Loading...
HomeMy Public PortalAbout020_051_CIP RESTROOM UPGRADES CIP RESTROOM UPGRADES 1.) Memorial Park — Current square footage is 418 ft. We can extend it by 200 square foot by adding on to the north side which would give us 3 more stalls in each restroom. With the extension and upgrades: $30,000 (In house — Contracted - $60,000) 2.) J. C. Park — By utilizing the old concession stand we can turn the current men and women's to just men's. We can add 4 stalls in the old break room which would double the capacity for both. We would leave the current handicapped restroom for both. With the upgrades and modification: $25,000 (In house — Contracted - $ 60,000) The Memorial Park extension would involve footing, block work, and 6 new fixtures. The J.C. Park would not involve as much construction but would be more involved as far as plumbing and sealing window casings. • These prices are based on current material costs and could fluctuate.