Loading...
HomeMy Public PortalAbout06-0005 CasonDATE ISSUED: 01 -4 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL FENCE 914 MILLER AVE DAVID & SANDRA CASON 1202 E HWY 80 TYBEE ISLAND GA 31328 DAVID & SANDRA CASON 1202 E HWY 80 TYBEE ISLAND GA 31328 P $ 25.00 $ 500.00 PERMIT #: 060005 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P.O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org O (,- 0005. Location: 63 4 M k L_ h ; CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT NAME ADDRESS PIN # T Owner 1-ukt-ki A,1 wt M • -/ 1bEC J �I �iiLLCR . t 7 &-7 t i� Architect or Engineer Building Contractor (Check all that apply) ❑ New Construction ❑ Duplex ❑ Residential ❑ Footprint Changes ❑ Other Estimated cost of Construction: $ Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: ❑ Renovation ❑ Single Family ❑ Commercial ❑ Repairs ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms # Bathrooms Living space (total sq. ft.) With culvert? Rear With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by at by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: / / 1//696, Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager Date FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL 2 S Sk A D eb 0 9(4 I ftL ?2 40E jgl oloc6 IJ C — +rr w. go. 4. Lm4rr A- PPtoXINATL.'1 2-1' 10 5 Me Pie ki�= CLEF MILLER AVENUE 60' R/W N 23 °21'01 "E 120.00' 63.00' g /8"R:B3 ' 57.00' _xv1-41% MEW. = 612 1W 83.00' S 23 °25'00' 120.00' LOT 89 PLAT OF A RECOMBINATION OF LOTS 103 & 104, WARD NO. 4, TYBEE ISLAND, CHATHAM COUNTY, GEORGIA S iT K 1 ADDRESS_ 914 MILLER ER AVENUE FOR: JAMES A. GRAVES ACCORDING TO THE F_LR.M. DATED 8/17/08 T IS PROPERTY' J WITHIN THE 100 YEAR FLOOD ZONE_ J. WHITLEY REYNOLDS LAND SURVEYOR 638 STEPHENSON AVENUE SUITE C SAVANNAH GEORGIA 31405 TELEPHONE: 912-- 352 -0454 FAX: 912- 352 -7787 WEVIM 88/18/96 EQUIPMENT: TOPCON AP -LIA ERROR OF CLOSURE: LINEAR: 1/30,000 ANG: 1"/ANGLE PLAT. 1/ 460,000 0 30 WALE- 1" - 30' DATE: MAY 4, 1998 FILE KG. 38 -113 LBLL 2SE Z1E sp i ouRaki Ga 14 i 4t! r dZ I =?.il SD 8z '°M