Loading...
HomeMy Public PortalAbout06-0071 BrownDATE ISSUED: 02 -8 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL FENCE 1003 FIFTH AVE JONATHAN BROWN PO BOX 269 TYBEE ISLAND GA 313280269 JONATHAN BROWN PO BOX 269 TYBEE ISLAND GA 313280269 P $ 25.00 $ 220.00 PERMIT #: 060071 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org Location: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT /0o3 s- ✓e NAME ADDRESS P 1 # TELEPHONE Owner d o � 4 /&D w /t/ � /0, 3 / " A{, c 564 7- j )s--5 Architect or Engineer Building Contractor ,v //zoo A J / P03 Air 5g7-77S_ (Che k all that apply) New Construction ❑ Duplex ❑ Residential El Footprint Changes El Others Estimated cost of Construction: $ ❑ Renovation ❑ Single Family ❑ Commercial n Repairs �Fct-t 2 20 Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (6) Other (please specify) ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms # Bathrooms Living space (total sq. ft.) With culvert? Rear With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by at by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. // Date: — ? �Q Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager Signature Date 2 -2 -04 FEES Permit 25- Inspections Water Tap Sewer Stub Aid to Const. TOTAL 2 s sof REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the ,Fity Ordinance requirements. Applicant name: Project I.D.: Attachments approved by: Date: 5/8" R.B.F. 16'± C.M.F = CONCRETE MONUMENT FOUND R.B.S. = 1/2" REBAR SET R.B.F. = REBAR FOUND S 65 °00'00" E 8'f R.B.S. ® ®. 61.04' CSk 4> HORSE PEN NOW OR FORMERLY NORA O'LEARY MISSROON PORTION OF FIFTH AVENUE \2 PORTION OF HIGH GROUND / IMPROVEMENTS NOT LOCATED 1 \ JACQUELYN R. BROWN G P.I.N. 4- 0012 -01 -007 z L. fT1 C W a J rrl N r -1=', v' r" 5' ACCESS EASEMENT - R.B.F. N - 60.50' 165'± 19.50' Lai 4 V) NI\ 144 P.K. NAIL END. IN CONC. IMPROVEMENTS NOT LOCATED JONATHAN WILLIAM BROWN P.1.N. 4- 0012 -01 -015 o W O (0.) d < of N z 13'± 19'± 61'± sio ,5 2 STATE OF GEORGIA NOW CHATHAM COUNTY Ale 1,41 G Piti ✓,4c% frr..'`'c iF R.B.S. 48.59' R.B.F. 80.00' _ --- N 65 °21'53" W PORTION OF FIFTH AVENUE OR FORMERLY CECIL R. & ELIZABETH JOHNSON PLAT OF PORTIONS OF 5th AVENUE, 1Oth STREET AND HIGH GROUND LOCATED EAST OF HORSE PEN CREEK, WARD 3, TYBEE ISLAND. FOR: JACQUELYN R. BROWN & JONATHAN WILLIAM BROWN DATE OF SURVEY: DATE OF PLAT: SCALE: 1"= 20' 20' FEBRUARY 11, 2005 FEBRUARY 16, 2005 (LAST REVISED JANUARY 11, 2006) 40' BERT BARRETT JR LAND SURVEYING, PC 145 RUNNER ROAD SAVANNAH, GA. 31410 (912) 897 -0661 IN MY OPINION THIS PLAT IS A CORRECT REPRESENTATION OF THE LAND PLATTED E.O.C. FIELD < ERROR /POINT ADJ. METHOD E.O.C. PLAT TOTAL STATION 1/ 18,000 1° NONE 1/ 56,781 GEODIMETER 610