HomeMy Public PortalAbout2018-13 Adopting the new Building, Zoning and Planning Fee ScheduleRESOLUTION NO. 2018.13
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, ADOPTING
THE NEW BUILDING, ZONING, AND PLANNING FEE
SCHEDULE; REPEALING THE BUILDING, ZONING, AND
PLANNING FEE SCHEDULE APPROVED BY
RESOLUTION NO. 2017-19; AND PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the Village of Key Biscayne ("Village") adopted its existing Building,
Zoning, and Planning Fee Schedule via Resolution No. 2017-19 ("Fee Schedule"); and
WHEREAS, the Village Council desires to revise the Fee Schedule as reflected in
ExhibitooA" attached hereto and incorporated herein; and
\THEREAS' in accordance with Section 6-3 of the Village Code of Ordinances, the
Village Council held a public hearing on April 10,2018 prior to adopting this Resolution; and
WHEREAS, the Village Council finds that this Resolution is in the best interest and
welfare of the residents of the Village.
NO\il, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS:
Section 1. Recitals Adopted. That each of the recitals stated above is hereby
adopted and confirmed.
Section 2. New Fee Schedule Adonted. That the Fee Schedule is adopted as shown
on Exhibit "A" attached hereto and incorporated herein.
Section 3. Repeal. That Resolution 2017-19, which established the prior Fee
Schedule, is hereby repealed, except that the Fees provided by Resolution 2017-19 shall continue
to apply to all unpaid Fees for services, which were provided pursuant to Resolution20lT-19.
Section 4. Effective Date. That this Resolution shall be effective immediately upon
adoption hereof. However, the fees adopted by this Resolution shall not be imposed until April
23,2018.
PASSED and ADOPTED this 10th day of April, 2018.
MAYRA PENA LINDSA
A
INA,
GE CLERK
APPROVED AS TO FORM AND LEGAL SUFF Ykz>
VILLAGE ATTORNEY
2
EXHIBIT *A"
BUILDING, ZONING, AND PLANNING FEE SCHEDULE
3
VIILAGE OF KEY BISCAYNE
BUILDING, ZONING AND PLANNING
FEE SCHEDULE
Effective: April 23, 2O1 I
TABLE OF CONTENTS
BUtLDtNG FEES.................5
APPLICATION FEES.........
PROCESSING FEE
DRY-RUN /counrrsv REVTEW pRocEssrNc FEE........... ..,............5
EARLY START AUTHORIZATION ...........
PLAN REVTEW FEE (MASTER PERMTT): ...........................ó
PLAN REVTEW FEE (REVTSTONS AND SHOP DRAWTNGS).................... ................ó
DRY-RUN (COURTESY REVTEW) PLAN REVTEW FEE................ .........ó
EARLY COMMENCEMENT PENALTY ........7
voLUNTARy CODE COMpUANCE...................
MISCELLANEOUS PERMIT FEES
PERMIT EXTENSION or PERMIT APPLICATION EXTENSION
PERMIT RENEWAL
BURGLAR ALARM VOUCHER
INSPECTION FEES
{
RE.INSPECTION FEE
RE-INSPECTION FEE
CANCELLATION INSPECTION FOR EXPIRED PERMIT.............
AFTER-HOURS or WEEKEND lNSPECT|ON............
CERTIFICATE OF OCCUPANCY or COMPLETION
CERTIFICATE OF OCCUPANCY or COMPLETION (CO or CC), or PROVISIONAL CO
TEMPORARY CERTIFICATE OF OCCUPANCY or COMPLETION (TCO or TCC):......
OPTIONAL CERTIFICATE OF COMPLETION..........,
OCCUPANCY WITHOUT A CERTIFICATE OF OCCUPANCY PENALTY.
BUSINESS TAX RECEIPT INSPECTION FEE...........
MISCELLANEOUS SERVICE FEES
LOST PLANS REPlACEMENT.................
7
I
I
I
I
I
I
I
8
I
I
I
9
9
9
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge 2 of l9 03/18 Dl.4
PERMIT CARD REPLACEMENT......
CHANGE OF CONTRACTOR OR SUB.CONTRACTOR:
DOCUMENT CONVERSION
DOCUMENT COST OF REPRODUCTION..............
SERVICES NOT CONTEMPLATED IN CURRENT FEE STRUCTURE...............
I
9
I
I
REGULATORY SURCHARGES
MIAMI-DADE COUNTY..
r0
r0
r0
t0
l0
l0
IO
r0
10
r0
r0
10
r0
10
r0
1l
STRUCTURAL GLAZING SYSTEMS - RECERTIFICATION FEE................ .............. I O
BOILERS AND PRESSURE VESS Frq
4O-YEAR RECERTIFICATION FEE
BUILDING DIVISION PROCESSING FEE................
ZONING PLAN REVIEW FEE................
INSPECTION FEE
DTSHoNoRED CHECK (NSF)
TECHNOLOGY
PERMIT DOCUMENT ARCHIVE FEE................
SITE PLAN REVIEW
ADVERTISING FEE IF NOTICE IN A NEWSPAPER..........
REFUNDS, TIME LIMITATION qnd CANCELLAT|ONS............ ..............1 I
PLANNING AND ZONING FEES........
SUPPLEMENT FEE BASED ON PROJECT SIZE FOR SITE PLAN REVIEWS AND VARIANCES .........,..... 14
APPEALS OF VTLLAGE COUNCTL DECISIONS. ..............14
PREPARATTON OF CERTTFTED RECORD FOR COURT ......................... t 4
BUTLDTNG DTV|STON PROCESSTNG FEE........... .......... 15
r3
r3
r3
r3
r3
r3
14
l5
t5REINSPECTION FE F
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge 3 of l9 03/18 Dl.4
RIGHT.OF.WAY PAVI ró
BUILDING DIVISION PROCESSING FEE
SPECTAL PRELTMTNARY REVTEW (SPR)
1ó
ló
t7
17
17
t7WORK DONE WITHOUT PERMIT
NEW BU|LDING OR ADD|TIONS, ALTERATTONS, AND REPATRS TO BU|LD|NGS AND OTHER
17
MULTI-FAMILY UNIT OR COMMERCIAL TENANT RENOVATION 17
REPAIRS. RENOVATION, MODIFICATIONS, RECONSTRUCTION AND ALTERATION TO BUILDINGS
AND OTHER STRUCTURES AND TO ESTABLISH USE..........17
LIFE SAFETY INSPECTION FOR CERTIFICATE OF TEMPORARY OCCUPANCY OR CERTIFICATE OF
FrRE ALARM PLAN REVtEW, ACCEPTANCE TEST AND TNSPECTTON/RECERTrFICAT|ON......................... l8
FIRE SUPPRESSION SYSTEM PLAN REVIEW ..............18
FIRE SAFETY SYSTEMS (t.E. FtRE ALARM, SpRtNKLERS, SMOKE CONTROL, ETC.).....................................18
SPECTAL REQUEST TNSpECTTONS (SRr)r8
FIRE WATCH FOR SPECIAL EVENTS FIREWORKS, PYROTECHNIC DISPLAYS AND FLAME EFFECTS.... I8
APPEALS TO SPECIAL MAGISTRATES, OR THE FIRE PREVENTION AND SAFETY APPEALS BOARD.....'I8
TECHNICAL PROFESSIONAL SERVIC Fq 19
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge 4 of l9 03/18 Dl.4
BUI¡.DING FEES
The following permit fees, chorges ond expenses sholl be exocted by the Villoge of Key Biscoyne
upon opplicotion for permits to construct, erect, olter, repoir, enlorge, move, or demolish ony
building or structure; or to erect, instoll, enlorge, olter, repoir, remove, correct, or reploce ony
electricol, gos, mechonicql or plumbing system or síte work ond excovotion thot require
permitting, review, ond inspection by the oppropriote Vílloge Division.
Any misrepresentotion in scope of work or cost of improvements mqy couse the revocofion of the
permit ondf or penolties ond fines to be ossessed.
APPTICATION FEES
PROCESSING FEE: $30.00
A processing fee ís opplicoble to oll permit opplicotions, shop drowings ond
revisions, unless otherwise noted. The processing fee is collected ot the time of
opplicotion submittol. The fee is non-refundqble qnd ít is not opplied towqrds the
bose permit fee. The processing fee is chorged in oddition to the permit fee.
SUBMITTAL FEE:5Oo/o ol Base Permit Fee
A submittol fee is chorged to oll opplicotions for odditions, olterotions, ond new
construction ot 5Oo/o of the bose permit fee ond sholl be poid ot the time of permit
opplicotíon submittol. The submittol fee is non-refundoble, but will be credited
towords the bose permit fee upon issuonce of the permit.
EXPEDITED PLAN REVIEW PROCESSING FEE:$r0o.oo
Upon wrítten request, ond contingent upon ovoilobility of plon reviewers,
expedited plon review is possible. So thot thís progrom does not impoct other
proiects, expedited plon review moy be performed outside normol work hours ot
the Expedited Plon Review rote os provided herein. An expedited plon review
processing fee is chorged in oddition to the regulor processing fee for such
requests. This fee is non-refundoble ond is not opplied towords permit or plon
revíew fees.
DRY-RUN/COURTESY REVTEW PROCESSTNG FEE: $3OO.OO
A dry-run or courtesy review processing fee is chorged when requesfing o
prelimínory review prior to officiol permit submittol. ln oddition to this fee, Plon
Review time per discipline is chorged os provided herein. A dry-run or courtesy
review does not convert to on officiol permit process or becomes o perm¡t. The fee
is not refundoble nor opplied towqrds the officiol permit fee.
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge 5 of l9 03/18 Dl.4
EAR LY START AUTHORIZATION
Upon written reguest, the Buildíng Officiol moy issue written outhorizotion to
commence preliminory ond explorotory work prior to permit issuonce, os per
Section 105.12 of the Florido Building Code.
Job Volue <$25,000:
Job Volue > $25,000 ond ( $100,000
Job Volue > $.l00,000
$2so.oo
$soo.oo
$7so.oo
PIAN REVIEW FEES
PLAN REVTEW FEE (MASTER PERMTT):
BUITDING BASE PERMIT FEES
BASE PERMIT FEE:
$25.00 per quorler hour
Plon review fees ofter the second review per discipline will be chorged bosed on
odditionol time spent re-reviewing submittol.
PLAN REVTEW FEE (REVTSTONS AND SHOP DRAWTNGS):$25.00 per quarler hour
All plon reviews for revisions ond shop drowings will be chorged bosed on the
time spenf reviewing submittol. Revisions increosing the floor oreo or volue of the
proiect will be ossessed oddítíonol bose permit fees os estoblished herein.
EXPEDITED PLAN REVIEW FEE:$4O.OO per quoder hour
All plon reviews performed outside normol hours will be chorged bqsed on the
time spent reviewing submittol.
DRY-RUN (COURTESY REVTEW) PLAN REVTEW FEE:$25.00 per quorler hour
All dry-run or courtesy reviews will be chorged bqsed on the time spent reviewing
submittol.
The bose permit fee is the primory permit fee ond sholl include the fees for sub-permits
(i.e. electricol, plumbíng, HVAC/Mechonicol, roofing qnd building) províded thot oll
subcontrqctor quolifier opplícotions ore submitted with the prime controctor's opplicotion
ond plons include the detoils of oll subcontroctor work included ín soid sub-permits.
Foilure to incfude the required informotion ot the time of opplicotíon moy require thot o
seporote permit be issued with oppropriote fees being chorged to the opplicont. The
bose permil fee covers the first plon review ond one follow-up review, one of eoch
required inspection, ond one follow-up of the some type of ínspection. Additíonol plon
reviews ond inspections will be seporotely chorged qs described herein.
Voluqtion for permitted work sholl be estoblished in occordonce with the Morsholl ond
Swíft, RS Meons, ICC Building Voluqtion Doto, or other notionolly recognized sources of
construction voluotion in their lotest editions or copy of executed controct, whichever is
higher. The Building Officiol moy require o copy of the signed executed controct ot the
time o building permit opplicotion is submitted to ossess the voluotion indicoted on the
opplicotíon.
Proposed Key Biscoyne Fee Schedule 2Q17 vB Poge ó of 19 03/18 Dl.4
The Villoge Monoger or their designee shall hove the díscretion to odiust permit fees for
those proiects thot do not fit the fee scoles estoblished in order to ovoid on inequitoble
fee.
All Residentiqland Commerciol New Construction, qnd Renovolions bosed on qreo:
$1.3O per totol sq. ft. of floor oreq
Minimum Permit Fee:
Moximum Permit Fee:
All Other Permit Types, ond Renovolions nol bosed on oreq:
Minimum Permit Fee:
Moximum Permit Fee:
$tOO per cpplicoble discipline
Not Appliccble
2.30o/o Volue of Construclion
$lOO per opplicoble discipline
$25,OOO
WORK WITHOUT PERM¡T
EARLY COMMENCEMENT PENALTY:
lf o property owner commences work without first securing o permit they ore subiect to o
penolty equol to one hundred percent (100%) of the bose permit fee in oddition to the
required permit fees; plus
$125.00 fine for first offense
$250.00 fine for second offense
$500.00 fine for eqch subsequenl offense
VOLUNTARY CODE COMPLIANCE:
lf o property owner voluntorily seeks the ossistonce of Villoge stoff in permitting work
which moy hqve been performed in the post, illegolly, or without the benefit of o
prerequisite permit, with the express intent of moking the work sqfe qnd legol, the
Director moy woive the penolty ond fine portion of the permit fee opplicoble to such
work, only if such work wos not previously cited or issued o stop work order by Code
Complionce or Building Divisíon stoff.
MISCELTANEOUS PERMIT FEES
PERMIT EXTENSION or PERMIT APPLICATION EXTENSION (prior to expirotion):$óo.oo
PERMIT RENEWAL: $100.00 plus I 2.5o/o of the originol bose permit fee
When renewing expired permits, bosed on the originol moster permit fee.
ANNUAL PREMISE PERMIT:
An onnuol premise permít only covers regulor mointenonce of existing focilities. The
property owner is required to use of Florido or County licensed controctors for eoch trode
(structurol, plumbing, electricol ond mechonicol). A letter from the owner or ossociotion
identifying controctors thot will be employed to perform the work sholl be submitted with
the opplicotion in odditíon to o copy of the controctor's license, workers compensotion ond
generol líobility insuronce. A log of moíntenonce ond repoirs identifying the scope of
work being performed sholl be kept on site for Villoge review ond ínspection.
Proposed Key Biscoyne Fee Schedule 2Ol7 v8 Poge Z of l9 03/18 Dt.4
Condominiums, co-ops ond other similqr focílities ore limited to performing regulor
mointenonce in the common oreos only. This permit is subiect to concellotion by the
Building Officiol upon determining the scope of work qllowed under regulor mointenonce
hos been exceeded.
All Condominium qnd Commerciol Buildings
First Trode (per building):
Eoch odditionol trode (per building):
$so0.0o
$3Oo.OO
BURGLAR ALARM VOUCHER:$4o.oo eoch
Plus, Stote ond County surchorges, os set by Stotute
INSPECTION FEES
RE-INSPECTION FEE for disopproved work'
Eoch re-inspection per discipline beyond the first re-inspection
$zs.oo
RE-INSPECTION FEE for portiol inspections:
Additionql înspections of the sqme type for portiol work, per discipline
$75.00
CANCELLATION INSPECTION FOR EXPIRED PERMIT (per inspection):
AFTER-HOURS or WEEKEND INSPECTION:
$zs.oo
Upon written request in qdvonce, poyment of oppropriote fees, ond contíngent upon
ovoilobility of inspectors, inspections outside the normol work hours ore possible. On
regulor working or non-working doys, weekends ond holidoys, o lhree-hundred dollor
($3OO.0O) minimum is chorged. Additionol time ofter the first two-hours will be chorged
ot the rote of one-hundred dollors ($l0O.0O) on hour, rounded up to the next hour.
CERTIFICATE OF OCCUPANCY or COMPTETION
CERTIFICATE OF OCCUPANCY or COMPLETION (CO or CC), or PROVISIONAL CO:
The following fee sholl be poid for qll uses. All structures ore íssued o permonent CO or
CC thot sholl remoin volid for qn unlimited tíme unless revoked for couse or obondoned,
provided there is no chonge of occuponcy,or thot there is no enlorgement, olterotion, or
oddítion in the use or structure. A Provisionol CO is issued on o temporory bosis ond
expÍres ot the end of the specified term.
One ond two fomily, townhouses, per unit $25.00
Bungolow court $ZS.OO
Aportment, hotel or condominium unit, per unit $100.00
Privote school, doy nursery, convolescent ond nursing home, hospitol, ACFL ond
Developmentolly Disobled home core $9ó.00
Commerciol (such os Retoil, Mercontíle, Assembly) $0.05/sq. ft. with $lO0.0O Minimum
Unusuol Uses $252.00
Churches No Fee
Coboret, nightclub, liquor or pockoge store $312.00
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge 8 of l9 03/18 Dl.4
TEMPORARY CERTIFICATE OF OCCUPANCY or COMPLETION (TCO or TCC):
Equol to the cosl of the CO or CC qs sel forlh herein, for the initiol ond eqch
subsequenl exlension
OPTIONAL CERTIFICATE OF COMPLETION (CC Optionol):
An Optionol Certificote of Completion is o certificote requested ot the option of
the permit holder signoling the closure of the proiect ond not o regulotory
requirement.
One ond two fomily, townhouse; per un¡t
All others
OCCUPANCY WITHOUT A CERTIFICATE OF OCCUPANCY PENALTY:
$2OO.0O fine plus lO0% of the regulor CO or CC fee in addition to the regulor CO or
CC fee.
BUSINESS TAX RECEIPT INSPECTION FEÊ:
lnspection fee per discipline $zs.oo
MISCETTANEOUS SER.VICE FEES
LOST PLANS REPLACEMENT: $3O.OO plus the reproduclion cosl
When permit documents reloted to on ongoíng proiect must be reproduced from
orchives, o replocement fee will be required to outhenticste o new iob set of
documents for construction purposes.
PERMIT CARD REPLACEMENT: $30.00
CHANGE OF CONTRACTOR OR SUB-CONTRACTOR, $lOO.OO or bose permit fee, whichever
is less.
DOCUMENT CONVERSION:
When converting poper bosed documents to electronic formot for plon review
purposes, the followíng chorge sholl opply:
Bose chorge: $20.00 plus the per sheel cosl
Per Sheet Cost for documents up to ond íncluding 11"x17" $O.l 5 per sheel side
Per Sheet Cost for documents lorger thon I 1"x17" $3.00 per sheet side
DOCUMENT COST OF REPRODUCTION:
Sheets up to 8-l f 2"x14" $0.15 per sheet plus $0.05 for double sided
Sheets lorger thon 8-t f2"x14" end up fo ond including 11"x17" $0.30 per sheel
plus $0.10 for double sided
$5o.oo
$ós.00
$5.00 per sheet side
$1.00 per pqge
$l.OO per documenl
$5.00 per order
Sheets lorger thon I 1"x17"
Certified copies
Notory Public Service
Reseorch ond Orderíng Plons
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge 9 of l9 03/18 D1.4
SERVICES NOT CONTEMPLATED IN CURRENT FEE STRUCTURE:
The Director hos the outhority to invoice for octuol costs on proiect(s) or serv¡ces not
contemploted in the current fee structure qt the rote of:
$25.00 per qucrler hour
REGULATORY SURCHARGES
MIAMI-DADE COUNTY' $0.óO per $l,OOO volue of conslruclion
Surchorge bosed on construction volue of $81.25 per squore foot or controct
volue when oreo is not opplicqble.
STATE OF FLORIDA:
DBPR (F.S. 553.721l' l.Oo/o of bose permit fee or qs delermined by Florido Stqtute
BCAI (F.S. 468.631) I .5o/o ol bose permit fee or qs delermined by Florido Stqtute
CONCURRENCY REVIEW: 60/o ol totol permit fee
IMPACT FEE: As delermined by counly or villoge ordinqnces on cerlain building permits
DISHONORED CHECK (NSF): 5o/o ol Check Amounl or $20.00, whichever is greoler
TECHNOLOGY FEE (per Moster Permit): $l8.OO
PERMIT DOCUMENT ARCHIVE FEE: lOolo of bose permit fee with o $l,OOO mqximum
Archive fee covers the cost to retqin hislorîcql public records os required by
Chopter I 19, F.S.
RECERTIFICATION FEES
4O-YEAR RECERTIFICATION FEE:
BOIIER,S AND PRESSURE VESSELS
FEE FOR PERIODIC RE-INSPECTION:
Periodic inspections ofter instollotion of vessel.
Steom boilers (onnuol), eoch
Hot Wqter Boilers (onnuol), eoch
Owners of buíldings or structures meeting the requirements of Miomi-Dode County
Code Section 8-'l I sholl conduct on inspectíon using the minimum guidelines issued
by the Boord of Rules ond Appeols for buildings 4O-yeors old or older ond every
I O-yeor intervol thereqfter. Finqlized report sholl be submitted together with
poyment of fee hereín.
STRUCTURAL GLAZING SYSTEMS - RECERTIFICATION FEE:$250.00 eoch building
Structurol glozÍng systems instqlled on threshold buildings sholl be inspected by the
owner ot ó months intervols for the first yeor ofter completíon of the instollqtion.
Subsequent inspections sholl be performed ot leost once every S-yeors. Finolized
report sholl be submitted together with the poyment of fee hereín.
$250.00 eoch building
$zs.oo
$zs.oo
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge l0 of l9 03/18 Dl.4
Unfired Pressure Vessels (onnuol), eoch
Minioture Boilers (onnuol), eoch
Certificote of lnspection, eoch
Shop lnspection of Boiler or Pressure Vessel, eoch
UNSAFE STRUCTURÊ5 FEES
Stoff T¡me
Cose Processing Fee, eoch
Photogrophs, eoch
ln¡t¡ol lnspection Fee
Re-lnspection Fee, eoch
Posting of Notices, eoch
Unsofe Structures Boord Processing Fee
Title Seqrch
Court Reporting Tronscription
Legol Advertising, eoch
Permit Fees
Lien/Recording/Concellotion of Notices, eoch
Bid Processing Fee
Demolition/Secure Services
$7s.oo
$zs.oo
$7s.oo
$zs.oo
$2O.OO per quorler hour
$4OO.OO
g2.so
$t4o.0o
$so.oo
$4o.oo
$t so.oo
Actuql Cost
Actuol Cosl
Actual Cost
Actuql Cosl
Actucl Cost
$t 25.OO
Actuql Cost
REFUNDS, TIME IIMITATION ond CANCEILATIONS
The fees chorged pursuont to th¡s schedule, provided the fee is required for o
permit in occordonce with the Florido Building Code or Villoge Ordinonce, moy be
refunded by the Deportment Dírector, subiect to the following:
No refunds shqll be mode on requests involving:
o Permit Fees of one-hundred dollors ($100.00) or less per discipline;
or
o Permits revoked by the Building Officiol under outhor¡ty gronted
by the Floridq Building Code, or permits conceled by court order,
or conditionol permits; or
o Permits which hove expired; or
o Permits under which work hos commenced os evidenced by ony
recorded inspection hoving been mqde by the Deportment or
physícol work hoving been instolled; or
o The originol permit holder when there is o chonge of controctor.
A cqncellotion inspection will be required to verify field conditions ot the fee
described herein.
A full refund less one hundred dollors ($100.00) per discipline or fifty percent
(5O%)of the permit fee, whichever is greoter, rounded up to the neorest dollor,
sholl be gronted to o permit holder who requests o refund provided thot:
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge I I of l9 03/18 Dl.4
The Deportment receives q written request from the permit holder
prior to lhe permit expirotion dqte; ond
The permit holder submits with the written request oll opplicont's
volidqted iob copy set of permit documents issued; ond
No work hos commenced under such permit os evidenced by ony
recorded inspection or physicol work hoving been instolled.
A concellotion inspection will be required to verify field conditions ot the fee
described herein.
a
o
O
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge l2of 19 03/18 Dt.4
PLANNING AND ZONING FEES
Fees estoblished to recover the costs for reviewing ond inspecting Zoning Permits ond processing
Plonning requests. When work hos commenced without the required permit(s), o penolty of IOOYo
of the usuol permit fee pfus the usuql permit fee will be qssessed on oll Zoning permits ond
Plonning processes.
BUILDING DIVISION PROCESSING FEE:
A processing fee is opplicoble to qll Plonning ond Zoning stondqlone permits ond
processes to cover the cost of servicing opplicotion processing through the Building
Division. The processing fee is collected ot the time of opplicotion submittol; it is
non-refundoble ond it is not opplied towords the bose permit fee. The processing
fee is chorged in oddition to the permit fee.
ZONING PLAN REVIEW FEE:
The bose permit fee covers plon reviews, first ond one follow-up review, ond
required inspections, one of eoch required type ond one follow-up of the some
type of inspection. Additionql plon reviews ond inspections will be seporotely
chorge os described herein.
All Residentísl or Commercíol New Construction:
Wolk-thru Type Permits os defined, eoch:
All Other Permit Types, eoch:
Re-review Fee beyond the first re-review:
$30.00
$0.13 per sq.ft. of floor qreo
$2s.oo
$roo.0o
$25.00 per quorler hour
$zs.oo
$r 50.00
$400.00
$8oo.oo
$e00.00
$soo.oo
$t,5oo.oo
$r,000.00
INSPECTION FEE:
Re-inspection fee for eoch oddítionol re-inspectÍon ofter the second inspectíon of
the some type
APPLICATION FEE:
For the following types of processes:
Supervisory Vqrionce (ony type of use):
Single fomily ond duplex (Administrotive ond Regulotory Vorionce):
MultÍple Fomily (Adminístrotive ond Regulotory Vorionce):
Commerciol qnd Hotel (Administrotive ond Regulotory Voríonce):
SITE PLAN REVIEW:
Chorged for the review of o site plon for new construction of ony single fomily or
duplex, for on oportment building, or commerciol buílding, or ony oddition,
renovotíon or repoir thqt exceeds 5Oo/o of the floor oreq of the present structure.
AdminÍstrotive:
Villoge Council:
Appeol of on Administrotïve Decision:
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge l3 of l9 03/18 Dl.4
Amendment to the Zoning ond Lond Development Regulotions:
Chonge of Zoning District:
Comprehensive Plon, Amendment:
Comprehensive Plon, Chonge of Lond Use:
$3,OOO.OO
$t,50o.oo
$3,OOO.OO
$3,OOo.oO
ADVERTISING FEE IF NOTICE IN A NEWSPAPER:
Published in the Villoge: Actuql Cost
Published in o newspoper thot meets the requírements of Chopter 1ó3 of Florido
Stotutes: Actuql Cost
MoilÍng fee: Actuql Cost
SUPPLEMENT FEE BASED ON PROJECT SIZE FOR SITE PLAN REVIEWS AND
VARIANCES:
Size of property: $|O0.OO per l0 qcres or any froclion thereof; qnd
Number of hotel or opqrtmenf units: $l5O.OO per l5 unils or ony
frqction thereof; or
Size of buildings - non-residentiol only' $150.00 per 5,000 sq. ft. or qny frqclion
thereof
APPEATS OF VILTAGE COUNCIT DEC¡sIONS
For every opplicotion for on oppeol of o decision by the Villoge Council, lhere
sholl be poid to the Development Services Deportment, for the processing for eoch
ond every opplicotion, o fee of six hundred dollqrs ($óOO.OO), to be poid ot the
time of opplicotion. Site plon modíficotion, where permitted, to oppeol requests
will be processed qt on odditionol cost of three hundred dollqrs ($óOO.O0).
PREPARAT¡ON OF CERTIFIED RECORD FOR COURT
For the purpose of court oppeols, herein the Director for the Development Servíces
Deportment is requested to moke ovoiloble the record upon which the decision of
the Council is bosed, there sholl be poid to the Development Services Deportment,
for the preporotion of o certified copy for the record, o fee of three hundred
dollqrs ($3OO.OO) to be poid ot the time of request.
Proposed Key Biscoyne Fee Schedule 2017 vB Poge l4 of l9 03/18 Ð1.4
PUBTIC WORKS FEES
Fees estoblished to recover the costs for reviewing ond inspecting Public Works Permits within the
street right-of-woy (ROW). Totol permit fee is mode up by odding eoch component of o proiect
listed below. When work hos commenced without the required permit(s), o penolty of .l00% of
the usuol permit fee plus the usuol permit fee will be ossessed on oll Public Works permits.
BUILDING DIVISION PROCESSING FEE:$3o.oo
A processing fee is opplicoble to oll permit opplicotÍons for Public Works to cover
the cost of servicing opplicotion processing through the Building Division. The
processíng fee is collected ot the time of opplícotion submirtol; it is non-refundoble
ond Ít is not opplied towords the bose permít fee. The processing fee is chorged
in oddition to the permit fee.
RE.REVIE\^/ FEE:
Eoch re-review of submittql documents: $25.00 per qucrler hour
REINSPECTION FEE:
Eoch re-inspection or odditionol inspections: $25.00
DRTVEWAY APP ROACH/APRON:
Resídentíol or Commerciol drivewoy opprooch/opron. lncludes first review ond first
inspection. Additionol reviews ond inspections os provided herein. $ó0.00
sr DEwALKS/CU R B/GUTTERS:
An odditionol chorge for eoch review ond inspection of instqllqtion of sidewolks, curb ond
gutters: $35.00
WATER METER INSTALLATIONS:
Review ond inspectíon of new woter meter instqllotion: $25.00
MATNTENANCE OF TRAFFTC (M.O.T.) pLANS:
Review ond inspectíon of M.O.T. Plons: $ZS.OO
FRENCH DRAINS:
Review ond inspection of ínstollotion of cotch bosins, seepoge trench or sookoge pit:
$3so.oo
Proposed Key Biscoyne Fee Schedule 2017 vB Poge l5 of l9 03/18 D1.4
RIGHT-OF.WAY PAVING:
Review qnd ¡nspection of construction of street povements, plus M.O.T., if opplicoble:
$2Z5.OO
SWALE PAVING:
Review ond inspection of povement for porkwoys/swoles, plus M.O.T., if opplicoble:
$20o.oo
RIGHT-OF-WAY CURBING:
Review ond inspection of street curbing, plus M.O.T., if opplicoble:
UNDERGROUND UTILITIES:
$35.00
Review ond inspection of lnstollotion or repoir of sonitory ond storm sewers, woterlines,
gos lines, ond other underground utilities, plus M.O.T., if opplicoble: $275.00
POLES/GUY WrRES:
Review ond inspection of instollotion of poles or down guy wires for overheod utilities,
plus M.O.T., if opplicoble: $125.00
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge ló of 19 03/18 D1.4
FIRE ENGINEERING FEES
Fees estoblished to recover the costs for reviewing ond inspecting Fire Engíneering Permits within
the Villoge.
BUILDING DIVISION PROCESSING FEE:$30.OO
A processing fee is opplicoble to oll stond-olone fire permit oppl¡cot¡ons for Fire
Engineering to cover the cost of servicing opplicotion processing through the
Building Division. The processing fee is collected ot the time of opplicotion
submittol; it is non-refundoble ond it is not opplied towords the bose permit fee.
The processing fee is chorged in oddition to the permit fee.
SPECTAL PRELTMTNARY REVTEW (SPR):
Some proiects mqy request o SPR to understond ony possible request to be mode
for Life Sofety. Such review will be o $lOO.OO per hour
WORK DONE WITHOUT PERMIT:
When work for which o permÍt is required is commenced prior to the obtoining of
o permít, the permit opplicont sholl be required to poy o penolty of 100% of the
usuol permit fee plus the usuol permit fee ond the following fine:
$l25.OO fine for first offense
$25O.OO fine for second offense
$5OO.OO fine for eqch subsequenl offense
NEW BUtLDING OR ADD|T|ONS, ALTERATTONS, AND REPATRS TO BUtLD|NGS AND OTHER
STRUCTURES:
One plon review ond one inspection for Building Permit: Minimum fee for qll
permits is opplicoble $250.0O. This fee includes fire plons review ond one life
sofety inspection request (field inspection by inspector). Subiect to Speciol Request
lnspections herein.
Plqn review fees qfter the first review will be chorged bosed on odditionql time
spent re-reviewing submittol. $25.00 per quorler hour
MULTI-FAMILY UNIT OR COMMERCIAL TENANT RENOVATION:
One plon revíew ond one inspection ot o minimum of $ZS.OO fee thot opplies to
o specific unit for renovotions only.
REPAIRS, RENOVATION, MODIFICATIONS, RECONSTRUCTION AND ALTERATION TO BUILDINGS
AND OTHER STRUCTURES AND TO ESTABLISH USE:
Such fees sholl be o minimum fee of $250.00.
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge l7 of l9 03/18 Dr.4
LIFE SAFETY INSPECTION FOR CERTIFICATE OF TEMPORARY OCCUPANCY OR CERTIFICATE OF
OCCUPANCY:
This fee will be chorged for the life sofety inspection leoding to the issuonce of o
Temporory Certificote of Occuponcy (TCO) ond for o Certificote of Occuponcy
(CO). An inspection fee of $75.00 for the inspection ond $l5O.OO for second re-
inspection.
RE.INSPECTIONS:
$Z5.OO for the firsl re-inspeclion ond $l5O.0O for eqch qddilionol re-inspection.
FrRE ALARM pLAN REVTEW, ACCEPTANCE TEST AND tNSPECT|ON/RECERT|F|CATION:
This includes fire plon review of the upgroded system ond one life sofety
inspectíon request: $l5O.OO plus $l OO.0O for I to I O devices or $250.00 for
more lhon lO devices.
FIRE SUPPRESSION SYSTEM PLAN REVIEW:
Test ond lnspection/Recertificotion eoch request: $lOO.OO for up to 20 heqds or
$250.00 1o¡ 2l heods or greoter.
FtRE SAFETY SYSTEMS (t.E. FtRE ALARM, SPRINKLERS, SMOKE CONTROL, ETC.):
$300.00 per ilem. This includes Fire pumps, Smoke Control, Fire Well, Stondpipes,
Hydront flow test ond recertificotions.
SPECTAL REQUEST TNSPECTTONS (SRr):
$300.00 per inspeclor ond in oddition to opplicoble inspection or re-inspection
fee. SRls losting over 4 hours will incur on qdditionol chorge of $l15.00 per hour
or portion thereof per inspector.
lnspections thot qre required to be performed before or ofter normql business
hours or on holidoys or weekends will result in on odditionol speciol request
inspection fee.
FIRE WATCH FOR SPECIAL EVENTS FIREWORKS, PYROTECHNIC DISPLAYS AND FLAME EFFECTS:
Requires Fire deportment review ond opprovol. Authority Hoving Jurisdiction con
require o Fire wotch for ony event deemed necessqry ot the owner's expense. $ó5
per hour (Minimum 4 hours)
Nofe: Plons thot sre submitted /ess fhon lhirty (30) doys prior Ío lhe evenl may resuh
in oddítionol fees such os expedifed plon review fee ondf or o specio/ reguesf
ínspecfion fee or moy resuh in deniol of the plon ond non-approvol of ¡he evenf.
APPEALS TO SPECIAL MAGISTRATES, OR THE FIRE PREVENTION AND SAFETY APPEALS BOARD:
$tOO per hour in oddition to odministrotive costs ond expenditure of resources
ossocÍoted with cose.
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge l8 of l9 03/18 D1.4
FIRE ALARM REGISTRATION:
$20.00. Applícont must prov¡de proof of underwriter's license from opproved
compony or monufocturer.
TECHNICAL PROFESSIONAL SERVICES:
Assessed for technicol professionol services requiring reseorch, preliminory plons
review, expedited plon review, zoning heoring opplicotions, lond subdivÍsion
proiects, subcontroct for specific review or review of engineered life sofety plons.
Expedited plon review fees sholl be in oddition to the opplicoble plon review fee:
First hour or porlion thereof $200.00. Eoch odditionql hour or porlion lhereof
$75.0o.
Proposed Key Biscoyne Fee Schedule 2017 v8 Poge l9 of l9 03/18 Dl.4