HomeMy Public PortalAbout82-168 (10-19-82)RESOLUTION NO. 82 -168
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF LYNWOOD APPROVING" CHANGE ORDER NO. 3 FOR HES
TRAFFIC SIGNAL UPGRADE AND - INTERCONNECT; PROJECT NOS.
5- 5008 -008 & 5- 009 -009, AND APPROVING FUNDS FOR
SAID CHANGE ORDER.
WHEREAS, the City Council of the City of Lynwood
continually intends to improve public safety, and
WHEREAS, the City of Lynwood.entered into a contract
with Steiny and Company, Inc., on May 18, 1982, for the improve-
ment of mastarm, left turn and pedestrian signals, and traffic
signals, and
WHEREAS, traffic through the intersections of Imperial
Highway and Century Blvd., and Imperial Highway and Long Beach
Blvd., is expected to increase due to increased development in
the vicinity and a change order is needed to provide left turn
phasing for northbound and southbound traffic at said inter-
sections, and
WHEREAS, said change order is expected to cost approxi-
mately $40,000, thus making the new contract total $955,630, and
WHEREAS, the $40,000 needed to implement this change
order will be obtained by transferring money from the Atlantic
Avenue at Century Blvd. Improvement Project (CIP FY1982 -83); and
WHEREAS, the City Council has studied this appropriation
and its budget implications, and
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Lynwood that:
SECTION 1. The City Council hereby authorizes the
City Manager to make the following transfer to provide for the
necessary funds.
FROM TO AMOUNT
5 -5010 -0010 5- 5008 -008 $40,000
TOTAL $40,000
SECTION 2.' This resolution shall take effect
immediately upon its adoption.
PASSED, APPROVED and ADOPTED this 19th day of
October, 1982.
�IS �THOMPTSON, Mayo
ATTEST: City of Lynwood
ANDREA L. HOOPER, City Clerk
City of Lynwood APPROVED AS TO CONTENT:
/ ROLD C �'C°. /,� .���
�lI -AROLD C. WILLIAMS, P.E.
Director of Public Works /City Engineer
APP ED AS TO FORM:' City of Lynwood ellr
4 Z Q �-
DVI4DcEW ,:City Attorney
City of Lynwood
CONTRACT CHANGE ORDE
CITY OF LYNWOOD
DEPARTMENT OF PUBLIC WORKS
5 -5008 -008
Date: Oc tober 12 19 82 Order NO. C - Job No. HE OOOS(002)
Job Title: Traffic Signal Upgrade HES- OOOS(002)
Sheet Nos. 11 & 14
Plan Reference: Imperial Hwv /Century Blvd. temReference: Proposal Items Nos. 7 & 10
Imperial Hwy /Long Beach Blvd.
The changes or interpretations described and noted herein are hereby authorized.
The signed original of this order is on file at the Office of the City Engineer
Show as separate numbered paragraphs: (1) Reason for change; (2) Description of change; (3) Change in contract cost;
(4) Extension of contract, if warranted. (5) New contract total including all change orders.
1. a. Traffic increase at above mentioned intersections, due to increased
development in intersection vicinity.
2. a. Install left turn phasing for northbound and southbound traffic for
above mentioned intersections. (Install poles, mastarms, left turn
and pedestrian signals, traffic signals, conduits and loops.)
3. a. ADD:
Install left turn phasing for above
mentioned intersections.
4. a. Thirty (30) working days extension.
5. a. New Contract Total (HES- OOOS(002))
LU`fP SUM
"�
$37,912.87
$628,303.04 + $37,912.87 = $666,215.91
i
i
I
i
,
i
Plans are attached.
(Use Reverse Side for Sketch)
Aooroved
�Ggineer
19_ Aoicroved'
Director of Ruollc works Agent
Cry Manager
ohtn EUtlon: WHITE — Ongrnal ro Gonuac;Or
CANARY — COntr=c !
GOIOENROD — Fuld
PINK — olhte
STATE OF CALIFORNIA )
) ss.
COUNTY OF LOS ANGELES )
I, the undersigned, City Clerk of the City of
Lynwood, do hereby certify that the foregoing resolution
was passed and adopted by the City Council of the City of
Lynwood at a regular meeting held on the
19th day of October 1982.
AYES: Byork, Green, Morris, Rowe, Thompson
NOES: None
ABSENT: None
a '6Lx, :::,/
City Clerk, City of Lynwood
r�