Loading...
HomeMy Public PortalAbout01-11-96 TRAFFIC AND PARKING COMMISSIONT96 -1ASM AGENDA ITEMS FOR CONSIDERATION AT THE SPECIAL MEETING OF THE LYNWOOD TRAFFIC AND PARKING COMMISSION / �R C E ✓ll( CITY OF LYNWOOU TO BE HELD ON JANUARY 11, 1996 AT 6:00 P. . CITY CLERKS OFFICE OPENING CEREMONIES JAN 9199E AM PM 1. CALL FOR ORDER - CHAIRPERSON MARGARET BRIGH71 2. PLEDGE OF ALLEGIANCE 3. ACKNOWLEDGEMENT OF POSTING v 4. ROLL CALL OF COMMISSIONERS MARGARET BRIGHT WILLIAM CUNNINGHAM EDWARD PACHECO RICK SANCHEZ RODNEY WHITE 5. APPROVAL OF MINUTES PUBLIC ORAL COMMUNICATIONS SCHEDULED MATTERS 6. ST. FRANCIS HOSPITAL DRIVEWAY APPROACH REQUEST r REVIEW OF UPCOMING ITEMS INFORMATIONAL ITEMS COMMISSION ORAL COMMUNICATIONS 7 C, JA Y"1 -• • all ' A REGULAR MEETING OF THE TRAFFIC AND PARKING COMMISSION OF THE CITY OF LYNWOOD Minutes of the November 30, 1995 Meeting CALL TO ORDER Chairperson Margaret Bright called the meeting to order at 6:15 p.m. PLEDGE OF ALLEGIANCE Commissioner Rodney White lead the Commission in the Pledge of Allegiance. ACKNOWLEDGMENT OF POSTING Christian Valtierra acknowledged the posting of the Traffic and Parking Commission Agenda on October 23, 1995. ROLL CALL Commissioners Margaret Bright, Rodney White, Rick Sanchez, Edward Pacheco and William Cunningham answered roll call. Also present was Christian Valtierra from the Public Works Department. APPROVAL OF MINUTES Commissioner William Cunningham made a motion to accept the minutes as written, Commissioner Edward Pacheco seconded the motion and the minutes were accepted as written. PUBLIC ORAL COMMUNTCATION Mr. Terry Wallace, Ms Marilyn Baca and Mr. Efrin Baca, addressed the Commission regarding the Red curb, at long Beach Boulevard and Burton Avenue. These residents are representing the property located at 12230 Long Beach Boulevard. Their concern is that there is no parking in front of their property due to the painting of curb red. Staff stated that property in question, had been inspected on September 18, 1995 and a letter was written to Mr. Wallace and Mr. & Mrs. Baca by Ted Semaan of the Public Works Department, which stated the reason this location had been painted red. A copy was then given to residents. Again on October 16, 1995 Mr. Semaan responded to both residents, by letter, explaining in detail the reasons for painting the curb red. Commissioner Bright, requested that this be put into an Item for Scheduled Matters, and brought up at future meeting. 1 y • • ELECTION OF CHAIRMAN AND VICE CHAIRMAN Commissioner Pacheco nominated Rodney White, for Chair of the Traffic and Parking Commission. Margaret Bright seconded motion and all voted in favor and Commissioner White accepted. Commissioner Rodney White nominated Commissioner Rick Sanchez, for Vice Chair for Traffic and Parking Commission. Margaret Bright seconded all voted in favor and Commissioner Sanchez accepted. INFORMATIONAL ITEMS The Commission was given a brief status of the following CIP's: 1. Public Works Corporate Yard 2. Bus Shelters 3. City Hall New Wing 4. City Hall South Exit Parking Lot A.D.A. Improvement 5. Penn Street Reconstruction 6. Duncan Avenue 7. Osgood Avenue and 112th. Avenue 8. Santa Fe Street Median Island The Traffic and Parking Commission was also given a copy of the Public Works Monthly Report for September, 1995 for their review. ITEMS FOR FUTURE CONSIDERATION The Traffic and Parking Commission reviewed items for future consideration. ;�SJW'ui�Y:Yi��]�l� Zi]711 Commissioner Cunningham - Complemented staff of the review of Louise and Wright Road. Commissioner Sanchez - Wanted to know why resident complaints are not resolved, and why system is not working, staff explained the centralized system, that problems should be brought before City Managers office if they have questions or problems. Commissioner Bright, received a request from the principal of Lincoln Elementary School, requesting that a crosswalk painted in front of their school as a result of meeting held with the parents of students that were concerned with cars speeding in front of school located at Los Flores and State Street. Commissioner White - none. ADJOURNMENT There being no further business, Commissioner White made a motion to adjourn the meeting, Commissioner Pacheco seconded the motion, and the meeting was adjourned unanimously at 7:45 p.m. t95 -11mt9 2 DATE: TO: FROM: BY: SUBJECT: PURPOSE: JANUARY 11, 1996 THE HONORABLE CHAIRPERSON AND MEMBERS OF THE TRAFFIC AND PARKING COMMISSION Emilio M. Murga, Director of Public Works Christian Valtierra, PW Administrative Div. St. Francis Hospital Drive Approach Request Supervi o To have the Traffic and Parking Commission review a request from St. Francis Hospital to open a new parking structure exit drive approach on Martin Luther King Jr. Blvd for employee use. BACKGROUND: On August 24, 1995, the Traffic and Parking Commission reviewed a request from St. Francis Hospital to relocate the existing ambulance entrance presently located on Martin Luther King Jr. Boulevard to Cesar Chavez Lane; and to open a new drive approach on Cesar Chavez Lane to be used as an exit point for employees leaving the existing parking structure. After a field visit and review of proposed driveway approaches, the commission considered the request. At that time, the Commission voted to allow St. Francis to resubmit an alternative plan and have the commission consider it for approval at that time. ANALYSIS: St. Francis Hospital has submitted an alternative plan and is requesting that they be allowed to construct a new parking exit driveway approach on Martin Luther King Jr. Blvd (see attached sketch). Staff has reviewed the request and finds it acceptable from a traffic point of view. Therefore, staff recommends that the Traffic and Parking Commission approve St. Francis Hospital request and direct St. Francis Hospital to submit for Public Works permits to open the driveway approach. RECOMMENDATION: It is recommended that, after review, the Traffic and Parking Commission approve the request from St. Francis Hospital for the opening of a new parking exit driveway approach on Martin Luther King Jr. Hospital. Item No. 6 t96 -1106 St. Francis Medical Center Our Mission is Life December 4, 1995 P'L ' 363o East Imperial Highway Lynwood, Cali fornia 90262 Telephone 3ro 6o3 6000 CITY OF LYNWOOD 11330 Bullis Road Lynwood, CA 90262 SUBJ: NEW CURB CUT Dear Mi. Murga: Request approval to establish an exit only drive way from our parking structure located on Martin Luther King Jr. Blvd. and Cesar Chavez Lane on to Martin Luther King Jr. Blvd. as shown on the attached sketch. In July 1995 the City disapproved our request for a similar exit onto Cesar Chavez Lane but indicated such an exit onto Martin Luther King Jr. Blvd. would be acceptable. Respectfully, Robert W Walter, P.E., CFM Vice President, Facilities ,3 ,,o Goa 6 • / t b i P • • S • r<, 1•nY Member of DAUGHTERS OF CHARITY NATIONAL HEALTH SYSTEM 0 s ' • ,. ' r5. `, 1, ?r.:'' .:� � { �I It t ;44t 2`1 IL A(D 0 W 'lia. nxaa: )i 'L tt q fL' 0 0 AGENDA ITEMS FOR FUTURE CONSIDERATION BY THE LYNWOOD TRAFFIC AND PARKING COMMISSION (List prepared 1- 02 -96) Presently Under Review 1. St. Francis Hospital Driveway Approach Request. 2. Review of Red Curb Painting at Long Beach Blvd and Burton. 3. Traffic Accident Review on Mariposa Ave. 4. Request for Traffic Study for Lincoln Elementary School area. 5. Traffic study for Long Beach Blvd, State Street and Tenaya Avenue. 6. Review School Routes citywide. For Future Consideration A. Review Traffic Safety Evaluation, Enforcement and Engineering analysis by Institute of Transportation Studies. B. Review and ranking of signalized intersections by number of accidents. C. Proposed alley vacations. D. Review pedestrian /traffic safety on Long Beach Boulevard from Martin Luther King Boulevard to Tweedy Boulevard E.. Review traffic safety on Long Beach Boulevard and Los Flores Boulevard. F. Review protected left turn phasing at traffic signals citywide. G. Parking restrictions on Mariposa Avenue, request by the City of South Gate Public Works Department. T96 -1fsm 0 • Monthly Status Report Department of Public Works November, 1995 Prepared: Emilio M. Murga Director of Public Works r 0 0 Contents Monthly Report November Capital Improvements Projects . . . . . . . . . . . . . Land Development Report . . . . . . . . . . . . . . . . Public Works Administration . . . . . . . . . . . . . . Complaint Summary . . . . . . . . . . . . . . . . . . . Management Information System (MIS) . . . . . . . . . . Water Maintenance . . . . . . . . . . . . . . . . . . . Traffic Signals /Street Lighting . . . . . . . . . . . . 1 -4 5 6 -7 8 9 -10 11 -15 16 Goals January, 1996 Public Works Administration . . . . . . . . . . . . . . 17 Management Information System . . . . . . . . . . . . . .18 Water Division . . . . . . . . . . . . . . .. . . . . 19 Traffic Signals /Street Lighting . . . . . . . . . . . . 20 v70 -107 1 CAPITAL IMPROVEMENT PROJECT November, 1995 2 3 0 0 Public Works Corporate Yard Project Description: Construction of City facilities including completion of Building "B" (Office & Warehouse), and construction of a portion of building "D" (garage), enclosed, City Vehicle Parking at the Public Works Corporate Yard at 11750 Alameda. Budget: Under review. Project Status: Needs Council funding. CITY HALL NEW WING (OLD SHERIFF STATION REMODELING) PROJECT DESCRIPTION Old Sheriff's Station building will be remodeled as a new wing to the City Hall, to be used by Public Works and Community Development Departments in the future. The work consists of architectural, mechanical, electrical, and structural design followed by related construction work. Budget: $ Under Review PROJECT STATUS Project is presently on hold. CITY HALL SOUTH EXIT AND PARKING LOT A.D.A. IMPROVEMENT Project Description The work consists of construction of a wheel chair ramp for City Hall South exit and also stripping for reserved parking stalls as A.D.A. improvement to City Hall. Project Status Kiosk has been ordered to complete project. 1 4. PENN STREET &ONSTRUCTION • Project Description Project consists of reconstruction of curb and gutter, drive. approaches, sidewalks, wheelchair ramp widening the curb returns, lowering the water service and street pavement and improvements. Budget: $100,000.00 Project Status Project has been completed. 5. DUNCAN AVENUE - PAVEMENT IMPROVEMENT PROJECT PROJECT DESCRIPTION The project consist of reconstruction of pavement along Duncan Avenue from Josephine Street to Lavinia Avenue. Budget: $45.000.00 PROJECT STATUS Project has been completed. 6. OSGOOD AVENUE AND 112TH AVENUE - PAVEMENT IMPROVEMENT PROJECT PROJECT DESCRIPTION The project consists of overlaying the Osgood Avenue and 112th Avenue. Budget: $40,000.00 PROJECT STATUS This project has been completed. 7. SANTA FE STREET MEDIAN ISLAND Project Description: Existing concrete pavement median island, reconstructed for a landscaped median island. The median island will have eleven palm trees, y6yellow flowers and solar automatic irrigated system. Volunteers from the area will do the labor part of this project. 2 Budget: • Project Status 0 10 Project was completed and ready for turn over to Facility Maintenance. LOS FLORES BOULEVARD IMPROVEMENT PROJECT PROJECT DESCRIPTION: The project c consists of reconstruction of damaged gutter and overlaying the AC pavement along Los Flores Boulevard from California Avenue to Imperial Highway. Budget: $ 45,000.00 PROJECT STATUS This project has been awarded to All American Asphalt and construction of this project will be started on December 11, 1995. STREET LIGHTING PROJECT ALONG VARIOUS STREETS PROJECT DESCRIPTION: This project c consists of installation of fifty (50) marbelite new street light poles underground system along Tecumsah Avenue, Seminole Avenue, Tenaya Avenue, Cherokee Avenue, Sequoia Drive, Michigan Avenue, Wisconsin Avenue and Minnesota Avenue from Mariposa Lane to Long Beach Boulevard. Budget: $250,000.00 PROJECT STATUS The foundations of all the street light have been poured one underground conduit has been installed and new street light poles have been erected. The project will be completed by the end of December, 1995. ALAMEDA STREET IMPROVEMENT PROJECT PROJECT DESCRIPTION The project consists of thirteen (13) new street lighting poles with underground system from 103rd. street to Martin Luther king Jr. Boulevard. The project does consist of replacement of broken curb and gutters an sidewalks. Budget: $60,000.00 3 PROJECT STATUS The foundations for thirteen 13 street lighting poles have been poured. 12. LONG BEACH BOULEVARD SAFETY /BEAUTIFICATION PROJECT DESCRIPTION The median island on Long Beach Street to Sanborn born Avenue w installation of hardscaping and pedestrians. A continues fence Lynwood Road will be installed. two marked cross walks close to and south sides of 105 freeway installed. Boulevard from Josephine ill be upgraded by landscaping for safety of from Josephine Street to Two pedestrian signals and on and off ramps on north by Caltrans will be Budget: $292.000.00 PROJECT STATUS Caltrans has been notified for Data collection for the project currently working on conceptual V80 -305 the required improvement. was done. Staff is design. 4 i Date: November, 1995 Subject: ENGINEERING DIVISION, LAND DEVELOPMENT MONTHLY REPORT • Permits: • Inspections: • Grading Plans: • Site Plans: • Planning Commission Meeting: ❑ Traffic and Parking Commission meeting: ❑ Underground Service Alert Markings (USA): ❑ Flood Zone Information: ❑ Traffic Signals: V70 -402 33 Issued 32 Performed 3 Plan check processed 4 Reviewed 1 Tuesday, November 14, 1995 1 Thursday, November 30, 1995 300 Locations marked 4 Requests processed 52 Intersections inspected once each week 0 M E M O R A N D U M DATE: December 11, 1995 46 TO: Emilio M. Murga, Director of Public Works FROM: Christian Valtierra, PW Administration Supervisor SUBJECT: Public Works Administrative Activities for November, 1995 1. General Administrative Projects: A. Submitted November, 1995 Complaint Summary. A total of three (24) complaints were received for the Department of Public Works. All complaints were addressed and routed to the proper divisions for resolving. B. Continued to work with HUB Cities, the County of Los Angeles, and Downey Volunteer Center to provide work experience to three HUB Cities student worker and several General Relief Workers. C. Prepared agenda /items for and attended, Traffic and Parking Commission meeting held on November 30, 1995. D. Worked with the Engineering Division to continue the Youth Training Program that consists of the hiring of 15 local youth hired to work on Bus Shelters, Imperial Highway Median Island Project, and commercial and residential street lighting projects. E. Prepared and sent out Public Works Monthly Report for November, 1995. F. Assisted in preparation of various City Council Items. G. Assisted with City Council in presentation of the Internet. H. Continued to obtain materials and water conservation kits to be passed out to residents who request a water audit /water conservation kits. 11 i General Office tasks: E The Public Works Administration Division is responsible for providing general support to all other Public Works Divisions. This includes complaint processing, time - sheets, mailing of parcel and utility maps; typing of Council Items and Resolutions, memos, filing and handling over the counter information. v7O -466 E MONTHLY COMPLAINT STATUS REPORT MONTH: November DATE: December 7, 1995 YEAR: 1995 NUMBER OF COMPLAINTS: ---------------------------------------- Complaint Type Incoming % ---------------------------------- - - - - -- OTHER COMPLAINTS 7 29.17 PONDING WATER 6 25.00 SCE STREET LIGHTS 11 45.83 ----------------------------------------- Total: 24 100.00 OTHER DEPARTMENTS I 24 0 0 Memorandum Date. December 6, 1995 To Emilio M. Murga, Director of Public Works From Frank Garcia, Civil Engineering Assistant Subject: Management Information Systems (M.I.S.) Monthly Report For November, 1995 E 1 Install PNA backup system upgrade on new network file server 2 Complete new computer system upgrade for Community Development Director 3 Assist Code Enforcement with computer system upgrade purchasing. 4 Modify and update information on City ofLynwood's Internet World Wide Web Site Page 5 Conduct City of Lynwood's Internet World Wide Web Site presentation for City Council. 6 Install new hard drive at Director of Finance computer system. 7 Continue with Novell Certified Network File Server upgrade for City ofLynwood's WAN system. 8 Install new HP Laser printer at Community Development print server station. 9 Service computer system momtor problem for City Manager 10 Service Public Works workstation in order to increase better Window Application performance 11 Complete notebook computer repair for Public Works. 12. Present LAN Users Group Meeting for November - Topic: Internet. 9 13 Assist City Clerk with s l lal election program installation and setlaser printer for label printouts. 14 Move requested computer system and connect to LAN for Community Development. 15 Continue with full maintenance process for all computer workstations on City of Lynwood WAN Maintenance will include full hardware and software diagnostics, physical hardware cleaning, and detailed report on description of analysis. 16 Continued maintenance and users support service for all departments. System statistics, down -time for November 1995 Total: 45 min. F \WORDFILETW- ENGRMSNIS -0001 10 0 0 MONTffi.Y PRODUCTION REPORT PUBLIC WORKS/WATER DIVISION NOVEMBER, 1995 TO: EM JO M. MURGA FROM: RAUL M. SAENZ Water Turn Ons 209 Water Turn Of s 183 Water Meter Read 4393 Water Meter Rereads 449 Sewer Backups 1 Pumps Checked 289 Leaks Checked 291 (Per Customer Complaint) Water Main Leaks l Locations: 11037 Louise Red Tags Posted 58 Lock/Pull Meters 12 Water Meters Replaced 84 General Complaints 42 F.XWad"..*0zua 11 NOVEMBER 1995 : WATER PRODUCTION ( WELLS & M.W.D. ) 0 r N ACRE -FEET • WELL 5 6 B 9 11 15 19 M.W.D. CONSERVATION : FY 1995 -1998 VS FY 1989 -1990 0 w ACRE -FEET ■ FY 19051998 ■FY 1989 -1990 • MONTH JUL AUG SEP OCT NOV DEC WATER PRODUCTION AND IMPORT SUMMARY FOR 1995 -1998 r WELL * JULY AUGUST SEPTEMBER OCTOBER NOVEMBER 5 103.95 87.82 44.79 0.80 8.58 8 88.10 80.95 21.04 0.27 111 8 1 159.11 135.24 117.38 0.80 1.00 9 57.88 122.70 112.38 0.40 2.47 11 84.54 101,80 39.78 0.84 2.81 15 34.97 38.39 11.51 0.00 0.88 19 329.18 277.73 240.81 0.10 1.01 LOCAL 1 817.71 824.83 587.87 2.81 15.48 M.W.D. 2 0.00 78.40 0.00 584.80 528.80 TOTAL 1 +2 817.71 901.03 587.87 557.41 $42.08 • Y WATER YEAR PROJECTION 1995499 SEASONAL STORAGE FROM OCTOBER 1, 1996 TO APRIL 30, 19 ACTUAL I PROJECTED 14 WATER: G GROUND WATER: 3563.36AF • $177.00/AF M.W.D. (NON4NTERRUPTIBL 3598.10 AF' $458.00 1AF SHORT TERM B.S. CREDIT: (359S.40•.90)AF' 5181.00 /AF LONG TERM S.S. CREDIT: (5337.00J583.36)AF' $120.00/A 2.1 POWER: SUB -TOTAL FOR WELLS: 3583.38AF $52.50/AF FOR BOOSTERS: 2419.51 AF • 523.00 /AF SUB -TOTAL = $ 830,714.72 = $ 1,639,821.80 $ 521,074.89 $ 212,838.80 $1,536,824.83 = $ 187,076.40 = $ 55,648.73 $ 242,725.13 0 GRAND -TOTAL $1,779,349.76 JuW4 A Oct-04 I NOV-84 OW-04 Jtn4S Frrb45 MYr4B Apr-95 MW40 VJun-96 TOTAL L AL 1 617.71 62493 T7.81 2.81 15.45 11.6E se.52 a.74 4.es 3.91 B213 970.47 _ 3693.3a M.W.D. 0.07 78.40 0.00 354.90 52560 511.eo 420.80 447.80 482.40 528.70 31.2.7 0. OD 3B8fl10 TOTAL 1 +2 517.71 001.03 987.07 1 07.41 1 542.08 3233e 477.32 459.54 407.05 532.51 645.37 1 870.47 7199.49 14 WATER: G GROUND WATER: 3563.36AF • $177.00/AF M.W.D. (NON4NTERRUPTIBL 3598.10 AF' $458.00 1AF SHORT TERM B.S. CREDIT: (359S.40•.90)AF' 5181.00 /AF LONG TERM S.S. CREDIT: (5337.00J583.36)AF' $120.00/A 2.1 POWER: SUB -TOTAL FOR WELLS: 3583.38AF $52.50/AF FOR BOOSTERS: 2419.51 AF • 523.00 /AF SUB -TOTAL = $ 830,714.72 = $ 1,639,821.80 $ 521,074.89 $ 212,838.80 $1,536,824.83 = $ 187,076.40 = $ 55,648.73 $ 242,725.13 0 GRAND -TOTAL $1,779,349.76 0 M E M O R A N D U M Date: December 4, 1995 0 To: Emilio Murga - Director of Public Works From: John C. Leichty, Electrical Maintenance /Supervisor Subject: Major Activity of Traffic Signal and Street Lighting Division, Month of November, 1995. STREET LIGHTING 1. Street lights repaired / relamped. a. Martin Luther king Jr. Boulevard = 9 b. Atlantic Avenue = 8 C. Bullis Road = 1 TRAFFIC SIGNALS a. b. c. d. CHRISTM Signal lamps Atlantic and Long Beach& Long Beach & coordination AS DECORATIONS replaced, lists and inspections = 23 Abbott, ped. signal repair /upgrade. Dorton, side signals hit by truck. Imperial, correct controller clock and problems. a. Provide power and hook up assistance as required. BANNERS OVER CITY STREETS Install and remove. a. Recreation = 2 b. St.Francis Hospital = 2 v70 -MR11 16 11 0 DEPARTMENT OF PUBLJC WORKS JANUARY, 1996 V45-6M M E M O R A N D U M DATE: December 11, 1995 To: Emilio M. Murga, Director of Public Works FROM: Christian Valtierra, PW Administration Supervise SUBJECT: PUBLIC WORKS ADMINISTRATION GOALS AND PROPOSED ACTIVITIES FOR JANUARY, 1996. 1. Meet with Public Works Division heads to review approved FY 95 -96 Budget. 2. Prepare and send out Public Works Monthly report and goals for month of December, 1995. 3. Respond to resident complaints, respond to work orders and urgent calls as they come in. .4. Prepare for and attend Traffic Parking Commission Meeting for December 28, 1995. 5. Continue to work with Downey Volunteer Center to take on volunteers who need to complete Community Service hours; work with HUB Cities to employ three (3) student workers and make available internship opportunities to anyone wishing to learn more about and volunteer in the Public Works Dept; work with the State Department to employ General Relief workers to work in the Department of Public Works. 6. Continue to provide residents with water conservation information and water conservation kits to help them reduce water consumption /costs. 7. Prepare, plan and begin work on City's prop 70 Tree Grant to have trees planted by tree of Life Students. v70 -467 17 0 0 MEMORANDUM Date: December 6, 1995 To Emilio Murga, Director of Public Works From. Frank Garcia, Civil Engineering Assistant Subject: Management Information Systems (M.I.S.) Goals for January, 1996 Establish more automatic information links necessary to manipulate data on LAN using Gateway Communication Server and Windows applications Generate requested accounting reports for Public Works and City Manager 2 Continue with full maintenance process for all computer workstations on City of Lynwood WAN. Maintenance will include full hardware and software diagnostics, physical hardware cleaning, and detailed report on description of analysis. 3 Complete new file server installation with Novel 4 0 NOS upgrade for City of Lynwood's WAN 4 Update and monitor City of Lynwood's World Wide Web Site on Internet 5 Compete Phase II of Timesheet automation process for Public Works. 6 Setup central CD -ROM server for Public Works. F:\WORDFILETW-ENGR\NIISNIS-1001 WP DATE TO: FROM: December 7, 1995 Emilio M. Murga, P.E. Director of Public Works Raul M. Saenz, Civil Engineering Associate/Water 0 SUBJECT: MONTHLY GOALS FOR THE MONTH OF NOVEMBER, 1995 1 2. 3. 4. 5. Install chlorine sensors and alarms on wells 6, 8, and 19. Install safety showers at wells 5, 9, 11, 15 and reservior. Build housing for chlorination system at well no. 19. Install exhaust fans at all wells and reservior. Finalize Preliminary Design Report for new well. 19 i 9 DATE: December 4, 1995 TO: Emilio M. Murga, Director of Public Works FROM: John Leichty, Electrical Maintenance SUBJECT: TRAFFIC SIGNALS AND STREET LIGHTING MAINTENANCE DIVISION GOALS JANUARY., 1996 STREET LIGHTING a. Continue testing, reviewing, listing and expedite service needs to City maintained lighting systems. b. Assist with removals of old systems, in areas of new systems construction. CHRISTMAS DECORATIONS a. Assist with temporary power removals as required. TRAFFIC SIGNALS a. Continue inspections for safe operations, and related maintenance and repair, replacement as required, to City maintained traffic signals. V-o -nmi 20