Loading...
HomeMy Public PortalAbout11-0552 CampbellCITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE & VALUE DATE ISSUED: 11/21/20V1 PERMIT #: 110552 WORK DESCRIPTION HVAC/RTTN WOOD /GTTRS/DR/CABNTS /WINDOWS WORK LOCATION 1305 JONES OWNER NAME GUY /ESMA CAMPBELL ADDRESS 103 E SOUTHFIELD DRIVE CITY, ST, ZIP SAVANNAH GA 31419 PHONE NUMBER CONTRACTOR NAME GUY /ESMA CAMPBELL ADDRESS 103 E SOUTHFIELD DRIVE CITY STATE ZIP SAVANNAH GA 31419 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 552.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $13,240.00 ADDED $1,640 FOR EXT DOOR & 7 WINDOWS TOTAL BALANCE DUE: $ 26.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: 3 -I\ 4-00 otd. close L'13(‘ c � n I ^s� Q rS,P 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 C);(>1.+■4- /1 (\ (912) 786 -4573 - FAX (912) 786 -9539 ���J}`}'t\� www.cityoftybee.org (3)7.\ 000 1*? '7-55cY DATE ISSUED: 10 -3 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT HVAC/RTTN WOOD /GTTRS /DR/CABNTS 1305 JONES GUY /ESMA CAMPBELL 103 E SOUTHFIELD DRIVE SAVANNAH GA 31419 GUY/ 103 E SAV PERMIT #: 110552 AMPBELL �hnSOn A•r Cord.. THFIELD DRIVE N GA 31419 P $ 526.00 $11,600.00 TOTAL BALANCE DUE: $ 526.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT I I- 5s-2- Location: ! � _) ur.- NAME ADDRESS PIN # TELEPHONE Owner Gec2`7 v-� ! 5ma an p4-1) 1 d3 ��e.(a( 1�R� Li a� -45�U t LI `t -511 5 d Architect or Engineer v h r,., 14,,cx ,r� d ( f '". (Y 4 13V j t `61-1,1-3,-1 5 Building Contractor (Check all that apply) n Repair ❑ Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other r Details of Project: 1- -leo- 411y ar.,0 0 . v , rep ICS c 4 V- f-ter4 A)e.- cw dvut, 49-3,Jg.1 Residential ▪ Single Family ❑ Duplex ❑ Multi - Family ❑ Commercial ❑ Footprint Changes ❑ Discovery ❑ Demolition E?k) Estimated Cost of Construction: $ nstruction Type (1) Wood Frame (2) ood & Masonry (3) Br k Veneer Propose, use: Remarks: ATTACH A following inf ell wi f •�i ! 1 /f d1 /ran �. (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry PY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the ation based on the construction drawings and site plan: # Units Lot Area # Off -st et parking s Trees 1,, cated & listed Acce .: Driv way Se . acks: Front aces site plan (ft.) Stories Height grade of the building to the extr units, ventilation ducts, air conditi # Bedrooms Living space (total sq. ft.) With culvert? Rear # Bathrooms With swale? Sides (L) (R) Vertical distance measured from the average adjacent e high point of the building, exclusive of chimneys, heating ing units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date I Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. ,ral-kaat2 The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? NFIP Flood Zone FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager O FEES Permit 1 a 3 Inspections 3 r Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http: / /www.epa.govAead /pubs /renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a are- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. IF YOU'RE NOT Lf )SASEMIMED .DISTURBING JUST SIX SQUARE FEET -COULD COST YOU .BIG TIME Si•n.ture ot- iv-al/1,1.0a) Printed Name phel Date Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Ca-n-ek) Undersigned U C ryyp he I Printed Name Date Office Use Only: Project Address: Permit Number: From:CITY OF TYBEE ISLAND 912 786 9539 1010412011 10:58 #068 P.003/003 CITY OF TYBEE ISLAND COMMUNITY DEVELOPMENT DEPARTMENT � �� �� P.O. Box 2749 •403 Butler Ave., Ty bee Island, GA 3 1 'n& Phone (912) 786 -4573 • Fax (912) 786 -9539 MECHANICAL PERMIT APPLICATION Location of work (street address) 1 3 0 5 Jones Ave . Contractor Johnson Air Conditioning LLC Address of contractor 2209 Rowland Ave. Thunderbolt, GA 31404 Contact name & telephone number of contracto ary Johnson 912- 355 -3224 Name of property owner Esma Campbell Mailing address ofpropertyowner 103 E. Southfield Dr. Savannah, GA 31419 Telephone number of property owner 912-844-3450 Residential x Commercial New Work Replacement Details of project install central heat and air conditioning Estimated cost of construction , 92 5 0 0 0 Date work will be ready for inspection, if known now ATTENTION: Permit Number Inspections for Mechanical Permits are required and will be in accordance with the International Residential Code or the International Mechanical Code and the Georgia Amendments. Requirements for "change -outs" will not be less than the requirements for new installations. In addition, elevation •f outside condensing units for FEMA compliance is required. Plan accordingly. Please if you have any questions. on ac or signature Gary L. Johnson Owner /Contractor printed name Date 13Ls J��� 63Q _ 1305` 4.Ye5 / c / do•—) / — ,J/Zw r 1114 42,4( pit.) .00/ R R I S S LOCAL GOVERNMENT fl - sL)T� D -23 -il E tea- Co,rAP tt ciLik LEGAL NOTICE CITY OF TYBEE ISLAND VIOLATIONS) PERMIT NO. WHEREAS, VIOLATIONS OF THE CODE OF THE CITY OF TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS HEREBY GIVEN THAT ALL PERSONS CEASE, DESIST FROM, AND STOP WORK AT ONCE ON ANY CONSTRUCTION, ALTERATION, REPAIR, OR FURTHER USE QF THESE PREMISES KNOWN AS UNTIL THE VIOLATION HAS BEEN CORRECTED AND APPROVED BY THE CITY OF TYBEE ISLAND. ALL PERSONS ACTING CONTRARY TO THIS NOTICE OR REMOVING OR MUTILATING IT ARE LIABLE TO SUMMARY ARREST UNLESS SUCH ACTION IS AUTHORIZED BY THE CITY OF TYBEE ISLAND. It PHONE 'N, v 4s•73 ay,4- 4 INSPECTOR 1140411101,