HomeMy Public PortalAbout07-0544 MorganInspection Report
City of Tybee Island
403 Butler Ave.
P.O. Box 2749
Tybee Island, GA 31328
Phone: (912) 786 -4573 ext. 114
Fax: (912) 786 -9539
0ermit No. 0 '1- OS
Date Requested I O - (S - C 6
)wner's Name / ' ) 0 r aarn Date Needed ) C ` (S - 0
(( �
aen. Contractor Subcontractor `o a S�i-Q ( i r [ o v. Ci f
•
:ontact Number
(r7 ,) qrn- q 130
,..ocation \ 3 0-1 tic; S AU€J.
[ nspecto r Date of Inspection 1 0 1 Q
c e Q I Q c P N.2 �� +s 1-145 �2� type of Inspection A, c,� vvu
Pass Er-
7 0'
Fad
1tJ1�L.s
�vG
�� �C� co 1Lo ti b-04-1/3 L�
o4.1.4
DATE ISSUED: 12 -31 -2007
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
MECH PERMIT - AIR HANDLER
1302 JONES AVE
THOMAS & BARBAR MORGAN
PO BOX 245
WOODBURY GA 30293 -0245
PH # 706 -553 -2301
COASTAL AIR CONDITIONING
P 0 BOX 22365
SAVANNAH GA 31403
P
$ 28.00
$2,269.00
PERMIT #: 070544
TOTAL BALANCE DUE: $ 28.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
RECEIVED
/2,3/ - -o7
Permit Number
p7 OSL/4
Date
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMNET
P.O. Box 2749
Tybee Island, GA 31328
Phone (912) 786 -4573 Fax (912) 786 -9539
MECHANICAL PERMIT APPLICATION
Location of wo (street address) lyea r 163 / t Y
CV60,1 e COAL-haill
Contractor
Address of Contractor C9(8 ( HO 1905710
Telephone number of Contractor 21 a-3a `g`� a
Name of Property Owner '16w) 1 V
Mailing address of Property Owner G" 1-01 S AVe/
0(0.) CI I OD
Date work will be ready for inspection, if known 1.2 24 04
422M'
Telephone number of Property Owner
Estimated cost of construction
Oil
Absorption Unit
Air Conditioning Unit
Boiler — Complete
Conversion Burner
Distribution System
Exhaust Hood
Floor Furnace
Gas Dryer
Gas Piping Distribution
New Work V Replacement
Gas
Electric
Heat Pump
Oil Burner
Refrigeration System
Space Heater (Vented)
Unit Heater
Wall Heater
Warm Air Furnace
/ W ! hard He
Ale V