty .ors? /DesktonModules/ ChathamCountv / BoardofAssessors /PronertvRecordCard.asp... 2/25/20 Chatham County Board of Assessors: ' 2 Property Record Card 4- 0005- 09 -0C" 2012 Chatham County Board of Assessors Property Record Card Page 3 of 4- 0005- 09 -00. 6 7TH ST TYBEE ISLANC BUILDING SECTION (CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL 85085-1-2012 'Residential 118,142 1967 1985 MS 27.00 0.00 0.00 0.00 27.00 86,244 86,200 ■ SPO Sacco Pori Gbh 96 111 SNP Solid Nall Porch 96 28' ■won . 7_' Wood Deck'.. 28' az STO Srne. Porch Wh ▪ WOO Weed Deck 65 • OPEN °pr. Arca 13' 65 13' a' • SPo r4 1 , Sc,,,. Porch (July ■ 100 Oil .X. 21' ■WOD W■.d neck 00 ■ OPEN OPe. Are. Si 35' [Click for larger picture] SECTION TYPE 1 - Main AREA 1867 TYPE 1 - Single- family Residence FRAME 1 - Stud Frame STYLE 2 - Two Story QUALITY 3.00 CONDITION 3.00 # UNITS 0 # OF BEDS / BATHS 3/ 3.00 COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 351 Warmed & Cooled Air R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 621 Slab on Grade (% or SF) R6 642 Single 2 -Story Fireplace ( #) Units % QUAL 100.00 100.00 100.00 11.00 1.00 1.00 100.00 httn: //boa.chathamcounty. ore /DesktopModules /ChathamCounty/ BoardofAssessors /PronertvRecordCard. asn... 2/25/201