HomeMy Public PortalAboutResolution 2022-03-02 Authorizing Expenditure from Water Fund for Scada System UpgradesTOWN OF FRASER
RESOLUTION NO. 2022-03-02
A RESOLUTION AUTHORIZING THE EXPENDITURE FROM THE WATER FUND FOR
SCADA System Upgrades.
WHEREAS, the 2022 Budget provides for certain water system projects.
THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF
FRASER, COLORADO THAT:
1. The Town Board of Trustees, Fraser, Colorado hereby authorizes Staff to expend up
to $13,550.00 from the Water Fund Engineering Account 50-40-330 for services and
hardware necessary to host the SCADA system in the cloud.
2. Said purchases must be completed in year 2022 or the approval will no longer be
effective.
READ, PASSED ON ROLL CALL VOTE, AND ADOPTED BY THE BOARD OF TRUSTEES
THIS 2nd DAY OF March 2022.
Votes in favor:
Votes opposed:
Absent:
Abstained:
2
0
BOARD OF TRUSTEES OF THE
SER, COLS;; ADO
0
O BY:
Mayor
ATTEST:
0-4Ja-f-Nj. 1W -(A9
Town Clerk
Town of Fraser
PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518
www.frasercolorado.com
MEMO TO: Mayor Vandernail and the Board of Trustees
FROM: Adam Cwiklin, Water and Wastewater Superintendent and
Russell Pennington, P.E., Public Works Director
DATE: March 2, 2022
SUBJECT: Cloud Hosted SCADA System
SUBJECT: SCADA System Upgrades
DEPARTMENT: Public Works
PRESENTER/PREPARER: Russell Pennington, Public Works Director
Adam Cwiklin, Water and Wastewater Superintendent
FISCAL INFORMATION:
Cost as Recommended: $13,550
Balance Available: $30,000
Fund: Water
Budget Line-Item Number: 50-40-330 Engineering
New Appropriation Required: No
REQUESTED ACTON:
Approve the Resolution 2022-03-02 to appropriate funding to execute priorities 21 of the
SCADA Master Plan and authorize the appropriate Town officer to expend said funds.
SUMMARY AND BACKGROUND OF SUBJECT MATTER:
SCADA stands for System Control and Data Acquisition. It ultimately controls water system
automation and maintains operating records for the Town. Upgrades to the system started in
2014 when the PLCs and touchscreens were replaced at the water treatment plants, pump
stations and storage tanks. The Fraser well field wells and were upgraded in 2019 and Town
Hall hardware and software in 2021.
To date, The Town has completed 20 of 21 priorities listed in the SCADA master plan
(attached). Number 21, the final priority, is to relocate SCADA system from a desktop server to
the Cloud. The SCADA system is more robust than it was a few years ago, but there is still
potential for a single point of failure.
The SCADA CPU is currently a desktop server computer located in Town Hall. If there were an
event that Fraser Town Hall is compromised, Fraser would operate its water system in hand or
Town of Fraser
PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518
www.frasercolorado.com
manually until the situation is remedied. Moving the SCADA system software client to the cloud
and utilizing the desktop server as the backup would eliminate a single point of failure situation
and allow Fraser to operate via direct connection to the software in the cloud from any Microsoft
device.
Moving from a desktop to the cloud requires two annual expenses and hardware changes.
The annual expenses are the cloud hosting service and a corresponding server maintenance
service. The hardware changes are due to proprietary compatibility issues. Apple vs Microsoft.
Currently, Utility operators use Ipads for remote desktop connection to a desktop server, the
primary SCADA computer. The cloud server cannot support Remote Desktop Connections.
Remote Desktop services require Active Directory (AD) and a cloud-based Windows OS server
cannot provide AD. The iPads cannot go directly to the cloud server. They are limited to connect
to the desktop server. Surface tablets are made by Microsoft and use Windows 10 OS. The
Ignition client can be installed on the Surface Tablets and then the Surface can connect directly
to the cloud server. To function in the cloud, Utilities needs to replace the iPads with Surface
Tablets.
SCOPE OF WORK:
There are three components need to complete the transfer to the cloud and maintain full
operations.
1. Azure services. This is an annual subscription for cloud hosted SCADA system.
2. Annual SCADA Server Maintenance Plan
3. Change from iPad to Surface Tablet. Replace the iPads with Surface Tablets. Surface
tablets are made by Microsoft and use Windows 10 OS. We can install the Ignition client
on the Surface Tablets and then the Surface can connect directly to the cloud server.
The Surface tablets are similar in cost to an iPad. They can also be purchase with a
built-in LTE cellular card for internet access.
Annual Azure Services Browns Hill $4,650.00
Annual SCADA server maintenance Browns Hill $1,700.00
Microsoft Tablets (4 at $1500) Executec $6,000.00
Subtotal $12,350.00
Contingency (20%on hardware) $1,200.00
Total $13,550.00
The engineer’s estimate for the project is $12,350.00. The project funding includes contingency
amounts for a total of $13,550.00 which can be used towards unforeseen changes during
installation and programing.
PROJECT SCHEDULE
Notice of Award March 3, 2022
Notice to Proceed March 3, 2022
Improvements complete May 1, 2022
Town of Fraser
PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518
www.frasercolorado.com
ATTACHMENTS:
SCADA Master Plan
Job# 21-754 SQ01
Job#22-023 SQ02 REV 1
Email, Cloud SCADA access JWalker
Resolution No. 2022-03-02
STAFF RECOMMENDATION:
Motion to approve Resolution No. 2022-03-02 authorizing the Staff to complete
SCADA Master Plan priority number 21 using the Engineering Account (50 -40-330) of
the 2022 Water Fund in an amount not to exceed $13,550.
Priority Site Issue Commments Cost Implementation
Date
Century
Link
Verizon
Cellular
1 Yellow
Zone Tank
Yellow Zone Tank Communications are not
reliable with existing serial radio connection to
Town Hall
Internet Connection at
YZT
Completed 2019
X
2 Maryvale
WTP
Install Internet connection to receive Yellow
Zone Tank Communications
Completed 2019 X
3 Maryvale
WTP/YZT
Modify Communications to allow Yellow Zone
Tank Level to go directly to Maryvale WTP.
Modify HMI to receive YZT Tank Level from
Maryvale WTP
Completed 2019
4 Well 8 Install Internet Connection for direct
communications with other sites.
Included in Well 8 Rehab Included in
Well 8
Rehab
Planned for Aug.
2019
Refer to Quote
18-023 SQ01
X
5 Fraser WTP Install Internet Connection for direct
communications with other sites.
Fraser WTP internet
connection will be shared
with Well 2
$3,633 Approval of Quote
19-023 SQ17 X
6 Blue Zone
Tank
Install Internet Connection for direct
communications with other sites.
$3,052 Approval of Quote
19-023 SQ18 X
7 Fraser
WTP/BZT
Modify Communications to allow Blue Zone
Tank Level to go directly to Fraser WTP.
Modify HMI to receive BZT Level from Fraser
WTP
$1,500 Approval of Quote
19-023 SQ19
8 Green Zone
PS
Install Internet Connection for direct
communications with other sites.
$3,640 Approval of Quote
19-023 SQ09 X
9 Red Zone
PS
Install Internet Connection for direct
communications with other sites.
$3,640 Approval of Quote
19-023 SQ10 X
10 Green Zone
PS
Reprogram Green Zone PLC to obtain YZT
and GZT Levels directly from these tanks for
Pump Station Control.
Modify Green Zone OIT to display data
directly from Maryvale WTP & Red Zone PS
$1,808 Approval of Quote
19-023 SQ11
11 Red Zone
PS
Modify Red Zone OIT to display data directly
from Maryvale WTP & Green Zone PS
$950 Approval of Quote
19-023 SQ12
12 Town Hall/
Maryvale
WTP
Revise communications failure alarming for
updated communications paths.
Modify Maryvale OIT to display data directly
from Green Zone PS & Red Zone PS
$2,068 Approval of Quote
19-023 SQ13
13 Town Hall
HMI
Modify existing HMI configuration for direct
access to Maryvale WTP, GZPS, RZPS PLCs.
Update OIT and HMI setpoint tags for direct
access.
Remove PLC messaging at Town Hall
$6,580 Approval of Quote
19-023 SQ14
14 Well 1 Existing PLC is scheduled for End of Life in
2021 and does not support Ethernet
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
Well 1 internet connection
will be shared with Well
3B
$10,500 Approval of Quote
19-023 SQ15
X
May 9, 2019
Town of Fraser - SCADA Master Plan
15 Well 2 Existing PLC is scheduled for End of Life in
2021 and does not support Ethernet
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
Well 2 will utilize radio
connection to access
internet connection at
Fraser WTP
$10,500 Approval of Quote
19-023 SQ16
16 Well 3B Existing PLC is scheduled for End of Life in
2021 and does not support Ethernet
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
Well 3B will utilize radio
connection to access
internet connection at
Well 1
$10,500 Similar to Quote 19-
023 SQ16
17 Well 5R Existing PLC is scheduled for End of Life in
2021 and does not support Ethernet
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
$10,500 Similar to Quote 19-
023 SQ15
X
18 Well 7 Existing PLC is scheduled for End of Life in
2021 and does not support Ethernet
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
Well 7 internet connection
will be shared with Well 9
$10,500 Similar to Quote 19-
023 SQ15
X
19 Well 9 Existing PLC is scheduled for End of Life in
2021 and does not support Ethernet
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
Well 9 will utilize radio
connection to access
internet connection at
Well 7
$10,500 Similar to Quote 19-
023 SQ16
20 Town Hall
HMI
Computer +
Software
Phase 1: Replace exsiting Genesis-32 software
with Ignition software. Installed Locally on
new new computer, provided by Town.
Gen-32 will be
discontinued in 2020 and
existing HMI is due for
replacement.
$21,000 Plan to Implement
in 2020
21 Town Hall
HMI
Computer +
Software
Phase 2: Add Microsoft Azure Cloud Services
to provide redundancy
HMI screens can be
accessed from Town Hall
or Internet
$8,000 Plan to Implement
in 2021
$89,871