HomeMy Public PortalAbout020_052_CIP SOUTHEND DRAINAGE UPGRADES CIP SOUTHEND DRAINAGE UPGRADES
1.) 3 — 18" TIDE-FLEX VALVES @ $6,000/EA = $18,000
2.) 14TH & CHATHAM DRIANAGE TO INCLUDE:
a) 160 ft. of 18" pipe
b) 2 3x3 catch basins
c) 2 4x4 grates
d) 20 tons of stone = $3,100
Total = $21,100
This should complete the master plan for the south end of the
island with the exception of Inlet Avenue which due to
fluctuating tides, shifting sand, outfall elevation, and extensive
costs cannot be addressed at this time.