HomeMy Public PortalAbout09-0281 Episcopal Church_1of2DATE ISSUED: 06 -9 -2009
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
UPDATE KITCHEN
804 JONES AVE
OWNER NAME EPISCOPAL CHURCH
ADDRESS PO BOX 727
CITY, ST, ZIP TYBEE ISLAND GA 31328 -0727
PHONE NUMBER
CONTRACTOR NAME W H STRONG CO
ADDRESS PO BOX 13308
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
U
$ 0.00
PROJECT VALUATION $30,000.00
PERMIT #: 090281
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
4- 21 -tL4 :,, So e,4- c,-s
re qut.1d
Cl o 1:lc.
9.O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: 80 1/ •T..vacs 4ie&
e-p;“.p./
{,; 1'1 t1 re-AN PIN #
NAME
ADDRESS
TELEPHONE
Owner
Eess ".p,/ a).16.Srr
uF,
&I t &• r S7
Architect
or Engineer
D .4," C•'yiW2_
za, E. 613'704, -5'7:-
S.avti, 6a 3/vP.
Building
Contractor
10 44,5-1 -o.t4t C.
—2.2, a-. 47i3 i -47 -
.slvy. . 3/ VP,
zs3 --7 690
(Check all that apply)
❑ Repair ❑ Residential
renovation ❑ S• ingle Family
❑ Minor Addition ❑ Duplex
❑ Substantial Addition ❑ Multi- Family
❑ Other ❑ C• ommercial
Details of Project:
l � - kris,✓',-
n Footprint Changes
n Discovery
n Demolition
Estimated Cost of Construction: $ O, OJ O
Construction Type Z (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: %l�g.,,� ✓rrr�, pZ�
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway
Setbacks: Front
(ft.)
# Bedrooms # Bathrooms
Living space (total sq. ft.)
With culvert? With Swale?
Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through C N ✓�Gh
On -site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore dr inage impaired by this
permitted co struction.
2
Date: / 9 Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
NFIP Flood Zone
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
FEES
Permit
k
Inspections q o
Water Tap
Sewer Stub
Aid to Const.
TOTAL
S Wa.v 13 1
C.41 vY• r
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
ilri/74#2- -5,12,9_,.../6/
Printed Name
G/ X/f/
Date y
Office Use Only:
Project Address:
Permit Number:
Dianne Otto
From: Diane Schleicher
Sent: Monday, June 08, 2009 2:18 PM
To: Dianne Otto
Subject: RE: building permit application - Episcopal Church
Yes.
From: Dianne Otto
Sent: Monday, June 08, 2009 1:27 PM
To: Diane Schleicher
Subject: building permit application - Episcopal Church
Diane:
Attached is an application for a $30,000 kitchen renovation at the Episcopal Church. Ray has completed review of the
rolled set of plans. The permit fee on that amount of work would be $255. Would you like to authorize waiving of the
permit fees?
Dianne Otto, CFM
Interim Zoning Administrator
City of Tybee Island
912.786.4573 ext. 107
From: oceprinter @oce.com [mailto:oceprinter @oce.com]
Sent: Monday, June 08, 2009 2:17 PM
To: Dianne Otto
Subject: Scan from Economic Development
1