Loading...
HomeMy Public PortalAbout06-0059 Merrimanj_ _- f - • .� 1: f ry. { hr ff f Inspection Report City of Tybee Island 403 Butler Avenue P.O. Box 2 749 Tybee Island, GA 31328 Phone: 785 -4573 extensions 104, 107, or 114 Fax: 785 -9539 Permit No. (-0(p- QO J 1 Date Requested_ 02 -0i - c.� ll- Owner's Name: I111- r' i r' O rm Date Needed: 0 2 - O 2 - ;n l� Gen, Contractor: _ Subcontractor: JSr,n . 4 k r nand , `I�nnay � Contact Numbei -1 - aa6 Location: 2 01 S e v e n 4- Z/Z %v' Date of Inspection: Comments: 1 n pertor- a Type of Inspection: M.J2 c a ('lo A cce 5 Time of Inspection: DATE ISSUED: 02 -1 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TEE ISLAND 22 PM CITY OF TYBEE ISLAND BUILDING PERMIT MECHANICAL PERMIT -UNIT Hy4 ER 201 SEVENTH ST its SMITH AIR CONDITIONING INOE N (S ) 1650 E VICTORY DRIVE SAVANNAH GA 31404 SMITH AIR CONDITIONING INC 1650 E VICTORY DRIVE SAVANNAH GA 31404 P $ 31.00 $2,000.00 REC4 : 00009 754 2/01/2006 TRAIN: 3,00000 Building Perm OPER: C.C, i RM: 063 RED= #: 2RFAMIT #: 060059 TENDERED: APPLIED: 31.00 1 (14 31,00- CHANGE: 0,09 TOTAL BALANCE DUE: $ 31.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: _,(44441a) ,t, P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org DATE ISSUED: 02 -1 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT MECHANICAL PERMIT -UNIT HEATER 201 SEVENTH ST SMITH AIR CONDITIONING INC 1650 E VICTORY DRIVE SAVANNAH GA 31404 SMITH AIR CONDITIONING INC 1650 E VICTORY DRIVE SAVANNAH GA 31404 P $ 31.00 $2,000.00 PERM1T #: 060059 TOTAL BALANCE DUE: $ 31.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND INSPECTIONS DEPARTMENT P.O. BOX 2749 TYBEE ISLAND, GA. 31328 Q(a -ooS9 MECHANICAL PERMIT DATE : l -d s -oCo CONTRACTOR: S I. 44,x_ � (C__ CONTRACTORS ADDRESS : /G S 6 , ft, CONTRACTORS PHONE a 3 a - fees U Di"2. NAME OF PROPERTY OWNER: ‘4,94.t ADDRESS OF PROPERTY OWNER: 6201 7 711 '5.14' WORK WILL BE READY FOR INSPECTION : - NEW WORK REPLACEMENT- - OIL GAS - EL CTRIC ESTIMATED COST. OF CONSTRUCTION I1 -D sg. j.?)i �� •DISTRIBUTION SYSTEMS WATER HEATER BOILER - COMPLETE AIR CONDITIONING UNIT HEAT PUMP REFRIGERATION SYSTEMS _ OIL. BURNER P ABSORPTION UNIT CONVERSION BURNER EXHAUST HOOD OTHER GAS PIPING DIST. WARM AIR FURNANCE GAS DRYER SPACE HEATERS (VENTED) FLOOR FURNANCE WALL HEATERS I UNIT HEATER o9 '12- 70111