HomeMy Public PortalAbout10-24-96 TRAFFIC AND PARKING COMMISSION4
L
0
AGENDA ITEMS FOR CONSIDERATION AT
REGULAR MEETING OF THE CITY OF
LYNWOOD TRAFFIC AND PARKING COMMISSION
TO BE HELD ON OCTOBER 24, 1996 AT 6:00 P.M.
OPENING CEREMONI
1.
2.
3.
4.
CALL FOR ORDER - CHAIRMAN RODNEY WHITE
PLEDGE OF ALLEGIANCE
ACKNOWLEDGEMENT OF POSTING
ROLL CALL OF COMMISSIONERS
RODNEY WHITE
RICK SANCHEZ
JOHN BEIMER
MARGARET BRIGHT
Qk
RE EIVED
CI OF LYNWOOD
CITY CLERKS OFFICE
Q; ; 12 19J6
AM PM
p� J��/ �� 718,9e1001�12�1�2i3i A6
/W I.'!t,/ t * l *�� 'o Cr/ GG
WILLIAM CUNNINGHAM
5
APPROVAL OF MINUTES
PUBLIC ORAL COMMUN ICATIONS
SCHEDULED MAT TERS
11
COMMERCIAL VEHICLE PARKING RESTRICTIONS
WEST SIDE OF WRIGHT ROAD BETWEEN
MARTIN LUTHER KING JR. BLVD. AND CORTLAND STREET
REVIEW OF UPCOMING ITEM
INFORMATIONAL ITEMS
7
REVIEW OF TRAFFIC COMMISSIONERS WORKSHOP
COMMISSION ORAL COMMUNIC
T96 -MTG
• •
A REGULAR MEETING OF THE TRAFFIC AND PARKING COMMISSION
OF THE CITY OF LYNWOOD
Minutes of the September 22, 1996 Meeting
CALL TO ORDER
Chairperson Rodney White called the meeting to order at 6:00 P.M.
PLEDGE OF ALLEGIANCE
Commissioner Rick Sanchez lead the Commission in the Pledge of
Allegiance.
ACKNOWLEDGMENT OF POSTING
Ted Semaan acknowledged the posting of the Traffic and Parking
Commission Agenda on September 21, 1996.
ROLL CALL
Chairperson Rodney White, Commissioners John Beimer, Margaret
Bright and Rick Sanchez and William Cunningham were present.
Also present were Ted Semaan and from the Public Works
Department, and Deputy Bryant from the Los Angeles Sheriff's
Department.
APPROVAL OF MINUTES
Commissioner Beimer made the motion to accept the minutes as
written. Commissioner Sanchez seconded the motion and the minutes
were approved as written.
PUBLIC ORAL COMMUNICATION
Ms. Cheryl Pritchett, 4316 Martin Luther King Jr. Boulevard,
addressed the commission in regards to a parking ticket she
received for parking in an alley. Her concern was that there
_are no signs posted, she is a new resident to the city, and was
unaware of the City code. Chairperson White explained
the this Commission could not commit to the outcome of her ticket
but would look into the matter for future reference.
Scheduled Matters
Item #6 Commercial vehicle parking restrictions west side of
Wright Road between Martin Luther King Jr. Boulevard and Cortland
Street.
Mr. Isidro Cortez, who owns a business at 11500 Wright Road was
in attendance to listen to procedure and the out come of item #6.
1
Mr. Willie Outley Jr. who lives at 4305 Lugo Avenue, addressed
the commission, to state his concern for the lack of parking for
truckers not only on Wright Road, but throughout the
City of Lynwood. Mr. Outley showed the commission a map that
indicated an area that could be used for parking of vehicles.
Commission thoroughly discussed the problem, both Mr.. Cortez and
Mr. Outley expressed their concerns. Chairperson White made a
motion to look into matter of private oc;nersh.ip of land to be
made into a parking lot for commercial vehicles.
The Commission agreed to hold taking action on the item until
their October 24, 1996 meeting so that the truckers could find
alternative truck parking sites. The Commission requested that
staff work with the truckers and to provide them assistance in
finding alternative sites, getting them in contact with Caltrans,
and assisting them with the Planning Division, site plan review
process as needed to help them with the parking problem.
REVIEW OF UP COMING ITEMS
Staff reviewed up coming items with Commission.
INFORMATIONAL ITEMS
The Commission was given a brief status of the following CIP's:
1. Public Works Corporate Yard
2. City Hall New Wing
3. Street Lighting Various Locations
4. Alameda Street Improvement
5. Emergency generator
6. Long Beach Blvd. Safety /Beautification
7. City Hall ADA Improvement Project
8. Atlantic Avenue - Water Improvement Project
ITEMS FOR FUTURE CONSIDERATION
The Traffic and Parking Commission reviewed items for future
consideration.
COMMISSIONER ORALS
Commissioner Sanchez - stated his concern that this Commission
was not achieving its goals, that too much time was spent on
issues. Mr. Cunningham explained the foundation principal of
the Commission. Staff also explained the procedures.
Commissioner Beimer - thanked staff for showi_r.g him Public Works
Department. Mr. Beimer also reminded Commission of upcoming
seminar.
Commissioner Cunningham - stated that the white zone in front of
Roosevelt School is badly deteriorating and needs to be
repainted. Also on Long Beach Boulevard, Metro Green Line
statiiion parking area, is being used by people to congregate for
long periods of time. He asked Deputy Bryant if that area could
be monitored around 4:00 p.m. in afternoon.
Commissioner Bright, stated that Abbott School has a parking
problem and when students and being dropped off and picked up
traffic is a problem.
Chairman White - Agreed with Commission Bright that there was a
problem with traffic in front of schools, he also acknowledged a
resident in audience Mr. Alvin Jackson, who lives at 11241 Colyer
who asked to address the commission on the problem of traffic in
front of Washington Elementary School, Deputy Bryant stated that
he would try to get some coverage between 8:15 to 8:30 am in
morning and 2:30pm to 2:40pm in afternoons.
ADJOURNMENT
There being no further business, Commissioner White made a motion
to adjourn the meeting, Commissioner Bright seconded the motion,
and the meeting was adjourned unanimously at 8:05 p.m.
t96 -9mtd
3
DATE: October 24, 1996
TO: THE HONORABLE CHAIRMAN AND MEMBERS OF THE TRAFFIC
AND PARKING COMMISSION
FROM: Emilio M. Murga, Director o Public Works
Ted Semaan, Civil Engineering ?assistant V
SUBJECT: COMMERCIAL VEHICLE PARKING RESTPIC'IIA
WEST SIDE OF WRIGHT ROAD
MARTIN LUTHER KING JR. BLVD. TO COFTLAND STREET
PURPOSE:
To recommend that the Traffic and Parking Commission support
staff's recommendation to eliminate parking on the west side of
Wright Road by installing "COMMERCIAL VEHICLE PARKING
PROHIBITED ", modified R36 signs between Martin Luther King Jr.
Blvd. to Cotland Street.
BACKGROUND:
The Public Works Department received a .request from Traffic and
Parking Commissioners William Cunningham and John Beimer to
investigate the restriction of truck parking on the west side of
Wright Road between Martin Luther King Jr.. Blvd. and
Cortland Street.
On September 26, 1996, the Traffic and Parking 'ommission
reviewed the item and agreed to hold off tah action on the
item until the October 24, 1996, meeting to allow truckers time
to find alternative truck parking sites. The Commission directed
staff to work with the trucks and provide assistance in finding
alternative sites, getting them in contact with Caltrans, and
assisting them with the site plan review process as needed.
ANALYSIS:
Wright Road is 40 feet, curb to curb. In conformance with the
Lynwood Municipal Code, Chapter 7, Section 15 -h. No person shall
park any commercial vehicle, truck, or trailer, with a
manufacturer's gross vehicle weight rating of ten thousand
(10,000) pounds or more on any street within any residential or
business district within the City, exclu ling industrial areas
with business districts as such districts are determined by
Sections 235, 240 and 515 of the Califoinia Vehicle Code, except
while loading or unloading property, cr when Loch vehicle is
parked in connection with and in aid of the performance of a
• •
service to or on property in the block icc whir such vehicle is
parked and for such time as is reasona}..Le necessary to complete
such permitted service, Prohibiting- C=271arcial -ehicle parking on
Truck Routes.
The City is recommending the elimination of co;uaercial vehicle
parking on the west side of Wright Rd. as requested. The
elimination of parking will improve traEf.ic safety and increase
visibility at the intersection of Wright R.c<id and Martin Luther
Ring Jr. Blvd. and for the residents using Ham Park.
Staff has provided information to the taisiness owners who
requested assistance in finding alternative parking .sites.
RECOMMENDATION
It is recommended that the
staff's recommendation to
Wright Road by installing
PROHIBITED ", modified R36
Blvd. and Cotland Street.
Traffic and Park_i_n:j f'cmmission support
eliminate parking on the west side of
"COMMERCIAL VEHI�_LE PARKING
signs between Martin Luther King Jr.
word /tpc /T96 -008
• •
AGENDA ITEMS FOR FUTURE CONSIDERATION BY
THE LYNWOOD TRAFFIC AND PARKING COMMISSION
(Prepared 10/21/96)
I. Presently Under Review
A. Commercial Vehicle Parking Restrictions
west side of Wright Road between
Martin Luther King Jr. Blvd and Cortland Street.
B. Speed Hump Installation Pilot Program
- Palm Avenue - Bullis Road to Muriel Avenue
- Bradfield Avenue - Carlin Avenue to Palm Avenue
- Muriel Avenue - Carlin Avenue to Palm Avenue.
C. Intersection Improvement Study - City wide.
D. Pedestrian Signal and Striping Installation, I -105
Eastbound On /Off Ramp at Long Beach Boulevard.
E. School Area Safety Study - City Wide.
II. For Future Consideration
A. Review Traffic Safety Evaluation, Enforcement. and
Engineering analysis by Institute of
Transportation Studies.
B. Proposed alley vacations.
C. Review pedestrian /traffic safety oil Long Beach
Boulevard from Martin Luther King Boulevard to
Tweedy Boulevard.
D. Review traffic safety on Long Beach Boulevard and
Los Flores Boulevard.
E. Review protected left turn phasing at traffic
signals citywide.
F. No left turn limitations onto Imperial Hwy from
Norton Avenue.
T96 -FUTR
0 0
r�
Content
Monthly Repor
SEPTEMBER
Capital Improvements Projects . . . . . . .
Land Development Report . . . . . . . . . .
Public Works Administration . . . . . . . .
Complaint Summary . . . . . . . . . . . . .
Management Information System (MIS) . . . .
Water Maintenance . . . . . . . . . . . . .
Traffic Signals /Street Lighting . . . . . .
Goals
November, 1996
Public Works Administration . . .
Management Information System. . .
Water Division . . . . . . . . .
Traffic Signals /Street Lighting .
E
1 -3
4
5 -6
7
8 -9
10 -14
15
. . . . . . . . . 16
. . . . . . . . .17
18
. . . . . . . . . 19
v7o -107
•
E
CAPITAL IMPROVEMENT PROJECT
September, 1996
1.
Public Works Corporate Yard
Project Description:
Construction of City facilities including completion of
Building "B" (Office & Warehouse), and construction of a
portion of building "D" (garage), enclosed, City Vehicle
Parking at the Public Works Corporate Ya: -d at 11750 Alameda.
Budget: Under review.
Project Status:
PROJECT IS PRESENTLY ON HOLD.
2. CITY HALL NEW WING (OLD SHERIFF STATION REMODELING)
PROJECT DESCRIPTION
Old Sheriff's Station building will be remodeled as a new
wing to the City Hall, to be used by Public Works and
Community Development Departments in the future. The work
consists of architectural, mechanical, electrical,, and
structural design followed by related construction work.
Budget: $ Under Review
PROJECT STATUS
Remodeling began in the building that had been occupied by
Sheriff's Department, electrical was repaired, air
conditioning units were installed, walls were painted,
carpet laid, created new conference room with glass
partitions.
1
9
3
7
EMERGENCY GENERATOR
PROJECT DESCRIPTION
The project consists of purchase and installation of an
emergency generator to serve as back up power for Well P,8
and reservoir boosters.
Budget: $130,000
PROJECT STATUS
Selection of type and size of generator has been completed.
Preparation of specifications for purchase of generator to
be reviewed by electrical engineer. Preliminary design for
installation phase is in process.
LONG BEACH BOULEVARD SAFETY /BEAUTIFI
PROJECT DESCRIPTION
The project consists of landscaping, hare. scaping decorative
lights and entry markers on Long -Beach Boulevard median
islands from Josephine to Mulford Avenue. Also addition ci
two marked, signalized cross walks by Caltr.ans are a part of
the project.
Budget: $ 292,000
PROJECT STATUS
5
All ornamental street light footing have been completed.
seventy (70 %) percent of the ornamental fence footing has
been constructed. Two entry marker foundations, one
planter around entry markers and four (4) planter areas have
been erected and constructed.
Students placed moisture barriers and 1 1/2 electrical
conduits at west curb in the median island from I -105
Freeway to Josephine Street.
CITY HALL ADA IMPROVEMENT PROJECT
PROJECT DESCRIPTION
This project will consist of removal of all barriers
financially feasible, to make the City Hall building ADA
accessible. Project to include restrooms, doors and
hardware, ramps, stairs, drinking fountain and all other
building items.
2
Budget: $ 3660.
PROJECT STATUS
Preliminary design and drawings have bc:cn completed and
final design is in process.
6. ATLANTIC AVENUE - Water Improvement Project
PROJECT DESCRIPTION:
The project consists of the installation, of a 12" PVC water
main on Atlantic Avenue from Brewester to Martin Luther Ring
Jr. Boulevard. The installation of wat( services from the
new water main to all the buildings on bcth sides of
Atlantic Avenue. The existing adjacent water mains will be
connected to the new main line.
PROJECT STATUS
The new system has been chlorinated and boring services
are being done to install 2" copper pip(-s. The new system
will also be de- chlorinateded and three samples of water
will be sent to the lab. They will be ccntinuning the
services for the main line to the side1A'6Lk.
V96 -sep
3
• 0
Date: OCTOBER 21, 1996
Subject: ENGINEERING DIVISION, LAND DEVELOPMENT MONTFLY REPORT
• Permits:
• Inspections:
• Plan Checks:
• Site Plans:
• Planning Commission
Meeting:
• Traffic & Parking
Commission meeting:
❑ Underground Service
Alert Markings (USA):
• Flood Zone Information:
• Traffic Signals:
V96 -074
17 Issued
18 Performed
5 Plan check processed
7 Reviewed
1 Tuesday, September. 10, 1996
1 Thursday, September 26, 1996"
40 Locations marked
4 Requests processed
52 Intersections
inspected once each week
0
• i
M E M O R A N D U M
DATE: October 21, 1996
TO: Emilio M. Murga, Director of Public Works
FROM: Christian Valtierra, Public Works Supervisor
Ted Semaan, Civil Engineering Assistant
SUBJECT: Public Works Administrative Activities
for September, 1996
1. General Administrative
a. Submitted August, 1996 Complaint Summary. total of
(15), fifthteen complaints were received for the
Department of Public Works. All complaints were
addressed and routed to the proper division for
resolving.
b. Continued to work with HUB Cities, to provide :cork
experience to various HUB student workers in various
Public Works Divisions.
C. Worked with the Engineering Division to continue the
Youth Training Program that consists of the hiring of
thirteen (13) local youth hired to work water
modifications for Atlantic Avenue including installation
of new water services, pull boxes, fire hydrant, various
and new water main lines installations.
d. Prepared and sent out Public Works Monthly Report for
August, 1996.
e. Assisted in preparation of various City Council Items.
f. Assisted the MIS Division, with the LAN Server Upgrade.
g. Assisted with the kick off for the Community 10,000
Marrow Drive on Friday September 27, 1996.
h. Staff assisted County by helping staff the L.A. County
Booth at the Pomona Fair to help educate visitors about
the NPDES program.
5
0 •
General.Office tasks:
The Public Works Administration is responsible for providing
general support to all other Public Works Divisions,. This
includes complaint processing, time- sieets, fnda' ling of parcel and
utility maps, typing of Council Items and Resolutions, filing and
handling over the counter information.
v96 -078
MONTHLY COMPLAINT STATUS REFORT
MONTH: September DATE: October Zd, 1996
YEAR: 1996 NUMBER OF COMPLAINTS:
-------- - - - - --
--------------
Complaint Type
-------- - - - ---
OTHER COMPLAINTS
SCE STREET LIGHTS
-----------------
-----------------
Incoming %
----------- - - - - --
4 26.67
7 46.67
SIDEWALK CONSTRUCTN 2 13.33
TRAFFIC SIGNALS 1 6.67
TRAFFIC /PARKING 1 6.67
-----------------------------------------
Total: 15 100.00
15
7
MEMORANDUM
Date: October 18th, 1996
To Emilio M. Murga, Director of Public Works
From. Frank Garcia, MIS Administrator
Subject: Management Information Systems (M.I.S )
Monthly Report For September, 1996
1 Continue with plan to segment Public Works Water Yard and City Hall LAN connection
via additional network interface adapter
2. Complete new Ethernet cable connection installations at Cit Hall Building for City
Manager, Finance and Human Resources LAN connections
3 Start new computer setup at Cable Studio with new color deslget printer and desktop
publishing application installations.
4 Complete 90% of computer connection for Public Works Project 'Manager at new City Hall
Building.
5 Move requested Public Works Water Yard computer system with Gate controlling device.
6. Move requested laser printer for Facilities Maintenance.
7 Complete computer system upgrade and resolve hard drive error f v Community
Development Project Manager workstation.
8 Install accounting program for Windows upgrade at Recreal ion v"orkstations
9 Replace defective mouse at Public Works front receptionist desk.
10 Resolve SCSI hard drive boot error on Lynwood Network File Seaver computer system.
I 1 Start research for new Internet provider for Cable Studio 14DN Internet access.
N
• 0
12. Continue with requested complaint database modificatulus Joi City \iarai and Public
Works.
13 Replace bad monitor and configure graphics video displa} ulyd Im Cable Studio
workstation.
14 Setup new laser printer for City Manager central printing st;i lien
15 Diagnose network printer problem on LAN
16 Upgrade sports program for Recreation
17 Resolve Monitor problem at Code Enforcement computer v� orkstahon
18 Resolve network error induced by outside consultants at Coinrnwnty Development
workstations.
19 Resolve Complaint Database error and Dataquick modem access problem for Code
Enforcement.
20 Setup Macintosh computer system with two desktop program installations and start
purchasing process on scanner for Public Works Project Manager
21 Continue with computer upgrade at Ham Park for Recreation.
22. Complete computer upgrade and LAN connection for Planning Manager workstation.
23 Setup new laser printer at Bateman Hall workstation
24 Continue with Internet access project via LAN/WAN protocol
25 Connect Housing Manager new computer system to LAN for Community Development,
26 Swap requested computer systems for City Manager
27 Continued maintenance and users support service for all departments
System statistics, down -time for September 1996 Total I ` min
H' \WORDFILE \PW- ENGRMSMIIS -0011. 9
WATER YEAR PROJECTION 1996 -1997
SEASONAL STORAGE FROM OCTOBER 1, 1996 TO APRIL 30, 1997
1 .0 ACTUAL
PROJECTED
1./ WATER
H
0
GROUND WATER.
3706.02AF * $177.00/AF
M.W.D. (NON- INTERRUPTIBLE) .
3578.20AF * $461.00/AF
SHORT TERM S. S. CREDIT.
2693.40AF * $162.00/AF
LONG TERM S. S. CREDIT.
(5337.00 - 3706.02) * $120.00 /AF
SUB -TOTAL
2.1 POWER.
FOR WELLS.
3706.02AF *$52.50/AF
FOR BOOSTERS.
2419.51AF * $23.00 1AF
SUB -TOTAL
= $
Jul -96
Aug-96
Sep-96
Oct -96
Nov -96
Dec -96
Jan -97
Feb -97
Mar -97
I A r -97
I Ma -97
I Jun -97
TOTAL
LOCAL 1
682.60
867.94
678.47
2.81
15.46
4.08
6.33
4.80
7.56
24.28
612.66
799.03
3706.02
M.W.D. 2
0.00
0.00
0.10
554.60
526.60
502.90
496.00
472.00
495.70
530.30
0.00
0.00
3578.20
OTAL 1+
682.60
867.94
678.57
55741
542.06
506.98
502.33
476.80
503.26
1 554.58
612.66
799.03
7284.22
1./ WATER
H
0
GROUND WATER.
3706.02AF * $177.00/AF
M.W.D. (NON- INTERRUPTIBLE) .
3578.20AF * $461.00/AF
SHORT TERM S. S. CREDIT.
2693.40AF * $162.00/AF
LONG TERM S. S. CREDIT.
(5337.00 - 3706.02) * $120.00 /AF
SUB -TOTAL
2.1 POWER.
FOR WELLS.
3706.02AF *$52.50/AF
FOR BOOSTERS.
2419.51AF * $23.00 1AF
SUB -TOTAL
= $
655,965.54
= $
1,649,550.20
436,330.80
195,717.60
$1,673,467.34
= $ 194,566.05
_ $ 55,648.73
$250,21478
GRAND-TOTAL $1,923,682.12
•
J
0
MONTHLY PRODUCTION REPORT
PUBLIC WORKS/WATER DIVISION
SEPTEMBER, 1996
TO: EMILIO M. MURGA
FROM. RAUL M. SAENZ
Water Turn Ons _ f
Water Turn Offs
Water Meter Read
Water Meter Rereads
Sewer Backups
Pumps Checked 7
Leaks Checked
(Per Customer Complaint)
Water Main Leaks
Locations:
Red Tags Posted
Lock/Pull Meters
Water Meters Replaced
General Complaints
F[\Word\MonOh D
11
WATER PRODUCTION AND IMPORT SUMMARY FOR 1996 -1997
r1
Li
WELL #
JUL
AUG
SEP
U -T -D TOTAL
5
43.86
71.98
50.54
166.38
8
36.42
49.91
39.31
125.64
8
92.65
- 111.18
103.70
307.53
r 9
122.93
154.91
102.14
379.98
N
11
94.99
98.50
98.90
292.39
15
31 48
45.36
2.98
79.82
19
260.27
336.10
280.90
877.27 •
LOCAL (1)
682.60
867.94
678.47
2229.01
M.W.D (2)
0.00
0.00
0.10
0.10
TOTAL (1 +2)
682.60
867.94
678.57
222911
F-
w
U
•
SEPTEMBER
1996: WATER PRODUCTION
300-.
,
25p
200
ui
4
150
100-1
5
6 8
9 11 15 19 M.W.D.
WELL
U
•
/
Ȥ
l \
>.:
.wa:
�
�
(o
/
Ȥ
l \
>.:
.wa:
�
�
•
M E M O R A N D U M
Date: SEPTEMBER 2, 1996
To: Emilio Murga - Director of Public Woks
From: John C. Leichty, Electrical Maintenance /Supervisor
Subject: Major Activity of Traffic Signal and Street Lighting
Division, Month of September, 1996.
TRAFFIC SIGNALS
1. 1. Signal lamps replaced = 18
2. Pedestrian signal repairs /upgraded = 2
3. Checked operations of intersections out, during east
side of City "Power Outage ".
STREET LIGHTING
1. Street Lights, relamped, repaired = 21
2. Complete pole and light replaced after knockdown ,
4619 Carlin Avenue.
3. Completed and turned on, street light project work,
areas if Atlantic & Pendleton, Atlantic & Abbott and
area of Alameda & 103rd. Street.
4. Repaired controls and restores lighting under the spruce
Street and I -105 Freeway underpass.
5. Work done to provide power for Long Beach Medians
Improvements.
OTHER
1. Completed the removals of 75 Pole banners.
2. Install (2) street banners for were installed for
Project 10,000 ".
3. Alameda yard, front gate wheel repair, and maintenance
v96 -SEPA
15
• 1 •
DEPARTMENT OF PUBLIC �\ ORKS
GOALS
FOR
NOVEMBER , 1 996
M E M O R A N D U M
DATE: October 21, 1996
To:• Emilio M. Murga, Director of Public Works
FROM: Christian Valtierra, PW Administration Supervisor
Ted Semaan, Civil Engineering Assistant
SUBJECT: PUBLIC WORKS ADMINISTRATION GOALS AND PROPOSED
ACTIVITIES FOR November, 1996.
1. Meet with Public Works Division heads to review approved
FY 96 -97 Budget.
2. Prepare and send out Public Works Monthly report and goals
for month of October, 1996.
3. Respond to resident complaints, respond to work orders and
urgent calls as they come in.
4. Prepare for and attend Traffic Parking Commission Meeting
for November 28, 1996.
5. Prepare for and attend Planning Commission meeting for
November 8,, 1996.
6. Continue to work with HUB Cities to employ student workers
and make available internship opportunities to anyone
wishing to learn more about and volunteer in the Public
Works Dept; work with the State Department to employ General
Relief workers to work in the Department of Public Tn'orks.
v96 -079
16
• 0
MEMORANDUM
Date: October 18th, 1996
To Emilio Murga, Director of Public Works
From: Frank Garcia, MIS Administrator
Subject: Management Information Systems (M.I.S.)
Goals for November, 1996
I Continue with additional Ethernet connections throughout Arcnet topology side of City of
Lynwood's LAN/WAM
2. Convert WordStar & WordPerfect LAN usage to Word for Windows.
3 Setup Mail Gateway Server for cc:Mail and Internet messaLing exchange.
4 Setup various computer workstations on Ethernet topology with Internet access via City of
Lynwood LAN
5 Connect additional Novel Server at Public Works Corporate Water Yard.
6 Setup and connect central CD -ROM server to LAN
7 Continue with Accounting/Excel data transfer system modifications
n \WORDFILE\PW- ENGRMIS\.MIS -1011
17
•
.�
City o f LYNWOOD CM0
(-4 City Meeting ChAeagen
..,I
11330 BULLIS ROAD I ' I
LYNWOOD, CALIFORNIA 90262
(310) 603 -0220
DATE:
TO:
FROM:
SUBJECT
1.
2.
3.
4.
OCTOBER 15, 1996
EIVIILIO MURGA, DIRECTOR OF PUBLIC WORKS -
RAUL M. SAENZ, CIVIL ENGINEERING ASSOCIATE /WATER
MONTHLY GOALS FOR OCTOBER, 1996
Finalize agreement for engineering services for design and construction
management for Well No. 21 manganese treatment plant.
Complete preliminary study for reclaimed water pipeline to irrigate I -105, Civic
Center, and Dymally Park.
Install new chlorination systems at Wells 6, 3 and 19.
Restructure backflow program to have all testing and repairs done within a one
-month period.
18
! !
Date: October 2, 1996
To: Emilio M. Murga, Asst. City Manager, Environmen-<.'
Services
From John C. Leichty, Electrical Maintenance Super,risc;:
SUBJECT: TRAFFIC SIGNALS STREET LIGHTNING MAI[7TENANCE DIV]SION
GOALS FOR THE MONTH OF NOVEMBER, 1996.
TRAFFIC SIGNALS
1. City wide inspections and operations checks.
2. Continue visibility upgrades and relamps.
STREET LIGHTING
1. Continue hours of darkness surveys, list problems and
expedite repairs and relamping.
2. Annual preparation for the time change, and up coming
holiday season of years end.
19