Loading...
HomeMy Public PortalAbout020_053_CIP 6 YEAR ROAD PAVING CIP 6 YEAR ROAD PAVING 2014 $50,000 plus $25,000 LMIG = $75,000 a) Veterans Drive 530 ft $10,600 b.) Chatham Ave. 2,000 ft $40,000 c.) Venetian Dr. 1,100 ft $22,000 Total = $72,600 2015 $70,000 plus $25,000 LMIG = $95,000 a.) 12th st. (Jones — Ven.) = $23,000 b.) Butler Ave (16th — 19th) = $32,000 c.) 7th st. 1850 ft = $37,000 d.) 18th 650 ft = $13,000 Total = $105,000 2016 $70,000 plus $25,000 LMIG = $95,000 a.) Lovell Ave (4th — Butler) = $26,000 b.) 7th Ave 1000 ft = $20,000 c.) 5th Ave 2100 ft = $42,000 Total = $ 88,000 2017 $70,000 plus $25,000 LMIG = $ 95,000 a.) 17th St 1260 ft = $25,200 b.) 13th St 1700 ft = $34,000 c.) Lewis Ave 2300 ft = $42,000 Total = $ 101,200 2018 $70,000 plus $25,000 LMIG a.) Miller Ave 3650 ft = $73,000 b.) 4th St 900 ft = $18,000 Total = $ 91,000 2019 $70,000 PLUS $25,000 LMIG a.) Laurel Ave 1050 ft = $ 21,000 b.) 2nd St 1100 ft = $ 22,000 c.) Taylor 1100 ft = $ 22,000 d.) Fort St 1200 ft = $ 24,000 e.) Polk St (Fort St — Bay) = $ 12,000 Total = $ 101,000 • These quotes were made from the current asphalt prices and current funding from GADOT and are subject to future changes.