HomeMy Public PortalAbout20100428 - Agenda Packet - Board of Directors (BOD) - 10-12 Midpeninsula Regional
Open Space District
Meeting 10-12
REGULAR AND SPECIAL MEETING
BOARD OF DIRECTORS
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
Wednesday,April 28,2010
CLOSED SESSION FOR MIDPENINSULA RE(i]ONAL OPEN SPACE DISTRICT RICT BEGINS AT 5:00 P.M.
PUBLIC SESSION BEGINS AT 7:00 P.M.
330 Distel Circle
Los Altos,California
AGENDA
5:00 ROLL CALL
SPECIAL MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT-CLOSED SESSION
I Closed Session: Public Employees Performance Evaluation Pursuant to Government Code Section
54957.Title of Employees: General Manager, General Counsel and Controller
7:00* REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT-PUBLIC SESSION
ROLL CALL
REPORT ON RETURN FROM CLOSED SESSION(The Board shall publicly state any reportable action taken in
Closed Session pursuant to Government Code Section 54957.1)
ORAL COMMUNICATIONS—PUBLIC
ADOPTION OF AGENDA
7:10* CONSENT CALENDAR
I Approve Minutes—March 10, 2010
2 Approve Revised Claims Report
3 Approve Written Communications—Response to Aviva Garrett
7:20* BOARD BUSINESS
4 Resolution in Support of the State Parks and Wildlife Conservation Trust Fund Act of 2010 R.
Jurgensen
5 Authorization to amend the contract with Ascent Environmental, Inc. to provide consulting services and
prepare CEQA/NEPA documents for Phase I Abatement of the Mount Umunhum Remediation Project
in an amount not to exceed$50,000 for a Total Contract Amount Not To Exceed$75,000—M.
Manning
Meeting 10-12 Page 2
6 Adoption of an Amendment to the Use and Management Plan for Thornewood Open Space Preserve
for a Minor Intervention, Long-Term Management Approach of Schilling Lake—M. Manning
7 Amend the contract with BAGG Engineers to conduct construction monitoring for the Pond DR06
Repair project located in the Former Wool Ranch Area of La Honda Creek Open Space Preserve and
Determine that the recommended action is exempt from the California Environmental Quality Act—J.
Andersen
INFORMATIONAL REPORTS— Written or oral reports on compensable meetings attended. Brief reports or
announcements concerning activities of District Directors and staff-, opportunity to refer public or Board
questions to staff for factual information; request staff to report back to the Board on matter at a future
meeting; or direct staff to place a matter on a future agenda.
A. Committee Reports
B. Staff Reports
C. Director Reports
SPECIAL MEETING CLOSED SESSION RECONVENED(IF NECESSARY)
REPORT ON RETURN FROM RECONVENED CLOSED SESSION(IF NECESSARY)(The Board shall publicly state
any reportable action taken in Closed Session pursuant to Government Code Section 54957.1)
ADJOURNMENT
Times are estimated and items may appear earlier or later than listed.Agenda is subject to change of order,
TOADDRESSTHE'BOARD.- the Chair will invite public comment on agenda items at the time each item is considered by the Board qfDirectors, You
ma-v address the Board concerning other matters during Oral Communications. Bach speaker will ordinarily be limited to three minutes.
Alternately,you may comment to the Board by a written communication,which the Board appreciates.
Consent Calendar:All items on the Consent Calendar m(tv be approved without discussion by one motion. Board members,the(;eneralAfanager,
and members oJ'the public may request that(in item be removed from the Consent Calendar during consideration of the Consent Calendar.
In compliance with the Americans with Disabilities Act,if you need assistance to participate in this meeting,please contact the District Clerk at(650)
691-1200. Notification 48 hours,prior to the meeting will enable the District to make reasonable arrangements to ensure accessibility to this meeting.
Public records provided to a majority of the District's Board of Directors relating to an Agenda Item on the open session of regular Board meeting
will be made available for public inspection at the District's Administrative Oft-ice located at 330 Distel Circle,Los Altos,California 94022 during
normal business hours.
CERTIFICATION OF POSTING OF AGENDA
1,Michelle Radcliffe,District Clerk for the Midpeninsula Regional Open Space District(MROSD),declare that the foregoing agenda for the April 28,2010
Special and Regular Meetings of the MROSD Board of Directors was posted and available for review on April 23,2010 at the Administrative Offices of MROSD,330 Distel Circle,Los Altos,California,94022. The agenda is also available on the District's web site at hit www.o)cirspALe.ojg.
Signed this 23rd day of April 2010,at Los Altos,California.
District Clerk Date: 04/23/10
1
Claims No. 10-09
Meeting 10-12
Date 4/28/10
Midpeninsula Regional Open Space District
# Amount Name Description
12630 $25,000.00 Restoration Design Group Planning&Design Services For The Alpine Road Long-Term
Management Project
12631 $14,892,02 Northgate Environmental Management Environmental Consulting Services-Review U.S.Army Corps Of
Engineers Work At Mt. Umunhum
12632 $11,189.79 The Ferguson Group Legislative Consultant-Lobbyist For Mt.Umunhum
12633 $9,352.76 *1 First National Bank Office Supplies/Printer Cartridges/Four Projectors/Cables For
Projectors/Video Conferencing Expenses/Memory Cards
12634 $8,997.50 Ascent Environmental CEQA/NEPA Strategy For Mt. Umumhum Remediation&Planning
12635 $6,831.53 California Surveying&Drafting Supply GPS Unit&Software
12636 $6,000.00 John Veverka Consulting Services-Interpretive Systems Plan For District
12637 $5,925.00 Bartel Associates Actuarial Consulting Services
12638 $5,846.89 *1 First National Bank Field Supplies/Sunscreen/Eight Firebox Flashlights/Supplies
For Equestrian Steps At Thornewood/Two GPS Units/Boat
Supplies For Schilling Lake/Hazardous Fire Area Signs/Poison
Oak Cream/Chainsaw Pack/Chipper Parts/Wheel Barrow
12639 $5,158.81 Telecommunications Engineering Furnish&Install New Antenna At Black Mountain
Associates
12640 $4,714.50 Shute,Mihaly&Weinberger LLP Legal Services-ECDM Staging Area And Trails Improvement
Project
12641 $3,271.47 VP II District Logo Bandanas For Giveaways/Two Canopies With
District Logo
12642 $3,162.68 KBM Workspace Office Furniture-AO
12643 $2,928.95 Tannerhecht Architecture Architecture Services For The SFO Remodel&Shop Building
Project
12644 $2,719.98 Office Depot Office Supplies/Binders/Copy Paper/Calendars/USB Flash
Drives/Dry Erase Board/Bookcase For FFO
12645 $2,487.24 Sierra Consulting Preparation Of Pest Control Recommendations For Maintenance
Spraying
12646 $2,472.63 Dell Business Credit One Laptop For Public Affairs Department/Microsoft Software
For Staff-AO&FFO
12647 $2,238.75 Concern Employee Assistance Program Quarterly Fee
12648 $2,125.12 Big Creek Lumber Materials For Equestrian Steps At Thornewood
12649 $1,926.64 *1 First National Bank Uniform Expenses/Fire Helmets/Eleven Hat Boxes/Baton End
Caps
12650 $1,755.00 Liebert Cassidy Whitmore Legal Services&Advice
12651 $1,724.01 All Premium Promotional Products Event Table Dressings With District Logo
12652 $1,721.79 Patsons Media Group Printing Services-Fremont Older Trail Brochures
12653 $1,672.65 *1 First National Bank Conferences&Training Expenses-Red-Legged Frog Survey
Training/Basic Firefighter Training/City Attorneys Conference
Expenses/Hazardous Waste Certification/PRAC Conference
Expenses
12654 $1,500.00 Interactive Design Group Digital Story Project-Dog Point-Of-View
12655 $1,500.00 Santa Clara County/Cities Managers' Two Enrollments In Leadership Academy
Association
12656 $1,471.60 Almaden Press Printing Services-Patrol Map Books
12657 $1,266.90 LFR Levine Fricke Engineer&Design Services-ECDM Staging Area Project
12658 $1,254.35 CMK Automotive Vehicle Maintenance&Repairs
12659 $1,175.00 Mayne Tree Expert Company Spraying Trees With Agri-Fos At RSA&ECDM
12660 $1,154.54 *1 First National Bank Rental Residence Expenses-Refrigerator/Water Filter Supplies
/Water Heater Anode
12661 $1,122.60 Tires On The Go Tires
12662 $1,094.72 Accountemps Accounting Temp
12663 $856.14 Wright,Elizabeth Reimbursement-Wildland Firefighter Training Expenses
12664 $679.74 *1 First National Bank Business Related Meals/Board Meetings/ABC Meeting/
LAFPAC Meeting/SOD Training
Page 1 of 3
Claims No. 10-09
Meeting 10-12
Date 4/28/10
Midpeninsula Regional Open Space District
# Amount Name Description
12665 $678.84 *1 First National Bank Vehicle Supplies,Service&Repairs-Motorcycle Equipment/
Water Truck Parts/Fire Extinguisher&Mounting Brackets
12666 $638.94 Sol's Mobile Service Tractor Repair
12667 $628.03 Grainger Chemical Spill Kits/Storage Cabinet-FFO
12668 $616.41 Gou,Vicky Reimbursement-Nonprofit Tech Conference Expenses
12669 $600.00 California Department Of Fish&Game California Natural Diversity Database Software
12670 $565.90 Metro Mobile Communications Radio Carrying Cases&Battery
12671 $550.72 *1 First National Bank Chairs For Events
12672 $525.28 *1 First National Bank Advertising/Subscription/Books-Plant ID Book/Eleven Copies
Of California Legal Source Books For Rangers/Dish Network!
Survey Monkey Monthly Subscription/Volunteer Match
Subscription
12673 $511.53 Pouncing Pachyderm Productions Design&Fabrication Services-Daniels Nature Center Sign
Panels
12674 $509.75 West Payment Center Legal Research Fees/Law Of Easements&Licenses
Subscription
12675 $436.90 California Water Service Company Water Service-FFO
12676 $425.00 Gorman,Michael Reimbursement-Trail Management Training
12677 $412.93 Gilroy Motorcycle Center Three Motorcycle Helmets
12678 $373.75 Jackson-Hirsh Laminating Supplies
12679 $365.00 Bill's Towing&Recovery Towing Services
12680 $311.09 *1 First National Bank Volunteer/Docent Events&Supplies-Safey Sleeves/
Respiratory Masks/Name Badges
12681 $309.38 Sanguinetti, David Reimbursement-Mileage
12682 $276.35 Big Creek Lumber Lumber For Coal Creek Barn Project
12683 $256.37 Safety Kleen Solvent Tank Service-SFO
12684 $246.41 Northgate Environmental Management Remedial Investigations&Design At Driscoll Ranch
12685 $232.96 Target Specialty Products Vehicle Spill Cleanup Kit/Safety Glasses
12686 $222.91 San Jose Water Company Water Service-RSA County Park
12687 $200.00 All Star Glass Windshield Replacement For Maintenance Truck
12688 $198.84 Summit Uniforms Uniform Expenses
12689 $188.71 *1 First National Bank Out Of Town Business Meeting Expenses-Washington DC Trip
For Mt. Umunhum
12690 $185.44 Cascade Fire Equipment Company Fire Protection Clothing
12691 $176.00 County Of Santa Clara-Office Of The Fingerprinting Services
Sheriff
12692 $175.42 *1 First National Bank Website/Internet Expenses-Internet For FFO/Web Hosting!
Subscription to Email Service Provider For Sending Email Blasts
12693 $174.80 *1 First National Bank Mulch For AO Garden
12694 $155.84 Madco Oxygen&Welding Gas Tanks
12695 $155.41 Barron Park Supply Plumbing Supply-Flush Valve
12696 $133.28 The Workingman's Emporium Uniform Expenses
12697 $121,68 Lab Safety Supply Safety Glasses/Ear Plugs
12698 $119.50 Staples Office Supplies/Break Room Supplies/Wrist Rest/Name Tags
12699 $105.00 *1 First National Bank Membership Dues-SERCAL Membership
12700 $104.93 *1 First National Bank Photo Contest Prizes
12701 $100.00 *1 First National Bank San Mateo County Notice Of Exemption Filing Fees For Sare
Property&Cooley Landing
12702 $93.56 *1 First National Bank Veterinary Service&Supplies For Twix
12703 $89.19 Gartside, Ellen Reimbursement-Sandbags For Slender False Brome Removal
12704 $86.27 Wright, Leslie Reimbursement-Communications/Dispatch Meeting Expenses
12705 $77.48 Forestry Suppliers Field Supplies-Magnifiers
12706 $67.02 McKowan, Paul Reimbursement-Volunteer Supplies
Page 2 of 3
Claims No. 10-09
Meeting 10-12
Date 4/28/10
Midpeninsula Regional Open Space District
# Amount Name Description
12707 $65.00 Normal Data Consulting Services-Insurance Tracking Database Development
12708 $64.00 American Red Cross CPR Recertification Fee&CPR Masks
12709 $56.25 Fitzsimons, Renee Reimbursement-Mileage
12710 $54.61 Sears Fire Pumper Hose For Maintenance Truck
12711 $50.00 San Mateo County Health Department Tick Testing
12712 $40.70 United Parcel Service Parcel Shipping
12713 $31.00 Roessler,Cindy Reimbursement-Mileage
12714 $25.74 Sunnyvale Ford Vehicle Maintenance&Repairs
12715 $21.54 Minton's Lumber&Supply Split Rails For RSA Parking Lot
12716 $19.25 ID Plus Name Tags For Staff
Total $160,022.21
'1 Urgent Check Issued 4/9/10
The total amount for First
National Bank is$23,641.57
Page 3 of 3
Claims No. 10-09
Meeting 10-12
Date 4/28/10
Revised
Midpeninsula Regional Open Space District
# Amount Name Description
12630 $25,000.00 Restoration Design Group Planning&Design Services For The Alpine Road Long-Term
Management Project
12631 $14,892.02 Northgate Environmental Management Environmental Consulting Services-Review U.S.Army Corps Of
Engineers Work At Mt. Umunhum
12632 $11,189.79 The Ferguson Group Legislative Consultant-Lobbyist For Mt. Umunhum
12633 $9,352.76 *1 First National Bank Office Supplies/Printer Cartridges/Four Projectors/Cables For
Projectors/Video Conferencing Expenses/Memory Cards
12634 $8,997.50 Ascent Environmental CEQA/NEPA Strategy For Mt.Umumhum Remediation&Planning
12635 $6,831.53 California Surveying&Drafting Supply GPS Unit&Software
12636 $6,000.00 John Veverka Consulting Services-Interpretive Systems Plan For District
12637 $5,925.00 Bartel Associates Actuarial Consulting Services
12638 $5,846.89 *1 First National Bank Field Supplies/Sunscreen/Eight Firebox Flashlights/Supplies
For Equestrian Steps At Thornewood/Two GPS Units/Boat
Supplies For Schilling Lake/Hazardous Fire Area Signs/Poison
Oak Cream/Chainsaw Pack/Chipper Parts/Wheel Barrow
12639 $5,158.81 Telecommunications Engineering Furnish&Install New Antenna At Black Mountain
Associates
12640 $4,714.50 Shute,Mihaly&Weinberger LLP Legal Services-ECDM Staging Area And Trails Improvement
Project
12641 $3,271.47 VP II District Logo Bandanas For Giveaways/Two Canopies With
District Logo
12642 $3,162.68 KBM Workspace Office Furniture-AO
12643 $2,928.95 Tannerhecht Architecture Architecture Services For The SFO Remodel&Shop Building
Project
12644 $2,719.98 Office Depot Office Supplies/Binders/Copy Paper/Calendars/USB Flash
Drives/Dry Erase Board/Bookcase For FFO
12645 $2,487.24 Sierra Consulting Preparation Of Pest Control Recommendations For Maintenance
Spraying
12646 $2,472.63 Dell Business Credit One Laptop For Public Affairs Department/Microsoft Software
For Staff-AO&FFO
12647 $2,238.75 Concern Employee Assistance Program Quarterly Fee
12648 $2,125.12 Big Creek Lumber Materials For Equestrian Steps At Thornewood
12649 $1,926.64 *1 First National Bank Uniform Expenses/Fire Helmets/Eleven Hat Boxes/Baton End
Caps
12650 $1,755.00 Liebert Cassidy Whitmore Legal Services&Advice
12651 $1,724.01 All Premium Promotional Products Event Supplies With District Logo
12652 $1,72139 Patsons Media Group Printing Services-Fremont Older Trail Brochures
12653 $1,672,65 *1 First National Bank Conferences&Training Expenses-Red-Legged Frog Survey
Training/Basic Firefighter Training/City Attorneys Conference
Expenses/Hazardous Waste Certification/PRAC Conference
Expenses
12654 $1,500.00 Interactive Design Group Digital Story Project-Dog Point-Of-View
12655 $1,500.00 Santa Clara County/Cities Managers' Two Enrollments In Leadership Academy
Association
12656 $1,471.60 Almaden Press Printing Services-Patrol Map Books
12657 $1,266.90 LFR Levine Fricke Engineer&Design Services-ECDM Staging Area Project
12658 $1,254.35 CMK Automotive Vehicle Maintenance&Repairs
12659 $1,175.00 Mayne Tree Expert Company Spraying Trees With Agri-Fos At RSA&ECDM
12660 $1,154.54 *1 First National Bank Rental Residence Expenses-Refrigerator/Water Filter Supplies
/Water Heater Anode
12661 $1,122.60 Tires On The Go Tires
12662 $1,094.72 Accountemps Accounting Temp
12663 $856.14 Wright, Elizabeth Reimbursement-Wildland Firefighter Training Expenses
12664 $679.74 *1 First National Bank Business Related Meals/Board Meetings/ABC Meeting/
LAFPAC Meeting/SOD Training
Page t of 3
Claims No. 10-09
Meeting 10-12
Date 4/28/10
Revised
Midpeninsula Regional Open Space District
# Amount Name Description
12665 $678.84 *1 First National Bank Motorcycle Equipment/Water Truck Parts/Fire Extinguisher&
Mounting Brackets
12666 $638.94 Sol's Mobile Service Tractor Repair
12667 $628.03 Grainger Chemical Spill Kits/Storage Cabinet-FFO
12668 $616.41 Gou Vick Reimbursement-
y e t Nonprofit Tech Conference Expenses
12669 $600.00 California Department Of Fish&Game California Natural Diversity Database Software
12670 $565.90 Metro Mobile Communications Radio Carrying Cases&Battery
12671 $550.72 *1 First National Bank Chairs For Events
12672 $525.28 *1 First National Bank Advertising/Subscription/Books-Plant ID Book/Eleven Copies
Of California Legal Source Books For Rangers/Dish Network/
Survey Monkey Monthly Subscription/Volunteer Match
Subscription
12673 $511.53 Pouncing Pachyderm Productions Design&Fabrication Services-Daniels Nature Center Sign
Panels
12674 $509.75 West Payment Center Legal Research Fees/Law Of Easements&Licenses
Subscription
12675 $436.90 California Water Service Company Water Service-FFO
12676 $425.00 Gorman,Michael Reimbursement-Trail Management Training
12677 $412.93 Gilroy Motorcycle Center Three Motorcycle Helmets
12678 $373.75 Jackson-Hirsh Laminating Supplies
12679 $365.00 Bill's Towing&Recovery Towing Services
12680 $311.09 *1 First National Bank Volunteer/Docent Events&Supplies-Safey Sleeves/
Respiratory Masks/Name Badges
12681 $309.38 Sanguinetti, David Reimbursement-Mileage
12682 $276.35 Big Creek Lumber Lumber For Coal Creek Barn Project
12683 $256.37 Safety Kleen Solvent Tank Service-SFO
12684 $246.41 Northgate Environmental Management Remedial Investigations&Design At Driscoll Ranch
12685 $232.96 Target Specialty Products Vehicle Spill Cleanup Kit/Safety Glasses
12686 $222.91 San Jose Water Company Water Service-RSA County Park
12687 $200.00 All Star Glass Windshield Replacement For Maintenance Truck
12688 $198.84 Summit Uniforms Uniform Expenses
12689 $188.71 *1 First National Bank Out Of Town Business Meeting Expenses-Washington DC Trip
For Mt. Umunhum
12690 $185.44 Cascade Fire Equipment Company Fire Protection Clothing
12691 $176.00 County Of Santa Clara-Office Of The Fingerprinting Services
Sheriff
12692 $175.42 *1 First National Bank Website/Internet Expenses-Internet For FFO/Web Hosting!
Subscription to Email Service Provider For Sending Email Blasts
12693 $174.80 *1 First National Bank Mulch For AO Garden
12694 $155.84 Madco Oxygen&Welding Gas Tanks
12695 $155.41 Barron Park Supply Plumbing Supply-Flush Valve
12696 $133.28 The Workingman's Emporium Uniform Expenses
12697 $121.68 Lab Safety Supply Safety Glasses/Ear Plugs
12698 $119.50 Staples Office Supplies/Break Room Supplies/Wrist Rest/Name Tags
12699 $105.00 *1 First National Bank Membership Dues-SERCAL Membership
12700 $104.93 *1 First National Bank Photo Contest Prizes
12701 $100.00 *1 First National Bank San Mateo County Notice Of Exemption Filing Fees For Sare
Property&Cooley Landing
12702 $93.56 *1 First National Bank Veterinary Service&Supplies For Twix
12703 $89.19 Gartside, Ellen Reimbursement-Sandbags For Slender False Brome Removal
12704 $86.27 Wright,Leslie Reimbursement-Communications/Dispatch Meeting Expenses
12705 $77.48 Forestry Suppliers Field Supplies-Magnifiers
12706 $67.02 McKowan,Paul Reimbursement-Volunteer Supplies
Page 2 of 3
`
� Claims No. 10-09
' Meeting 18'12
Date 4/2010
Revised
Midpeninsula Regional Open Space District
# Amount Name Description
12707 *05,00 Normal Data Consulting Services'Insurance Tracking Database Development
12708 $84.00 American Red Cmoo CPR Recertification Fee&CPR Masks
12709 $5625 Fitzsimons, Renee Raimbvrsement-Mi|eego
12710 *54.61 Soem Fire Pumper Hose For Maintenance Truck
12711 $nuou San Mateo County Health Department Tick Testing
12712 $40.70 United Parcel Service Parcel Shipping
12713 *3100 Roessler,Cindy Reimbursement'Mileage
12714 *25.74 Sunnyvale Ford Vehicle Maintenance&Repairs
� 12715 $21.54 Minton'u Lumber uSupply Split Rails For RSA Parking Lot
�
12716 *1825 ID Plus Name Tags For Staff
�
� 12717R $15.e80.44 Ascent Environmental CEQ/VNEPA Strategy For Mt. UmumhumRameuianon&Planning
12718n $8.511.71 California Surveying&Drafting Supply GPS Unit&Software
12719R $2.800.00 Jones Hall Drafting Promissory Note&Reviewing Transactional Documents
� For Land Acquisition
� 12720R *1.200.00 Macro Corporation Project Management Services'Implementation Of District's New
Radio System
12721n *1.088.47 Cagwin&oomanjLandscape Service&Repair Irrigation System'*O
Contractors
� 12722n $651.e3 Cascade Fire Equipment Company piepumporEquipment-ri||pioings
�
12723R $600.00 Macro Corporation Black Mountain Microwave Study For Districts New Radio System
12724n $562.27 Ame,iGuo pmpone-nenta|uooiuenoee
12725n $548.16 United Site Services Sanitation Services'Sierra Azu|&Fremont Older
� 12725R $48175 Hsieh, Benny Reimbursement'Conference Phone
� 12727n $375.00 eomaon.Gom neimbumammnt-Reg|mtmUpnpo,Red-LeqnedFmgvVnmohup
� 1272en *198.27 Hammond,Tracy Reimbumement-UnifvnnExpenso
1272en $182.e5 California Water Service Company ways,Oumice-xD
� 12730n $120�00 Ruiz,Ana neimbusement-CenPxono
12731 R $102.32 San Jose Water Company Water Service-Rental Residence
� 12732n $n7�aO Tvp|ov. oaviu Reimuu�ement-Canoom|a*savmunvn0fpvm Pu
rchasing
� Officers Membership
Total o183,520.58
`1 Urgent Check Issued*m/1V
The total amount for First
National Bank io$23.641.s7
�
�
�
Page om,
����
Midpeninsula Regional
• ' Open Space District
To: Board of Directors
From: Stephen E. Abbors
Date: April 28, 2010
Re: Written Communications
�
�
DRAFT ����
~ RESPONSE
April 29, 2010 PREPARED BY STAFF
� �
wwwu ��rn "u° ~~w,�~�vDERA»x��N
AvivuGurnz ��
l555jBoh|monRoad
Saratoga, C/\ 95050
BE: Request for Dog Use a1 £| ScrcnmOpen Space Preserve
Dear Ms. Garret,
Thank you for your letter dated February 27, 2010 that follows your prior letter dated September 10, 2009
in which you reiterate an interest in having the remainder of El Sereno Open Space Preserve(Preserve)
open <o dogs oo |cuuh. This request, although seemingly simple u/first glance, does require considerable
staff time to comply with the District's Board-approved use and management planning process. Along
with evaluating tile Pvcacrvc`s site uuitubi|ity for expanded dogs-on-leash use, the District is also
responsible for reviewing the proposal at publicly-noticed meeting with the Use and Management
Cumroi8cc, must assess and prepare the proper documentation to identify the potential environmental
�
implications for this action as required by the California Environmental Quality Act(CE0&)` respond to
any public comments in support of or opposition to the proposal, and then proceed with full Board review
and consideration of this item as ail amendment to the Preserve's Use and Management Plan. Once this ia
completed and assuming Board approval of the itern, signs and maps are then modified to reflect the
change inuse.
� With this in mind and given staff limitations, the District had to weigh this request with all other project
proposals and priorities located across tile District's 27open opuuc preserves, which now encompass over
58,000oorea. Staff reviewed these projects against a set of criteria to determine which projects would
move forward ua part of the District's 2Ol0-| \ Action Plan. Although Your request for dog access was
not initially a component of the Action Plan as part of this screening process, we have determined that
should projects bede|uycdorremuovedfionnthc |im&ductoununticipo1edfaotom, whiohnuuyoucur, oiufT
would then recornmend that the Board move forward with your proposal during the Midyear Action Plan
Review that occurs inNovenuhcr/[>cccnnbcr. Staff will contact you iu the fall to let you know the status
Of Your request as we begin to review the Midyear Action Plan. If you have any questions regarding this
|o8or, please feel free tocall Ana Ruiz, Planning Manager, a1(650) 69|'l200. |n the mean drne, we
encourage you to visit other open space preserves that currently allow dog access, which are listed oil Our
vvchoite at .
Again, thank you for your comments.
Sincerely,
Mary Davey, Board President
co: K4flOBD Board m[Directors
Stephen E. &hbom, General Manager
/\nu Ruiz` Planning Manager
��
f
I
15555 Bohiman Road
Saratoga, CA 95070
27 February 20 =
Anna Ruiz 00't EV E
Nonette Hanko
Santa Clara County Open Space Authority MAR 16 ZU;,
330 Distel Circle
Los Altos, CA 94022 11 ..IA 1111E-0111111�h
I
Dear Ms. Ruiz and Ms. Hanko:
My neighbors Cynthia Riordan and Connie Puglia, along many other residents in the
Bohlman Road neighborhood in the unincorporated area of Saratoga, have petitioned the
Santa Clara County Open Space Authority in September 2009 to allow dogs on leashes
at the Bohiman Road entrance to the Sereno Open Space District. We know that leashed
dogs are allowed to enter this open space area from the Overlook entrance, and we and
other local Bohiman Road residents want to be able to walk into the open space district, but
at the same time we feel the need to keeps our dogs with us as protection against mountain
lions. (My husband acquired our dog for the primary purpose of protecting me as I walk.)
We do not feel safe walking without our dogs.
In May 2009, Cynthia Riordan spoke with Andrea Christensen in your office, and she
received a letter from Nonette Hanko in your office, who both indicated that if we would
submit our petition by September 2009, you would address the request in April at your
planning meetings for the next fiscal fiscal year. 1 was disappointed to learn from Ms.
Riordan that you will not be addressing this request until some time in the future, and, to
quote Ms. Hanko, only"if there is a lull in our scheduled projects. We want to ask you to
reconsider this decision and address our request at your April planning meetings.
The petition we submitted is signed by many of our neighbors on Bohiman Road, starting
at the lower junction of On Orbit Drive and Bohlman Road, and continuing up to neighbors
who live immediately adjacent to the Sereno�Open Space District. So there is broad
support from the local residents who would be most affected by dog traffic for allowing
leashed dogs in the open space district.
We believe that effecting this policy change would be straightforward, with the main change
being to change the sign at the Bohlman Road entrance to indicate that leashed dogs are
i allowed. It seems that such a change should not be too costly to implement,
and hopefully
your budget would allow for it.
Sincerely yours,
Aviva Garrett
avivagarrett@gmail.com
408-867-8851
Midpeninsula Regional
Open Space District
IZ-10-63
Meeting 10-12
April 28, 2010 AGENDA ITEM 4
AGENDA ITEM
Resolution in Support of the State Parks and Wildlife Conservation Trust Fund Act of 2010.
GENERAL MANAGER'S RECOMMENDATION
Adopt the attached resolution to support the State Parks and Wildlife Conservation Trust Fund
Act of 2010.
SUMMARY
The State Parks and Wildlife Conservation Trust Fund Act of 2010 is currently in circulation in
order to qualify for the November ballot. This resolution supports the proposed statewide
initiative which would create a stable source of funding for California's parks by levying new
fees dedicated to state parks and wildlife conservation.
DISCUSSION
As a result of continued and worsening budget cuts, California's vital state park system is not
only in disrepair but literally on the verge of closing its gates forever. A stable and adequate
source of funding is necessary to prevent losing this valuable public resource. The State Parks
and Wildlife Conservation Trust Fund Act of 2010, prepared for the November ballot, and
currently in the signature-gathering process, promises to give Californians the chance to vote on
free, year-round admission to state parks in exchange for a new $18 vehicle license fee
specifically dedicated to state parks and wildlife conservation. This fee will provide reliable,
stable and adequate funding to protect California's state parks for today, tomorrow and the
future. As a result, the General Manager recommends that the Board adopt the attached
Resolution in support of this effort.
FISCAL IMPACT
No fiscal impact is anticipated from the acceptance of this information.
PUBLIC NOTICE
Notice was provided pursuant to the Brown Act. No additional notice is necessary.
R-10-63 Page 2
CEQA COMPLIANCE
No compliance is required as this action is not a project under CEQA.
NEXT STEP
If approved by the Board, staff will send the resolution to the California State Parks Initiative.
Attachment:
1. Resolution
Prepared by:
Rudy Jurgensen, Public Affairs Manager
Contact person:
Same as above
RESOLUTION 10-
RESOLUTION OF THE BOARD OF DIRECTORS OF MIDPENINSULA REGIONAL
OPEN SPACE DISTRICT SUPPORTING THE STATE PARKS AND WILDLIFE
CONSERVATION TRUST FUND ACT OF 2010.
The Board of Directors of Midpeninsula Regional Open Space District does resolve as follows:
WHEREAS, California's parks, once considered the best in the nation, are falling apart
because of chronic underfunding; and
WHEREAS, twice in the past two years, state parks were on the brink of being shut
down; and
WHEREAS, nearly 150 state parks were shut down part-time or suffered deep service
reductions because of budget cuts, and more park closure proposals and budget cuts are expected
this year; and
WHEREAS, the State Parks and Wildlife Conservation Trust Fund would provide a
stable, reliable and adequate source of funding for the state park system, for wildlife
conservation and for increased and equitable access to those resources for all Californians; and
WHEREAS, funding for the Trust Fund would come from an $18 annual State Park
Access Pass surcharge on all California cars, motorcycles and recreational vehicles that would be
collected by the Department of Motor Vehicles as part of the annual vehicle license fee; and
WHEREAS, California vehicles subject to the State Park Access Pass surcharge and all
occupants of those vehicles would receive free day-use admission to all state parks throughout
the year; and
WHEREAS, there are nearly 80 million visits to state parks every year, where the
abundance of outdoor activities entices visitors to exercise and lead healthier lifestyles; and
WHEREAS, parks contribute to public health by protecting forests and natural areas that
are sources of clean air and water and by combating climate change by reducing greenhouse
gases; and
WHEREAS, parks protect the state's wide diversity of plants and animals, preserve an
unparalleled collection of historic and cultural assets and provide exciting educational
opportunities for young and old alike;
WHEREAS, the State Parks and Wildlife Conservation Trust Fund would protect
California's 278 state parks so that all Californians can enjoy their benefits;
THEREFORE BE IT RESOLVED, the Midpeninsula Regional Open Space District
supports the State Parks and Wildlife Conservation Trust Fund Act of 2010.
IN WITNESS WHEREOF, we, the Board of Directors of Midpeninsula Regional Open
Space District do hereby adopt this resolution this, the 28`h day of April, 2010.
s
Midpeninsula Regional
' Open Space District
R-10-47
Meeting 10-12
April 28, 2010 AGENDA ITEM 5
AGENDA ITEM
Authorization to Amend a Contract with Ascent Environmental, Inc., to Provide Consulting
Services and Prepare CEQA/NEPA Documents for Phase I Abatement of the Mt. Umunhum
Remediation Project in an Amount Not to Exceed $48,000 for a Total Contract Amount Not to
Exceed $73,000.
GENERAL MANAGER'S RECOMMENDATIONS
l. Determine that the proposed action does not constitute a project under the California
Environmental Quality Act (CEQA) based on findings as set out in this report.
2. Authorize the General Manager to amend a contract with Ascent Environmental, Inc., for an
additional $48,000 that includes an $8,000 contingency, for a total contract amount not to
exceed $73,000, to provide environmental services and prepare CEQA/NEPA documents in
support of Phase I Abatement for the Mt. Umunhum Remediation project at Sierra Azul
Open Space Preserve.
SUMMARY
The District is rapidly proceeding with site remediation and site planning of the former radar
station atop Mt. Umunhum. Remediation will start with hazardous materials abatement. These
remediation activities are federally-funded and require discretionary approval from the Board.
As a result, these activities are subject to both federal (National Environmental Policy Act or
NEPA) and state (California Environmental Quality Act or CEQA) environmental review
requirements. The project began with an accelerated schedule to meet stringent federal
requirements for obligating funds. Earlier this year, under the General Manager's authority, the
District entered into a short-term contract with Ascent Environmental, Inc. to outline a schedule
and prepare a cost estimate to complete the required NEPA/CEQA environmental review
processes, for an amount not to exceed $25,000. The contract amendment of$48,000
recommended in this report, would expand the current scope of services to authorize preparation
of the NEPA/CEQA documents and related services necessary to proceed with abatement
activities to remove and safely dispose of lead and asbestos-containing substances at Mt.
Umunhum. If approved, the total contract amount for this phase of the project would not exceed
$73,000.
I
R-10-47 Page 2 JI
DISCUSSION
Federal Appropriation
The District obtained Congressional funding in the amount of$3.2 million under a Federal
Department of Defense appropriations bill for the 2010 federal fiscal year. Staff was notified of
the appropriation in December 2009, which carries a deadline to obligate the funds by the end of
the current federal fiscal year that ends on September 30, 2010. Due to the urgency, staff must
promptly begin the environmental review process. In addition to CEQA review, the abatement
project at Mt. Umunhum also requires federal environmental review under the National
Environmental Quality Act (NEPA) as a condition of the federal funding.
Ascent Environmental, Inc.
Staff conducted research on firms with expertise in both CEQA and NEPA environmental review
processes, particularly in relation to former defense sites. Staff evaluated qualifications,
expertise, and availability. There were a small number of finns offering a similar nature and
level of expertise required for this project, and an even smaller number of firms who were able to
begin work immediately. After determining qualifications, staff and General Counsel negotiated
competitive rates with Ascent Environmental, Inc., (Ascent) of Sacramento, California.
Due to funding deadlines and the need to begin remediation work immediately, the General
Manager, under his contractual authority, approved retaining Ascent to begin work with the
District to develop an appropriate approach to environmental review. The District's Professional
Consultant Selection Policy authorizes the General Manager to approve the selection of a
particular consultant given special circumstances. These special circumstances are applicable to
this project for the reasons set out in this report.
Ascent has the expertise necessary to continue moving the project forward and has already
proven to be a valuable asset to the District. To help guide initiation of the environmental review
process, Ascent has developed an approach in support the District efforts to: 1)move forward in
full compliance with environmental laws while meeting applicable deadlines; 2) demonstrate
progress to support subsequent Congressional funding requests; and 3) proceed with abatement
of lead and asbestos to prepare the site for future re-use. Ascent has participated in initial
meetings and discussions with the Army Corps of Engineers (USACE), who will assist the
District with abatement and site clean-up.
Contract Terms
For a project of this scope, the typical lead time required to contract with a consulting firm takes
at least two months. This includes preparing the Request for Qualifications, advertising, staff
review, interviews, rating of qualifications, selection, and rate and contract negotiations.
Additional time is required to introduce new consultants to the project and project team to ensure
services begin promptly. The timing constraints on this project directly effect disbursement of
federal funding and cannot accommodate the time required for the standard contracting process.
Moreover, the District cannot show rapid and substantial progress on the ground to enhance the
potential to obtain additional federal funding without first completing the NEPA and CEQA
environmental review. Therefore, staff recommends amending the contract with Ascent to
authorize their continued project services to allow staff to continue work without delay.
Phased Approach
To date, Ascent has assisted staff in determining the most prudent course of action to take given
the complexity of the project, tight deadlines, and yet-evolving answers regarding timing and
R-10-47 Page 3
funding from federal lawmakers in Washington, DC and federal agencies in Sacramento. Ascent
has worked with staff and General Counsel to create a two-phased approach to move the project
forward. Phase I includes NEPA/CEQA review of the lead-based paint and asbestos abatement
work to be undertaken by the USACE. Phase 11 includes environmental review of subsequent
District demolition/remediation and site planning actions. The scope and nature of Phase 11 tasks
will be presented to the Board at a future meeting after staff has fully assessed the required tasks
and services for this phase.
Completion of Phase I under this amendment will include the following principal tasks:
• Coordination with USACE (NEPA Lead Agency)
• Assistance with regulatory agency meetings
• Preparation of a Categorical Exclusion Document required by NEPA
• Preparation of an Initial Study and Negative Declaration required by CEQA
• Assistance with response to public agency and other comments on project documents
• Completion of all procedural requirements to finalize the NEPA and CEQA documents
FISCAL IMPACT
Federal Appropriations
As described earlier in this report, the District will receive $3.2 million in federal appropriations
by September 30, 2010, specifically for abatement of hazardous materials and structure
demolition. All proposed consultant fees up to $50,000 associated with Phase I NEPA/CEQA
for abatement of hazardous materials are expected to be fully reimbursed by federal funding.
District Budget
At the Regular Board meeting of March 24, 2010, $180,000 was approved as part of the
FY201 0-11 budget for site remediation at Mt. Umunhurn (Report R-10-53). The $48,000
requested in this report is included within in that $180,000 item.
PUBLIC NOTICE
Notice has been provided as required by the Brown Act.
CEQA COMPLIANCE
The recommended actions do not constitute a project under CEQA; no CEQA review is required.
NEXT STEPS
Staff will amend the contract with Ascent and work closely with them to begin work
immediately on preparing environmental review documents for Phase I abatement.
Prepared by: Meredith Manning, Senior Planner
Contact person: Gina Coony, Mt. Umunhurn Site Manager
Midpeninsula Regional
Open Space District
R-10-58
Meeting 10-12
April 28, 2010 AGENDA ITEM 6
AGENDA ITEM
Adoption of an Amendment to the Use and Management Plan for Thornewood Open Space
Preserve for a Minor Intervention, Long-Term Management Approach to Schilling Lake.
USE AND MANAGEMENT COMMITTEE'S RECOMMENDATIONS
1. Determine that the proposed project is categorically exempt from the California
Environmental Quality Act (CEQA) based on the findings as set out in this report.
2. Amend the Use and Management Plan for Thornewood Open Space Preserve to implement a
long-term management plan for Schilling Lake that adopts a minor intervention approach as
outlined in this report.
SUMMARY
A range of management options for Schilling Lake is described in a 2008 Technical
Memorandum by Wetlands and Water Resources, Inc. Staff presented these options to the full
Board in 2008, and received authorization to perform an inundation modeling study that was
completed in 2009. Results of the inundation study informed staff's analysis and
recommendation for long-term management of the lake, which staff presented at a March 19,
2010 Use and Management Committee (Committee) meeting. At this meeting, the Committee
unanimously recommended forwarding to the full Board a minor intervention management
approach for the lake that includes: (1) removal of six redwood trees growing on the earthen dam
to maintain dam integrity, (2) partial removal of duckweed to enhance lake aesthetics and water
quality, and (3) cattail removal near the spillway to allow unimpeded flow of water through the
spillway to help with the flushing of duckweed.
DISCUSSION
Background
The Board of Directors directed staff in 2007 to investigate long-term management and
enhancement options for Schilling Lake, a half-acre, man-made lake located along a tributary to
Dennis Martin Creek draining to Middle Searsville Lake in the Town of Woodside (Exhibit A).
As part of this evaluation, staff contracted with Wetlands and Water Resources, Inc. (WWR),
who produced a 2008 Technical Memorandum (TM) outlining five management options, cost
estimates, and regulatory considerations for each option, as discussed herein. Schilling Lake is
R-10-58 Page 2
formed by a 200-foot-long, un-engineered earthen dam first constructed in the late 1800s by
pioneering lumberman Dennis Martin, and enhanced in 1910 by Augustus Schilling. Although
sediment deposition has reduced the lake volume by 75% over the last century, the lake still
holds approximately three (3) acre-feet of water (approximately I million gallons, or 1.5
Olympic-sized swimming pools). Staff estimates the lake will fill completely with sediment
within another 50 years, partly due to its close proximity to the Pilarcitos Fault and San Andreas
Fault Zone, which can reactivate many shallow- and deep-seated landslides in an area underlain
by highly erosive sandstone geology.
Study Results
At the regular meeting of September 24, 2008, the Board of Directors received an update on
management and enhancement options for Schilling Lake (Report R-08-103). The update
summarized several key findings, outlined potential management and enhancement options, and
described in detail the preferred alternative: minor intervention. In 2007, a dam engineer
presented staff with concerns regarding the integrity of the earthen dam, most notably due to the
presence of 17 large trees on the dam crest. Because of this concern, staff determined the need to
complete a downstream inundation study for the lake to further inform the development of a
long-term management recommendation.
At the regular meeting of November 12, 2008, the Board of Directors approved funding for a
preliminary inundation study (Report R-08-129). The inundation study consisted of hydraulic
modeling to establish or refute the potential for downstream flooding, and map the extent of
downstream inundation that could be expected in the event of a partial or total dam breach or
failure. Results of the first study showed potential for inundation, flooding, and damage to
structures between Schilling Lake and Middle Searsville Lake. However, the model was run
under extremely conservative parameters based on sandy soil brought up in one hand-augered
sample of the dam material. The hydraulic modeling process was iterative, spending only the
funds necessary to answer questions that would inform the next step. Therefore, staff returned to
the Board seeking authorization to complete a thorough geotechnical analysis of the dam and run
the model a second time with much more accurate inputs (Report R-09-57). The second model
run showed that dam failure at the current lake volume posed no risk ot'downstream looding at
any residences, other structures, or road/stream crossings between Schilling Lake and Searsville
Lake, including Old La Honda Road, Portola Road, and Family Farm Road (Exhibit B).
Management Options and Implications
To form the basis for identifying long-term lake management options, WWR gathered and
reviewed existing information, then characterized existing conditions and ecological functions of
the lake. They developed options for sustainable management and enhancement activities that:
1) Are compatible with the mission of the District;
2) Enhance habitats for targeted wildlife species, if applicable;
3) Can be implemented by District staff, where feasible;
4) Require minimum capital investment; and
5) Are cost effective.
These options are presented in Attachment C and were presented to the Use and Management
Committee (Committee) at a public meeting held on March 19, 2010. At this meeting, the
Committee unanimously recommended that the following preferred management option be
forwarded to the full Board of Directors for review and consideration:
R-10-58 Page 3
Recommended Use and Management Plan Amendment: Long-Term, Minor Intervention
Management Approach for Schilling Lake (tree, duckweed, and cattail removal)
Tree Removal
Six redwood trees growing along the earthen dam would be removed because they do not
respond well to pruning. Should one or more of them fall, damage to the dam surface would be
significant. The remaining 12 madrone and oak trees will be pruned to reduce windthrow
potential.
Duckweed Removal
The District would undertake minor efforts to manage the physical aquatic habitat and biological
communities by regularly removing duckweed from the lake. At certain times of the year,
duckweed covers 100% of the lake surface, and regular, partial removal would allow greater
sunlight penetration, improving overall water quality and aesthetics.
Cattail Removal
The District would simultaneously remove a small amount of cattails growing across the
spillway entrance to allow the floating duckweed to leave the lake with spillway overflow, where
it will not survive.
Long-term Monitoring
Despite the lack of inundation risk to downstream structures, staff intends to periodically monitor
the dam as part of an ongoing maintenance program to ensure public safety and prolong the life
of the dam and spillway. Long-term monitoring is inexpensive and requires little staff time.
Public Input
Thirteen (13) members of the public attended the onsite Use and Management Committee
meeting held on March 19, 2010. Attendees unanimously supported staff s recommendation,
including redwood tree and floating vegetation removal, and no objections were heard. A
request, which is now part of the management recommendation, was made to include cattail
removal at the spillway entrance.
Policy Implications
n m
Thornewood Open Space Preserve contains multiple landscape featuresremaining from the i
Schilling and Thorne estates, including the man-made lake. The Committee's recommendation
to perform minor intervention is intended to prolong the life of the lake by reducing the
probability of dam failure from tree windthrow, enhance visitor enjoyment, and improve wildlife
habitat with minimal capital or operational cost. The Committee's recommendation for minor
intervention takes into account other more immediate priorities in other open space preserves.
FISCAL IMPACT
Partial funds in the amount of$15,000 for this project were included in the Planning
Department's budget for Fiscal Year 2010-11. The total cost to implement all recommended
actions is estimated at $22 000. As a result, staff expects to return to the Board at mid-year to
request $7,000 in additional funds. Annual staff time will also be needed to collect and remove
floating vegetation and cattails, and monthly staff time to perform visual inspection and routine
monitoring of dam and spillway integrity.
R-10-58 Page 4
PUBLIC NOTICE
For the Use and Management Committee, notices were sent to neighbors and interested parties
by mail and follow-up phone calls were also made. Thirteen (13) members of the public, one (1)
representative from the Town of Woodside, eight (8) staff, and three (3) committee members
attended the Committee meeting for a total group of twenty-five (25) people.
Property owners of land located adjacent to or within 300 feet of Thornewood Open Space
Preserve and interested parties have been mailed written notices of this proposed Use and
Management Plan Amendment. Notice has also been provided as required by the Brown Act.
CEQA COMPLIANCE
This project includes removal of six redwood trees growing on an earthen dam, as well as
duckweed and cattail removal and is categorically exempt under Section 15301 of the California
Environmental Quality Act Guidelines as described below.
C'ategorical exemption 15301 —Existing Facilities
This section exempts minor maintenance of existing facilities and topographical features
involving negligible expansion of existing use. This project falls under Subsection 15301 (9),
which exempts maintenance of existing landscaping, native growth, and water supply reservoirs,
excluding the use of pesticides. This project will maintain a reservoir and existing vegetation
without expanding use.
NEXT STEPS
Should the Board approve the Use and Management Plan amendment, staff will:
1. Begin project implementation, including submittal of a tree removal permit to the Town of
Woodside.
2. Return to the Board at mid-year to request approximately $7,000 to complete all
recommended action items.
Attachment(s)
1. Attachment A: Exhibit A, Vicinity Map
2. Attachment B: Exhibit B, Inundation Study Map
3. Attachment C: Long-Term Management Options presented to the Use and
Management Committee
Prepared by:
Meredith Manning, Senior Planner
Contact person:
Same
Graphics prepared by:
Gretchen Laustsen, Open Space Planner I
d
s.
Schilling Lake Watershed
-" 0 1
® Deep-seated Landslides Portola B9ad
-
aa
San Andreas Fault Zone Q�
�ocaa — Searsville
Pilarcitos Fault va lake
84 Middle
Lake
r,rA
as
c
4
I boa ,
i •
Skyline Boulevar
351 �x
Y
Project Site r
I
-j
i,
84)
m V
Exhibit A: SchillingLake, Thornewood OSP VicinityMa Midpeninsula Regional
P Open Space District
April 2010
e0 0.125 0.25 0.5 Miles •
� x + Sed!"SVWs
' InundationAL
.�; Depth (ft) �� b7kio
1 -3
AIM
5-7 "° r rn5s ��, si ,�
_ w a
r
10-15
15-20
r I
20 30
�+.- s -.. ' tk A,� '.-��yih•.y - .q �,,.` e t .r �i�rS'r,• M
-"{ 6 ._,+' �.� � ... .L .ff�..�.A8 ..- 'w .lai'�' .' e, � '�-�` �'�J�" '� •GAR
•a
s
zj—
ti i ak
41
Ae
gn� we'i j, ' far♦tom-f :.,R•-'� �. t;7 a {I ,toe 3 nr^•¢,L i .. '
= F
•,i��h`r .M�,• '�' 4
rr s !)A^ Me X
jjj d fr tiyo� T
yam('*�[" _ _-'` '•i � �t+�� Nk
• tierce i
s i! i r ti
s
w F
Project Site
r
rf
•!+ � * '�. .i. _.r _ 4 $ "ems,.. ,.. • }r
AV
M F �
Y • F � �(
r
, .. •`r • � •yf 1 �P �to �
•1' ♦ py�y y1 _
•S
�3 sa
Exhibit B: Schilling Lake, Thornewood OSP Inundation Study Map Midpeninsula Regional
Open Space District
April 2010
e � •
Miles
0 0.05 0.1 0.2 Ram
Open Space'Distriictna' Memorandum
To: Use & Management Committee Directors Hassett, Riffle, and Siemens
From: Meredith Manning, Senior Planner
Copy: Ana Ruiz, Planning Manager; Michael Williams, Acting General Manager;
Steve Abbors, General Manager
Date: March 18, 2010
Re: Thornewood OSP Schilling Lake Management Plan meeting Friday March 19
The following summarizes the large amount of technical information gathered to investigate
tong-term management options for Schilling Lake at Thornewood Open Space Preserve. It also
gives background to understand staff's recommendation to the Committee, which will occur
onsite at the take tomorrow, Friday, March 19 beginning at 1:30pm.
PURPOSE of COMMITTEE MEETING
Obtain Committee consensus on a long-term management option to forward to the full Board
of Directors for their consideration.
SUMMARY
The Board of Directors directed staff in 2007 to investigate tong-term management and
enhancement options for Schilling Lake, a half-acre, man-made lake located along a tributary
to Dennis Martin Creek draining to Middle Searsville Lake. As part of this evaluation, staff
contracted with Wetlands and Water Resources, Inc. (WWR), who produced a 2008 Technical
Memorandum (TM) outlining five management options, cost estimates, and regulatory
considerations for each option, discussed below. Schilling Lake was first constructed in the
late 1800s by pioneering lumberman Dennis Martin, and enhanced in 1910 by Augustus
Schilling. Since then, 75% of the original take capacity has fitted in with sediment. Staff
estimates the lake will fill completely with sediment in another 50-75 years partly due to the
close proximity to the Pilarcitos Fault and San Andreas Fault Zone which can reactivate many
deep-seated landslides in the watershed.
The TM also included a brief analysis by a dam engineer who raised concerns regarding the
integrity of the earthen dam, most notably due to the presence of 17 large trees along its
crest. Because of this concern, staff obtained authorization from the Board in 2008 to
evaluate the integrity of the earthen dam that forms the lake. The evaluation included a
hydraulic modeling effort that characterized the potential extent of downstream inundation
should Schilling Lake Dam fail. The first round of modeling concluded that there was a
potential for inundation, flooding, and damage to structures between Schilling Lake and
Middle Searsville Lake resulting from a dam breach; however, the model was run under
extremely conservative parameters based on sandy soil brought up in one hand-augered
sample of the dam material. The hydraulic modeling process was iterative, spending only the
funds necessary to answer questions that would inform the next step; therefore, in 2009, the
Board authorized staff to complete a thorough geotechnicat analysis of the dam and run the
model a second time, with much more accurate inputs. The second model run showed that
dam failure at the current lake volume posed no risk of downstream flooding at any of the
road/stream crossings between Schilling Lake and Searsville Lake, including Old La Honda
Road, Portota Road, and Family Farm Road.
MANAGEMENT OPTIONS AND STAFF RECOMMENDATION
To form the basis for identifying management options, WWR gathered and reviewed existing
information, then characterized existing conditions and ecological functions of the lake. They
developed options for sustainable management and enhancement activities that:
1) Are compatible with the mission of the District;
2) Enhance habitats for targeted wildlife species, if applicable;
3) Can be implemented by District staff, where feasible;
4) Require minimum capital investment; and
5) Are cost effective.
Option 1: No action. No cost.
The lake would continue to gradually fill in with sediment and would eventually transform
from open water to emergent marsh habitat and ultimately to riparian woodland.
This option is not recommended because taking a "do nothing" approach will allow trees to
continue to grow along the earthen dam, which will eventually destabilize the dam or block
the spillway.
Option 2: Minor Intervention - Tree Removal. Cost $18,000.
Six redwood trees would be removed and the remaining 12 madrone and oak trees pruned to
reduce windthrow potential.
This option targets removal of redwood trees, which do not respond well to pruning, and
whose mature heights can exceed hundreds of feet. This option: 1) reduces the risk of tree
windthrow that can lead to dam failure ors spillway blockage, or both b existing redwood
P Y g Y g
trees that are growing on the dam face; 2) recognizes that the cost to fall the trees
increases with each passing year.
STAFF'S RECOMMENDATION
Option 3: Minor Intervention - Duckweed and Tree Removal. Cost $20,000.
In addition to the tree removal actions under Option 3, the District would undertake minor
efforts to alter the structure and functions of the physical aquatic habitat and biological
communities by regularly removing duckweed from the lake.
Along with the benefits outlined in Option 3: 1) at certain times of the year, duckweed
covers 100% of the take surface, and regular partial removal would allow greater sunlight
penetration, potentially induce growth of submerged vegetation, improve water quality, and
increase dissolved oxygen concentrations for the benefit of non-target species, and improve
visual aesthetics for Preserve users.
Option 4: Moderate Intervention - Re-introduction of Special Status Species . Cost not
evaluated.
This option was removed from consideration following consultation with regulatory agencies,
especially the US Fish Et Wildlife Service, who determined that the take provided poor
habitat value for targeted species, and declined funding for habitat enhancement.
This option is not recommended because: 1) tack of sufficient quality habitat in the area to
support target species; 2) high effort for relatively small potential success; 3) lack of funding
support by resource agencies; 4) uncertainty regarding regulatory concerns and
requirements. i
Pace 2 of 3
Option 5: Major Intervention - Reestablish Lake Depth. Cost $225,000
Sediment would be dredged from the lake bottom to deepen open water habitat and inhibit
a gradual transition to emergent marsh habitat and eventually riparian woodland. This
option includes actions under Option 4 (duckweed and tree removal).
This option is not recommended because: 1) high project cost for unknown benefit to target
species; 2) unknown regulatory concerns regarding "take" of species given that agencies may
need to assume presence in the take; 3) dredging would need to be performed at regular
intervals to maintain desired lake depth; 4) increasing lake depth means increasing volume
of water behind dam, which could increase the potential for flooding of downstream
structures if the dam were to fail; and 5) a new inundation study would be required.
Option 6: Major Intervention - Active Transition to Riparian Woodland. Cost $305,000
The Jake's transition to riparian ecosystem would be hastened by draining the lake, lowering
the spillway and dam, and re-vegetating. This option serves as a partial restoration that
reduces the water holding capacity of the dam.
This option is not recommended because: 1) results of the inundation study show no risk of
downstream flooding and therefore eliminates the need to consider a reduction of water
storage capacity for downstream public safety; 2) high project cost to facilitate an already
occurring trajectory; and 3) unknown regulatory concerns of implementing project.
OTHER PROJECTS IN THE VICINITY OF THE LAKE
The District obtained the property containing the lake in 1978 and has implemented one
repair in 1998 to prevent a landslide from collapsing the north side of the concrete retaining
wall forming part of the spillway. Non-native trees were removed in the area in 2008 by staff,
who is also leading an ongoing effort to eradicate Slender False Brome on District and
neighboring property. The new Bridle Trail joins with the Schilling Lake Trail uphill of the
spillway, but otherwise does not impact the lake or dam. Final work to deconstruct the old
Dennis Martin Trait, to be implemented this summer, does not occur in the vicinity of the lake
or dam.
POLICY CONSIDERATIONS
Thornewood Open Space Preserve contains multiple cultural landscape features remaining
from the Schilling and Thorne estates, including the man-made lake. Staff's recommendation
to perform minor intervention would potentially prolong the life of the lake by reducing the
probability of dam failure due to tree windthrow, as welt as enhance visitor enjoyment and
improve habitat for local wildlife by managing the duckweed growth without incurring great
capital or operational cost. Staff's recommendation for minor intervention also reflects the
many other more immediate priorities located at other open space preserves, which include
habitat enhancements where target species are present, contaminant remediation, access
improvements to open new areas to the public, and projects with grant deadlines.
NEXT STEPS
Staff expects to forward the Committee's recommendation to the full Board in late spring of
this year.
Fl,igr> 3 of 3
Midpeninsula Regional
Open Space District
R-10-62
Meeting 10-12
April 28, 2010
AGENDA ITEM 7
AGENDA ITEM
Contract Amendment with BAGG Engineers to Include Construction Monitoring for the Pond
DR06 Repair Project located in the Former Wool Ranch Area of La Honda Creek Open Space
Preserve.
GENERAL MANAGER'S RECOMMENDATION
Authorize the General Manager to amend a contract with BAGG Engineers for an additional
$17,910, for a total contract amount not to exceed $3 8,685, to include permit-required
construction monitoring for the Pond DR06 repair project located at the fanner Wool Ranch
Area of La Honda Creek Open Space Preserve.
SUMMARY
In July 2009, the District contracted with BAGG Engineers (BAGG) to conduct geotechnical
investigations, prepare a topographic survey, and develop an interim and a long-term repair plan
for the failing earthen berm at Pond DR06 to preserve the pond as breeding habitat for the
California red-legged frog (Rana aurora drqvtonii) (CRLF) and as a cattle water source. An
interim repair was prepared by BAGG and implemented by District staff in the fall of 2009 to
prevent total berm failure during the forecasted El Nino winter. BAGG also prepared long-term
repair plans that are currently under permit review at San Mateo County.
The initial contract was issued only for geotechnical investigations and repair design. To
complete the project, San Mateo County is requiring construction oversight and sign-off by the
engineer of record to ensure that the project is implemented according to plans. The proposed
contract amendment of$17,910 covers expenses related to construction oversight.
DISCUSSION
The Pond DR06 repair project is the first action item undertaken by the District to implement the
2009 Pond Management Plan for the Former Wool Ranch pond complex at La Honda Creek
Open Space Preserve. The project was identified as an "urgent"priority because of the actively
R-10-62 Page 2
failing earthen berm in a known CRLF breeding pond. Although the pond supports breeding of
CRLF, as evidenced by the presence of egg masses, current conditions cause the pond to dry too
quickly to allow tadpoles to fully mature. The repair will deepen the pond and add a new, native,
clay lining to lengthen the ponding duration and facilitate successful breeding of CRLF. The
pond is also considered suitable habitat for the San Francisco garter snake (Thamnophis sirtalis
tetrataenia) (SFGS), which is a species listed as endangered under both the State and Federal
Endangered Species Acts. Although SFGS has not been detected at the pond, the pond is an
excellent site for the future introduction of the snake. The pond repair will provide an
opportunity to increase the number of CRLF, which is the primary prey species for the SFGS.
The pond repair project involved coordination with multiple regulatory agencies, including the
United States Fish and Wildlife Service (USFWS), the California Department of Fish and Game,
the United States Army Corps of Engineers, the Regional Water Resources Control Board, and
San Mateo County. During project permitting, the District also worked closely with the San
Mateo County Resource Conservation District (RCD) to assess the value of the current
agricultural grading exemption process and its applicability for pond repair projects. This
experience has strengthened working relationships between the District and RCD, which will
facilitate future partnering opportunities to implement joint resource management projects.
For this project, the USFWS issued the District an Endangered Species Act Recovery Pen-nit to
perform ongoing monitoring and restoration activities for CRLF. The Recovery Pen-nit is valid
for future pond repair projects and prescribed fire efforts to recover SFGS and protect CRLF at
the Fortner Wool Ranch. The Recovery Permit will reduce future biological monitoring costs by
allowing the work to be performed either directly by District staff or jointly with consulting
biologists.
FISCAL IMPACT
The Planning Department budget for FY201 0-11 includes $86,000 to complete the Pond DR06
repair project. Of this amount, $17,910 would be allocated to fund the recommended contract
amendment with BAGG to perform the required construction oversight and monitoring.
PUBLIC NOTICE
Public notice was provided as required by the Brown Act. No additional notice is required.
CEQA COMPLIANCE
Staff concludes that amending the consultant agreement to include construction management
services for the Pond DR06 repair project does not constitute a project under the California
Environmental Quality Act (CEQA)because such services do not have the potential to result in
either a direct physical change, or a reasonably foreseeable indirect physical change, in the
environment. A Mitigated Negative Declaration for Pond DR06 repair implementation was
previously approved by the Board on September 23, 2009.
R-10-62 Page 3
NEXT STEPS
If the contract amendment is approved by the Board, staff will authorize BAGG to perform
construction oversight and monitoring for the Pond DR06 repair, which is scheduled to occur
between June and October 2010 for a two to four week period. Required permits are either in
place or pending. An on-call consulting biologist has been retained for the project and a request
for bids and qualifications has been released to hire a construction contractor. Staff expects to
return to the Board in June 2010 for authorization to award the construction contract.
Attachment:
1. Map of Pond DR06 repair project area
Prepared by:
Julie Andersen, Resource Planner I
Contact person:
Julie Andersen, Resource Planner I
Midpeninsula Regional Open Space
District Preserves and Surrounding
i '
tot
Ik..m�y nw ant
, Nn lr w.wMer1 iirihW.
,aa#r alwa 11n1.
�lUstip...wMY..pN.tile y.4f.
�vv..lr.+ev.w.n!twlrla p
.rml wiwa.!WwA
� ��b�Wwww N k 4n iwrlrirn MA Nra•
A w cvrywwd J oiw S�pOD:m.d I.nd m to yan
. w� ww*pw.an.w p�nnVs1 kv�x aMmmM.matmR
+lr++.n^.t^Mm+MAr..w`.wr7.,nlwdMF+l lw.wrynr
. tla• t+1n+t nw4.,<.,4tn .rr.e ,n tlw ,.N.uy
aeaaa,+rwtiw+� ���
General Project Area
La Honda Creek Open Space Preserve
11
ram, ✓�°a• 4 ,C '�� .'y�e. � I,
..,..d 5 d iht Ari
N-
ti.
IIA
1 f)K( � -.
t
A y ) r
+y
r �
-� �L- _��"� frrnrKr 11vro1
to Hnndi
,, "• Creek OSP
Project Vicinity
12
Midpeninsula Regional
• ' Open Space District
To: Board of Directors
From: Stephen E. Abhors
Date: April 28, 2010
Re: FYI
Midpeninsula Regional Memorandum
Open Space District
r �
To: MROSD Board of Directors
Through: Steve Abhors, General Manager
From: Cindy Roessler, Senior Resource Management Specialist
Date: April 21, 2010
Re: Quarterly Resource Management Report
h resource management activities in the period of October 2009
Attached please end a summary of the b
through March 2010.
Integrated Resource Planning and Mana emeet Program
g g g
Quarterly Summary: October 2009—March 2010
Resource Planning and Management Department Progress
Project/Description
Cultural and Historic Resources
Alma College Conditions Assessment Planning Consultants prepared and submitted draft
Phase I Conditions Assessment.
Ecological Restoration
Picchetti Ranch Stream Restoration Operations Volunteers installed plants alongside restored
Public Affairs creek section.
Planning of final phase underway for summer
Skyline Ridge Tree Farm Restoration Operations 2010 construction. Negotiating possible
mitigation funding from Caltrans.
Education/Interpretation
Interpretive Plan Consultant Operations Hired and toured preserves with consultant to
Public Affairs develop an interpretive system plan.
Updated docents on Sudden Oak Death
Operations research at MROSD. Provided field training
Sudden Oak Death Public Affairs to Environmental Volunteers at Los Trancos.
Revised signboards and website. Conducted
media outreach and received good coverage.
Operations Conducted first docent-led hike to Driscoll
Driscoll Ponds Planning ponds to view frog,newt and turtle activity at
Public Affairs night, and discuss grazing program.
Central Coast Invasive Weeds Symposium Operations Field staff attended.
Made presentation on MROSD's resource
California Native Plant Society Operations management program to Chapter Councils of
the California Native Plant Society.
Environmental Remediation
Began work with US Army Corps of
Mt Umunhum/Almaden AFS Remediation Planning Engineers for federally funded cleanup efforts
Public Affairs at former Air Force Base. Recruited and
hired a pro'ect manager for the project.
Completed debris site cleanup and water well
Driscoll Ranch Remediation Planning abandonment to meet requirements of Water
Board closure of site.
Consultants prepared draft Constraints
Mindego Ranch Landfill Removal Planning Evaluation Report for the landfill removal
activities.
Began field work to evaluate potential
erosional mercury sites on District lands in
Guadalupe River Watershed Mercury Total response to Technical Report Requirement
Maximum Daily Load(TMDL) Planning from Water Board and began coordinated
monitoring program development with other
responsible parties in response to Water
Board re uirement.
Page 1 of 3
Integrated Resource Planning and Manag, --nt Program Quarterly Summary 3rd& . Quarters,October 2009 through March 2010
Rare,Threatened and Endangered Species
Management
Hired consultant and developing preliminary
Operations designs for boardwalk, trail and educational
Alpine Pond Long Tenn Management Plan Planning facilities, and restoration of native aquatic
Public Affairs wildlife. Researching grant opportunities for
funding.
Completed design and permitting for project.
Driscoll Pond DR06 Repair Project Planning Awaiting USFWS Biological Opinion,then
staff will release bid documents for contractor
selection. Expect construction in June/July.
Resources Inventory
Operations Conducted late season hydrologic monitoring
Driscoll Ponds Monitoring Planning and surveys and subsequent early season
monitoring at Driscoll Ranch ponds.
District-wide Pond Database Operations Completed surveys to identify and assess
Planning ponds for District-wide and database.
Resource Program Planning and Policy Development
RWQCB Maintenance 5-Year Permit Planning Continued to work with Water Board staff to
obtain 5-Year Permit.
Contractor completed installation of
defensible space along access road to Bear
Creek Redwoods OSP and communications
Wildland Fire Defensible Space Program Planning facility at Black Mtn. (Monte Bello OSP).
Defined scope of fuels reduction project at
Rancho San Antonio OSP with Los Altos
Hills Fire.
La Honda Creek Master Plan Resources Element Planning Evaluated potential trail alignments as
alternatives tooptions presented in plan.
Vegetation Management
Applied fungicide and removed bays around
specimen oaks in Los Trancos, Russian Ridge
Sudden Oak Death Operations and Skyline Ridge. Reapplied fungicide at
research sites in Rancho San Antonio and El
Corte de Madera.
Dug, flamed, mulched, pulled, and sprayed
bull thistle,broom, fennel, gorse, Harding
grass,milk thistle,purple starthistle, slender
false brome, smilo grass, stinkwort, thistles,
Operations vinca, and yellow starthistle at Bear Creek
Invasive Plant Control Public Affairs Redwoods,Coal Creek, El Corte de Madera,
El Sereno, Fremont Older, La Honda, Los
Trancos, Mills Creek, Monte Bello, Picchetti,
Pulgas, Purisima Creek, Ravenswood,
Russian Ridge, Saratoga Gap, Skyline Ridge,
Thornewood, and Windy Hill.
Page 2 of 3
Integrated Resource Planning and Management Program Quarterly Summary 3d o--,-'Quarters,October 2009 through March 2010
Vegetation Management(cont.)
In 2009, coordinated control of 53 acres of
slender false brome on private property.
Slender False Brome Operations Presentations made at CA Invasive Plant
Public Affairs Council conference, Weed Management
Areas,and Bay Area Early Detection
worksho
Controlled Harding grass and drill seeded
Prescribed Bums Operations native grasses at 2009 bum area at Russian
Ridge.
Participated in Central Coast Rangeland
Conservation Grazing Operations Coalition training. Conducted annual fall
grazing monitoring.
Purisima-to-the-Sea Properties Operations Developing detailed management plans for
Grazing Management Plan Planning individual properties as they are acquired.
Real Property
Water Quality Protection
Big Dipper Ranch Road Removal—DFG Fisheries Planning Negotiated with San Mateo County for
Restoration Grant adinpermit.
Rogue Valley Pond Planning Completed hydrologic assessment of pond at
Rancho San Antonio OSP.
Reviewed proposed flood control project and
Permanente Creek Flood Control Project Planning conducted site meeting with Santa Clara
Valley Water District.
Contractor completed geotechnical
investigation of impoundment. Staff
Schilling Lake Planning developed recommended management actions
for presentation to Use and Management
Committee.
El Corte de Madera Creek OSP Watershed Plam-iing Completed erosion control and revegetation
Protection Program Operations projects.
White Oaks Trail Rehabilitation Operations Designed trail reroute to eliminate erosion
Planning proble s. Conducting CEQA review.
Developed and submitted grant funding for
Thomewood OSP Proposition 50 Grant Planning American Recovery and Reinvestment Act.
Construction postponed until 2010.
Wildlife Management
Giant Salamander Research Operations Coordinated surveys for giant salamanders to
enable genetic studies.
Stanford Study on Argentine Ants Operations Coordinated surveys for Argentine ants in
preserves.
Deer Surveys Operations Conducted annual fall deer surveys.
Public Affairs
Coordinated additional radio-collaring of
Mountain Lion Studies Operations mountain lions in Sierra Azul area.
Presentation to docents.
S:\Resource Management\Quarterly&Annual RM Reports to Board\2009 quarterly reports\Resource Management
Quarterly Summary_Q3_Q4_200920 I O.doc
Page 3 of 3
Midpeninsula Regional
Open Space District
To: Board of Directors
From: Stephen E. Abbors
Date: April 28, 2010
Re: Late FYIs
Mdennsua Regional
O i penp iSpace(Dist ict Memo ran d u m
To: MROSD Board of Directors
Through: Steve Abbors, General Manager
From: Kirk Lenington, Senior Resource Planner
Gina Coony, Mt. Umunhum Project Manager
Date: April 14, 2010
Re: Summary of Mt. Umunhum Remediation and Restoration Project Reports:
• Structural Summary Report
• Slope Stability Report
• Hazardous Materials Survey Reports
The following is a summary of information contained in the final reports prepared for the Mt
Umunhum remediation project by Northgate Environmental and their sub-consultants. The
research, evaluation and recommendations described within these reports have been completed to
support and inform both the remediation project and future site planning.
Structural Summary Roort
The Structural Summary Report prepared by Jax Kneppers, a consultant to Northgate
Environmental, focused on two buildings which could be retained on site due to their potential
for re-use, should the site planning efforts conclude that re-use is a viable option. Potential for
re-use for building 102, the Radar Tower, is largely a result of the overwhelming response this
building evokes (both positive and negative) because it is considered an important visual
"landmark" atop Mt Umunhum. Building 211 is an Automotive Maintenance Building, replete
with sunken service bay, which could serve the District well operationally.
In summary, the Structural Report indicates the following:
Radar Tower:
I. The Radar Tower building, a cast in place concrete structure, was designed and
built to extremely high standards. Overall, the building remains in very good
structural condition. Concrete samples taken at the radar tower tested at 4000
psi, which is high strength concrete.
2. There are diagonal cracks evident on the east and west walls of the building,
assumed to have been the result of the 1989 Loma Prieta earthquake. If the
building is to be retained, these cracks would need to be repaired utilizing epoxy
injection;
3. It is believed that the Loma Prieta earthquake weakened the lateral integrity of
the east wall. Therefore, if building is retained, the east exterior wall openings
it
would ne,_ (o be in-filled with high strength cone. _ and doweled into the
existing walls to re-establish lateral stability.
4. Currently there are many existing floor slab openings which provided for
vertical access for conduits and ducts. These will need to be filled-in with high
strength concrete and doweled into adjoining slab areas if the building is
retained.
S. The existing vertical access is via a pre-fabricated metal stairway. If the
building is retained, this stairway will either need to be repaired and reinforced
or replaced.
6. The existing rooftop guardrail is in a deteriorated state and does not meet
current guardrail code requirements. If the building is retained, the guardrail
will need to be replaced with a new, code compliant guardrail.
Automotive Maintenance Building:
1. The Automotive Maintenance Building is a steel frame structure with metal
siding, concrete slab on grade, depressed concrete service bay, and roll up
doors.
2. The existingstructure was observed to be in good condition. The existing metal
siding appeared to be properly lapped and in good condition.
3. The concrete slab did have some cracks of up to I". If the building were
retained, these would need to be epoxy filled.
4. If the building were to be retained, there should be a more comprehensive
assessment of all steel connections: Loose connections should be "tuned-up"
(tightened, repaired, or replaced). Any areas of rust should be wire brushed and
painted.
NOTE: The structural report only addresses structural concerns. It is at a concept level,
and has been based on site inspections and concrete sampling. Should either the Radar Tower of
the Automotive Maintenance Building be retained, additional evaluation for mechanical,
electrical, plumbing, accessibility and fire life safety code requirements will need to be
completed.
The Structural Summary Report is available upon request.
Slope Stability Report
The Slope Stability Report prepared by Joyce Associates, a consultant to Northgate,
evaluated the slope stability and potential for future slippage along the slope north of the
RadarTower
In summary, the Slope Stability Report indicates the following:
l. The Radar Tower does not lie within a landslide area and has not been affected by
landslide movement since it's construction;
2. Approximately two rockslides have occurred along the north slope within the last
10-20 years;
3. These rockslides have encroached on the distance between the radar tower and the
top of the slope;
4. While future rockslides can be anticipated, slippage will be gradual and there is
not imminent danger to the radar tower building;
5. Should the rauar tower structure be retained on site, tiion the potential for further
slope slippage will need to be mitigated either through rock bolting or
construction of a buried shoring system.
The Slope Stability Report is available upon request.
Hazardous Materials Survey Reports
Hazardous Materials Survey Reports were completed by IHI Environmental for
Northgate Environmental. Buildings 102 (Radar Tower), 207 (Headquarters Building) and 211
(Automotive Maintenance Building) were surveyed to determine the types of hazardous
materials, specifically asbestos and lead based paint, present within these structures. Buildings
102 and 211 were selected for the survey because they could potentially be retained for re-use.
Building 207 is representative of many similar structures on site. It is anticipated that this 3-
building sampling will closely represent what will be discovered in other structures on site.
In summary, the Hazardous Materials Survey Reports found:
1. Common asbestos containing materials were found throughout all buildings
sampled. These include:
a. Floor tiles, roofing mastic, cement wall panels, caulks and sealants,
gypsum joint compound, pipe insulation, fire-proofing, fire door cores,
duct flashing;
2. Less common asbestos containing materials found included:
a. asbestos in the exterior paint at the radar tower, in the silver roof paint at
building 207, and in the textured paint on the walls of the oil well and
stairway at building 211;
3. Lead-based paint was detected in almost all paint samples;
4. Lead ceiling panels on 5`" floor of radar tower;
5. Lead in ceramic tiles glazing at 51h floor restroom in radar tower;
6. Suspected PCB-containing light fixture ballasts in all buildings.
The Hazardous Materials Survey Reports are available upon request.