Loading...
HomeMy Public PortalAboutResolution 2021-09-02 Expenditure of Wastewater Fund for Railroad Right of Way Permitting Employee Owned 2480 W. 26th Street, Unit B225 Denver, Colorado 80211 Tel: +1 303-964-3333 hello@merrick.com www.merrick.com August 31, 2021 Adam Cwiklin, CWP Water and Wastewater Superintendent Town of Fraser 153 Fraser Avenue, PO Box 370 Fraser CO, 80442 Via email: acwiklin@town.fraser.co.us RE: Proposal for Permitting Services, Sewer Main Expansion, Fraser Colorado Dear Adam: Merrick & Company (Merrick) is pleased to present this proposal to complete early permitting activities for an upgraded sewer main extending under Highway 40 and the Union Pacific Railroad (UPRR), tracks in Fraser. Work crossing railroad rights-of-way will require a permit from the UPRR which has historically required significant time to complete, typically ranging from six months to almost a year. Due to this extended time, we propose to start the permitting process so that the sewer upgrades may be completed in the next year. Note that this work includes upsizing the sewers from manhole W012 to manhole B010. It does not include upsizing the sewer in Leonard Lane. We propose to complete the following activities: • Conduct preliminary conversations with UPRR and the Colorado Department of Transportation (CDOT) to determine any special permit requirements for this location. • Verify the preliminary sizing calculations for the loading on this sewer based on future projections that were developed as part of the Wastewater Collection System Master Plan. • Prepare a preliminary layout for the sewer upgrades, including new manholes. It is assumed that construction of a parallel sewer would be most cost effective if determined practical. • Propose preliminary means of construction, including open cut and boring methods. Boring methods will be based on assumed geotechnical conditions and consultation with a boring specialist to determine potential surface impacts to the highway and railroad. • Utilize the information above to determine whether the current sewer right -of-way is sufficient for any necessary realignment or if additional or temporary rights-of-way may be necessary for construction. r:\utilities\cip\board memos\ss rr crossing permit\sewer main upgrade permitting proposal 2021_0831.docx 2 • File permit applications with UPRR and CDOT. • Meet with you throughout this design process to ensure that our preliminary design meets your expectations and the Town’s needs. • Prepare a summary letter report including the status of permits and rights-of-way. Preliminary design drawings including simplified plan-and-profile sheets will be included in this report. Assumptions We have assumed a reasonable effort to address our understanding of permitting requirements for the new sewer main. Our total estimated fee of $12,000 is based on an hourly rate plus expenses basis in accordance with our current rate schedule. Permit application fees are not included in our estimate. Please contact us if you have any questions or concerns regarding these proposed services. Sincerely, Merrick and Company Randy Kenyon, P.E. Terry Kenyon, P.E. Project Manager Principal/Senior Project Manager