Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. %'\ D CI Date Requested
I ^ ' c15 Date Needed
Subcontractor ; ,i
r-
Contact Information 1--') . ! 1211
Project Address 1 L1 0 9 0- ha*o ►r Ave) .
Scope of Work. !\ it Ve0S- 41 r / 1/)f;1
Owner's Name
Gen. Contractor
INTERNATIONAL
CODE COUNCIL
MEMBER
7-
Inspector Date of Inspection
Inspection l7 Pass 12 F l - Fee
5
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass El Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 11 -22 -2010
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADD REAR STAIRS/BRICK WALLS
1409 CHATHAM AVE
PETER &CATHERINE EDWARDS
494 BRIARWOOD RD
GUYTON GA 31312
912 - 472 -4026
ROBIN RESTORATION
570 E YORK ST
SAVANNAH GA 31401
P
$ 301.00
$32,000.00
PERMIT #: 100551
TOTAL BALANCE DUE: $ 301.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
$60,/4-
10-0 5S1
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: iNO9 6407/14 00 6tJUs
NAME
ADDRESS
PIN # d0 II -Q7 -Or
TELEPHONE
Owner
'R;T2_�p1,,1�42IOs
1 l 0 ( &»w 33' i 3zS-
t, z) '%Z - v11I ze
Architect
or Engineer
SAM L1.3 E2-r i
Pal i t<Lt�P1z_
2i R i c,0 P .+� D4 3w D Zg4I(
14 ?AL.-ie,,,,D 491 Ci j z94ic
t(3) of 5- 95-7 -
C8'113)757-3 `f ((
Building "iii.
Contractor
' ' et' :vz.Irtz., n1
5Avrawern f1nce ge s
S1C e4 -;t-". (CZL ..5,; 41;1r , :51 4 i
6ii Mm.Dawgi� 1t (,n.2 OE J1i.L.v_ 249tz
( r "r 6 55t '133Y$
$Y3 - 9'y-/060
(Check all that apply)
❑ Repair ❑ Residential
❑ Renovation ❑ Single Family
4inor Addition ❑ Duplex
❑ Substantial Addition ❑ Multi- Family
❑ Other ❑ Commercial
Details of Project: R OO r<64)2_ S re) , Q. TO t-hov SL. A 'u0 13WD
Ls JOS040),;1?G -3 (A)Ci-,vwA.Jf_, AoO'rtok) 0c rfl 30&9 i-A/urEJZ$
Estimated Cost of Construction: $___ 2, 00 = t 3 2, o o
(puS(ro.11
Construction Typ- (Enter appropriate number)free S
(15, Wood Fram (4) Masonry (6) Other (please specify)
(2) Wood & M sonry (5) Steel & Masonry
(3(.00 Cell
❑ Footprint Changes
❑ Discovery
❑ Demolition
(3) rick Venter
Propo ed use:
Remar
ATTAC OPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following rmation based on the construction drawings and site plan:
# Units
Lot Area
# Off - street . arkin
Trees locate. & list
Access:
Driveway
Setbacks: 'rout
spaces
on site plan
# Bedrooms # Bathrooms
Living space (total sq. ft.)
With culvert? With swale?
Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the ext -me high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditi c . ing units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through OL) .)
On -site waste and debris containers will be provided by Cd,j-ritf Z._
Construction debris will be disposed byCU ^7 ?fAG7- ' . by means of 'MOO<
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: ( ).15(
t (J Signature of Applicant:, -
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
Signature
FEES
Z o
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
301