HomeMy Public PortalAbout2018-17 Exhibit AL/%1 I 1 LJI 1 U%
Building Code Services
Civil Engineering / Roadway
& Highway Design
Coastal Engineering
Code Enforcement
Construction Engineering &
Inspection (CEI)
Construction Services
Data Technologies &
Development
Electrical Engineering
Engineering
Environmental Services
Pacilitles Management
Geographic Information
Systems (GIS)
Governmental Services
Indoor Air Quality
Landscape Architecture
Planning
Project Management
Redevelopment
& Urban Design
Surveying & Mapping
Traffic Engineering
Transportation Planning
Water / Utilities Engineering
Website Development
1800 Eller Drive
Suite 600
Fort Lauderdale, FL
33316
954.921.7781 phone
954.921.8807 fax
www.cgasolutions.com
Calvin, Giordano & Associates, Inc.
EXCEPT I ONA L S O L U TI O N S'
DATE:
RE:
CLIENT:
Additional Services Agreement
March 23, 2018
530 Crandon Blvd Additional Engineering Services
Village of Key B iscayyle
Village Hall, 88 W. McIntyre Street, Room 210
Key Biscayne, FL 33149
ATTENTION: Mr. John C. Gilbert
CGA NO.: 16-8467.14
CGA HAS BEEN ADVISED TO PROCEED WITH THE FOLLOWING ADDITIONAL
SERVICES:
Due to the client's request for work outside the original scope of services, Calvin, Giordano &
Associates, Inc. will provide the following additional services:
I. Professional Engineering Services
A. Civil Engineering
1. Preliminary Engineering
• CGA will perform preliminary site investigation, and utility
coordination. Based on Sunshine design ticket, preliminary utility
request letters will be sent to the utility providers.
CGA will prepare and coordinate preliminary site grading,
• CGA will prepare preliminary civil engineering plans based on
Site Plan.
• Preliminary Engineering Plans will only include paving, grading,
& drainage plans.
FORT LAUDERDALE MIAMI-DADE WEST PALM BEACH CLEARWATER/TAMPA ESTERO PORT ST. LUCIE
CGA will coordinate with Geotechmcal Engineer (sub
consultant) to analyze the subsurface soil conditions beneath the
site by performing (1) Standard Penetration Test boring (to a
depth of 15 feet below grade) and (1) Exfiltration Test Owner
must provide access to the site for the testing rig
2 Fmal Engineering
Upon acceptance of the prehmmary plans by the Client CGA
will proceed to prepare the Fmal Engineering Plans and Details
Such plans will only include paving grading & dramage plans
and details for site work
Comments received from the client will be addressed in the final
engineering plans
CGA will prepare Cost Estimate techmcal specifications tor civil
site work Technical specifications will be mcluded m the project
plans only
CGA will perform Drainage Calculations for proposed drainage
system
3 Perimtting
CGA will subrmt Plans for Miami Dade County RER review and
will address reasonable Agency comments
4 Bidding Phase Services
CGA will issue Plans for Bidding
CGA will respond to bidder Request for Information (RFI)
CGA will update Bid Plans as necessary
" C G A w i l l a t t e n d P r e - B i d m e e t i n g a s n e c e s s a r y .
5 . E n g i n e e r i n g D u r i n g C o n s t r u c t i o n
C G A w i l l p e r f o r m S h o p D r a w i n g s r e v i e w f o r D r a i n a g e a n d s i t e
w o r k .
" C G A w i l l a d d r e s s C o n t r a c t o r '