Loading...
HomeMy Public PortalAboutCH2M Hill Amend 1 Task Order 2 Gila Ava ProjectAmendment 1 TASK ORDER 2 This task order amendment is issued pursuit to the Professional Engineering Services Continuing Services Contract ("AGREEMENT") deted February 9, 2015, between CH2M HILL Engineers, Inc. ("CH2M HILL") and City of Crestview, Florida ("CLIENT") for services performed for the CLIENT on a Task Order basis. Professional Engineering and Consulting Services for the Gil Ava Street Stormwater System Reconstruction Article A. Purpose: Introduction The purpose of this Amendment 1 to Task Order 2 is to amend Article B. Scope of Work, Article C. Compensation Provisions, and Article D. Period of Service. The compensation provisions were modified to incorporate additional scope of work, which is provided in Article B below, and the extension of the period of service. The period of service was increased due to the extension of the construction schedule for the reconstruction work. Article B. Scope of Work: Task 1—Design Services The additional design services that were not included in the original task order but required to complete the project are summarized below: • Preparation of conceptual design and attendance at subsequent workshop • Development of a stormwater runoff model and calculations for the Gil Ava drainage basin • Preparation of a design summary memorandum • Preparation of three requests for NRCS grant extensions Task 3 - Services During Construction and Post -Construction Services The additional services during construction that were not included in the original task order but required to complete the project are summarized below: • Twelve additional site visits during construction due to the extension of the construction schedule and to observe additional milestones and differing site conditions related to the project. • Engineering services to modify the plans and specifications to provide additional stabilization of the side slopes and to capture and direct the runoff from the top of banks. Negotiations with contractor for a change order related to the modifications. • Preparation of an Operation and Maintenance Plan and Quality Assurance Plan, as required by the NRCS. " Construction management and general engineering services for an additional 90 days. The construction schedule was extended because of an unusual number of rainfall events, the additional work described above, encounters with unforeseen conditions, and the lack of available imported fill material. Assumptions The following assumptions have been taken into consideration in the preparation of this task order amendment: " The general contractor for the Gil Ava Street project will be substantially complete with construction by May 27, 2016. Article C. Compensation Provisions: As compensation for providing the additional services as described in Article B. Scope of Services in this task order amendment, the CLIENT shall pay CH2M HILL, in accordance with Section 5 of the Agreement a not -to -exceed amount of $37,260. The additional compensation will increase the total not -to -exceed amount from $118,000 to $155,260. The Article D. Period of Service: The proposed schedule and milestone dates for the Project within Task Order 2 are as follows: Authorization to Proceed Original termination of Task Order Revised termination of Task Order April 16, 2015 January 31, 2016 September 1, 2016 Article E. Authorized Representatives: The Authorized Representatives designated below are authorized to act with respect to Amendment 1 of Task Order 2. Communications between the parties and between CH2M HILL's subcontractors shall be through the Authorized Representatives: For the City of Crestview, Florida For CH2M HILL Name: Wayne Steele, Public Services Director Name: William J. Klaus, P.E. Address: P.O. Drawer 1209 Crestview, Florida 32536 Address: 25 W. Cedar Street, Pensacola, FL 32502 Telephone: (850) 682-6132 Telephone: (850) 941-7276 2 Article F. Authorization: Task Order 2 is effective: Acce ted for CLIENT by Accepted for CH2M HILL by: �,2.) ____ 17e2-4 ' Nam k/996e-f,f 0 gi Name: David tejskal, P.E. Title: ern7 Ch._1._ Title: Operations Manager ********* End ******** 3