HomeMy Public PortalAbout2020.04.23 Clear Solutions EngineeringApril 15, 2020 Nick Zaninovich , P.E . City Engineer 815 N. Samson Trail McCall , ID 83638 CLEAR SOLUTIONS ENG I NEER I NG Subject: Proposal for Engineering Services City of McCall -Legacy Beach Intake Station Reconstruction Project Dear Nick, Clear Solutions Engineering, LLC (Clear Solutions) is pleased to submit this proposal to provide engineering services for the City of McCall Legacy Beach Intake Station Reconstruction Project located at 1100 E. Lake Street, McCall, Idaho. BACKGROUND The City of McCall operates the Legacy Park Pump Station to convey raw water from Payette Lake to the City Water Treatment Plant. Legacy Pump Station has been in service since the late 1950s. The building structure has experienced significant settling resulting in structural deficiencies. Parts of the building structure are at the end of their useful life and in need of reconstruction . The City has identified several Pump Station upgrades to structural, life safety, mechanical , and architectural elements which are desired to renovate the facility so that it can reliably provide raw water supply to the City. SCOPE OF WORK The proposed scope of work has been organized into four tasks outlined below related to design and permitting for the project. This proposal is based on the following assumptions: • Clear Solutions will lead Idaho Department of Environmental Quality (DEQ) permitting efforts related to review and approval of the Preliminary Engineering Report and the Final Plans and Specifications. • Clear Solutions will provide water system engineering services for the project. • Crestline Engineers will be a subconsultant to Clear Solutions and will provide Site/Civil engineering services . • Bennett Architect, Inc . will lead the architectural and structural design and the Planning and Zoning permitting efforts. Task 1 -Prepare Preliminary Engineering Report and Obtain Idaho DEQ Approval This task includes preparation of the Preliminary Engineering Report (PER) for the project. The PER will include engineering evaluation and recommendations for the proposed Pump Station upgrades including process mechanical, site/civil, structural, and arch itectural elements. The PER will include an Engineer's Opinion of Probable Construction Cost . A Draft PER will be prepared and submitted to the City for review, and comments will be incorporated into the Final PER. The Final PER will be submitted to Idaho DEQ for review and approval. Clear Solutions Engineering PO Box 538 Eagle , Idaho 83616 208-608-3080 www.clearsolns.com Task 2 -Preliminary Plans and Specifications This task includes the preparation of preliminary engineering plans, specifications, figures, and details for the proposed Pump Station upgrades. Water system upgrades will likely include a new chlorination system, standby generator upgrades, pressure relief valve station, and miscellaneous upgrades including water sampling taps, etc. Preliminary Plans and Specifications will be submitted to the City for review and comment, and any comments will be incorporated into the Final Plans and Specifications. Task 3 -Final Engineering Design and Permitting This task includes the preparation of final construction plans, specifications, and Opinion of Probable Construction Cost. Clear Solutions will coordinate the Final Plan set with other design disciplines and submit to Idaho DEQ for review and approval. Bid documents will be prepared for competitive bidding of the construction work. A representative will attend the pre-bid meeting, and Clear Solutions will prepare a letter of recommendation for bid award. Task 4 -Site/Civil Engineering Design and Permitting (Crestline Engineers) Task 4 includes Site/Civil Engineering services to be provided by Crestline Engineers as a subconsultant to Clear Solutions . Deliverables includes preparation of Cover Sheet, General Notes Sheet, Site and Utilities Plan, Grading, Drainage and Stormwater Management Plan, Civil Details Plan, Stormwater Drainage Report meeting the requirements of the DMGs, and City of McCall stormwater and construction plan approvals. Crestline Engineers will attend the Planning and Zoning pre-application meeting, the Planning and Zoning meeting, and the City Council meeting as necessary . For a more complete description of the Scope of Work for Crestline Engineers, please see the attached proposal from Crestline dated April 14, 2020 . PROJECT DELIVERABLES The following project deliverables will be prepared and submitted as part of this Scope of Work: • Preliminary Engineering Report PER o Draft PER for City Engineering Review and Approval o Final PER for Idaho DEQ Review and Approval • Draft and Final Construction Plans o Cover Sheet o General Information and Notes Sheet o Site and Utilities Plan o Grading, Drainage, and Stormwater Management Plan Sheets o Pump Station Building Floor Plan o Mechanical Piping Plan o Civil Details Sheet(s) o Draft Plans for City Engineering Review and Approval o Final Plans for Idaho DEQ Review and Approval • Stormwater Drainage Report meeting the requirements of the DMGs • City of McCall stormwater and construction plan approvals • Engineer's Opinion of Probable Construction Cost • Bid Documents for competitive bidding of the construction work NOT INCLUDED IN SCOPE OF WORK The following services are not included in the Scope of Work, but may be added if desired for an additional fee: • Surveying • Stormwater Pollution Prevention Plan (SWPPP) development and implementation • Landscape and Irrigation System Design Proposal -McCall Legacy Pump Station Design and Permitting -April 15, 2020 Page 2 of 4 " Environmental Site Assessment " Electrical and Controls Design " HVAC Design " Additional engineering services due to significant plan changes " Construction management services including construction observation, engineering, and inspection services. " Work associated with the administration of a phased construction project. FEE FOR ENGINEERING SERVICES Clear Solutions proposes to provide these services on a time and materials basis. Anticipated costs associated with the Scope of Work are shown in the table below. TASK HOURS CRESTLINE TOTAL Task 1-Prelim inary Engineering Report & DEQ Perm itting 32 $4,960 Task 2 -Prelim inary Plans and Specifications 28 $4,340 Task 3 -Final Engineering Design and DEQ Permitting 20 $3,100 Task 4 -Site/Civil Engineering (Crestline Engineers) $12,000 $12,000 TOTAL 80 $12,000 $24,400 Standard payment terms are 30 days after invoice date. Invoices will be sent to the Client monthly, based upon the amount of work complete at time of billing. Failure to make payment within 30 days may delay work and deliverables. Invoices not paid in full within 45 days of invoice are overdue and subject to interest at 12% per annum compounded monthly. Non-payment by the Client may constitute a breach of contract, and all work can be stopped on the project. Any unbilled time already accrued to the project will be invoiced and all outstanding amounts must be paid before resumption of work on the project. ADDITIONAL SERVICES Should additional services be needed, they will be billed on a time and materials basis at the following rates: Principal Engineer: Senior Project Manager: $155 per hour $145 per hour Project Manager: $135 per hour " " , 1" 11 1,1 . ,,, Senior Project Engineer: $125 per hour .... , " " --, lf ~011'1,.~ '\ .-~ " 7 r 1 Project Engineer: $115 per hour ... � " """'" J. ... ~ ... ' ~ -,. ..,-~ {#. Associate Engineer: $90 per hop r .... l .. ~ 'l Designer: $90 per hou r.~ i l~~?, l " ~ Administration: $60 per hayr;: 'lo ,._. ' ., " ~ ~ . ~ Clear Solutions will be responsible for maintaining ;ro~~~gi.o al liagijit' �in~tlrance. Clear Solutions will be responsible to a level of competency for professional e hg1.n Jr~ ~~r"'J~e; presently maintained by other practicing professional consultants performing similar worWin itb.e st~te where the project is located. USAGE OF DOCUMENTS The documents prepared by Clear Solutions shall remain the property of Clear Solutions and shall not be used in whole or part for any other project without written consent of Clear Solutions. Proposal -McCall Legacy Pump Station Design and Permitting -April 15, 2020 Page 3 of 4 MISCELLANEOUS 1. Effe ct of Proposal. This Agreement shall be binding on and inure to the benefit of the parties hereto and their respective heirs , successors , and assigns . 2. Merger. As to the sub j ect matter contained herein, this Proposal shall be the complete, entire, final and exclusive agreement among the parties hereto and incorporates and supersedes all prior and contemporaneous negotiations, agreements , and understandings, written or oral , between the parties . 3. Amendment . This Proposal may not be modified or supplemented in any manner or form whatsoever, either by oral or written evidence, or by course of dealing, but only by written amendment signed by all parties hereto . 4. Attorneys' Fees. If any party is requ i red to enforce or defend against any claim related to this Proposal, the prevail ing party shall be entitled to recover its reasonable attorneys' fees and costs incurred, whether incurred at mediat ion , arbitration , or in judicial proceedings (including both the trial court level and on appeal). 5 . Execution in Counterparts . Thi s Proposal may be executed in counterparts, each of which is deemed an original but all of which constitute one and the same instrument. This Proposal may be signed and delivered by facsimile or via email in PDF or other sim ilar format, each of which shall be effective as an original. 6. Governing Law and Venue. This Proposal shall be construed , interpreted, and enforced in accordance with the laws of the State of Ida ho . AGREEMENT This proposa l is valid for a period of thirty days from date of issue . If this proposal meets with your approval, it may serve as the basis for agreement by affixing signatures in the space provided below. Your signature will be considered as a notice to proceed with a budget of $24,400. If you have any questions , or require addit ional information, please do not hesitate to ask . We look forward to working with you on the Project . Respectfully submitted, CLEAR SOLUTIONS ENGINEERING, LLC By Eric Landsberg, P.E. Principal Engineer Accepted By : CITY OF McCALL By ~xl de_~_) T i tle_-'~-f-L-~""-A,,1-¥-C------- Proposal -McCall Legacy Pump Station Design and Permitting -April 15, 2020 Page 4 of 4