HomeMy Public PortalAbout20090722 - Agenda Packet - Board of Directors (BOD) - 09-22 Midpeninsula Regional
Open Space District
Meeting 09-22
SPECIAL AND REGULAR MEETINGS
BOARD OF DIRECTORS
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
6:00 p.m.
Wednesday,July 22, 2009
330 Distel Circle
Los Altos, California
AGENDA
6:00 ROLL CALL
SPECIAL MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT-CLOSED SESSION
I Conference with Legal Counsel- Existing Litigation - California Government Code Section
54956.9(a)- Anderson et al. vs. Midpeninsula Regional Open Space District et al., Santa Clara
Superior Court Case No. 108CV 112242
2 Conference with Legal Counsel- Existing Litigation - California Government Code Section
54956.9(a)- Chiocchi et al. vs. Midpeninsula Regional Open Space District et al., Santa Clara
Superior Court Case No. 107CV095669
REGULAR MEETING
7. 0* REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT
ROLL CALL
REPORT ON RETURN FROM CLOSED SESSION(The Board shall publicly state any reportable action taken in
Closed Session pursuant to Government Code Section 54957.1)
PLEDGE OF ALLEGIANCE
ORAL COMMUNICATIONS—PUBLIC
'p -
ADOPTION OF AGENDA
7:10* CONSENT CALENDAR
I Approve Minutes of June 24, 2009 Special Meeting
2 Approve Revised Claims Report
3 Approve Written Communications—None
Meeting 09-18 Page 2
7:20* BOARD BUSINESS
4 Presentation on Mountain Lion Research within Sierra Azul Open Space Preserve—K. Lenington
5 Determination that the Recommended Actions are Exempt from the California Environmental Quality
Act and Approval of an Agreement with Timothy C. Best, Certified Engineering Geologist(CEG)Not
to Exceed $150,000 to Provide CEG Services at Various Open Space Preserves During Fiscal Years
2009-2014—G. Basson
6 Review of FY2009-1 0 Action Plan First Quarter Report—A. Speidel
INFORMATIONAL REPORTS— Written or oral reports on compensable meetings attended. Brief reports or
announcements concerning activities of District Directors and staff, opportunity to refer public or Board
questions to staff for factual information; request staff to report back to the Board on matter at a future
meeting; or direct staff to place a matter on a future agenda.
A. Committee Reports
B. Staff Reports
C. Director Reports
SPECIAL MEETING CLOSED SESSION RECONVENED(IF NECESSARY)
REPORT ON RETURN FROM RECONVENED CLOSED SESSION(IF NECESSARY)(The Board shall publicly state
any reportable action taken in Closed Session pursuant to Government Code Section 54957.1)
ADJOURNMENT
Times are estimated and items may appear earlier or later than listed. Agenda is subject to change of order.
TOADDRESSTHEBOARD: The Chair will invite public comment on agenda items at the time each item is considered by the Board of
Directors. You may address the Board concerning other matters during Oral Communications. Each speaker will ordinarily be
limited to three minutes. Alternately,you may comment to the Board by a written communication, which the Board appreciates.
Consent Calendar. All items on the Consent Calendar may be approved without discussion by one motion. Board members, the
General Manager, and members of the public may request that an item be removed from the Consent Calendar during consideration
of the Consent Calendar.
In compliance with the Americans with Disabilities Act, if you need assistance to participate in this meeting,please contact the
District Clerk at(650)691-1200, Notification 48 hours prior to the meeting will enable the District to make reasonable arrangements
to ensure accessibility to this meeting.
Public records provided to a majority of the District's Board of Directors relating to an Agenda Item on the open session of regular
Board meeting will be made available for public inspection at the District's Administrative Office located at 330 Distel Circle, Los
Altos,California 94022 during normal business hours.
CERTIFICATION OF POSTING OF AGENDA
1,Anna Jatczak, Interim District Clerk for the Midpeninsula Regional Open Space District(MROSD),declare that tile foregoing agenda for
the July 22,2009 Special and Regular Meetings of the MROSD Board of Directors was posted and available for review on July 17,2009 at
the Administrative Offices of MROSD,330 Distel Circle,Los Altos,California,94022. The agenda is also available on the District's web
site at http://\v\N\\-open
Signed this 17th day of July 2009,at Los Altos,California.
Interim District Clerk Date: 07/17/09
7 Claims No. 09-13
Meeting 09-22
Date 7/22/09
Revised
Midpeninsula Regional Open Space District
# Amount Name Description
10733 $48,861.00 B Bros Construction Construction Services For AO Remodel
10734 $7,687.40 Forestry Suppliers 25 Fire Shelters&Cases
10735 $7,676.11 Santa Clara County Sheriffs Office Patrol Services
10736 $5,316.22 Go Native Nursery Invasive Species Control&Herbicide Application-Mindego Hill
10737 $4,991.26 Sage Associates Grazing Consulting Services
10738 $4,811.18 Philip Williams&Associates Dambreak Analysis-RSA
10739 $3,704.73 Roy's Repair Service Vehicle Repairs&Service
10740 $2,929.18 Tires On The Go Tires
10741 $2,660.79 Peckham&McKenney Recruitment-Assistant General Manager
10742 $2,157.39 Ecological Concerns Native Revegetation Maintenance&Monitoring-Skyline Ridge
Tree Farm
10743 $1,727.24 Mortensen Design Design Services-Implementation Of New District Logo
10744 $1,570.00 Biological Control Of Weeds Hairy Weevils For Biocontrol Of Weeds
10745 $1,260.00 Ric Springer Reimbursement-Slender False Brome Treatment
10746 $1,258,61 Tadco Supply Janitorial Supplies
10747 $1,232.13 Los Altos Garbage Company Wood Recycling Debris Box-FFO/Garbage Service-AO&FFO
10748 $1,201.04 '1 Home Depot Field Supplies,Tools For Maintenance Truck,Materials For
Rental Residence Repairs, HVAC Supplies For FFO,DHF
Supplies
10749 $1,181.35 Orchard Supply Hardware Field Supplies,Tools For Maintenance Truck,Cargo Bag For Fire
Extinguisher&Tools,Paint For Fremont Older Residence,
Fencing Supplies&Nature Center Supplies
10750 $997.62 Metro Mobile Communications Two Portable Radios
10751 $921.00 Brownstein, Hyatt, Farber&Schreck Legal Services-Chiocchi Litigation
10752 $745.47 Foster Brothers Lock&Key Services-32 Padlocks&70 Keys For Various
Preserve Gates
10753 $700.00 Valley Tree Care Tree Removal-Bear Creek Redwoods
10754 $699.26 West Payment Center Legal Research&Books
10755 $682.00 Rex Halepeska Motorcycle Safety Gear
10756 $668.05 Gardenland Power Equipment Field Supplies,Chain Saw Supplies&Thread Repair Kit
10757 $515.34 San Jose Water Company Water Service-RSA County Park
10758 $500.00 Green Waste Dumpster For SFO
10759 $420.50 G.P. Sports Install Kick Start To Patrol Motorcycle
10760 $418.40 Cartridge World Printer Supplies-Cartridges
10761 $407.50 Department Of Toxic Substances Environmental Protection Agency Fees
Control
10762 $402.42 Life Assist First Aid Supplies
10763 $350.25 Barron Park Supply Plumbing Supplies For RSA
10764 $289.41 Perez, Mike Reimbursement-Uniform Expenses
10765 $275.41 Pringle Tractor Company Tractor Supplies-Clevis, D-Ring&Shredder Knife
10766 $275.31 Summit Uniforms Uniform Expenses
10767 $261.39 Lab Safety Supply Safety Equipment
10768 $195.38 R&B Company Plumbing Supplies For Windy Hill Water System
10769 $178.00 Davison,Steve Reimbursement-Tuition
10770 $164.71 Ergo Works Ergonomic Equipment
10771 $138.77 Goodco Press Printing Services-Shift Change Forms
10772 $122.60 California Water Service Company Water Service-Rental Residences
10773 $99.00 Premiere Global Services Fax Broadcast Services
10774 $85.48 Peterson Tractor Tractor Supplies-Hydraulic Hose For Excavator
10775 $81.00 Maze, Leigh Ann Reimbursement-Russian Ridge Burn Expenses
10776 $70.00 Rokon International Battery For ATV
Page 1 of 2
r -
a Claims No. 09-13
Meeting 09-22
Date 7/22/09
Revised
Midpeninsula Regional Open Space District
# Amount Name Description
10777 $57.00 Topley, David Reimbursement-Charges For Sewing Patches On Caps&
Sunhats
10778 $40.00 JaVelco Equipment Service Field Equipment Repair
10779 $39.97 FedEx Office Copies For Fire Management Plan Meeting
10780 $28.28 Conoco Phillips Fuel
10781 $25.25 Rayne Of San Jose Water Conditioning Service-Fremont Older
10782 $20.00 *2 Secretary Of State Fee For Document Copies Needed For The Chiocchi Litigation
10783 $6.50 Hoge, Fenton,Jones&Appel Legal Services-Chiocchi Litigation
10784 R $34,292.35 Downtown Ford Purchase of 2009 Ford Escape Hybrid
10785 R $7,734.52 Hertz Equipment Rental Equipment Rental For Road Improvements&Culvert Installation
On Various Roads In The Skyline Area
10786 R $4,665.58 Pringle Tractor Center Hydraulic Link, Hydraulic Tilt Cylinder,Suitcase Weights&
Rear Wheel Weights For Tractor
10787 R $3,453.62 The Ferguson Group Legislative Consultant-Lobbyist For Mt. Umunhum
10788 R $1,748.00 John Shelton Supplies For Kennedy Trail&Regnart Trail Culvert Replacement
Projects
10789 R $1,437.50 Macro Corporation Black Mountain Microwave Study For Districts New Radio System
10790 R $1,380.00 Macro Corporation Project Management Services-Implementation Of District's New
Radio System
10791 R $867.67 Gardenland Power Equipment Field Supplies/Weed Whip/Chainsaw&Brushcutter Parts
10792 R $700.00 Gordon Von Richter Reimbursement-Slender False Brome Treatment
10793 R $622.27 Staples Office Supplies&Coffee
10794 R $617.50 Normal Data Consulting Services-Citation Database Development&Support
10795 R $594.23 Sears Tools For Tractors
10796 R $528.77 California Water Service Company Water Service-FFO
10797 R $434.30 San Jose Mercury News Legal Advertisement-Invitation To Bid For Fletscher Property
Demolition
10798 R $420.00 Susan Kahn Reimbursement-Slender False Brome Treatment
10799 R $325.00 Shute,Mihaly&Weinberger LLP Legal Services-Planning Advice
10800 R $240.85 Farm Plan Parts For Mower
10801 R $183.00 San Mateo County Health Department Tick Testing/Water Testing
10802 R $161.00 Board Of Equalization Sale&Use Tax-Book Sales
10803 R $153.63 Alhambra&Sierra Springs Water Dispenser-AO
10804 R $128.52 Board Of Equalization Diesel Fuel Tax
10805 R $106.00 Stevens Creek Quarry Concrete Disposal
10806 R $68.01 Petty Cash Parking&Mileage/Russian Ridge Burn Supplies/Family Picnic
Supplies
10807 R $42.48 FedEx Shipping Charges
10808 R $18.66 Pape'Material Handling Bobcat Parts
Total $172,030.36
*1 Urgent Check Issued 7/13/09
*2 Urgent Check Issued 7/8/09
Page 2 of 2
M
Claims No. 09-13
Meeting 09-22
Date 7/22/09
Midpeninsula Regional Open Space District
# Amount Name Description
10733 $48,861.00 B Bros Construction Construction Services For AO Remodel
10734 $7,687.40 Forestry Suppliers 25 Fire Shelters&Cases
10735 $7,676.11 Santa Clara County Sheriffs Office Patrol Services
10736 $5,316.22 Go Native Nursery Invasive Species Control&Herbicide Application-Mindego Hill
10737 $4,991.26 Sage Associates Grazing Consulting Services
10738 $4,811.18 Philip Williams&Associates Dambreak Analysis-RSA
10739 $3,704,73 Roy's Repair Service Vehicle Repairs&Service
10740 $2,929.18 Tires On The Go Tires
10741 $2,660.79 Peckham&McKenney Recruitment-Assistant General Manager
10742 $2,157.39 Ecological Concerns Native Revegetation Maintenance&Monitoring-Skyline Ridge
Tree Farm
10743 $1,727.24 Mortensen Design Design Services-Implementation Of New District Logo
10744 $1,570.00 Biological Control Of Weeds Hairy Weevils For Biocontrol Of Weeds
10745 $1,260.00 Ric Springer Reimbursement-Slender False Brome Treatment
10746 $1,258.61 Tadco Supply Janitorial Supplies
10747 $1,232.13 Los Altos Garbage Company Wood Recycling Debris Box-FFO/Garbage Service-AO&FFO
10748 $1,201.04 '1 Home Depot Field Supplies,Tools For Maintenance Truck,Materials For
Rental Residence Repairs, HVAC Supplies For FFO,DHF
Supplies
10749 $1,181.35 Orchard Supply Hardware Field Supplies,Tools For Maintenance Truck,Cargo Bag For Fire
Extinguisher&Tools,Paint For Fremont Older Residence,
Fencing Supplies&Nature Center Supplies
10750 $997.62 Metro Mobile Communications Two Portable Radios
10751 $921.00 Brownstein, Hyatt, Farber&Schreck Legal Services-Chiocchi Litigation
10752 $745.47 Foster Brothers Lock&Key Services-32 Padlocks&70 Keys For Various
Preserve Gates
10753 $700,00 Valley Tree Care Tree Removal-Bear Creek Redwoods
10754 $699.26 West Payment Center Legal Research&Books
10755 $682.00 Rex Halepeska Motorcycle Safety Gear
10756 $668.05 Gardenland Power Equipment Field Supplies,Chain Saw Supplies&Thread Repair Kit
10757 $515,34 San Jose Water Company Water Service-RSA County Park
10758 $500.00 Green Waste Dumpster For SFO
10759 $420.50 G.P.Sports Install Kick Start To Patrol Motorcycle
10760 $418.40 Cartridge World Printer Supplies-Cartridges
10761 $407.50 Department Of Toxic Substances Environmental Protection Agency Fees
Control
10762 $402.42 Life Assist First Aid Supplies
10763 $350.25 Barron Park Supply Plumbing Supplies For RSA
10764 $289,41 Perez, Mike Reimbursement-Uniform Expenses
10765 $275.41 Pringle Tractor Company Tractor Supplies-Clevis, D-Ring&Shredder Knife
10766 $275.31 Summit Uniforms Uniform Expenses
10767 $261.39 Lab Safety Supply Safety Equipment
10768 $195.38 R&B Company Plumbing Supplies For Windy Hill Water System
10769 $178.00 Davison,Steve Reimbursement-Tuition
10770 $164.71 Ergo Works Ergonomic Equipment
10771 $138.77 Goodco Press Printing Services-Shift Change Forms
10772 $122.60 California Water Service Company Water Service-Rental Residences
10773 $99.00 Premiere Global Services Fax Broadcast Services
10774 $85.48 Peterson Tractor Tractor Supplies-Hydraulic Hose For Excavator
10775 $81.00 Maze, Leigh Ann Reimbursement-Russian Ridge Burn Expenses
10776 $70.00 Rokon International Battery For ATV
Page 1 of 2
1�
Claims No. 09-13
Meeting 09-22
Date 7/22/09
Midpeninsula Regional Open Space District
# Amount Name Description
10777 $57.00 Topley, David Reimbursement-Charges For Sewing Patches On Caps&
Sunhats
10778 $40.00 JaVelco Equipment Service Field Equipment Repair
10779 $39.97 FedEx Office Copies For Fire Management Plan Meeting
10780 $28.28 Conoco Phillips Fuel
10781 $25.25 Rayne Of San Jose Water Conditioning Service-Fremont Older
10782 $20.00 *2 Secretary Of State Fee For Document Copies Needed For The Chiocchi Litigation
10783 $6.50 Hoge,Fenton,Jones&Appel Legal Services-Chiocchi Litigation
Total $111,106.90
*1 Urgent Check Issued 7/13/09
*2 Urgent Check Issued 7/8/09
Page 2 of 2
AMW
Midpeninsula Regional
Open Space District
R-09-89
Meeting 09-22
July 22, 2009
AGENDA ITEM 4
AGENDA ITEM
Presentation on Mountain Lion Research within Sierra Azul Open Space Preserve
GENERAL MANAGER'S RECOMMENDATION
Accept a Presentation on Mountain Lion Research within Sierra Azul Open Space Preserve.
SUMMARY
Dr. Chris Wilmers from the University of California, Santa Cruz is leading a research program
that examines the movement, range, physiology and predatory habits of pumas, also known as
mountain lions (Puma concolor), in the Santa Cruz Mountains. Dr. Wilmers and his research
team are collaborating with the Felidae Conservation Fund (a non-profit organization based in
Marin) and the California Department of Fish & Game (DFG) on the project, with additional
support from California State Parks. Given extensive District land ownership in the Santa Cruz
Mountains, District staff is collaborating with Dr. Wilmers to extend the research work into
Sierra Azul Open Space Preserve.
DISCUSSION
The primary objective of this Mountain Lion Research Program is to determine how variability
in landscape features (including habitat fragmentation, choke points and corridors) combine with
predator physiology to influence the ecosystem services provided by pumas. The research team
has designed and tested a Global Positioning System (GPS)/accelerometer collar, which is
attached to mountain lions captured in the Santa Cruz mountains (to date the team has captured
and collared six lions). The GPS device records the lion's location every 20 minutes. The
accelerometer measures activity continuously, including when the animals are running and when
they are still, to determine the caloric expenditure. Information collected by the collars will
address the following research objectives: 1) the extent to which the predatory impacts of pumas
on the food web are attenuated or amplified by landscape connectivity and fragmentation and 2)
identify the critical corridors for mountain lions to move among habitat patches within and
between mountain ranges in the central coast of California(and in particular, the Santa Cruz
Mountains).
p AN R-09-89 Page 2
Dr. Wilmers has worked on large predatory mammals, including gray wolves and mountain
lions, for over ten years. He and the research team are experts in animal handling, including the
field capture and anesthetization of mammals, radio and GPS telemetry, animal movement
modeling, and Geographic Information Systems. They have published over 15 papers in
1 prestigious journals such as Proceedings of the National Academy of Sciences, Ecology Letters
and PLoS Biology (a peer-reviewed open-access journal published by the Public Library of
Sciences) and have been the subject of media coverage by National Geographic, The New York
Times, and NPR.
Dr. Wilmers will present on the ecology and natural history of mountain lions, their population
and status in the Santa Cruz Mountains, as well as preliminary data and findings from the
research program.
FISCAL IMPACT
i
The District has received a proposal from Dr. Wilmers for $5,000 in funding support through the
District's Resource Management Grant Program. The proposal is being evaluated by District
staff and a funding recommendation will be provided to the Board at their next meeting on
August 12, 2009.
PUBLIC NOTICE
Public notice was provided as required by the Brown Act. No additional notice is required.
CEQ A COMPLIANCE
This item is not subject to the California Environmental Quality Act.
NEXT STEPS �
Staff will provide the Board with periodic updates on the status of the research as well as any
media stories that are generated on the research program.
I
Prepared by:
Kirk Lenington
Senior Resource Planner
Contact person:
Same as above
I
� d
i
Midpeninsula Regional
' Open Space District
� r i
R-09-72
Meeting 09-20
July 8, 2009
AGENDA ITEM 5
I
I
i
AGENDA ITEM
Determination that the Recommended Actions are Exempt from the California Environmental
Quality Act and Approval of an Agreement with Timothy C. Best, Certified Engineering
Geologist (CEG)Not to Exceed I110,000 to Provide CEG Services at Various Open Space
Preserves During Fiscal Years 2009-2014.
GENERAL MANAGER'S RECOMMENDATIONS
1. Determine that the recommended action is categorically exempt from the California
Environmental Quality Act (CEQA) as set out in this report.
2. Authorize the General Manager to enter into an agreement with Timothy C. Best, CEG, for
a total contract amount not to exceed $150,000, to provide professional engineering
geology, hydrology, and construction administration services as requested for a term not to
exceed five ears. Annual funding amounts for these services will be determined during the
y g
Y preparation reparation of the Action Plan and Budget subject to Board review and approval.
3. For FY2009-10, authorize the provision of services under the Agreement in an amount not
to exceed $30,000.
SUMMARY
The services of a Certified Engineering Geologist (CEG) and/or Registered Professional
Geotechnical Engineer (GE) are needed to complete road and trail inventory work and
miscellaneous road and trail assessments, to provide repair designs, and to assist in construction
years. The total contract amount is $150 000 $30
administration over the next five ye s ,000 of which
is budgeted for FY2009-10. Award of a multi-year contract will substantially reduce staff time
that would otherwise be required to prepare five separate annual proposals.
i
i
R-09-72 Page 2
DISCUSSION
Background
Road and trail inventories and assessments provide essential information on the condition and
configuration of existing roads. These inventories and assessments identify sources of
sedimentation that may require attention, and also include prescribed treatment measures to
reduce sediment transport at potential problem sites, a ranking system for treatment, and cost
estimates for implementation. Recent road and trail repair and decommissioning projects that
have been presented to the Board for contract approval and have received outside grant funds
were originally identified as high priority treatment sites as part of these inventories and
assessments.
The previous agreement was for a three-year term that recently ended at the start of this fiscal
year. A new, multi-year contract is needed to continue the road and trail inventory work to fill
the information gaps at various Preserves. Multi-year contracts are terminable at the discretion
of the District. Such contracts are an efficient and cost-effective way to determine and select
highly qualified professionals who then can be available to provide such services at a set price on
an as-needed basis.
Request for Qualifications and/or Proposals Process
On June 15, 2009, District staff issued a Request for Qualifications and/or Proposals (RFQ/P) to
consultants with CEG and/or GE qualifications to conduct a comprehensive road and trail
inventory for 26 miles of District roads and trails in the Mindego Ranch area of Russian Ridge
Open Space Preserve, the western area of Bear Creek Redwoods Open Space Preserve, and the
Rancho de Guadalupe area of Sierra Azul Open Space Preserve. The RFQ/P also asked
consultants to provide information about qualifications for additional engineering geology
services in anticipation of future projects that will require CEG and/or GE assistance.
The RFQ/P was posted on the District's website and was also sent to seven consultants. Four
consultants submitted proposals for the road and trail inventory project and eight submitted
qualifications for additional engineering geology services.
Timothy C. Best, CEG, was selected as the most qualified consultant for the road and trail
inventory contract work. Mr. Best has extensive expertise in hydrogeology and forest road
design, possesses the most road and trail inventory experience of those who submitted proposals,
and has previously conducted many road and trail inventories across varied landscapes and soil
types on District land. Mr. Best has provided excellent deliverables to staff that include highly
practical and cost-effective repair and maintenance recommendations. Additionally, staff has
placed Mr. Best and seven other consultants on a pre-qualified contact list should future
engineering geology services be needed. Additional services include reviewing potential new
trail alignments, assessing links through new properties, rerouting existing trails, and stream
channel restoration. Pre-qualification also results in more efficient and cost-effective consultant
services.
R-09-72 Page 3
FISCAL IMPACT
The Planning Department FY2009-10 budget includes $30,000 for road and trail assessments.
Staff anticipates the ongoing need for CEG and/or GE assistance in the next five years at similar
annual expenditure levels, totaling $150,000. Therefore, the total recommended contract amount
for fiscal years 2009 through 2014 is $150,000. Annual funding amounts for these services will
be determined during the yearly preparation of the Action Plan and Budget, and will be subject
to Board review and approval.
PUBLIC NOTICE
Public Notice is provided as required by the Brown Act. No additional notice is required.
CEQA COMPLIANCE
Staff concludes that entering into this consultant agreement for engineering geology services
does not constitute a project under the California Environmental Quality Act (CEQA); therefore
the recommended action is exempt. Any future action taken by the Board of Directors to
implement any projects recommended by the consultant will be subject to CEQA review at that
time.
NEXT STEPS
If approved by the Board, staff will finalize the contract with the consultant who will begin work
on road and trail inventories and assessments in the late summer of the current year.
Prepared by:
Galli Basson, Planning Technician
Contact person:
Same as above
Midpeninsula Regional
` Open Space District
R-09-90
Meeting 09-22
July 22, 2009
AGENDA ITEM 6
AGENDA ITEM
Review of FY2009-10 Action Plan First Quarter Report
GENERAL MANAGER'S RECOMMENDATIONS
Review and accept the First Quarter Report of the progress of the FY2009-10 Action Plan.
SUMMARY
The District's Action Plan provides scope, schedule and budget for projects/work plan approved
each fiscal year. The projects consum
e 100% of District work capacity. During a given year,
Y P J
g g Y
unanticipated opportunities may present themselves. Unplanned circumstances that impact
project funding or schedule may also occur. The purpose of the Quarterly Action Plan Report is
p J g Y p �
to keep the Board informed and involved in changes to the Action Plan and provide an orderly
mechanism by which the District can effectively adapt to changed circumstances and take
advantage of emerging opportunities.
DISCUSSION
This Action Plan Quarterly Reports presents the status of the District's Key Projects and the
reasons for variances and adjustments to the Action Plan project schedule. The following
summary presents the status of milestones scheduled for the first quarter and also the updated
status of the milestones for the remaining quarters.
A. 1st Quarter Status of Project Milestones
The departments' report on completion of the Key Project milestones scheduled for Vt
st
uarter, FY2009-10 showed very good progress. The percentage of 1 Quarter Action
Q � Yg p g p g
Plan milestones either on target or partially on target is 79.4%. The summarized results, as
shown in the 1 st Quarter Report, are as follows:
i
�I
R-09-90 Page 2
Measures— l't Quarter Milestones % of Total
On Target 37 54.41%
Partially on Target 17 25.00%
Not on Target 11 16.18%
On oing 3 4.41%
Total Milestones - 1 st Qtr 68 100.00%
B. 2nd 3" and 0 Quarter Status of Project Milestones
The departments' report on the expected completion of the Key Project milestones
i
scheduled for the remaining three quarters of the fiscal year also shows a high percentage,
79.2%, of milestones that are either on target and/or partially on target.
Measures —2° 3r 41 uarters Milestones % of Total
On Target 117 75.97%
Partially on Target 5 3.25%
Not on Target 18 11.69%
Ongoing 14 9.09%
Total Milestones - 2" , 3r , 4` Qtrs 154 100.00%
C. Format Design
The format of the Action Plan Quarterly Report contains the following information:
1. Key Projects and Project Milestones
a) Action Plan projects and associated milestones are listed for each department.
2. Quarter of Action Plan Scheduled Date for each Project Milestone
a) Planned milestone dates are indicated by an "X" in the appropriate quarter.
3. The "On Target" Status of the Scheduled Date for each Milestone
a) This column indicates whether the milestone is "On Target" to be completed
during the quarter shown in the Action Plan or if it will be partially completed
or not completed during that quarter. If a milestone represents ongoing
activity, that is also indicated.
b) The report includes all four quarters to inform the Board when a change in a
i
milestone's planned quarterly completion date impacts, in later quarters, the
"On Target" status of subsequent milestones or changes the completion date
for the entire project (ff them is such an impact, it will require a change in the
planned completion dates for the other milestones affected and will be
explained in the "Description of Variances" column). This information is
provided so that the Board can see, in advance, the full fiscal year impact of
changes in planned project schedule.
4. Description of Reasons for Variances and Adjustments
a) Reasons for changes in the planned milestone dates, changes in the project
work, and/or changes in the planned completion date for the total project are
provided in the "Reasons for Variances & Adjustments" column.
R-09-90 Page 3
The preparation of a Quarterly Action Plan report (1) provides an opportunity for the
departments to review their fiscal year project planning/programming and to recognize the
impacts to the adopted Action Plan of projects that are added throughout the year and (2)
promotes interdepartmental collaboration as the departments review their responsibilities on
shared projects.
The departments have also prepared a report entitled "Potential New Projects under
consideration for Midyear Addition to FY2009-10 Action Plan". This report is an adjunct to the
Quarterly Report and enables the departments to notify the Board that these potential new
projects are currently under consideration and may be presented for approval during the Mid-
Year Review process. The reasons for the potential implementation of these projects are
provided.
FISCAL IMPACT
The fiscal impact of any project milestone non-completions or partial completions for the quarter
will be specific to that project and, if they affect the budget, this information will be provided at
the time of the Mid-Year Budget adjustments.
PUBLIC NOTICE
Public notice will be provided as required by the Brown Act. No additional notice is required.
CEQA COMPLIANCE
All Action Plan projects requiring CEQA compliance will fulfill the CEQA requirements.
NEXT STEPS
The District's departments will continue to implement the Action Plan Key Project milestones as
indicated in the First Quarter Report and will assess any new project additions to make at the
time of the Mid-Year Budget Review. The FY2009-10 Budget Quarterly Report for the First
Quarter will be presented in August, 2009 due to the routine lag in the availability of financial
information following the close of the fiscal quarter.
Attachment: Midpeninsula Regional Open Space District FY2009-10 Action Plan First
Quarter Report
Prepared by:
Arleen Speidel, Principal Management Analyst
Contact Person:
Arleen Speidel, Principal Management Analyst
I
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
FY2009-10 ACTION PLAN
FIRST QUARTER REPORT
♦S
CONTENTS PAGE
PLANNING DEPARTMENT QUARTERLY REPORT .............................................................................................. 3
OPERATIONS DEPARTMENT QUARTERLY REPORT
PUBLIC AFFAIRS DEPARTMENT QUARTERLY REPORT.............................................. ........................... 16
ADMINISTRATION DEPARTMENT QUARTERLY REPORT ...................................................................................... 24
LEGAL SERVICES (ADMIN) QUARTERLY REPORT .................................................................................................. 31
REAL PROPERTY DEPARTMENT QUARTERLY REPORT.......................................................................................... 36
POTENTIAL NEW PROJECTS UNDER CONSIDERATION .......................................................................................... 41
2
PLANNING DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Key Project Milestone Q r L. - L Q r_ I- Q Description of
1 01-- 2 O I 3 O 4 O Reasons for Variances&Adjustments
La Honda Creek Draft Master Plan release; 1st X Yes
Master Plan Public Hearing(tent. approval).
Development Draft Plan edits. X P Draft Master Plan Board review process extended to
(Priority 1) allow for Board Informational Report and 4 public
(AP completion date: hearings versus 2. NEW DATE: August 2009.
2Q FY2009-10) Finalize CEQA document. X I P Same as above. NEW DATE:September 2009.
Circulate CEQA document; X P Same as above. NEW DATE: September-October
receive comments. 2009.
Hold Public Hearing(final plan X No Same as above. NEW DATE: October 2009.
approval,CEQA Certification).
Sierra Azul/Bear Complete Admin Draft Plan/EIR. X Yes
Creek Redwoods Release of Draft Plan and DEIR. X No Delay due to extended planning process for La
Master Plan Honda and need to stagger master planning
Development processes given`staff time constraints. New date:
(Priority 1) October 2009.
(AP completion date: Open House/Public Hearing X No Same as above. New date: November 2009
4Q FY2009-10) (receive comments,tentative
approval)
Assemble Final EIR with X Yes Expect to assemble FEIR between November and
comments received to date and December 2009 (Q3).
their responses.
Complete Final Master Plan and X Yes
EIR; Hold public Hearing (plan
approval and CEQA
certification).
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 3
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PLANNING DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Key Project Milestone Q = Q Q .. Q L Description of
1 O 2 O ~ 3 O E" 4 O Reasons for Variances&Adjustments
Memoranda of Determine partner agency X Yes
Understanding with interest in entering into MOU.
County and Resource Submit draft MOU agreement(s) X Yes
Agencies to willing agencies for review
'Priority 1) and comment.
�completion date:
4Q FY2010-11)
Resource Management Present revised document to X No Delay due to key staff involvement in Almaden AFS
Policies Board at Study Session. Remediation with US ACOE, Mindego Ranch
(Priority 1) Invasives Control,and Purisima to Sea properties
(AP completion date: I I I purchase. NEW DATE: September 2009.
3Q FY2009-10) Complete CEQA Analysis. X No Same as above. NEW DATE: December 2009.
Board final adoption of plan and X No Same as above. NEW DATE: February 2010.
CEQA determination.
Driscoll Ranch Oversight agency written X Yes
Remediation approval of remedial action
(Priority 1) items.
(AP completion date: Complete Site Management X P Delay due to key staff involvement in Almaden AFS
1Q FY2009-10) Plan. Remediation with US ACOE, Mindego Ranch
Invasives Control, and Purisima to Sea Properties
purchase. NEW DATE:August 2009.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 4
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
PLANNING DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Key Project Milestone Q = L Q r L Q r L Q = L Description of
1 0 �l 2 O 3 O 4 0 Reasons for Variances&Adjustments
Mindego Ranch Retain consultant to provide X Yes
Remediation professional remedial
(Priority 2) investigation and design
(AP completion date: services.
3Q FY2011-12)
San Mateo County approval of X P Project will be delayed to allow sufficient time foi
remedial strategy. review and consultation per landfill removal
agreement. NEW DATE: November 2009.
Board tentative approval of X Yes Staff expects to present to Board in December after
Remedial Action Plan and County approval of remedial strategy--with
submittal to oversight agency. submittals to oversight agency completed soon
after.
Prepare Remedial Action Plan X Yes
plans and specifications and
draft CEQA document.
Board final approval of X Yes
Remediation Plan and CEQA
certification.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 5
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PLANNING DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
v
Key Project Milestone Q cL 4 C �- 4 L Description of
1 O 2 O 3 0 - 4 O ' Reasons for Variances&Adjustments
Mt. Umunhum Former US Army Corps to complete the X P US Army Corps of Engineers has identified additional
Air Force Base final site investigation report. contamination concerns and is preparing
Remediation supplemental reports. NEW DATE: September
(Priority 2) 1 2009.
'4P completion date: Retain consultant to provide X P Continuing to use existing consultants to provide
1014+) project management services. oversight services. Will contract for project
management services if appropriation is granted.
Federal budget passage-if X Yes Voting on appropriations bills is scheduled for
appropriations request is September;federal fiscal year begins October 1;
granted, initiate site assuming federal funds are appropriated,
remediation planning to address remediation planning would commence soon after
contamination issues. the appropriation.
Board authorization to accept X Yes
Federal funding.
Pond Management Conduct aquatic species surveys X 0
Plans and first year monitoring.
(Priority 2) Prioritize pond enhancement X Yes
(AP completion date: projects and select Phase I
`FY2012-13) projects to begin design during
FY 2010-11.
Conduct additional aquatic X Yes
species surveys
Complete draft Monte Bello OSP X No Identified as a partnership project with Santa Clara
Pond Management Plan. Valley Water District,which was unable to obtain
regulatory concurrence on meeting mitigation
requirements with this project.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 6
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PLANNING DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
�i a a a
Key Project Milestone Q Q - L Q r L Q c Description of
1 O 2 O E' 3 01-- 4 O Reasons for Variances&Adjustments
Schilling Lake Complete inundation study. X Yes
Management Plan
(Priority 1) U&M Committee meeting to Y No Results of inundation study resulted in further study;
(AP completion date: discuss results of study and plan has changed to implement geotechnical study
2Q FY2009-10) solicit public input. of dam and run model a second time. NEW DATE:
September 2009.
El Corte de Madera Complete plans and specs. X Yes
Creek Open Space Submit permit applications for X Yes
Preserve Watershed FY 2011 construction.
Protection Program,
Year 5
(Priority 2)
(AP completion date:
3Q FY2013-14)
Big Dipper Ranch
Fisheries Restoration/ Complete plans and specs. X Yes
Sediment Control Submit permit applications. X Yes
(Priority 2)
(AP completion date:
FY2010-11)
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 7
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PLANNING DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
v W 4) a
Key Project Milestone Q c L Q r L Q = L Q = Description of
1 O 2 O 3 O 4 0 Reasons for Variances&Adjustments
Former Fletcher Asbestos investigation; submit X P Asbestos investigations completed; permit
Property Demolition for permits. submittals are pending asbestos abatement.
(Priority 3) 1 1 1 1 NEW DATE:July 2009.
(AP completion date: Release bid package; permit X P Bid package released; demo permit approval
q FY2009-10) approvals. pending asbestos abatement. NEW DATE: July 2009.
Award site cleanup and asbestos X No Delay in releasing bid package due to higher priority
contract;CEQA determination. I projects. NEW DATE:July 2009
Complete site cleanup. X Yes
Implement seeding and netting. X Yes
ECdM Staging Release CEQA document for X P Delayed due to Admin. Office Improvements, Phase
Area and Trail public review. II staff time requirements. NEW DATE: August
Improvements— 2009.
Planning and Design Board final approval of the U&M X Yes Expect to release CEQA document in August with
(Priority 1) Plan amendment to include the subsequent Board meeting in September.
(AP completion date: project and CEQA Certification.
3Q FY2013-14)
Alma College Retain consultant team. X Yes
Conditions Assessment
•lority 3)
completion date: Prepare draft existing conditions X P Delay in awarding contract due to RFP complexities.
4Q FY2009-10J assessment. NEW DATE: September 2009.
Prepare treatment X No Project has been broken into iterative phases. New
recommendations, schedule for treatment recommendations and final
report will be determined after completed existing
conditions assessment and Use and Management
Committee consultation.
NEW DATE: TBD.
Prepare final report. X Yes Final report will only focus on Phase I work.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 8
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PLANNING DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a a a a
Key Project Milestone Q = Q Q Q Description of
1 O �- 2 O 3 0 4 0 Reasons for Variances&Adjustments
Administrative Office Bidding process. X Yes
Improvements, Phase Award construction contract. X Yes
II End of construction. X P Delay in city review of permit drawing set. NEW
(Priority 1) SCHEDULE: September 2009.
(AP completion date:
3Q FY2009-10)
Skyline Field Office Board approval of scope. X No Scope change per Ad Hoc Committee request to
Remodel research remodel vs. build new green bldg and
(Priority 1) explore long term staff facilities needs.
(AP completion date: I I NEW DATE: TBD.
4Q FY2010-11) Complete schematic design. X No Same as above.
Complete design development. X No Same as above.
Complete construction X No Same as above.
documents.
Submit permit applications. X No Same as above.
Bidding process. X No Same as above.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 9
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
OPERATIONS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 O T Q2 O IT Q3 O h Q4 O Reasons for Variances&Adjustments
Upgrade Citations and Complete entry of test data X Yes Project may be extended into 4th quarter to ensure
Warnings Database by field Administrative adequate testing time for new system.
(Priority 1) Assistants. Conduct periodic testing of system to ensure
(AP completion date: accuracy and conduct meeting with users to ensure
FY2009-10) needs are met.
Have patrol staff field test X Yes
system.
Create reports based on X Yes
existing reports in current
database, and monthly and
annual reports.
Complete X Yes
documentation/User
Manual for new system.
Transition existing data to X No
new system.
Two-Way Radio Seek grant funding sources X Yes This is a multi-year project, which we now feel will
Improvement Project for the project. require the full five year time frame:
ority 1) -Required agreements both Santa Clara and San
(HP completion date: Mateo Counties are being negotiated.
FY2011) -A potential 2"d frequency is in negotiation.
-A Possible loss of our consultant's representative
may require a new representative to get up to speed.
Complete Mobile Repeater X Yes A waiver request for an FCC license for the mobile
Pilot Program. repeaters has been submitted.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 10
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
OPERATIONS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 O Q2 O Q3 O h Q4 O Reasons for Variances&Adjustments
Two-Way Radio Complete Microwave X Yes
Improvement Project System Design.
(continued)
Picchetti Ranch OSP Project must be completed X Yes Real property is the lead department for this projc.
Stream Restoration/ by the start of official "wet
Grading Improvements season". (10/15/2009)
(Priority 1)
(AP completion date:
3Q FY 2009-10)
Construct Ford across Project must be completed X No Planning is the lead department for this project
Dennis Martin Creek at by the start of official "wet This project is grant funded (prop.50)and will be
Thornewood OSP. season". (10/15/2009) delayed due to the State budget situation.
Construct and open
the Bridal Trail,and
restore the Natural
Stream Channel by
removing Old Roadbed
(Priority 2)
(AP completion date:
3Q FY2009-10)
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 11
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
OPERATIONS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
4�i a a
Description of
Key Project Milestone Q1 O h Q2 O Q3 Or- Q4 O Reasons for Variances&Adjustments
Fremont Older OSP- Project will need to be X Yes
Parker Ranch Trail Re- completed by the start of
Route official "wet season".
(Priority 2) (10/15/2009)
"O completion date:
FY2009-10)
Los Trancos Trail and Project must be completed R No Planning is the lead department for this project.
Drainage by the grant due date,or by This project is grant funded (Prop. 50)and will be
Improvements the start of official"wet delayed due to the State budget situation.
(Priority 2) season". (10-15-2009)
(AP completion date:
3Q FY2009-10)
Monte Bello OSP Trail Project will need to be X Yes
Re-Alignments of completed by the start of
White Oak Trail official "wet season".
(Priority 3) (10/15/2009)
(AP completion date:
FY2009-10)
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 12
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
OPERATIONS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 O Q2 O Q3 O Q4 O � Reasons for Variances&Adjustments
Control of Slender Coordinate program to X Yes Ten year work plan to be completed in 2016.
False Brome at control slender false brome
Thornewood OSP,and on private properties near
on Nearby Properties District preserves in spring
(Priority 1) through fall 2009.
(AP completion date:
FY2016)
Sudden Oak Death Conduct Agri-Fos spraying X Yes Ten year work plan to be completed in 2016.
Monitoring and at 3 sites in May 2009.
Research
(Priority 1)
(AP completion date:
FY2016)
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 13
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
OPERATIONS DEPARTMENT
Action Plan FY2009-10 First Quarter Proitress Report
4-0 a a a
Description of
Key Project Milestone Q1 O Q2 O IT Q3 O M Q4 O FM- Reasons for Variances&Adjustments
Conservation Grazing Complete grazing X Yes Anticipated completion of project in 2018.
Program management plans for new
(Priority 2) properties prior to 2010
(AP completion date: grazing season.
_")018)
Prescribed Burns Notify public of possibility X Yes Design of monitoring program and pre-burn
(Priority 2) of controlled burns at monitoring has been completed.
(AP completion date: Rancho de Guadalupe and
FY2018) Russian Ridge.
Plan for burns and do X Yes
necessary pre-burn control
activities at Rancho de
Guadalupe.
Conduct burn at Rancho de X Yes
Guadalupe safely.
Plan for burns and do X Yes
necessary pre-burn control
activities at Russian Ridge.
Conduct burn at Russian X Yes
Ridge.
Conduct post-burn X Yes
monitoring as necessary.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 14
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
OPERATIONS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
L L PA PA Description of
Key Project Milestone Q1 O h Q2 O Q3 O Q4 O Reasons for Variances&Adjustments
Skyline Ridge Tree Remove obsolete Christmas X Yes All phases of construction to be completed by
Farm trees, regrade unstable November, 2010. Maintenance and monitoring to be
Restoration/Phase III slopes and drainages, and completed by September, 2015.
(Priority 3) install erosion control
(AP completion date: measures.
3Q FY2009-10 for
construction;2Q
FY2015 for
maintenance&
monitoring)
Plant and seed with native X Yes
species.
Maintain, monitor and X X 0
report on new and prior
plantings and erosion
control.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 15
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
O =This work is ongoing
i
PUBLIC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
+J .�
L L Description of
Key Project Milestone QS O Q2 O Q3 O Q4 O Reasons for Variances&Adjustments
Support for La Honda Support Planning Dept. with Draft X Yes
Master Plan events Master Plan release; 1st Public
(Priority 1) Hearing (tentative approval).
(AP completion dote:
2" cY2009-10)
Support Planning Dept.with Draft X P Draft Master Plan Board review process
Plan edits. extended to allow for Board Informational
Report and 4 public hearings versus 2. NEW
DATE: August 2009.
Support Planning Dept. Finalize X P Same as above. NEW DATE: August 2009.
CEQA document.
Support Planning Dept.Circulate X P Same as above. NEW DATE: August—
CEQA document. September 2009.
Support Planning Dept. with 2nd X Yes Same as above. NEW DATE: September
Public Hearing(final plan adoption, 2009.
CEQA Certification).
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 16
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
PUBLIC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
+r r ++ a.+
tW
Description of
Key Project Milestone Q1 O � Q2 O Q3 O F Q4 O Reasons for Variances&Adjustments
Support for Sierra Support Planning Dept.to X Yes
Azul/Bear Creek Complete Admin Draft Plan & EIR.
Redwoods Master Plan
events
(Priority 1)
(AP completion date:
4Q FY2009-10)
Support Planning Dept.to Release X No Delay due to extended planning process for
of Draft Plan and DEIR. La Honda and need to stagger master
planning processes given staff time
constraints.
Support Planning Dept.with Open X No Same as above.
House with full Board.
Support Planning Dept.to X Yes
Assemble Final EIR with comments
received to date and their
responses.
Support Planning Dept.with 1st X Yes
Public Hearing(tentative adoption).
Support Planning Dept. complete X Yes
Final Master Plan and EIR; 2nd
jPublic Hearing(plan adoption and
CEQA cert.).
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 17
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PUBLIC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
i
a, a
Description of
Key Project Milestone Q1 O Q2 O Q3 O h Q4 O Reasons for Variances&Adjustments
Visitor Estimate Survey Intern advertising&selection (if X Yes
—Phase III needed).
implementation
(Priority 2)
projected
' letion date: 4Q
FY2009-10)
Survey season preparation. X Yes
Active surveying at designated X Yes X Yes
preserves.
Season wrap up (removal of X Yes
equipment,final download of
survey numbers).
Draft report memo to Board & X Ye
s
es
staff.
"Healthy Trails" Continue program research, X Yes X Yes X Yes
Program Development including creating potential
rity 1) partnerships with health
(At,completion date: organizations&wellness-oriented
4Q FY2009-10) businesses.
Develop program proposal, X Yes X Yes
including formally establishing
partnerships through agreements.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 18
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
O =This work is ongoing
11
PUBUC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a
Description of
Key Project Milestone Q1 O � Q2 O � Q3 O Q4 O ~ Reasons for Variances&Adjustments
District Coffee Table Conduct early phase research & X Yes X Yes X Yes X Yes
Picture Book further scope the project with the
(Priority 2) District's LFPAC members.
(AP projected
completion date: 4Q
FY2009-10)
Draft photographer/writer/artist X Yes
RFP.
New Logo As needed,continue to work with X 0 X 0 X 0 X 0
Implementation District departments to implement
(Priority 1) the new logo.
(AP projected
completion date: 4Q FY
2009-10)
Transition the volunteer uniform X Yes
items to the new logo.
Continue to develop, in X 0 X 0 X 0 X 0
coordination with logo graphic
design consultant, a broad District
Identity Guideline to ensure
consistent use of District's identity.
Work with the District's Legal X Yes
Program to trademark the logo.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 19
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PUBLIC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a oDescription of
Key Project Milestone Q1 O Q2 O h Q3 O 2- Q4 O Reasons for Variances&Adjustments
eNature Wildlife NOTE: Project is contingent upon Two Year contract agreement.
Guides Shearwater's ability/availability to
(Priority 2) support the program.
(AP projected
r oletion date: 4Q
09-10)
In coordination with Shearwater, X Yes
Inc. launch the eNature Wildlife
Guides on the District's website.
As the launched Wildlife Guides will X Yes X Yes
be in Beta for an established
timeframe,follow up on any
technical issues that arise(1S`Beta:
12/2009,2"d Beta:3/2010).
Work with District volunteers to X Yes
further customize the guides to
District preserves as needed.
Legislation Milestones cannot be determined
t. ,rity 1) as this project is dependent on the
(AP projected unpredictable legislative process.
completion date: 4Q
FY2009-10)
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 20
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PUBLIC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
aPC Description of
Key Project Milestone Q1 O F- Q2 O Q3 O Q4 O Reasons for Variances&Adjustments
Federal Legislation Milestones cannot be determined
(Priority 1) as this project is dependent on the
(AP projected unpredictable legislative process.
completion date: 4Q
FY2009-10)
Docent Program Research X Yes
Recruitment&
Training: OEL&NC
(Priority 1)
(AP projected
completion date: 4Q
FY2009-10)
Train Docents. X Yes
New docents begin "shadowing". X Yes
New docents take lead roles. X Yes
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 21
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PUBLIC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
aDescription of
Key Project Milestone Q1 O Q2 O Q3 O Q4 O Reasons for Variances&Adjustments
Interpretive Systems Request&compile samples of X Yes
Plan other agencies' interpretive plans
(Priority 2) as examples of approach &
(AP projected breadth.
oletion date: 4Q
09-10)
Determine scope& priorities of a X Yes
plan in-house; possibly establish a
committee.
Solicit RFPs from interpretive X Yes
consultants.
Review proposals, select&contract X Yes
with a consultant.
Work with consultant to research X Yes
interpretive opportunities based on
natural &cultural resources of each
preserve.
Begin drafting the interpretive plan. X Yes
NOTE: On Tamet Code: Yes= Milestone completed in quarter as planned 22
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
PUBLIC AFFAIRS DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a v
Description of
Key Project Milestone Q1 O tf° Q2 O N Q3 O 1- Q4 O tm Reasons for Variances&Adjustments
ARMS Program Determine & implement field X Yes
Management supervision system with Operations
(Priority 1)(AP Department.
projected completion
date: 4Q FY2009-10)
Monitor new field supervision X Yes
system to ensure volunteers are
receiving timely, useful responses
to their questions& requests.
Organize & lead a staff/volunteer X Yes
meeting to discuss program
success,challenges, etc.
Discuss 2010-2011 plan/potential X Yes
for half-time field supervision.
Upgrade Volunteer Create online quizzes for X Yes
Web Pages graduating Crew Leader and
(Priority 1) Volunteer Trail Patrol volunteers.
(AP projected
completion date: 4Q
FY2009-10)
Contact local schools&form X Yes
partnership for creating video clips
for volunteer pages.
Beta test& upload new video clips X Yes
&enhanced pages.
Send evaluations to volunteers X Yes
regarding new features.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 23
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
ADMINISTRATION DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 Q2 0 Q3 M Q4 Or Reasons for Variances&Adjustments
Research& Phase I—Create project team & X Yes Completion in next fiscal year with exception of
Evaluate New determine needs& Payroll module.
Integrated requirements.
Accounting,Budget
'inance
ware Package
(Priority 1)
(AP completion
date: FY 2010-11)
Phase II—Retain consultant, X Yes
research local government
programs/vendors/cost, and
prepare RFP.
Phase III—Evaluate proposals, X Yes
recommend new system to
Board and request approval to
purchase.
Phase IV-Overlap for X Yes
implementation into 1Q FY
2010-11. (Payroll module is
exception with 1Q FY 2011-12
implementation)
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 24
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
ADMINISTRATION DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
44
W 0) d a Description of
Key Project Milestone Q1 O F Q2 O Q3 O M Q4 Oc F Reasons for Variances&Adjustments
Year-end Audit of Start Audit
Financial Services X Yes
(Priority 1)
(AP completion
date: 2Q FY 2009-
10)
Finish Audit X Yes
Office Copiers Phase I—Create project team, X Yes Ahead of schedule, RFP has been developed and
(Priority 1) review current contract and issued.
(AP completion evaluate current equipment.
date: 3Q FY2009-
10)
Phase II—Research & identify X Yes
needs/features/costs. Prepare
RFP and solicit proposals.
Phase III—Review and evaluate X Yes
proposals. Recommend vendor
to Board & request approval for
purchase. Install,test and train
staff on new equipment.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 25
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
ADMINISTRATION DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a 0 Description of
Key Project Milestone Q1 O H Q2 O Q3 Oc Q4 Reasons for Variances&Adjustments
District-wide Phase I—Create project team X Yes Project team created and needs determined.
Policies& and determine needs
Procedures
Manuals
rity 1)
,. completion
date: 3Q FY2009-
10)
Phase II—Organize materials, X Yes
create master manual &
distribute CD-based copies.
Staff Retention and Phase I-Evaluate and analyze X Yes
Attraction Survey— responses and comments from
Implement survey. Management team and
Workplace staff to identify, discuss, scope
Improvements and recommend potential
(Priority 1) workplace improvements to
(AP completion Board.
d^ : 4Q FY2009-
Phase II—Allocate resources X Yes
(staff time&funding)for
workplace improvements.
Implement improvements as
approved &directed by Gen.
Mgr. & Board.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 26
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
i
ADMINISTRATION DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone 41m Q2 m Q4 Oc Reasons for Variances&Adjustments
New Staff Phase I—Review District, state, X Yes
Orientation local and federal requirements,
Program update forms and materials,
(Priority 2) add new health &safety
(AP completion section, and seek input from
date: 3Q FY2009- departments.
10)
Phase II—Incorporate ideas X Yes
from departments, create DVD
presentation of District
overview, and create HR
components for intranet.
Performance Phase l—Mgmt Team reviews X P Performance evaluation system is being modified;
Evaluation Forms performance 2007-8 evaluation therefore, need to modify the format of the forms
(Priority 3) forms. HR makes revisions to again to meet the desired outcomes of the new
(AP completion forms and has meet&confer system.
date: 3Q FY2009- with District Field Employee's
10) Corp. Final revisions are made
to forms.
Phase II—HR provides training X No Might be delayed, pending timing of a successful
to supervisors&managers on meet and confer session with the District Field
use of new forms& Employees Corporation.
performance appraisal
methods. Implementation of
new performance evaluation
forms.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 27
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
ADMINISTiRATION DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a a a Description of
Key Project Milestone Q1 a Q2 M Q3 O Q4 0 F Reasons for Variances&Adjustments
Replace Phone& Phases I & II—Audit phone X Yes Phone service records have been audited and District
Voicemail System service records, set up mini-lab, needs have been identified. Demonstrations of
(Priority 1) select vendor or in-house phone systems have been completed.
(AP completion solution. Review records&
3Q FY2009- adjust services. Seek bids,
purchase hardware&software.
Install new system &conduct
beta test. Fix workability issues.
Phase III—Provide training on X Yes
new system. Recycle or sell old
system.
Video Conferencing Phase I—Research potential X Yes
to FFO&SFO Field systems, solicit& invite vendors
Offices to bid on project.
(Priority 1)
/"°completion
4Q FY2009-
10)
Phases II, 111—Choose vendor& X Yes
obtain approval for contract..
Install and implement system.
Test system between all 3
offices.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 28
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
ADMINISTIRATION DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a v c Description of
Key Project Milestone 41 O F 42 O 43 0 M Wt p M Reasons for Variances&Adjustments
Create Virtual Phase I—Test VPN usage and X Yes
Private Network evaluate user experience.
(VPN) Increase current internet
(Priority 1) bandwidth if required. Draft
(AP completion District-wide VPN policy
date:1Q FY2009- including high-level security
10) measures.
Phase II—Review and approve X P VPN policy has not yet been approved.
VPN policy. Set up District
equipment/hardware for VPN District equipment has been set up for VPN access
access. Install security and security measures have been installed.
measures. Document&train Preliminary training has occurred.
staff on how to use system.
District-wide Phase I—Set up test lab&demo X Yes Intranet infrastructure has been completed and team
Intranet services. Assign group of users of content managers has been developed.
(Priority 2)(AP to test& provide feedback of
completion date: service.
4Q FY2009-10)
Phase II—Finalize choice& X Yes
install intranet service(s).
Create team of users from each
department to start populating
the intranet with content
Phase III—General roll-out of X Yes
intranet to all employees.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 29
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
O =This work is ongoing
it
f
ADMINISTRATION DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
a v a Description of
Key Project Milestone Q1 O m Q2 O M Q3 Q4 0 Reasons for Variances&Adjustments
Development& Establish Strategic Plan Team. X Yes Completion in July, 2010.
Implementation of (March, 2009)
District's Strategic
Plan(Priority 1) (AP
iletion date:
Y2010-11)
Team will design structure& Y P Draft structure and content have been designed but
content of plan using best need review and comment from Strategic Working
practice research, public and Group.
private sector models&
expertise of Strategic Plan Team
members.
Team will determine process to: X Yes
1) identify District vision,
mission,goals, strategies and
initiatives; 2) Establish a priority
setting system &criteria for
prioritization of initiatives and
3) establish performance
measurement system to
evaluate plan results.
Staff will implement strategic X 0 X 0 X 0 Plan development will extend into FY2010-11.
plan process&develop plan
involving stakeholders, Board
and staff. (FY2010)
Strategic Plan completed & Plan completion will extend into FY2010-11.
distributed. (FY 2010)
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 30
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
LEGAL SERVICES (ADMIN)
Action Plan FY2009-10 First Quarter Progress Report
4
to a a a
_ = tu Description of
Key Project Milestone Q1 O 1- Q2 O N Q3 O h Q4 O Reasons for Variances&Adjustments
Purisima-to-the- Close of Escrow on UC Elkus). Completion of all purchases in next fiscal year. UC
Sea Property Elkus was in last FY's Action Plan.
(Priority 1) X Yes X Yes
(AP completion
date: FY2010-11)
Close of Escrow on POST(Blue X Yes
Brush Canyon).
Close of Escrow on POST
(Lobitos Ridge). X Yes
Draft Contingent on SFPUC priority X Yes Letter of Intent in FY 2009-10 and Transaction in FY
Transactional for project and progress on 2010-11 per Action Plan.
Documents to mutually acceptable terms of a
Accomplish Bay letter of intent.
Trail Connection
between
Ravenswood Open
Space Preserve
and Don Edwards
National Wildlife
Refuge
(Priority 2)
(AP completion
date: FY2010-11)
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 31
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
J
LEGAL SERVICES (ADMIN)
Action Plan FY2OO9-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 O Q2 O Q3 O Q4 O Reasons for Variances&Adjustments
Represent District Continue discovery/trial X Yes
in Pending preparation.
Chiocchi v. District
Litigation
'^,iority 1)
completion
date: FY2009-10)
Trial preparation, pretrial X Yes
motions,trial.
Resolve Negotiate appropriate X Yes Next fiscal year for negotiated resolution per Action
Encroachment on resolution (contingent on status Plan.
Kennedy Trail, of negotiations). Either
Sierra Azul OSP implement Real Property's
(Priority 1) (AP resolution or determine
completion date: whether litigation is required to
2Q FY2010-11) achieve resolution.
Represent District Document discovery and X Yes Contingent on mediation.
in pending depositions.
Anderson v.
`rict Litigation
,. .iority 1)
(AP completion
date: 4Q FY2009-
10)
Trial preparation or negotiated X Yes
resolution.
Trial. X Yes
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 32
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
LEGAL SERVICES (AAMIN)
Action Plan FY2009-10 First Quarter Progress Report
-W;
UO Description of
Key Project Milestone Q1 O Q2 O Q3 O Q4 O Reasons for Variances&Adjustments
Ridge Vineyards Finalize fee acquisition. X P Q1:Completed negotiating major business terms;
Property Exchange Transactional work deferred due to Real Property and
(Priority 1) Legal Program priority needed for other Priority 1
(AP completion Projects in Q1 (Purisima to the Sea).
date: 4Q FY2009-
10)
Finalize easement transaction. X Yes
Integrate Risk Implement database. X Yes
Management
Function into Legal
Program
(Priority 1)
(AP completion
date: 4Q 2009-10)
Implement contracting X Yes
resources.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 33
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
LEGAL SERVICES (ADMII1i)
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 O Q2 O h Q3 O Q4 O Reasons for Variances&Adjustments
Stevens Creek Adequately address upland X 0 Dependent on NASA& Navy schedules.
Nature Study Area sources of contamination
Site Remediation (NASA, Navy).
(Priority 1)
completion
Dependenton
NASA and Navy
schedules)
Resample site (Navy). X 0
Design Remedial plan &carry X 0
out(Navy).
Begin restoration of site (Navy). X 0
_..aline Field Office Assist Planning Dept. in X No Based on revised Planning Department's schedule.
(Priority 1) preparation of bid &contract Scope and schedule changed per Ad Hoc Committee.
(AP completion documentation for projects. Department's schedule. Planning has Action Plan
date: 4Q FY2010- Advise Planning during contract dates of Feb-March 2010 to begin the bidding process
11) implementation&construction. for Skyline Field Office improvements.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 34
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
LEGAL SERVICES (ADMIN)
Action Plan FY2009-10 First Quarter Progress Report
a a
tw
Description of
Key Project Milestone Q1 O ►f6- Q2 O Q3 O h Q4 O Reasons for Variances&Adjustments
Administrative Assist Planning Dept. in X Yes
Office preparation of bid &contract
Improvements documentation for projects.
(Priority 1) Advise Planning during contract
(AP completion implementation &construction.
date: 3Q FY2009-
10)
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 35
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
REAL PROPERTY DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
W W a
Description of
Key Project Milestone Q1 O Q2 O Q3 O Q4 O ~ Reasons for Variances& Adjustments
Land Purchases
Purisima-to-the-Sea Close Escrow on POST(Blue X Yes
Property Purchases Brush Canyon).
'ty 1) Close Escrow on UC Elkus X Yes Holdover from FY2008-09. Anticipated close of Escrow
(. impletion date: Highlands. in Q2.
FY2010-11) Close Escrow on POST(Lobitos X Yes
Ridge) property.
Potential New Land Pursue land purchase X Yes Close of Escrow on POST(Moore)addition to Sierra
Additions opportunities, utilize non-profit Azul & POST(Roberts) addition to Mills Creek.
(Priority 1) and agency partnerships and
(AP completion date: previously secured grant funding
FY2009-10) where available.
New Land Transition Establish new land project teams X Yes
Process(Priority 1) to ensure new land transition
(AP completion date: process is adequate to address
FY2009-10) costs, responsibilities&impacts.
Ridge Trail&Coastal Negotiate agreements with State Project on hold due to State Budget situation.
T Management Parks for cooperative
h ments with management of the Bay Area
California State Ridge Trail adjacent to Saratoga
Parks(Priority 2) Gap Open Space Preserve and
(AP completion date: California Coastal Trail at Cowell
TBD) Ranch on the San Mateo Coast.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 36
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
REAL PROPERTY DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 O Q2 O Q3 O Q4 O 1--- Reasons for Variances& Adjustments
Bay Trail Connection Negotiate an exchange of X Yes Contingent upon negotiations with SFPUC.
Between easements with the SFPUC
Ravenswood Open providing for grant of
Space Preserve and easements. Staff will evaluate
Don Edwards feasibility of alternative trail
National Wildlife easement routes through SFPUC
Refuge lands and enter into letter of
(Priority 2) intent with SFPUC.
(AP completion date:
FY2010-11)
Property
Management
District AT&T X P AT&T not up for renewal
Communication FAA. Replace with FAA; new lease in process; bring to the
Leases board in August.
(Priority 1) Metro PCS. X P Amendment in process; bring to the Board in August
(AP completion date: C&C/GGNRA Tower. X Yes
See milestones) Communication&Control (old X P Reassignment in process; priority given to Nextel,C&C,
ACE site). and FAA; bring to Board in August/September.
County of San Mateo. X No Priority given to other communication leases.
Nextel. Yes Holdover from FY2008-09; complete.
Defensible Space, Black X Yes New element of project.
Mountain.
New Land Rental POST(Blue Brush Canyon). X Yes
Property Transition POST(Lobitos Ridge). X Yes
(Priority 1) UC Elkus Ranch Grazing Lease. X Yes Holdover from FY2008-09.
(AP completion date: Other residences—as needed.
See milestones)
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 37
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
REAL PROPERTY DEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
Description of
Key Project Milestone Q1 O N Q2 Or- Q3 O h Q4 O Reasons for Variances& Adjustments
Bi-annual Contractor Review/revise current X Yes
Bid Process policy/contracts.
(Priority 2) Departments X Yes
(AP completion date: Review/revise/policy/contracts.
June, 2009) Board approval, X No Board approval not required as process already
included in current administrative policy.
Bids issued. X No Priority given to communication leases; new milestone
end of Q2.
Contractor selected. X No Priority given to communication leases; new milestone
end of Q2.
Picchetti Winery Dependent on time available Anticipated completion for Q2 or Q3 contingent upon
Implementation from Planning and Operations. Fish &Game permit.
Plan: Drainage
Restoration
(Priority 2)
(AP completion date:
See milestone-Q2 or
Q3 FY 2009-10)
Property Requirements document. X Yes
Management Select software. X Yes
Software(Priority 3) System up and running. X Yes
(. )mpletion date:
3Q FY2009-10)
Land Protection
Ridge Vineyards Close Escrow on fee transfer. X No Negotiation of business terms complete Q1. Fee
Property Exchange transfer deferred to Q3 with staff priority given to
(Priority 1) Purisima to Sea project in Q1 and Q2.
(AP completion date: Close Escrow on easement X Yes
Q4 FY2009-10) transfer.
NOTE: On Target Code: Yes= Milestone completed in quarter as planned 38
No = Milestone not completed in quarter as planned
P =Milestone partially completed in quarter as planned
0 =This work is ongoing
REAL PROPERTY BEPARTMENT
Action Plan FY2009-10 First Quarter Progress Report
41i a a
tu Description of
Key Project Milestone Q1 O Q2 0 9 Q3 0 � Q4 O � Reasons for Variances& Adjustments
Gullicksen Landfill Board approval of remediation X Yes County has filed lawsuit to compel remediation by
Removal and Site plan and Permit to Enter. Gullicksen et al. Timeliness on milestone contingent
Restoration upon County receiving remediation plan acceptable to
(Priority 1) District.
(AP completion date:
FY2010-11)
Commencement of Fill material X Yes Timeliness on milestone contingent upon Gullicksr
removal from site. commencing remediation under court order or
settlement.
Resolution of Contingent upon negotiations. X Yes
Kennedy Trail Access with neighboring property
(Priority 1) owner.
(AP completion date:
Q3 FY2009-10)
Design Review of Complete design review and X Yes District design review completed; however Stringer's
Proposed Site negotiation for any amendment building permit application to County is currently
Improvements on to Covenant of Restrictions. inactive,with the possibility the application may be
Stringer Private In- (Restrictions if necessary) pulled and the remodel project abandoned.
holding at Russian
Ridge OSP
(Priority 2)
(AP completion dates:
1 Q FY2009-10 Design
review&2Q FY2009-
10 Board approval
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 39
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
0 =This work is ongoing
REAL PROPERTY DEPARTMENT '
Action Plan FY2009-10 First Quarter Progress Report
a a a
Description of
Key Project Milestone Q1 O F Q2 O Q3 O H Q4 O Reasons for Variances& Adjustments
Youngblood Draft Exchange Agreement. X Yes
Encroachment
(Priority 3)
(AP completion date:
Driven by County&
applicant)
Bring executed Exchange X Yes
Agreement to Board for
approval.
NOTE: On Target Code: Yes=Milestone completed in quarter as planned 40
No = Milestone not completed in quarter as planned
P = Milestone partially completed in quarter as planned
O =This work is ongoing
J
POTENTIAL NEW PROJECTS UNDER CONSIDERATION FOR MIDYEAR ADDITION TO FY2009-10 ACTION PLAN
Real Public Admin Reasons Project may be added
Project Name Planning Property Operations Affairs Admin Legal Svcs to FY2009-10 Action Plan
Lower Purisima Creek x x x Respond to neighbor concerns regarding existing roadside
Redwoods Parking Area parking on Purisima Creek Road;parking is currently
limited to 6 vehicular spaces;parking demand on high
visitation days can be greater than 40 vehicles.
Cooley Landing Development x x x x x City of East Palo Alto has obtained a Packard Foundation
Review grant and has hired a new project manager to reinitiate
the planning process for the Cooley Landing Peninsula,
located adjacent to Ravenswood OSP. Significant staff
time is expected to review revised proposals, meet with
City staff and community leaders and develop
recommendations that complement District's use and
management of the adjacent Preserve.
Sierra Azul Mercury Mining x x x The California Regional Water Quality Control Board has
Waste Site Investigations issued a regulatory action letter,requiring the District to
conduct mercury mining waste investigations to determine
the need for onsite remediation. Several progress reports
and a final report are required to be submitted,with the
first report scheduled for December 31,2009.
Hawthorne's Property Transfer x x x x x Trust distribution of property includes buildings earlier
than anticipated; Board has already approved gift
acceptance. The property transfer will require initiation of
resource inventories,data collection,site assessments,
etc.to collect existing conditions data to inform short-term
management decisions and future planning. There is
heightened interest in this property especially from the
Town of Portola Valley.
Rogue Valley Pond Hydrology x Failing pond outlet culvert replaced last year as interim
and Modifications measure. Hydrology report in process. Modifications to
the pond levee to upgrade outlet per Hydrology Report
will likely be needed.
Moody Gulch as an Addition to x x x x x Three water companies(Redwood,Chemeketa&Idylwild)
Bear Creek Redwoods Open are ready to move forward with amended Moody Gulch
Space Preserve Agreement. Depending on timing,property would be
added to SA/BCR Master Plan.
41
POTENTIAL NEW PROJECTS UNDER CONSIDERATION FOR MIDYEAR ADDITION TO FY2009-10 ACTION PLAN
Real Public Admin Reasons Project may be added
Project Name Planning Property Operations Affairs Admin legal Svcs to FY2009-10 Action Plan
Saratoga to Skyline-Sanborn x x x x Partnership with City of Saratoga&Santa Clara County
Partnership Parks&Roads Dept to protect Congress Springs Scenic
Corridor and provide a future trail connection between the
City and Skyline-Sanborn County Park.
Bear Creek Stables Analysis, x x x x x Site and implementation Plan for considering a long term
Bear Creek Redwoods Open lease of BCR stables to coincide with Master Plan
Space Preserve recommendations involving multiple depts.
Saratoga Country Club x x x x x Negotiate potential easement as part of a resolution of the
E ant/Property Exchange, Fremont Older Prospect Road Parking Lot dispute with the
Fr.. int Older Open Space Saratoga Country Club.
Preserve
Spring social event for local x Board-requested event held on April 2, 2009.
elected officials
Craig Britton Trail Renaming x x March 11, 2009 Board decision to rename the Soda Gulch
and Bench event Trail the"Craig Britton Trail",construct and install a
memorial bench and hold a dedication event.
Apple Orchard/Stevens Creek x Transfer of project from POST requires additional
Canyon Ranch volunteer resources.
F rus Sampling,Alma x x Santa Clara Vector Control testing at Mt. Umunhum and
C, &Mt. Umunhum Alma College requires coordination, neighbor notification
and preparation for possibility that tests come back
positive.
Dog waste at Pulgas Ridge x x Situation requires campaign to build public awareness.
"Eyebrows"caused by x x Damage to preserves requires campaign to reach out to
mountain bikers mountain biking community.
42
• Midpeninsula Regional
• ' Open Space District
i
To: Board of Directors
From: Stephen E. Abbors
Date: July 22, 2009
Re: FYI's
9 " IMidpeninsula Regional
Open Space District
i I
CLOSING MEMORANDUM
To: Stephen E. Abhors, General Manage
From: Michael Williams,Real Properly Manager
Date: July 7, 2009
Subject: Peninsula Open Space Trust(Moore)Property Addition, Sierra Azul Open Space
Preserve
Escrow closed for the subject transaction on June 30,2009, and title to and possession of this 81.5-acre
parcel passed to the District.
I am not aware of any use and management concerns that were not addressed in the staff report to the
Board. In accordance with the Public Notification Policy,neighbors to the property were notified of this
purchase. As there were no comments made by any of the neighbors or members of the public that might
require amendment to the use and management recommendations, close of escrow marks the final
adoption of the Preliminary Use and Management Plan, approved by the Board of Directors at its meeting
j of May 13, 2009.
The following chart presents dedication and acquisition details for this property:
DEDICATION&AC UISITION INFORMATION
Ownership Status: Board Approval Date&
Preserve Resolution Number or
& County Grantor Acres (Fee,Easement,Lease, General Manager
Area & Mgmt Agreement) Approval Date
A.P.N.
Peninsula Open 81 5 Fee May 13,2009
Sierra Azul 558-30-001 Space Trust 09-13
M mt.Status:
Dedication Date
g &
Closing Date (Open,Closed,CMU, Status(Intended or Purchase Price GIS Code
or Other T Withheld) ype
June 30,2009 Closed Withheld Fee $250,000 ID#2076
Misc.Notes:
cc:
Board of Directors Planning
Administration GIs Coordinator
Accounting Public Affairs
Operations&Field Offices Legal
Midpeninsula Regional
Open Space District
CLOSING MEMORANDUM
To: Stephen("E. A,born,General Manager
'},�rTW�ms Real Pro er Manager
From: Mir "cA p h
Date: July 7, 2009
Subject: Peninsula Open Space Trust(Roberts) Property Addition, Mills Creek Open Space Preserve
Escrow closed for the subject transaction on June 30, 2009 and title to and possession of this 31.9-acre parcel passed
to the District.
I am not aware of any use and management concerns that were not addressed in the staff report to the Board. In
accordance with the Public Notification Policy,neighbors to the property were notified of this purchase. As there
were no comments made by any of the neighbors or members of the public that might require amendment to the use
and management recommendations,close of escrow marks the final adoption of the Preliminary Use and Management
Plan, approved by the Board of Directors at its meeting of June 24, 2009.
The following chart presents dedication and acquisition details for this property:
DEDICATION&ACQUISITION INFORMATION
Ownership Status Board Approval Date&
Preserve County Resolution Number or
& & Grantor Acres (Fee,Easement,Lease, General Manager
Area A.P.N. Mgmt Agreement) Approval Date
Peninsula Open June 24,2009
Space ace Trust
Mills Creek 064-390-020 31.9 Fee 09-20
Dedication Date
Mgmt.Status: &
Closing Date (Open,Closed,CMU, Status(Intended or Type Purchase Price GIS Code
or Other) Withheld)
June 30,2009 Closed Intended Cash $400,000 ID 42066
Gift $250,000
$650 000
Misc.Notes: 1. Service Fee:The Fire Service Fee is$405.91 as required by the Agreement between San Mateo County and the
District(Regarding Fire Services)increasing 2%annually.
2. The Access Easement(Attachment 1)to the subject property from Miramontes Street does not allow for genral
public use.
3. As part of this transaction,the former owner has reserved an easement to use and maintain an existing well and
pipeline(Attachment 2).
4. As part of this transaction,the District was assigned a lease for an existing storage shed which expires in December
2010 and requires the lessee to remove the shed and belongings at the end of the term(Attachment 3).
5. The Purchase Agreement with POST includes a covenant for 5 years to recognize significant donors in accordance
with the District's"Policies for Site Naming and Gift Reco nition".
cc: Board of Directors Administration Accounting
Planning GIS Coordinator Public Affairs
Legal Operations&Field Offices-Attachments 1,2&3
Attachments: 1.Access Easement 2. Well,Pipeline and Access Easement 3.Lease Agreement
Midpeninsula Regional
12 Open Space District
CLOSING MEMORANDUM
To: Stephen E. Abbors, General Manager,_4_:�iw
From: Michael Reeves, Real Property Specialist C �G �
Date: July 8, 2009
Subject: Peninsula Open Space Trust(Bluebrush Canyon)Property Addition, Purisima Creek Redwoods Open
Space Preserve
Escrow closed for the subject transaction on June 30, 2009 and title to and possession of this 259.92-acre parcel
passed to the District.
1 am not aware of any use and management concerns that were not addressed in the staff report to the Board. In
accordance with the Public Notification Policy, neighbors to the property were notified of this purchase. As there
were no comments made by any of the neighbors or members of the public that might require amendment to the use
and management recommendations, close of escrow marks the final adoption of the Preliminary Use and Management
Plan approved by the Board of Directors at its meeting of June 24,2009.
The following chart presents dedication and acquisition details for this property:
DEDICATION&ACQUISITION INFORMATION
Ownership Status: Board Approval Date&
Preserve Resolution Number or
& County Grantor Acres (Fee,Easement,Lease, General Manager
Area & Mgmt Agreement)
Approval Date
A.P.N.
Purisima Creek Peninsula Open 259.92 Fee June 24,2009
Redwoods 066-230-060 Space Trust 09-19
Mgmt.Status: Dedication Date
CMU, & Purchase Price GIs Code
or Other)
Closing Date (Open,Closed, Status(Intended or Type
e
Withheld
June 30,2009 Closed Withheld Cash $3,225,000 ID#1682
Misc.Notes: 1. Service Fee:The Fire Service Fee is$1,181.61 as required by the agreement between San Mateo County and the
District regarding fire services,increasing 2%annually.
2. The property has an agricultural tenant who grazes cattle under an existing agricultural lease that expires on March
9,2010. This lease was assigned to the District as part of this transaction,and will be replaced with a District
lease(Attachme
nt agricultural lease with the same tenant on or before the expiration of the existing ( )
3. The property also has a rental residence. POST's rental agreement with the existing tenants was replaced with a
District month-to-month residential rental agreement at close of escrow(Attachment 2).
4. An access easement across the adjoining Beffa property provides vehicular access to the portion of the subject
property located on the south side of Purisima Creek(Attachment 3). POST also granted a license to the District
to access the south side of the creek from POST's adjacent Lobitos Ridge property(Attachment 4).
5. The Purchase Agreement with POST also includes a covenant for 5 years to recognize significant donors in
accordance with the District's"Policies for Site Naming and Gift Recognition"
cc: Board of Directors Administration—residence value$185,000 Accounting
Planning GIS Coordinator Public Affairs
Legal—residence value$185,000 Operations&Field Offices-Attachments 1,2,3&4
Attachments: 1. Agricultural Lease 3. Access easement across Beffa(Parcel Three of attached legal description)
2. Residential Rental Agreement 4. Access License from POST
Integrated Resource Planning and Management Program
Quarterly Summary: April—June 2009
Resource Planning and Management Lead Progress
Project/Description Department
Cultural and Historic Resources
Cultural Resources Training Planning Completed training for AO and field offices
Operations
rations in February.
p tS'
White Oaks Trail Re-route Cultural Resources planning Surveyed trail reroute in Monte Bello OSP for
Survey cultural resources prior to construction.
Alma College Conditions Assessment Planning Selected consulting team through RFP
process and entered into contract.
Districtwide Cultural Resources Inventory and Planning Began inventory of collected artifacts and
Curation preliminary curation assessment.
Collected significant cultural resources from
Beatty Property Resources Collection Planning structures prior to demolition at addition to
Sierra Azul OSP.
Ecological Restoration
Skyline Ridge Tree Farm Restoration Operations Hired contractor for maintenance of Phase 1.
Design of Phase lI under way.
Purisima-to-the-Sea Properties Consultant has submitted draft Grazing
Operations Management Plans for Purisima-to-the-Sea
Grazing Management Plan
properties.
San Mateo County approved removal of
Pulgas Ridge Eucalyptus Removal Operations additional eucalyptus trees in 2009 through
2011.
Education/Interpretation
California Coastal Prairie Workshop, Elkus Range Staff attended workshops. District Rangeland
Camp, Sudden Oak Death workshop, California Operations Ecologist taught at the range camp and guided
Native Grassland conference tour of MROSD's conservation grazing
properties.
Protecting Wildlife During Maintenance Operations San Francisco Bay Bird Observatory led
tailgate training for field staff.
District Consultant(Condor Country
Operations Consulting)conducted field training on
Aquatic Amphibians & Reptiles Planning California red-legged frog, San Francisco
garter snake and western pond turtle at
Mindego Ranch.
District Resource Specialist presented
South Bay Ecological Restoration Workshop Operations restoration program for the Skyline Ridge tree
farm at workshop.
- 1 -
Integrated Resource Planning and Management Program Quarterly Summary I"Quarter,April through June,2009
Education/Interpretation (cont.)
Planning Released RFP to solicit partnership and
Resource Management Grants Program Operations research proposals for 2"d year of grant
Public Affairs program.
Environmental Remediation
Continued review of US Army Corps of
Mt Urnunhum/Almaden AFS Remediation Planning Engineers cleanup efforts at former Air Force
Public Affairs Base. Obtained federal appropriation request
in both houses of Congress for FY 2010.
Planning Began contractor selection for debris site
Driscoll Ranch Remediation cleanup to meet requirements of Water Board
closure of site.
Planning Entered into contract with Geocon
Mindego Ranch Landfill Removal Consultants to design and implement
remediation.
Rare,Threatened and Endangered Species
Management
Hired consultant hired to survey California
Operations
Rare Amphibians and Reptiles at Mindego Planning red-legged frog, San Francisco garter snake
and western and turtle at Mindego ponds.
Contracted with BAGG Engineers to
Driscoll Ranch Pond DR06 Repair Planning complete geotechnical investigation and
design for repair of CA red-legged frog
breeding p nd.
Conducted on-site meeting with Santa Clara
Valley Water District, US Fish and Wildlife
Monte Bello OSP Pond Management Plan Planning Service, and CA Department of Fish and
Game to present project. SCVWD was not
able to obtain concurrence from USFWS for
ro'ect to atisfy mitigation requirements.
Resources Inventory
Conducted botanical surveys of Purisima to
Botanical Surveys Operations the Sea properties.
Operations Collaborated with the University of Colorado
Pond Surveys Planning to monitor Driscoll Ponds for amphibian
parasites.
Wool Ranch Pond Management Plan Planning Completed second year of pond monitoring at
former Wool Ranch (La Honda Creek OSP).
Consulting Geologist completed partial
Bear Creek Redwoods/Sierra Azul OSP Road and Planning inventory of roads and trails within preserves.
Trail Inventory Remainder of inventory will be completed
this fiscal year.
Integrated Resource Planning and Management Program Quarterly Summary I"Quarter, April through June,2009
Resource Program Planning and Policy Development
Held meeting with Water Board staff for 5-
Year Routine Maintenance Permit and
RWQCB Maintenance 5-Year Permit Planning submitted application package for current
year's projects. District staff invited to attend
Water Board annual meeting and present on
watershed protection efforts of the District.
Wool Ranch Pond Management Plan Planning Completed second year of pond monitoring at
former Wool Ranch(La Honda Creek OSP).
Mailed outreach letter to neighboring parcels
with overlapping defensible space in Sierra
Wildland Fire Defensible Space Program Planning Azul OSP region. Participated in completion
of Lexington Hills Community Wildfire
Protection Program report.
Completed revisions to Wildland Fire section
La Honda Creek Master Plan Resources Element Planning of report. Presented on resource management
recommendations at 2 public hearings
Bear Creek Redwoods/Sierra Azul Master Plan Completed revisions to Wildland Fire section
Planning
Resources Element of report.
Vegetation Management
Hired contractor and conducted preventative
treatment of oaks trees with Agri-Fos
fungicide, removed bay trees at research sites
Sudden Oak Death Operations in Rancho San Antonio, Monte Betio and El
Corte de Madera Creek OSPs. Planted
potentially resistant tan oak trees at Skyline
Ridge OSP. Participated in Sudden Oak
Death Science Symposium.
Pulled, mowed and sprayed cocklebur, fennel,
French broom, Harding grass, slender false
brome, thistles at Bear Creek Redwoods, El
Corte de Madera, La Honda Creek, Long
Invasive Plant Control Operations Ridge, Los Trancos, Mills Creek, Mindego,
Public Affairs Monte Bello, Picchetti Ranch, Pulgas Ridge,
Purisirna Creek, Rancho San Antonio,
Ravenswood, Russian Ridge, Saratoga Gap,
Skyline Ridge, Windy Hill OSPs.
Conducted training burn at Rancho de
Guadalupe area of Sierra Azul OSP, including
Prescribed Burns Operations prior and follow-up treatment of Harding
grass.
Conducted CEQA review for Mindego thistle
control. Hired Go Native, Inc. as contractor
Operations
Vegetation Management Contractor Planning for work on Mindego Ranch and Districtwide
projects. Completed Pest Control
Recommendations.
- 3 -
Integrated Resource Planning and Management Program Quarterly Summary I"Quarter,April through June,2009
Vegetation Management cont.
Completed CEQA review,developed
reimbursement program with private property
owners, hired Slender False Brome
coordinator, surveys and treatment on open
space preserves and private property currently
Operations underway. Conducted workshops for
Slender False Brome neighbors and contractors. Received funds
Public Affairs from National Fish and Wildlife Foundation
to reimburse removal of slender false brome
on private property. Submitted new grant
applications to California Department of Food
& Agriculture (federal stimulus funds) and
National Fish and Wildlife Foundation.
i
Water Quality Protection
Selectively removed cattails to provide
Alpine Pond Operations educational viewpoints while protecting
a uatic s ecies.
Completed plans and specifications and
submitted to San Mateo County for grading
Big Dipper Ranch Road Removal—DFG Fisheries Planning permit, obtained DFG permit. Completed
Restoration Grant biological assessment for consultation with
USFWS on listed species permitting for
ro ect construction.
Rogue Valley Pond Planning Completed hydrologic assessment of pond at
Rancho San Antonio OSP.
Schilling Lake Planning Contracted with Haro, Kasunitch to complete
eotechnical investigation of impoundment.
Completed installation of 3 bridges by SFO
El Corte de Madera Creek OSP Watershed Planning crew and work to narrow upper segment of
Protection Program Operations trail by volunteers and California
Conservation Corps on EUM Creek Trail.
Proposition 50 Grant Planning
State placed hold on funding for bond funded
Thornewood OSP p g n
projects. Co
nstruction postponed until 2010.e
Wildlife Management
Bird boxes Operations Monitored bluebird nesting boxes.
Coordinating research on mountain lions
Mountain Lion Management Operations including radio-tagging with collars under the
Bay Area Puma Project.
S:\Resource Management\Quarterly&Annual RM Reports to Board\2009 quarterly reports\Resource Management Quarterly
Summary_Q 1_2009.doc
- 4 -
a ' ( Midpeninsula Regional Memorandum
Open Space District
To: MROSD Board of Directors
From: Tina Hugg dg-
Copy: _
Date: July 17, 2009
Re: Update on the Administrative Office Remodel Project for Board Meeting on July 22, 2009
This update is being provided to the Board regarding the current status of the Administrative Office
remodel project as of July 17,2009.
• Work completed includes the following:
o Passed plumbing and electrical rough-in work inspection
o Drywall work nearing completion; passed nails inspection
o Fire sprinkler work nearing completion; final inspection scheduled for Friday,July 17`t'
o Light tubes in Planning installed
o Door for private office in Planning installed
o Ceiling grid in kitchen installed
o HVAC rough-in (kitchen)
• Work underway:
o AC unit in server room
o Dry fire suppression system in server room
o Windows in Planning private offices to be installed on Monday
o Drywall being textured and sanded for painting,which may begin next week
• Separate non-remodel related issues:
o HVAC repair of boiler leak completed June 22"d
o HVAC repair of malfunctioning VAV boxes serving Real Property area and server room
underway(hot water is being fed through coils even though it is not called for, making
both areas very warm)
Next Steps:
Staff will continue to work on:
• Construction administration
• Cost assessment for mid-to long-term HVAC improvements for the entire AO building
An update will be provided through an informational memorandum to the Board at the next meeting.
i
Midpeninsula Regional
' Open Space District Memorandum
To: MROSD Board of Directors
From: Tina Hugg �-
Copy: _
Date: July 17, 2009
Re: Update on the Skyline Field Office Remodel Project for Board Meeting on July 22,2009
This update is being provided to the Board regarding the current status of the Skyline Field Office
remodel project as of July 17, 2009.
• The second Staff Facilities Ad Hoc Committee has been scheduled for Wednesday, July 22"d at
8:00 AM.
• Tannerhecht gave a preview to staff of their July 22"d presentation for the Staff Facilities Ad Hoc
Committee. Staff provided feedback to be incorporated for the July 22"d Ad Hoc Committee
meeting.
• Staff has compiled information on construction costs. Staff has compiled information on
preliminary plan for facilities improvements. This information will be provided at the July 22"d
meeting.
Next Steps:
• SFO Remodel FYIs will be issued at every other Board meeting beginning July 22' , due to time
spent on construction administration of the AO remodel, which has slowed progress on the SFO
remodel project.
• Respond to feedback received on July 17"'and continue to compile information on green
construction costs, projected facility expansion, staff growth, priorities, and timelines in
preparation for the July 22"d Ad Hoc Committee meeting.
An update will be provided through an informational memorandum to the Board at the August 26`h
meeting.
Page 1 of 1
Anna Duong
From: Anna Duong
Sent: Friday, July 17, 2009 12:32 PM
To: 'mkolluri@msn.com'
Subject: Access to Rancho San Antonio Open Space Preserve via Olive Tree Lane, Los Altos Hills
Dear Kathleen Kolluri and M.V. Kolluri:
The District has received your letter and e-mail dated July 14, 2009 re: Access to Rancho San Antonio Open
Space Preserve via Olive Tree Lane, Los Altos Hills. Your letter will be forwarded to the Board for a written
response to the specific issues you raised.
In regards to your request for(1) a copy of the minutes of the open meeting of the board held on July 08, 2009, it
will not be available to the Board for approval until the August 12, 2009 regular meeting, as the turn around time
for minutes transcribing takes about 4 weeks. Once approved by the Board on August 12, the District will provide
you a written copy. As for your other request, (2) either written or audio transcripts of the open meeting of July 08,
2009 where the issue was discussed, the Clerk's Office is preparing a CD which includes such audio recordings
and will send it to you via postal mail in the next few days. Lastly, you will be notified via e-mail when the issue of
concern is discussed again at the District's future board meetings.
Thank you for your letter and e-mail.
Sincerely,
Anna Duong.
dk
Anna Duon-
Deputy District Clerk/Office Manager
aduon (a,open space.org
Midpeninsula Regional Open Space District
330 Distel Circle, Los Altos, CA 94022
P: (650)69 1-1 200 074 V: (650)691-0-W
7/17/2009
To: Nonette Hanko, Board President --Ilk -z-0 u 9
The Mid-Peninsula Open Space District
From: Kathleen Kolluri &M. V. Kolluri , ED
24749 Olive Tree Lane, Los Altos Hills, CA 94024
(650) 949-1612 JUL 15 2009
mkolluri@msn.com
LA i ilitC IONAL OPF
Re: Access to Rancho San Antonio Open Space Preserve via Olive Tree Lane, Los DISMiOT
Altos Hills
We received your letter dated July 09, 2009. The letter does not address the questions
that we raised at the board's open meeting on July 08, 2009. This is not surprising since
the letter is identical to the draft response prepared by the staff for board consideration
prior to the meeting being held.
You state that the district is "not the entity to grant access". But by cooperating with
installing the fence and gate and agreeing to the 13 property owners access to the public
preserve as part of the easement agreement, the district HAS granted access to 13
property owners on the same private street that we reside on. There should be no legal
justification for the district to grant access to a subset of the property owners on a private
street and yet not grant access to all of the residents on the same private street.
You also state that the board entered into an easement agreement with 13 property
owners of the subdivision at the end of Olive Tree Lane in unincorporated Santa Clara
County by which you committed in writing "not to promote or encourage use of the
roadway by the public". Indeed we are questioning the justification and validity of the
original agreement which was made with a subset and not all of the property owners on a
private street.
These issues were raised by us at the open meeting and have not been answered in your
letter. We would like a response to specific issues that we raised at the meeting and are
repeated above.
We would also like 1) a copy of the minutes of the open meeting of the board held on
July 08, 2009, 2) either written or audio transcripts of the open meeting of July 08, 2009
where the issue was discussed, and 3) be notified if this issue will be discussed at a future
board meeting.
Thank You.
Sincerely,
Kathleen Kolluri M. V. Kolluri
Mid peninsula Regional
P �
• ' Open Space District
To: Board of Directors
From: Stephen E. Abbors
Date: July 22, 2009
Re: Late FYI's
Date: July 9,2009 CAL FIRE Contacts:Colleen Baxter(831)335-6724,Angela Bernheisel(831)335-6794
MROSD Contacts:Gordon Baillie,Leigh Ann Maze(650)691-1200
July 8 controlled burn safely, successfully completed
in Russian Ridge Open Space Preserve
Los Altos, California [July 9,20091 —The California Department of Forestry and Fire Protection(CAL FIRE)
and the Midpeninsula Regional Open Space District(MROSD) successfully completed a controlled burn of 100
acres on July 8 in the Russian Ridge Open Space Preserve, located along Skyline Boulevard near the
intersection of Page Mill Road.
Weather conditions were favorable, and the burn was safely completed in about four hours providing a valuable
opportunity for local fire agencies to practice wildland firefighting and interagency coordination. Firefighters
from CAL FIRE,the La Honda Fire Brigade,the King's Mountain Volunteer Fire Brigade,the Palo Alto Fire
Department and the Ben Lomond Fire Camp as well as rangers from the City of Palo Alto and MROSD
participated.
The burned area will serve as a fire break during the hotter, drier late summer and fall months, will help control
invasive weeds like Harding grass, and increase the abundance and diversity of native California grasses and
wildflowers next spring.
Controlled burns are one of several tools MROSD uses to manage grasslands in the Russian Ridge Open Space
Preserve for the health of the environment and to reduce fire hazard. Four controlled burns have been
successfully implemented at Russian Ridge since 1998, and have proven effective in controlling brush, reducing
invasive plants, and improving the native grasslands,which are adapted to periodic fire. As a result, Russian
Ridge has become a popular Bay Area destination to see spring wildflowers. Other techniques used in
combination with controlled burns at Russian Ridge include grazing, seeding, mowing, bio-control insects and
selective herbicide application.
Firefighters carefully monitor the controlled burn
with hoses ready in the Russian Ridge Open Space
Preserve Jul 8.The 100-acre burn was safe) and
Y Y
successfully completed in about four hours.
Photo by Jack Owicki
I ,
rt
:w d.
I
Midpeninsula Regional Open Space District For Immediate Release
i
Date: July 7, 2009 Contact: Leigh Ann Maze,650.691.1200
MROSD releases weed-eating insects on non-native yellow starthistle
Los Altos, California [July 7, 20091 —The Midpeninsula Regional Open Space District received 5,250
hairy weevils that will be released today and tomorrow in six open space preserves as part of the District's
effort to reduce the spread of the non-native, invasive weed yellow starthistle and restore the natural
environment on the preserves.
Media representatives are invited to attend the weevil release at the Fremont Older Open Space
Preserve near Cupertino and Saratoga Wednesday July 8 at 10 a.m.. Please contact Leigh Ann
Maze before 4 p.m.on Wednesday July 7 if you're interested.
The hairy weevil (Eustenopus villosus) is one of several insects researched by the U.S. Department of
Agriculture that is effective in controlling yellow starthistle, substantially reducing the amount of seeds
produced within three years. Weevils are a good tool for reducing starthistle in locations where other
control methods such as mowing, prescribed burning, cutting, pulling, and select herbicide application,
are not immediately feasible.
The District first released hairy weevils in 1997, and conducted additional releases from 2004-2008,
Follow up monitoring revealed that 40-90 percent of the yellow starthistle seedheads were damaged and
the remaining starthistle populations in some locations noticeably declined. The District will continue to
monitor the weevil populations and their effectiveness.
Originally from Greece, the hairy weevil is 6-8 mm long, has a distinctive long snout and an overall
brown-gray striped color. Adult weevils feed on developing buds and the larvae feast on immature seeds,
effectively diminishing the yellow starthistle seed production.
Created by voters more than 35 years ago, the Midpeninsula Regional Open Space District has successfully protected and
managed more than 57,000 acres of open space.The public enjoys the District's diverse and beautiful preserves 365 days a year.
The District is an independent, non-enterprise, California special district whose mission is to acquire and preserve a regional
recnbelt of open s ace land in perpetuity,protect and restore the natural environment and provide opportunities for ecologically
$ P P rP Y.P � P PP g Y I
sensitive public enjoyment and education.www.openspace.org.
Midpeninsula Regional Open Space District For Immediate Release
Date: July 6,2009 CAL FIRE Contacts: Colleen Baxter(831)335-6724,Angela Bernheisel(831)335-6794
MROSD Contacts:Gordon Baillie,Leigh Ann Maze(650)691-1200
Controlled burn planned for July 8
in MROSD's Russian Ridge Open Space Preserve
Los Altos, California [July 3,2009] —The California Department of Forestry and Fire
Protection (CAL FIRE) and the Midpeninsula Regional Open Space District(MROSD) are
planning a controlled burn of 100 acres on July 8 in the Russian Ridge Open Si)ace ('reserve,
located along Skyline Boulevard near the intersection of Page Mill Road.
The burn is expected to be completed in one day, but may extend to two or be rescheduled
depending on weather conditions and availability of fire personnel and equipment.
Please help us inform your audience in the Peninsula area that during the burn:
• Smoke will be visible emanating from the burn site,and is not cause for alarm.
• The Russian Ridge Open Space Preserve will be closed to the public.
• There may be minor traffic delays on Skyline Boulevard.
Fire personnel and equipment on-hand for the burn include four MROSD patrol units and a water
tender, five CAL FIRE engines, a La Honda Fire Brigade engine and water tender, a King's
Mountain Volunteer Fire Brigade engine, a Ben Lomond Fire Camp Crew and a firefighting
helicopter. A control line has been established around the burn perimeter.
Controlled burns are one of several tools MROSD uses to manage grasslands in the Russian
Ridge Open Space Preserve for the health of the environment and to reduce fire hazard. Four
controlled burns have been successfully implemented at Russian Ridge since 1998,. and have
proven effective in controlling brush, reducing invasive plants such as Harding grass, and
increasing the abundance and diversity of native California grasses and wildflowers, which are
adapted to periodic fire. As a result, Russian Ridge has become a popular Bay Area destination
to see spring wildflowers. Other techniques used in combination with controlled burns at Russian
Ridge include grazing, seeding, mowing, bio-control insects and herbicides.
"The controlled burn improves fire safety by reducing dry vegetation and creating a firebreak
along this prominent ridgeline in San Mateo County. The burn also provides valuable live fire
training to local emergency response agencies, who work together when incidents occur on Open
Space District lands and in surrounding communities," said CAL FIRE Unit Chief John Ferreira.
Media representatives with interest in this controlled burn should contact the Public Information
Officers at CAL FIRE or MROSD listed above.
Created by voters in 1972,the Midpeninsula Regional Open Space District has successfully protected more than 57,000 acres of
open space.The public enjoys the District's diverse and beautiful preserves 365 days a year.The District is a public agency
whose mission is to acquire and preserve a regional greenbelt of open space land in perpetuity,protect and restore the natural
environment,and provide opportunities for ecologically sensitive public enjoyment and education. �v�iiv.opensnsrce.rrr�