Loading...
HomeMy Public PortalAbout06-0002 WilliamsInspection Report City of Tybee Island 403 Butler Avenue P.O_ Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No, 016 - 0 0 0 2 Date Requested: () (o 0 3" 0 co Owner's Name: W. 1' i a m S Date Needed: O (- OS-0(.0 Gen. Contractor: Subcontractor: Contact Number: (- - ) A . m (Q 12) 1 4 8 7- 194S- Location: 33 3 I 1, , r Date of Inspection: 60/1/0 L Type of Inspection: Comments: Inspector: Rz.2-7 /L-( -C.r■al fy\jt far QI nab b. 4 Time of Inspection- _'? Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. fi(n- o00 2 Owner's Name: Date Requested: (')3 - a i- - O (o Date Needed: 03- ,) -7 -0 Co Gen. Contractor: Subcontractor: Contact Number: `l rn rm (,J , j a vo ( a 1 303 --r'w,rd sL-, Location: Date of Inspection: Y a 7 * .‘ Comments: Inspector: Type of Inspection: 0 1 53 f` s Time of Inspection: Inspection Report City of Tybee Island 403 Butter Avenue P.U. Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. 06' 0002— Owner's Name: W��I Q✓''S Gen. Contractor: Contact Number: a Location: ✓ 0 3 r c�- S`t' , Date Requested: ' 2 2- 0(,) Date Needed: Subcontractor: - r c,A ts19 ,8 W(0 -7767 Date of Inspection: Comments: 3 Type of Inspection: ti4-asc-°_, �/ Inspector: Time of Inspection: road d Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No Do- 0002- Date Requested: 0 3 - 2 i - c7 Go Owner's Name: LA.), I (. a M S Date Needed: 03 -2 2- O , Gen, Contractor: ° Subcontractor: Contact Number: Ckr's (j S% - Z I Z •' rv. (&?- 194 Location: 0 3 I L r c\ 3-4-. Date of Inspection: ' De) ()L., Type of Inspection: 70-15 k Comments: Inspector: Time of Inspection: — Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. D b- o 0 0 -2- Owner's Name: L,1, i I , Q m Gen. Contractor: Contact Number: Location: Date Requested: 0 3 - 21- 3 Date Needed: Subcontractor: R 55-4_ l I ( — 1 0 c - 3o-7 3 Date of Inspection: 3--D1- 0 (0 Comments: Inspector: 10 ft, fc 0 Type of Inspection: S"e n5 Op Cr rOJ s,„1 e 4r Time of Inspection: P5S Cm) ;.S • • Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 7 749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786 -9539 Permit No. Do- bOJZ Date Requested: 03- I 1p- 0(.0 Owner's Name: Gen. Contractor: Contact Number: Location: 3 0 3 Date Needed: Q 3 20- D(.0 Subcontractor: S.(e I ( tee, �, 7 y --1 -13 0 '7 r d . Date of Inspection: Comments: Inspector: L1 wcra Type of Inspection: e e c 4- C d {— 4-er. C Te\Ro _sad SEpco 1 QPSS Time of Inspection: - r * * * * * * * * * * * * * ** -COMM. :NRL- * * * * * * * * * * * * * * * * * ** DATE MAR-20-20F K * ** TIME 15:03 * * * * * * ** MODE = MEMORY TRRNSMISSION START= MRR -20 14:59 END = MAR -20 15:03 FILE NO. =016 STN COMM. ONE - TOUCH/ STATION NAME /EMAIL ADDRESS /TELEPHONE NO. PAGES DURATION NO. AMR NO. 001 OK 8 2316641 001/001 00 :00:19 -CITY OF TYBEE ISL. ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** -CITY OF TYBEE - * * * ** - 912 786 9539- * * * * * * * ** Date: City of Tybee Island BUILDING AND ZONING P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (912) 786 -4573 — FAX (912) 786 -9539 www.cityoftybee.org FAX TRANSMITTAL SHEET 03- Zo -Occ Number o f Pages Including Cover Sheet • 1 Company Name: Savannah Electric and Power Company Fax Number: 231 -6641 From: Dianne K. Otto Title: Administrative Assistant Phone Number: (912) 786 -4573 extension 114 Name of Electrician ELECTRICAL RELEASE Pennit Number Qt,a -- Q 0 0 2 Contractor or Owner Lot No. Subdivision Address 3 o 3 r Tybee island, GA 31328 Type of Release: SAW POLE TEMPORARY POWER FINAL OTHER INA,cier .Gum Release to SEPCO Chuck Bargeron City of Tybee Island City Marshal Telephone (912) 786 -4573 extension 104 Date: City of Tybee Island BUILDING AND ZONING P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749 (912) 786 -4573 — FAX (912) 786 -9539 www.cityoftybee.org FAX TRANSMITTAL SHEET �3- Zo -oco Number of Pages Including Cover Sheet: 1 Company Name: Savannah Electric and Power Company Fax Number: 231 -6641 From: Dianne K. Otto Title: Administrative Assistant Phone Number: (912) 786 -4573 extension 114 Name of Electrician Permit Number ELECTRICAL RELEASE Russe,11 E G-1-r,c� Olo -oo02 Contractor or Owner •, .-.t.- (,J ; 11; Q m E Lot No. Subdivision Address 303 I r d -j-'. Type of Release: SAW POLE TEMPORARY POWER FINAL 6THE1)p 4.er Car, Release to SEPCO Chuck Bargeron City of Tybee Island City Marshal Telephone (912) 786 -4573 extension 104 Tybee Island, GA 31328 DATE ISSUED: 01 -3 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPAIRS RESIDENTIAL BLDG 303 THIRD ST KITTY WILLIAMS PO BOX 2911 TYBEE ISLAND GA 313282911 KITTY WILLIAMS PO BOX 2911 TYBEE ISLAND GA 313282911 P $ 135.00 $15,000.00 PERMIT #: 060002 TOTAL BALANCE DUE: $ 135.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT L-001/42_. Location: ? 0 : J Svip NAME ADDRESS PIN# 0 -G `l . /7 -r TELEPHONE Owner T . & .2W he e, < Architect or Engineer Building Contractor S S / (Check all that apply) ❑ New Construction ❑ Duplex Residential ❑Footprint Changes C ©' Other C Ah , skids p A) 4 PA 11/4)C1 nq hz e4-2ec1 01 C.s st l e e+N4 J-1�1ti . 1 � Estimated cost o1 Construction: $ Q , D YV Ei N (' fa- iofL�t 1�Hcz) Renovation ❑ Single Family ❑ Commercial ❑ Repairs El Minor Addition ❑ Substantial Addition Multi - Family ❑ Demolition El !/AC . •Ken Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off-street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms # Bathrooms Living space (total sq. ft.) With culvert? Rear With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by di; . n e R. Construction debris will be disposed by at by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 0 i /1) /0 j (.{) Signature of Applicant. Note: A permit normally takes 7 to 10 days to process. ce.6 The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager Air ignature/ Date FEES Permit Inspections y5:00 Water Tap Sewer Stub Aid to Const. TOTAL 1t3512c