HomeMy Public PortalAboutr 13-032�Re0A111florT of Ifle Poro ,, � of Qlaukexe , J�l I
Date of Adoption F'('W-urV 2M
AUTHORIZING A PROFESSIONAL SERVICES CONTRACT
FOR ENGINEERING SERVICES WITH T &M ASSOCIATES —
UPDATED HYDROGRAPHIC SURVEY & DREDGING PLAN
WHEREAS, the Borough of Carteret is in need of specialized engineering services in
comtection with the updated Hydrographic Survey & Dredging Plan; and
WHEREAS, the Borough's Consulting Engineers, T &NI Associates, possess the
requisite skill and expertise to provide said services; and
WHEREAS, T &M Associates has submitted a proposal to provide said engineering
services at a total cost not to exceed $10,500.00; and
WHEREAS, the Mayor and Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be available
for said purpose.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough
of Carteret, County of Middlesex, State of New Jersey, as follows:
That the proposal from T &M Associates for engineering services
related to the updated Hydrographic Survey & Dredging Plan, in a
total amount of $10,500.00 billable in accordance with T &M's
existing contract with the Borough is hereby approved;
2. That annexed hereto is a copy of said proposal;
3. That this action is approved as an award of a professional services
contract pursuant to N.J.S.A. 40A:11- 5(1)(a) in accordance with the
Borough's Fair and Open Process as authorized by law.
Adopted this 7` day of February, 2013
and certified as a true copy of the
original on February 8, 2013.
KATHLEEN M. BARNEY, NIMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.B.
COUNCILMAN
YES
NO
NV
A.B.
BIILTI�D
X
lQ2lCl
X
DIFlZ
X
P4\IL6
X
DI RA�
X
Sum
X
X - Indicate Vole An - Absent NV - Not voting
XOR- Indicates vote to o"onle Veto
Adopted at a meeting of the Ahnticipal Council
p� ���,..,� .@�71U3 � 2113
CLERK
r�
1
4f rfrrlir II . gi rl f
Miooresex couNry
j" Etu �crseU
OFFICE OF
KATI {LEEK Al. BARNEY, RA1C /CHIC
AIUNICIPAL CLERK
TEL (732) 541 -3800 "
FAX (732) 541 -8925
61 COOKE AVENUE
CARTERET, NEW JERSEY 07008
Date: Fehiary 6, 2013
TO: Patrick J. DeBlasio, Treasurer
Borough of Carteret 1
REQUEST FOR CERTIFICATION. OF A VAILABLE FUNDS:
For: 'I&M Associates, Re: IIgin eriig Services Re: 4)dated lwrogra"c Survey & R4irg Plan.
Name ofAccou
AMOUNT TO BE ENCUMBERED: Total cast not to exceed $10, 500.00 billable ia= acc:otdatxe ,Ath IBM's
existing contract.
r
KATBLEPN M. B y
Municipal Clerk
CERTIFICATION OF A VAILABLLITy OF FUNDS
I, Treasurer of the Borough of Carteret; do certify that there
budget to are suffi funds available _iathe- current --
_ enable the Municipal Council to authorize the entering into a
and: be tween contract be the Pprph of Carteret
i� i ` l %sent A
The funds available for this contract are in the Budget, in the account of
in the amount of
By this certi5cadon, I have hereby encumbered the above named account or the amount of the contract.
PATR.I K J. DeBLASIO, Treasurer
Date: `� �% — 13
P.
373 13H0AF) STR1 H I, SUITI_ 306, CI_II` TOM i 3 -`i23
(973) 014 -0005 ` fax (973) 616 -0025 - aw.ftuuun iasor,I ,ir�s.cun�
CART -02200
Mayor Daniel J. Reiman
Borough of Carteret
Municipal Building
61 Cooke Avenue
Carteret, N.J. 07008
Re: Updated Hydrographic Survey & Dredging Plan
Dear Mayor Reiman:
r'
..i
A..:;���
..�r
Re: Updated Hydrographic Survey & Dredging Plan
Dear Mayor Reiman:
February 2, 2013
As you are aware, Ms. Suzanne Dietrick, Chief of the DEP Office of Dredging &
Sediment Technology (ODST) is requiring the Borough to update its hydrographic
survey being used as the base map for the ferry terminal dredging plan due to the age of
the original hydrographic survey which is approximately 6 years old and due to the
anticipated movement of sediment at the proposed ferry site due to Hurricane Sandy.
In order to assist the Borough in obtaining an updated hydrographic survey, T &M
Associates is pleased to present this scope of services and fee estimate to provide the
required in water survey. Our scope of services and fee presented herein also provide for
a revised and updated dredging plan for the proposed ferry. The dredging plan will need
to be redesigned as a result of new Arthur Kill channel depths which were changed by
Himicane Sandy.
Our proposed Scope of Services is as follows:
1. Hydrographic Survey
T &M Associates will commission Hydrographic Surveys, Inc to perform a
Fathometric Survey for the subject ferry slip site. Nationally Certified
Hydrographers will perform all soundings. The soundings will conform to U.S.
Army Corps of Engineers Class I- payment survey standards as outlined in
Engineer and Design Hydrographic Surveying manual EMI 110-2-1003 dated
October 31 st 1994.
The survey will be performed using either the Trimble AgOps 132 or the Starlink
212G /MBA -2DGPS Satellite sub -meter positioning system to determine
horizontal location. Hydrographic Surveys, Inc will utilize an Imrerspace 448
Precision Survey Fathometer to collect bottom elevations. The area to be surveyed
is approximately 500' x 225'. All soundings to be performed using a 50' x 5'
Grid. All soundings shall be expressed in USACOE MLW and plotted on a 24" x
36" plan view drawing. The Hypack Max software will be operated for
navigation, data collection, and post processing.
1 N(iINI I W; , PI HN17iS I./lHW;C / AHCHIII CTS ` NVI N)NI 'AlLNIN h;(;11 HIWI13 S;[Wv[a`ORS
(;IVII 1 1 I'C I IB( YAI 1 -_P 1 1W)H!�!F N! Al I °;III 6011hWW;ll tiTRUI,IUltril.° IP 'i'IC IHAi !ti PORT; �I If>II
..i
A..:;���
..�r
February 2, 2013
As you are aware, Ms. Suzanne Dietrick, Chief of the DEP Office of Dredging &
Sediment Technology (ODST) is requiring the Borough to update its hydrographic
survey being used as the base map for the ferry terminal dredging plan due to the age of
the original hydrographic survey which is approximately 6 years old and due to the
anticipated movement of sediment at the proposed ferry site due to Hurricane Sandy.
In order to assist the Borough in obtaining an updated hydrographic survey, T &M
Associates is pleased to present this scope of services and fee estimate to provide the
required in water survey. Our scope of services and fee presented herein also provide for
a revised and updated dredging plan for the proposed ferry. The dredging plan will need
to be redesigned as a result of new Arthur Kill channel depths which were changed by
Himicane Sandy.
Our proposed Scope of Services is as follows:
1. Hydrographic Survey
T &M Associates will commission Hydrographic Surveys, Inc to perform a
Fathometric Survey for the subject ferry slip site. Nationally Certified
Hydrographers will perform all soundings. The soundings will conform to U.S.
Army Corps of Engineers Class I- payment survey standards as outlined in
Engineer and Design Hydrographic Surveying manual EMI 110-2-1003 dated
October 31 st 1994.
The survey will be performed using either the Trimble AgOps 132 or the Starlink
212G /MBA -2DGPS Satellite sub -meter positioning system to determine
horizontal location. Hydrographic Surveys, Inc will utilize an Imrerspace 448
Precision Survey Fathometer to collect bottom elevations. The area to be surveyed
is approximately 500' x 225'. All soundings to be performed using a 50' x 5'
Grid. All soundings shall be expressed in USACOE MLW and plotted on a 24" x
36" plan view drawing. The Hypack Max software will be operated for
navigation, data collection, and post processing.
1 N(iINI I W; , PI HN17iS I./lHW;C / AHCHIII CTS ` NVI N)NI 'AlLNIN h;(;11 HIWI13 S;[Wv[a`ORS
(;IVII 1 1 I'C I IB( YAI 1 -_P 1 1W)H!�!F N! Al I °;III 6011hWW;ll tiTRUI,IUltril.° IP 'i'IC IHAi !ti PORT; �I If>II
i
ASSOCIATES
CART -02200
Le: Mayor Daniel I Rciman
Borough of Carteret
Re: Updated nydrographie Su"ey & Dredging Plan
February 2, 2013
2. Cross Sections and Base Man
Based on the updated hydrographic survey and soundings obtained as described
above we will provide existing cross sections for the Arthur Kill in the vicinity of
the proposed ferry slip. Following the fathometric work to obtain the cross
sections, we will prepare a base map for the project to present existing waterway
bottom conditions.
Dredging Plan & Quantities
Once the cross sections and base mapping have been completed, we will develop
a dredging plan for the one and two ferry slip alternatives. Once the Dredging
Plan is revised based on the new hydrographic survey, we will also prepare an
estimate of dredge material quantities for the final project plan.
Project Schedule
T &M Associates will commission the work on the hydrographic survey immediately
upon written authorization to proceed. We anticipate completing this phase of work in
15 -days following authorization to proceed weather permitting. Once the hydrographic
survey and base mapping of same are complete, we will proceed with the dredging plan
revisions and complete this work within 15 -days.
Fee Schedule
T &M will provide the above -noted Hydrographic Survey and Dredging Plan Services for
an estimated cost not to exceed $10,500. The Scope of Services described above shall be
billed in accordance with the Schedule of Hourly Billing Rates and Schedule of
Miscellaneous Charges in our current annual engineering services agreement.
We appreciate this opportunity to submit this scope of services for professional services
in connection with the Ferry Service Terminal project. We believe the proposed scope of
work is consistent with the NJDEP ODST required services.
ASSOCIATES
CART -02200
Le: Mayor Daniel J. Relman
Borough of Carteret
Re: Updated Hydrographle Survey & Dredging Plan
February 2,2013
We will await your authorization to proceed. In the interim, if you have any questions or
require additional information, please call.
Very truly yours,
T&M ASSOCIATES
. t, �
DONALD NORBUT, P.E., C.M,E.
CARTERET BOROUGH ENGINEER
DJN:sp
Cc: John DuPont, Director of Engineering
Kathy Barney, Clerk
Patrick DeBlasio, CFO
H:', CART�022001CorceapondencekUpdated Hydrogmphic Survey & Dredge Plan Proposal - 22.11docx
AFFIDAVIT OF PUBLICATION
The following is a true copy of a Classified/Help Wanted Ad of
the Borough of Carteret that has appeared in the Star Ledger,
a newspaper which is printed in Newark, New Jersey and
published in Essex County, of general circulation in said
county and state. One (1) time(s) once in each issue as follows:
APRIL 29, 2013
Notary Public bfiDkAv kathleen M. Barney, MMC
NOTARY PUBLIC OF NEW JERSEY Municipal Clerk
MY COMMISSION EXPIRES MAY 2, 2016
Sworn and Subscribed before
Me this _ Zday of /"/ c ' / 3