Loading...
HomeMy Public PortalAbout07-0544 MorganInspection Report City of Tybee Island 403 Butler Ave. P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786 -4573 ext. 114 Fax: (912) 786 -9539 0ermit No. 0 '1- OS Date Requested I O - (S - C 6 )wner's Name / ' ) 0 r aarn Date Needed ) C ` (S - 0 (( � aen. Contractor Subcontractor `o a S�i-Q ( i r [ o v. Ci f • :ontact Number (r7 ,) qrn- q 130 ,..ocation \ 3 0-1 tic; S AU€J. [ nspecto r Date of Inspection 1 0 1 Q c e Q I Q c P N.2 �� +s 1-145 �2� type of Inspection A, c,� vvu Pass Er- 7 0' Fad 1tJ1�L.s �vG �� �C� co 1Lo ti b-04-1/3 L� o4.1.4 DATE ISSUED: 12 -31 -2007 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT MECH PERMIT - AIR HANDLER 1302 JONES AVE THOMAS & BARBAR MORGAN PO BOX 245 WOODBURY GA 30293 -0245 PH # 706 -553 -2301 COASTAL AIR CONDITIONING P 0 BOX 22365 SAVANNAH GA 31403 P $ 28.00 $2,269.00 PERMIT #: 070544 TOTAL BALANCE DUE: $ 28.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P.O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org RECEIVED /2,3/ - -o7 Permit Number p7 OSL/4 Date CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMNET P.O. Box 2749 Tybee Island, GA 31328 Phone (912) 786 -4573 Fax (912) 786 -9539 MECHANICAL PERMIT APPLICATION Location of wo (street address) lyea r 163 / t Y CV60,1 e COAL-haill Contractor Address of Contractor C9(8 ( HO 1905710 Telephone number of Contractor 21 a-3a `g`� a Name of Property Owner '16w) 1 V Mailing address of Property Owner G" 1-01 S AVe/ 0(0.) CI I OD Date work will be ready for inspection, if known 1.2 24 04 422M' Telephone number of Property Owner Estimated cost of construction Oil Absorption Unit Air Conditioning Unit Boiler — Complete Conversion Burner Distribution System Exhaust Hood Floor Furnace Gas Dryer Gas Piping Distribution New Work V Replacement Gas Electric Heat Pump Oil Burner Refrigeration System Space Heater (Vented) Unit Heater Wall Heater Warm Air Furnace / W ! hard He Ale V