HomeMy Public PortalAbout100_013_In pavement traffic counter construction summary worksheet SOUTHERN TRAFFIC SERVICES
CONSTRUCTION SUMMARY WORKSHEET
02/11/2014
City of Tybee
US 80 at Lazaretto Bridge
Cabinet will be located on the South Side of Roadway behind the Existing Guardrail at 12'fro'
Build 2 lanes of Loop Loop with New Type III Cabinet, 15' Pelco Pole, 100 Watt Solar Panel, I
Peek 3000 4 Loop Board, 10" Rack System, Sierra Wireless Verizon XP Modem, Cables, An
Lane 1 L1-320 T1 320
Lane 2 L2-330 T2-330
Lane 3
Lane 4
Install 2 Loops in each Lane
Install Quazite Pull Box
Install Concrete Foundation, 15' Pelco Pole, Breakaway Base,
Install Type III Controller Cabinet with Back Plane for Loops, Surge Protection
Install 100 Watt Solar Panel with cables
Install 100 Amp Hour Battery
Install 1 Peek 3000 10 inch Rack Loop Loop
Sierra Wireless XP Modem
STS will provide all documentation for Traffic Interruption Report, Encroachment Permit, Utilit
Site Plans, Design Programs, Uniform Equipment Paperwork, and Provide Training for City o
Polling, Troubleshooting, and Set Up of Peek Counter, and Sierra Wireless Program
City of Tybee will provide Blue Light Police Service for duration of In Road Activity to Support
City of Tybee will provide a City Owned Laptop/ Desktop for Training of ATR/ Modem Access
City of Tybee will provide to Southern Traffic Service the Verizon Plan for Modem Setup
City of Tybee will be responsible for Wireless Modem Usage Plan
STS will provide a 1 year warranty for all work related installations
m EOP
Battery
tenna
y Locate
f Tybee Island for
STS MOT