Loading...
HomeMy Public PortalAbout11-0681 WilliamsMAYOR Jason Buelterman CITY COUNCIL Wanda Doyle, Mayor Pro Tem Barry Brown Jan Fox Bill Garbett Tom Groover Paul Wolff September 6, 2013 Mr. and Mrs. Ken Williams 116 Evergreen Drive Dawsonville, GA 30534 Reference: Permit #11 -0681 Dear Mr. and Mrs. Williams: IED WOO CITY OF TYBEE ISLAND CITY MANAGER Diane Schleicher CITY CLERK Janet LeViner CITY ATTORNEY Edward M. Hughes On December 28, 2011, Planning and Zoning issued a building permit to renovate the kitchen and bath at 1217 Bay Street, Unit 218B. We were not contacted by you or your contractor that this project has been completed. In an attempt to close out this file, we need you to contact our office about setting up a final inspection. Please call me at 912 - 472 -5033. Thank you in advance. Sincerely, Jerris A. Bryant Administrative Assistant a -o_( -∎4 esp e 0.e_ -ct Dk/V- \e5 P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (866) 786 -4573 — FAX (866) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE & VALUE DATE ISSUED: 12/28/2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION ADDED $1,000 FOR ELECTRICAL RENOVATE KITCHEN & BATH 1217 BAYST218B KEN & CAROL WILLIAMS 116 EVERGREEN DR DAWSONVILLE GA 30534 770 - 503 -5683 KEN CELL THD AT -HOME SERVICES INC 2690 CUMBERLAND PKWY STE 300 ATLANTA GA 30339 P $ 105.00 $7,500.00 PERMIT #: 110681 TOTAL BALANCE DUE: $ 8.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: (CA P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org DATE ISSUED: 12 -19 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT RENOVATE KITCHEN & BATH 1217 BAY ST 218B KEN & CAROL WILLIAMS 116 EVERGREEN DR DAWSONVILLE GA 30534 770 - 503 -5683 KEN CELL THD AT -HOME SERVICES INC 2690 CUMBERLAND PKWY STE 300 ATLANTA GA 30339 P $ 97.00 $6,500.00 PERMIT #: 110681 TOTAL BALANCE DUE: $ 97.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 12- 15- 11;10:41 ;From: To:19127869539 # 2/ 13 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: /Z/ 6747 - r �/8 PIN # 54V4A/A44H' ,e ASH C•VIS NAME ADDRESS TELEPHONE Owner Coo 4N/ eel/ t , /2/7 a4' S'rt'07 UNi - : M 5� 89S 5D3 56 �3 Architect or Engineer /I /4 /16 ev6.e4oce n/ P4. .�}wsc9n/✓i44Ci 64 3053¢ Building Contractor , / / /4L f6 DCPor /90/ 4S 7 0e, ro,¢ y . ,5¢4¢,1./,✓,#J 6.4 �/2 36• - 356 (Check all that apply) Repair Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: Wiry ■941,,✓r EB,,JergeW MC EE$: £e tW,A1G 1 Estimated Cost of Construction: Residential Single Family ❑ Duplex EMulti - Family Commercial . ,PekadE ❑ Footprint Changes ❑ Discovery Demolition at.lt 4tys7 ,4 4.4,e /a,e'7 4i1/ AgASe 8.0.405 1ALa AND ,Qe ,oz e / AI . i r fwd 8.4 rW SINKS 4''O 73 i1- &r, $ (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry Construction Type (l ) (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed usc: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms # Bathrooms Living space (total sq. ft.) With culvert? With swale? Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. 12- 15- 11;10 41 ;From: To:19127869539 # 3/ 13 During construction: On -site restroom facilities will be provided through 7:;/L-J r L,/iac. , g__,4 ��Le.Q,,utvE�TEb On -site waste and debris containers will be provided by awAteAs - its tr/jk 'L /Ze,p 441y,,e Construction debris will be disposed by tWA/ S by means of iir_ead (.7_ ,cLome 77 to'- 1 . L.ANo� /LL. I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. —�L� Date: /c„...,061 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? NFIP Flood Zone Existing FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Signature Date FEES Permit 7 Inspections a 1 Water Tap Sewer Stub Aid to Const. TOTAL 12- 15- 11;10 41 ;From: To:19127869539 # 1/ 13 TURN KEY, NRY •`•'.! PO Box 2070 Covington, GA 30015 770 -717 -9625 Fax: 770 -717 -9628 Trey Long, President Ken Williams, Vice President- Operations .See us on the web at: www.tlwmasonry.com FAX To: Tybee Building Permits From: Ken Williams Fax: Phone: Re: 912 786 9539 912 786 4573 Cabinet Reno - Permit -c12 /� i`10 .,ti�7,�a ��t, a�a1 Comments: Tybee Permit Office, Following, please find an application for a building permit to repo cabinetry at 1217 Bay Street, Unit 218B of Savannah Beach and Racquet Club. I am wondering. I was told the permit was required due to the plumbing and electrical reconnections associated with this cabinet renewal. Will the plumber need to pull a permit as well or will he be covered under the permit that we are pulling? I know of no need to involve an electrician. Appliances will be unplugged and new ones plugged -in. The new range came with an adapter for the old receptacle. Please advise in that regard. There will also be additional reno that I was told would not need to be included in the permit but that we do want to make you aware of. We will be repainting the unit, replacing existing carpet with a vinyl laminate flooring, and replacing baseboards and adding shoemould to finish the new flooring installation. I think that is all I have for now. Please issue a permit for us. If you need any other information, please call Ken Williams at 770 503 5683. Thanks. With Kindest Regards, Ken Williams i2 /R gi3o C,ii; „f z „ � 7;v