Loading...
HomeMy Public PortalAbout10-0193 Sunshine AlleyDATE ISSUED: 04 -19 -2010 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT SIDING/WINDOWS /DOORS 42 VAN HORN . SUNSHINE ALLEY PO BOX 2862 SAVANNAH GA 31402 -2862 M K W CONSTRUCTION LLC 11708 ABERCORN EXT SAVANNAH GA 31419 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 186.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $21,350.00 PERMIT #: 100193 TOTAL BALANCE DUE: $ 186.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: - 44 )40 1 5P e C- \`‘' f‘ e fl old. •-)es4-ec P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 04/19/2010 08:32 912 - 920 -4834 (0 -193 JIFFY MANAGEMENT on PAGE 06 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: 4- >..- lia. �.►._ a •� �,• •�; �+ PIN # TELEPHONE Owner G+ o.,j.�1.a ,..1' `i .) 1s' c '1 /U U / G . 6 5.2 -/b Z-6 INJ Architec t or En :; i eel' f A Building Contractor M ' c - Q\ l'4`.‘(-C is-k" co w.,. 1 17 •,r-o ,, ..,, jti f ` ('Z.O -676'4 (Check all that apply) U Repair ❑ Renovation Minor Addition Substantial Addition Other ❑ Residential ❑ Single Family D Duplex RMulti- Family Commercial ❑ Footprint Changes ❑ Discovery El Demolition Details of Project: -+ kerc 4? ,r i c� o... o� v1 4 •.r�c?� f b Estimated Cost of Construction.. $ 1 r .3 S Q �. Construction Type (l (Enter appropriate numbar) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: f `Jf # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators', and similar appurtanccs. 04/19/2010 08:32 912- 920 -4834 JIFFY MANAGEMENT CO PAGE 07 During rest room facilities will be provided through ivy, ... `? \vC' On -site waste and debris containers will be provided by ' s, Construction debris will be disposed by ex, uc49J by means of ,, .,�►. ,,,� I understand that I must comply with mina flood damage control. building, fire, shore protein$ said wetlands ances ordin FEMA reeulatagns and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requinemeets are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is establishe4. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrovsulingproperty is no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 4 /1 4 1.2_0 Signature of Applicant: Note• A peanut n nnallytadres 7 to 10 da►ya toprocess.. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number New Existing is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager FEES Inspections nspecc tions Water Tap Sewer Stub Aid to Const. TOTAL 04/19/2010 08:32 912 - 920 -4834 JIFFY MANAGEMENT CO PAGE 08 Perak Aeknowledeee nt of AsimetwiEnvirosurentill Notificat*t to Qeoreia EPA tor Prolects InvolvintDemotition, Wreaths.. or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representatives, or permit holder to proceed with demolition, wrcaciong, or renovation of a structure prior to the filing of any required ten (1 0) day "Project Notification for Asbestos Renovative Encapsulation or Demolition" fora in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rnles require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almwt without exemption. Georgia EPD requires a completed demolition notification from be submittal 10 workings days in advance even if no asbestos is present in the building. Further guidance for -regulatory compliance and contact telephone numbers are provided by the brochures entitle] Asbestos A Renovation and Asbestos and Detntolitiort. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the Pr'oJ - c\ l..0exk)n �.,, Printed Name � 9-h 46,/20/ Date •