HomeMy Public PortalAboutVAN HORN ST_78.pdfDATE ISSUED: 11 -4 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
CITY OF TYBEE ISLAND
BUILDING PERMIT
INSTALL SIGN
78 VAN HORN -TIPD
CITY OF TYBEE
PO BOX 2749
TYBEE ISLAND GA 31328 -2749
ELKINS CONSTRUCTORS, INC
7 E. CONGRESS STREET
Savannah GA 31401
P
$ 0.00
4- 0021 -06 -002
PROJECT VALUATION $ 500.00
PERMIT #: 130692
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
& Art
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
13 -06102-
Property Address: 7 14^' /7/0,¢x✓
City of Tybee Island, Georgia
912 - 472 -5033 or 912 - 472 -5031 • Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
PIN: 14 -- 0 2 - 0 (A
El Single Family
❑ Duplex
❑ Multi - Family units
❑ Commercial unit(s)
Check all that apply
El Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
E. Other i�EL S�j-.i
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
/,.� c
Details of Project:
t/,,f si 7C. A.'2
Estimated Cost of Construction: $ ,Soo (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through �� Construction debris will be disposed
by N- by means of A . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date:
/0
02` i Signature:
Printed ame of Applicant:
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Signatu Date
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
Name
Mailing Address
Telephone
Owner
Ci f/ of 776/ -1:-7 /A-
Home:
Cell:
Architect or
Engineer
6,2,,./ /,.-
/4z cF/,t,c2I,/1
a Y e 35'h Sr u�T
5AVIA/AM hi, GA 3i„of
Office:
Cell: a33 -906"`
Contractor
/A-•'`'5 C°•-- sr'C✓` $
7 (AP- C4.^,j"`SS .s1•: 5 ir� 3-00
SAVA,✓NN`/, e? 4, 3 {1/47/
Office: qtu- ,3s -�'os "�
Cell: /, 2.306 -c9( 3
El Single Family
❑ Duplex
❑ Multi - Family units
❑ Commercial unit(s)
Check all that apply
El Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
E. Other i�EL S�j-.i
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
/,.� c
Details of Project:
t/,,f si 7C. A.'2
Estimated Cost of Construction: $ ,Soo (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through �� Construction debris will be disposed
by N- by means of A . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date:
/0
02` i Signature:
Printed ame of Applicant:
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Signatu Date
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http: / /www.g aswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post e .ng, Type C o
Sign ture for receipt of Lead Paint, Asbestos, and BMP notices
Printed Name
Dat>�
1-0"
CITY OF TYBEE ISLAND
SPLOST FUNDS AT WORK
MIIflhI
TYpEE ISLAND PUDL1C $AF T8,114)1ING1'
Police Department & Municipal Court Facility
( r`?
ELKINS
CONSTR CIORti,
OPENING 2014
,a1111166,_
GREEN '
SN FA\EL
SALE:
GREEN
A4 C1-11TECTU4E
28 E 35TH ST
SAVANNAH, GA 31401
7 912.447.5665
F 912.447.8381
WWW.GREENLINEARCH.COM
CITY OF TYBEE ISLAND
6-1
0
z
(75
0
LT_
0
LOTS 78 & 80 VAN HORNE STREET
TYBEE ISLAND, GEORGIA
0
5
SIGN PANEL
108 NO: 13.013
ISSUE DATE 10/25/2013
DRAWN: DMR
A1.1
o'� 44 �`�
A 91/4
PC' cP
OP eN IT 0
e 4
Pi V
y� E n
CO P13 g ,o
i ICIDIOPO
• 40 rd 0 zi 0
t� E 4) . +2 F-i rr1
a m .--1 O 0
I§ 0 c.; 0 cd t� .0
0 02 o ) •
.• a6 m
}a a 0 • - t 5 O .1-4
E cd o• r orr v
T I cr: .0 o.
H O 4- 'h N Q "CI
W M O a., --4 cd
M m a 0
Q °-t
CD V • v
O O • 4)
{] 0 c.. 4-5
Chatham C
S I SN I \STALLATIO
SCALE: 1/2" = 1'_0"
GREEN L 1 N E
AP C N I r f C T U P E
28 E35TH ST
SAVANNAH, GA 31401
T 912.447.5665
F 912.447.8381
W W W.GREENLINEARCH.COM
CITY OF TYBEE ISLAND
z
C/i
z
0
I..L
0
z
LOTS 78 & 80 VAN HORNE STREET
TYBEE ISLAND, GEORGIA
z
0
7-
1(1
J
z<
CD (I)
JOB NO: 13.013
ISSUE DATE: 10/25/2013
DRAWN: DMR
Al .2
PLYWD SIGN PANEL
r
9
1
WD
O
9
4x4x 12' POST
4'x'1.= �4
r1
Iy
°
-
_ °
d
°III
-III
III-
III
=
I_
1'
1
III
12"
—III
DIA
:
Lt4(N(�
a-n.
s
I_
GONG
t,
-tME#
c
FOOTING
tsc
c'
—III
,�,1.►p
(30,4
1—
III
°
°
°
-III-
=
1
I_
Q
S I SN I \STALLATIO
SCALE: 1/2" = 1'_0"
GREEN L 1 N E
AP C N I r f C T U P E
28 E35TH ST
SAVANNAH, GA 31401
T 912.447.5665
F 912.447.8381
W W W.GREENLINEARCH.COM
CITY OF TYBEE ISLAND
z
C/i
z
0
I..L
0
z
LOTS 78 & 80 VAN HORNE STREET
TYBEE ISLAND, GEORGIA
z
0
7-
1(1
J
z<
CD (I)
JOB NO: 13.013
ISSUE DATE: 10/25/2013
DRAWN: DMR
Al .2
"
G
z
0
ail
rn
rot
5' -O" y
5 61°25'25" tell 343 33
// I
cn <
z
A- I
r
0 o
9NI011ns
3YVdd
9NI011n0
N3018
A801S 380
oI
J
FOR T
,VENUE 60
- - -___ R/11
X21Vd - 900
0380
1N3WdIn03
3NOHd 1133
0380
1N3Y1dIn03
3NOHd 1133
1
waling
N3018 31383NO3
A801S 081
Cad
L
\
l3,ba0 1j
\�/ I J
,3 L�c\
n b a 0
n`r N3018
— 0 1 31383NO3
I III I
] I- 1 8311081 3908010
I L 8311081 30080113
- -- I 83801 3NOHd 1139
j
0380 I
1N3Wd1003
3NOHd 1133
J
3811 533 SI
ONb � 001 �VWS SnON3iYf1N
L
N 51 °35'54" 149.43'
081011ne
83018 31383803
141015 380
J/1/Yd 000
1'
N 57 °51'31" E 280.3'
REVISIONS
SIGN
LOCATION
CITY OF TYBEE ISLAND
NOTIFICATION SIGNAGE
LOTS 78 8, 80 VAN HORNE STREET
TYBEE ISLAND, GEORGIA
z
0
t
D0