Loading...
HomeMy Public PortalAboutVENETIAN DR_1308.pdfDATE ISSUED: 10 -29 -2013 WORK DESCRIPTION WORK LOCATION CITY OF TYBEE ISLAND BUILDING PERMIT REROOF HOUSE & SHED 1308 VENETIAN OWNER NAME PATRICIA C. CULLUM ADDRESS PO BOX 7901 CITY, ST, ZIP WESLEY CHAPEL FL 33545 -0106 PHONE NUMBER CONTRACTOR NAME ACE ROOFING & REMODELING INC ADDRESS 5256 HWY 80 E CITY STATE ZIP ELLABELL GA 31308 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 80.00 PROPERTY IDENTIFICATION # 4- 0011 -03 -018 PROJECT VALUATION $4,000.00 PERMIT #: 130681 TOTAL BALANCE DUE: $ 80.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: O.A.D Obb P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 2013 -10 -23 09:19 ACE ROOFING 9127283945 :--> 9127869539 13-b logo Property Address: ► 1/1 ` �- PIN: 'D�if o� � -0/ P 1/1 City of Tybee island, Georgia 912 -472 -5030 Fax 912 -786 -9539 APPLICATION FOR BUILDING PERMIT .- Single Family ID Duplex ❑ Multi - Family units ❑ * Commercial unit(s) Check au that apply ❑ Discovery/Tearout ❑ Footprint Changes d ._,__ _ additional square feet heatedlcooled ❑ Demolition or Relocation ❑ Other A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license_ A commercial project may require Site Plan Approval. Details of Project: _X \ CA-C Y('•' S �( _ Jr k4 c r ' Puce l Cs - - - C.st-- , - . f i t z : i Id, 0 - 1 1 1 1 iy j. "-1:sec ,•I': -i;� ✓I 4 y -V• • e- • S 7 1 .CVC_ /OC Eat o nstruction: $ j C� � • (materials + labor + profit/overhead) `� T ],— - J v If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required_ Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site est�jm facilities will be provided throug Construction debris will be disposed by YVC'k by means of �I understand that I must comply with pning, do i damage control, buildingJire, shortorotectlon and wetland ordinances. FEMA regulations and_all applicable codes and regulation. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this perm =d construction, Date: 10.013) 13 Signature: Printed Name of Applicant: Note: A permit normally takes 7 to iQ fivs to vtess Prncesslna time for a historic structtre may be longer Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager • Signatu 9_Mw t FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const_ TOTAL «ID Name Mellin • Address Tele • hone Owner r� 11 �� r 13. 1 1 y ‘ ` Home: Cell:. 13 - f 100 Architect or Engineer �� • Office: Cell: Contractor A\C- 1 C `c3 1G \'\o\\9 C;lC\e 3 7`-1 Cell: La Ca 1 .- Single Family ID Duplex ❑ Multi - Family units ❑ * Commercial unit(s) Check au that apply ❑ Discovery/Tearout ❑ Footprint Changes d ._,__ _ additional square feet heatedlcooled ❑ Demolition or Relocation ❑ Other A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license_ A commercial project may require Site Plan Approval. Details of Project: _X \ CA-C Y('•' S �( _ Jr k4 c r ' Puce l Cs - - - C.st-- , - . f i t z : i Id, 0 - 1 1 1 1 iy j. "-1:sec ,•I': -i;� ✓I 4 y -V• • e- • S 7 1 .CVC_ /OC Eat o nstruction: $ j C� � • (materials + labor + profit/overhead) `� T ],— - J v If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required_ Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site est�jm facilities will be provided throug Construction debris will be disposed by YVC'k by means of �I understand that I must comply with pning, do i damage control, buildingJire, shortorotectlon and wetland ordinances. FEMA regulations and_all applicable codes and regulation. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this perm =d construction, Date: 10.013) 13 Signature: Printed Name of Applicant: Note: A permit normally takes 7 to iQ fivs to vtess Prncesslna time for a historic structtre may be longer Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager • Signatu 9_Mw t FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const_ TOTAL «ID 2013 -10 -23 09:05 ACE ROOFING 9127283945 » 9127869539 P 1.1 LEAD - BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right Important Lead Heard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 8 ft2 per Interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. Asbestos /Environmental Notification to Georgia EPD for Projects Involvine Demolition, Wreckin �t' QVation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owners representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger, Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fail over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. ■ t r) Sig and ure for receipt a Lead !Paint, Artie BMP notices Y‘ \tL Z� l Printed Name } / I P31.1 Date Chatham County Board of Assessors: 2013 Property Record Card 4- 0011 -03 -018 2013 Chatham County Board of Assessors Property Record Card Page 1 of 2 4- 0011 -03 -018 1308 VENETIAN DR TYBEE ISLAND APPRAISER ALCUMMIN LAST INSP 12/29/2011 APPR ZONE 000008 LOTS 360A, 360 & PT OF LOT 333 WARD 4 TYBEE CULLUM PATRICIA C 81 SHIPWATCH RD SAVANNAH GA 31 41 0 -291 7 CAMA 215,800 76,200 19,600 311,600 ASMT 215,800 76,200 19,600 311,600 LAND 3 BLDG 1 OBXF 7 Cost - MS SALES 01 Jun 1986 GRANTOR: GRANTEE: BOOK/ INS VI QU RSN PRICE PAGE I U U7 45,000 PERMITS TYPE DATE 080508 11 -0189 080508 020420 RF RN AMOUNT NaN 29 Dec 2011 Comp 1,300 27 Apr 2010 Comp 1,500 13 Jan 2003 Comp COMMENTS: 22 Jan 2010 19 Mar 2001 12 Mar 2001 TY2010 RET VAL ENT 3/19/2001 SPLIT COMPLETE. VM. 2001 NEW PIN; COMBINATION OF 4- 11 -3 -3 4- 11 -3 -14 PER APPR REQUEST 3/12/01 [Click for larger picture] SAG IS -.+ atham County Tax Commissioner p Property Tax Statement CODES PROPERTY 0006 RESIDENTIAL USE UTA 0004 Tybee Island NBHD 020222.00 T222 TYBEE HORSE PEN EXEMPTIONS HISTORY LAND IMPR TOTAL 2012 328,700 90,400 419,100 Cama 2011 328,700 108,000 436,700 Cama 2010 434,200 108,000 542,200 Cama 2009 620,500 96,500 717,000 Over 2009 532,000 96,500 628,500 Over 2008 620,500 96,500 717,000 Cama 2007 531,500 96,500 628,000 Cama 2006 394,000 96,500 490,500 Cama 2005 159,000 114,000 273,000 Over 2004 159,000 114,000 273,000 Over 2003 273,000 NC 2002 213,000 NC 2001 118,000 95,000 213,000 Cama EXTRA FEATURES ID# BLDG # SYSTEM DESC 140852 86568 KNEE WALL /GLS/SLAB 140853 86568 2 "Decking /w post,pi 140854 140855 140856 140857 140858 86568 86568 86568 86568 86568 SITE VALUE OPEN SLAB AV Av Cpt Gable Rf Av Det Gar CBI 2 "Decking /w post,pi Dock roof MTL DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT 12 20 240.00 A 28.44 6,826 1990 1990 IR 73 6 438.00 A 23.55 10,315 1990 1990 2R 11 17 187.00 A 4.16 778 1990 1990 IR 22 24 528.00 A 12.43 6,563 2000 2000 6R 12 20 240.00 A 23.07 5,537 1990 1990 6R 12 10 120.00 A 23,55 2,826 1990 1990 2R 12 10 120.00 A 6.10 732 2008 2008 ECON FUNC SP SP% RCNLD 5,256 2,063 MKT VALUE 5,300 2,100 599 600 5,907 5,900 4,430 4,400 565 600 732 700 LAND ID# 111185 111186 111187 USE DESC MARSH VIEW MARSH VIEW MARSH VIEW FRONT 0 0 0 DEPTH 0 0 0 UNITS / TYPE 4,500.00 -SF 4,250.00 -SF 1.00 -G PRICE 38.00 38.00 70000.00 ZONING R2 R2 R2 LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE V50 135900 SZ -50 42800 37100 i/- aIiq 1 a i2h V-Adzy 41, 300 http: //boa. chathamcounty. org/DesktopModules/ ChathamCounty /BoardofAssessors /Prope... 10/23/2013 Chatham County Board of Assessors: 2013 Property Record Card 4 -001 L -03 -018 Page 2 of 2 2013 Chatham County Board of Assessors Property Record Card 4- 0011 -03 -018 1308 VENETIAN DR TYBEE ISLAND BUILDING SECTION 86568 -1 -2013 CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL Residential 123,754 1990 MS 23.00 0.00 0.00 0.00 23.00 95,291 76,200 [Click for larger picture] HOUSE ENCROACHED ON REAR PARCEL; BACK PARCEL WAS $30,000 APPLIED 25% DISC TO REAR PARCEL ONLY ON COMBINATION; TOTAL LAND VALUE $59,000; CJ ON REAR PARCEL $22,500. VM. SECTION TYPE 1 - Main AREA 1659 TYPE 1 - Single- family Residence FRAME 1 - Stud Frame STYLE 1 - One Story QUALITY 3.00 CONDITION 3.00 # UNITS 0 # OF BEDS / BATHS 3 / 2.00 COMPONENTS Units % QUAL R1 108 Frame, Siding, Wood 100.00 R2 208 Composition Shingle 100.00 R3 352 Heat Pump 100.00 R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) 8.00 R6 602 Plumbing Rough -ins ( #) 1.00 R6 621 Slab on Grade (% or SF) 100.00 R11 904 Slab Porch (SF) with Roof 85.00 http: //boa. chathamcounty .org/DesktopModules/ ChathamCounty /BoardofAssessors /Prope... 10/23/2013 10/29/2013 11:31 9127866538 it.),,D -2 0+4 ■-,L Date: TYBEE ISL HIST SOC City of Tybee Island PLANNING AND ZONING P.O. Box 2749 - 403 Butler Avenue, iybee isIanc, Georguti8i4-2741i (912) 412-5030 - FAX (912) 786,9539, WWW .cityoftybee .org PAGE ( FAX TRANSMITTAL SHEET October 23, 2013 Number of Pages Including Cover Sheet! 5 ro: Mr. Cullen Chambers Organizattorr: Tybee Island historic Preservation Commission FilA Number: 786-6538 From: -ferns Bryant Administrative Assistant Phone Number: 912-472-5033 62„,a4pt NOTICE OF APPLICATM Oetaiis of Project: Peroof Date Application Recetved: October 23, 2013 Name of Applicant: Phone Number: Location of Structure: Response Deadline: Response Deadline: X its 0- Zi Atr a -1 )4 pet i77 3 'Y leA Frank Cullum 912-313-1100 1308 Venetian Dr. • 04 (45 calendar days - demolition or reloixition) (14 business days - building permit) dr?-' /9"zi-r-4-16) CA' 4-) Fax Transmission Result Repo. Page [1] of [1] Date /Time 10 -24 -2013 10:46 AM Model Name CLX -9352 Machine Serial Number Z94UB1ED500022H Linel City of Tybee Linel Name 9127869539 Line2 is not available Line2 Name is not available Job Destination Start Time Duration Mode Job Type Page User Result 910 Historic Preservati 10 -24 -2013 10:32 14'39" ECM H -Tx 5/5 LocalUser OK on Commission/78 AM 66538 City of Tybee Island PLANNING AND ZONING P.O. Box 2749 - 403 Buffer Avenue, Tybee Island, Georgia 31329-2749 (912) 472-5030 - FAX (912) 786 -9539 www.cltyoftybce.org FAX TRANSMITTAL SHEET Date: October 23, 2013 Number of Pages Including Cover Sheet: 5 To: Mr. Cullen Chambers Organization: Tybee Island Historic Preservation Commission Fax Number. 786-6538 From: Jerris Bryant 6404t luln -- a:Az .a ' Title: Administrative Assistant 111 16. Phone Number. 912- 472 -5033 l/ NOTICE OF APPLICATION Details of Project: Reroot Date Application Received: October 23, 2013 Name of Applicant: Frank Cullum Phone Number: 912 -313 -1100 Location of Structure: 1308 Venetian Dr. Response Deadline: (45 calendar days - demolition or relocation) Response Deadline: X (14 business days - building permit) H -Rx: Host Rx H -Tx: Host Tx M -S: Memory Save P -Rx: Poll Rx D -Tx: Delay Tx S -Rx: Secure Rx P -Tx: Poll Tx BC -Tx: BroadCast Tx