HomeMy Public PortalAboutNovember
UPDATE
11/1/04
Fuel Tanks
Fuel tanks pumped out and locked. Tank tightness test passed, currently evaluating installation of pumps or above ground tanks depending upon EPA, DEQ requirements.
Golf
COMPLETED
11/1/04
Golf Course Equipment
Purchases
Mower fund purchases to date: 2 greens mowers, 1 trim mower, 2 sets of cutting units, and 1 set of verticut units. $3,900 remaining was spent on the Cutter equipment purchases; we have
purchased another fairway mower for $3,500 with funding through the Men’s Golf Association.
Golf
UPDATE
11/1/04
Golf Course Equipment Needs
In addition to the mower fund and Cutter Purchases, additional equipment is needed, we budgeted FY 04-05 for rough mowing equipment to complete our immediate needs. We need safety equipment
and new shop upgrades. Cost and options for these items are currently under development.
Golf
COMPLETED
11/1/04
Golf Course Equipment
Golf Management Committee authorized $15,000 from the golf foundation to be used towards purchasing additional equipment. We purchased a fairway mower, two greens mowers, a fairway
sprayer and a utility vehicle from Cutter Equipment. Total purchases were $23,000 with the balance to be subsidized by the City of McCall.
Golf
UPDATE
11/1/04
Golf Course Committee
Next scheduled meeting TBD.
Golf
UPDATE
11/1/04
Equipment Repairs
Equipment steam cleaned, preventative maintenance and ongoing maintenance continuing.
Golf
COMPLETED
11/1/04
Clubhouse Repairs
Holes repaired in clubhouse walls. Overhead lighting repairs initiated. Bids for repair of kitchen floor complete. Construction of outside storage complete except roofing material.
Range hood fan and motor replaced. Painting of clubhouse complete, landscaping completed. Insurance claims for roof ice damage turned in, repairs completed.
Golf
COMPLETED
11/1/04
Asphalt Repairs
Final asphalt repairs were completed at the clubhouse cart storage area. Cart path repair on #6 green to be completed as Public Works can complete grading work in preparation this fiscal
year.
Golf
UPDATE
11/1/04
Golf Greens
All greens winterized, treated chemically for snow mold protection, fertilized and aerated.
Golf
NEW
11/1/04
Dumpster Relocation
Grading complete, concrete slab installed. Wall construction 70% complete, gate to be installed.
Golf
COMPLETE
11/1/04
Professional Development
Director of Golf Operations attended the GCSAA Conference. OSHA compliance, hazard assessment and safety seminars complete. IDGCSA Conference in Jackson, WY Sept 29th
Golf
UPDATE
11\1/04
Personnel
Currently one seasonal employee on staff and four full-time employees. One full-time employee will plow snow at the airport 40 hrs/week for golf fund budget relief. We have hired a
golf course mechanic.
Golf
COMPLETE
11/1/04
Golf Course Entrance
Roadside to be burned the week of June 7th, seeding of wildflowers completed, irrigation repairs completed.
Golf
UPDATE
11/1/04
Continuing Education
City Arborist CEU’s needed to complete recertification – 10, to be completed by 12-04
City Arborist
UPDATE
11/1/04
Golf Course Trees
Many hazard trees identified and removed, annual tree inspection on-going.
City Arborist
COMPLETE
11/1/04
Brown Park Trees
High Mountain Nursery replaced ten trees at Brown Park for a total of $2,200, total tree replacement scheduled will be 15 trees installed for $3,000.
City Arborist
NEW
11/1/04
Tree Ordinance
Tree Committee is currently working on re-wording the Tree ordinance as well as strengthening the penalties for un-authorized tree work or removal.
City Arborist
COMPLETED
11/1/04
Tree Committee
John Lillehaug expressed interest in joining the tree committee. Appointment to be confirmed on October 14th.
City Arborist
COMPLETED
10/1/04
Tree Committee
Committee completed a walk through of the hazardous fuel reduction site near the airport. The committee has formed a list of recommendations for the contract removal of trees and clean-up.
City Arborist
NEW
11/1/04
Revenue/Rate Analysis
Currently evaluating volume of play and revenue while estimating rate structure scenario’s
Golf
NEW
11/1/04
Golf Course Construction
#9 tee and # 7 tee on the Aspen Course have been rebuilt along with re-shaping the old #6 green. A cart path section will be asphalted next spring and seal coated when the parking lot
is seal coated.
Golf