HomeMy Public PortalAbout06-0098 Elk Property Development LLCDATE ISSUED: 02 -23 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIR DECK RAILINGS
1213B BAY ST
ELK PROPERTY DEVELOPMENT LLC
1008 HWY 80 EAST
TYBEE ISLAND GA 313282947
ELK PROPERTY DEVELOPMENT LLC
1008 HWY 80 EAST
TYBEE ISLAND GA 313282947
P
$ 40.00
$1,000.00
PERMIT #: 060098
TOTAL BALANCE DUE: $ 40.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Da-005)?
cation: I
NAME
PIN #
ADDRESS
Owner
L Lk P
n 144,
P t� ` )'`'C Z qLfj
1
�-'��
Architect
or/Engineer
Iv
�%
7
uilding
j c..� , \
/ y Q`�L �'
J
Urtx
(Check all t a a ly)
❑ New Construction
❑ Duplex
❑ Residential
❑ Footprint Changes
❑ Other
Estimated cost of Construction: $
❑ Renovation
❑ Single Family
❑ Commercial
a Repairs
(nN ?)/7"--. yo ?a?
❑ Minor Addition
❑ Substantial Addition
❑ Multi - Family
❑ Demolition
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: E- p 4 /1 ./4J R ' '
a I I I &)
Remarks: 7
Ok) beciec
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.)
Setbacks: Front
# Bedrooms # Bathrooms
Living space (total sq. ft.)
With culvert? With swale?
Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by at
by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date:
Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
NFIP Flood Zone
Existing
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
LAIS )J�E
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signatur Date
_
ad.",graissik rev
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
/5-‘
TOTAL _Q_
iEQIA
Coastal Resources Division
January 23, 2006
Louis W. Kietzman
Elk Property Development LLC
PO Box 2947
Tybee Island, Georgia 31328
7
RE: Shore Protection Committee Permit #356, Modification of an existing private dune
crosswalk for the exclusive use of property owners of Lots 5A, 5B, 7A, 8A, 8B and 9A and their
subdivisions in a private 20' Access Utility Easement located on Lot 9 -A, a resubdivision of
Lots 5, 7, 8, 9 of Beach Block #4, Sand Point Run, Bay Ward, Atlantic Ocean, Tybee Island,
Chatham County, Georgia
Dear Mr. Kietzman,
The Shore Protection Committee considered and approved permit # 356 referenced above on
January 23, 2006 under the Shore Protection Act O.C.G.A. 12 -5 -230 et. seq. The permit placard
and permit conditions are attached to this letter. All decision documents (attached), as well as all
other plans, documents and materials submitted during the application process become terms of
this permit and are now enforceable conditions. You may begin construction 30 days
following permit issuance, provided there is no legal appeal of this permit, you have all
other necessary federal, state and local authorizations and you have met all of the standard
and special conditions as required by this permit.
Permitted Project Description:
Modification, construction and maintenance of an existing private dune crosswalk. Access to the
permitted crosswalk will be limited to property owners of Lots 5A, 5B, 7A, 8A, 8B and 9A
including existing and future subdivisions of those parcels and their guests. The construction and
maintenance includes modifying the existing crosswalk by adding handrails, widening the
crosswalk to four feet and place a "Y ", or new arm, to be built within the access utility easement.
The new section of crosswalk will be approximately 50 feet long with stairs landing at the toe of
the most seaward dune, five feet wide and elevated three feet above the existing sand dunes, with
handrails Standard and special conditions apply to this permit.
Permit and Construction Placards:
Enclosed is the permit placard to be posted at the work site (within 24 hours) for the duration of
the construction activity. Please note that you will also need to notify the Department no
later than 15 days prior to the start of project construction to obtain a separate
construction placard. DNR staff will arrange a site visit to confirm the project footprint before
construction begins and to initial the construction placard at the identified intervals during, the
project. This placard will also need to be posted at the site during construction.
Georgia Department of Natural Resources • Coastal Resources Division
One Conservation Way • Brunswick, Georgia 31520
TEL: (912) 264 -7218 • FAX: (912) 262 -3143 • WFB. httn //rrrl dnr ctato o-a „c
Kietzman Elk Property Development, LLC
SPA # 356 Final Approval
January 23, 2006
Post Construction Requirements: Compliance Certification and File Maintenance
Also enclosed is a Certification of Compliance that must be submitted to us within 30 days
following completion of the permitted activity. Department staff will assess compliance and
provide you with a written verification of project completion and compliance.
This letter and attachments are to be held by you for your files and for inspection by any
authorized persons. The expiration date for the permit is five (5) years from the date of
issuance. However, no construction may commence within the area of jurisdiction of the Act
until the expiration of thirty (30) days following the date of issuance, provided there is no legal
appeal of this permit, you have all other necessary federal, state and local authorizations and you
have met all of the standard and special conditions as required by this permit.
Conveyance of Ownership Interest:
If you as the permit holder sell, lease, rent, or otherwise convey the land or any portion of
the land for which the permit was issued, you must notify the Department within 30 days of
this transfer or conveyance. The permit shall continue in force in favor of the new owner,
lessee, tenant, or other assignee so long as there is no change in the use of the land as set forth in
the original application. The Department will transfer the permit to the new owner with all of the
original terms and conditions.
We ask that you carefully read through this document and attachments and comply with the
terms and conditions of this permit. Feel free to contact me if you need clarification of any of
these conditions or for assistance with this project.
Sincerely,
--,
Brad Gane
Ecological Services Section
Enclosures: SPA Permit # 356 and Permit Conditions, Compliance Certificate
cc with approved permit drawings:
Jeff Kramer, Diversified Construction
PO Box 1379
Tybee Island, Georgia 31328
Dee Anderson
City of Tybee Planning and Zoning
Kietzman Elk Property Development, LLC
SPA # 356 Final Approval
January 23, 2006
Chuck Bargeron, City of Tybee
GiA
Coastal Resources Division
Shore Protection Committee Permit #356
Final Conditions
January 23, 2006
Louis W. Kietzman
Elk Property Development LLC
PO Box 2947
Tybee Island, Georgia 31328
Project Location: A private 20' Access Utility Easement located on Lot 9 -A, a resubdivision of
Lots 5, 7, 8, 9 of Beach Block #4, Sand Point Run, Bay Ward, Atlantic Ocean, Tybee Island,
Chatham County, Georgia.
Project Description: Modification, construction and maintenance of an existing private dune
crosswalk. Access to the permitted crosswalk will be limited to property owners of Lots 5A, 5B,
7A, 8A, 8B and 9A including existing and future subdivisions of those parcels and their guests.
The construction and maintenance includes modifying the existing crosswalk by adding
handrails, widening the crosswalk to four feet and place a "Y ", or new arm, to be built within the
access utility easement. The new section of crosswalk will be approximately 50 feet long with
stairs landing at the toe of the most seaward dune, five feet wide and elevated three feet above
the existing sand dunes, with handrails.
Standard and special conditions apply to this permit.
SHORE PROTECTION ACT O.C.G.A. § 12 -5 -230
STANDARD PERMIT CONDITIONS
1. The project must comply, as applicable, for areas permitted herein, with all other Federal,
State, and local statutes, ordinances, and regulations, and the applicant must obtain all
licenses and permits prior to commencement of construction.
2. This permit does not resolve actual or potential disputes regarding ownership of or rights in
or over the property upon which the subject project is proposed, and shall not be construed as
recognizing or denying any such rights or interests.
3. All plans, documents, and materials contained in this permit application, required by the
Shore Protection Act O.C.G.A. 12 -5 -230 et. seq. are a part of this permit and conformance to
such plans, documents, and materials are a condition of this permit. No change or deviation
from these plans, documents, and materials shall be permitted without prior notification and
approval by the Department or Committee.
Georgia Department of Natural Resources • Coastal Resources Division
One Conservation Way • Brunswick, Georgia 31520
TEL: (912) 264 -7218 • FAX. (9171 7A7- '314'1 • WPP. - -
Kietzman, Elk Property Development, LLC
SPA #356
Final Permit Conditions
January 23, 2006
4. No further encroachment or construction shall take place within State jurisdiction, except as
permitted by the Shore Protection Committee. Any modification of the plans or structure in
the jurisdictional area must be reviewed and approved by the Department prior to
construction.
5. A construction placard will be required to be obtained from the Department up to 30 days
prior to the start of project construction and must be posted at the site. This placard will
include certain steps in the construction of the permitted project that must be approved by the
Department prior to construction.
6. The exact location and configuration of this project must be reviewed onsite and approved by
Department staff immediately prior to beginning construction. Minor changes to the location
may be allowed or required in areas that have eroded or accreted subsequent to the original
jurisdictional determination.
7. No construction materials may be disposed of in the jurisdictional area of the Shore
Protection Act.
8. Any incidental impacts associated with the construction of this project must be rectified by
restoring areas to their pre - construction topographic and vegetative states.
9. The public shall maintain rights of ingress and egress on the foreshore beach area seaward of
the ordinary high water mark.
10. If the permitted improvements are damaged, fall into disrepair, become dilapidated, are not
meeting their expected usefulness, or are not maintained at a serviceable level, then it is the
responsibility of the owner to remove the improvements. A new permit will be required to
retain and repair the structure, improvement or asset if it loses its structural integrity and is
no longer serviceable.
11. The Shore Protection Committee is not bound in the future to protect any asset or
improvements authorized by the permit.
12. The permit must be posted onsite within twenty -four (24) hours of beginning construction.
13. A copy of the above conditions must be supplied to the person in charge of construction.
SHORE PROTECTION ACT OFFICIAL CODE OF GEORGIA ANNOTATED
(O.C.G.A.) § 12 -5 -230
STANDARD PERMIT CONDITIONS FOR DUNE CROSSWALKS
Only one crosswalk structure shall be allowed on a parcel. In considering the design and routing
of a crosswalk, the shortest route over the lowest area of the dunes shall be plotted to minimize
impacts to the sand sharing system. For new construction, no decks or viewing platforms will be
approved in the jurisdictional area. Previously permitted and grandfathered structures may be
maintained provided they are serviceable. Additionally, the applicant requesting the structure
must own 100% of the private lands through which the structure crosses or have the express
written permission of the owner.
The following standard conditions shall apply to dune crosswalks:
Kietzman, Elk Property Development, LLC
SPA #356
Final Permit Conditions
January 23, 2006
1. The height of the structure shall be at least 36" above the grade of the sand dune and
the width shall be no greater than 6' as measured from the outside posts, to allow for
sand movement or accretion in the dynamic dune field.
2. The structure shall begin at the toe of the landward most dune.
3. Heavy equipment is prohibited in the Shore Protection Act jurisdiction. This project
must be constructed using hand tools.
4. Clearing and grading of dunes is not authorized in conjunction with the construction
of this project; stockpiling of materials in the dunes is prohibited.
5. Vegetation may be cleared only for the width of the permitted structure. The
maintenance trimming of jurisdictional vegetation will only be allowed within 6" of
the sides of the structure and 7' high over the structure.
6. No motorized vehicles are permitted on the crosswalk structure, except for motorized
wheelchairs for handicapped persons.
7. Any sand needed to restore the site to pre - project vegetated and topographic
conditions, or for backfilling, must be beach quality and obtained from an upland
source and not from the beach.
SPECIAL CONDITIONS:
1. The length and exact landing of the crosswalk on the seaward side of the dune will be
determined by DNR staff immediately prior to construction.
2. If erosion, accretion or artificial alterations such as renourishment of the dynamic dune
area causes the crosswalk to not function for its intended purpose, the crosswalk must be
re- designed or removed.
3. Peimittee must provide a post - construction survey of subject parcel depicting the dune
crosswalk to the Department of Natural Resources within 30 days following project
completion. The survey must be performed by a surveyor registered in the State of
Georgia and must comply with appropriate professional industry standards.
Coastal Resources Division
CERTIFICATION OF COMPLIANCE
FOR THE CONSTRUCTION AND MAINTENANCE
OF PROJECTS PERMITTED UNDER
THE SHORE PROTECTION ACT
PERMITTEE:
Name: Louis Kietzman, Elk Property Development, LLC
Address: PO Box 2947
City or Town: Tybee Island, Georgia
Waterway or Island: Atlantic Ocean
County: Chatham
Permit Number: SPA # 356
Within 30 days of completion of the activity authorized by this permit, sign this
certification and return it to the Habitat Management Program of the Ecological
Section at the address listed below.
Please note that your permitted activity is subject to compliance inspections by DNR
representatives before and after completion of the project. If you fail to comply with
the permit terms and conditions it may be subject to suspension, modification, or
revocation.
Permittee Statement:
"I hereby certify that the work authorized by the above referenced permit has been
completed in accordance with the terms and conditions of the said permit."
Signature of Permittee:
Date:
Georgia Department of Natural Resources • Coastal Resources Division
One Conservation Way • Brunswick, Georgia 31520
TEL: (912) 264 -7218 • FAX. (912) 7h7 -'1148 • WFR• hi-try / /ctrl Ant ci-mf „c
3y:
STATE OF GEORGIA
REVOCABLE LICENSE REQUEST
APPLICANT'S NAME (S): [_tieriS 14i-E42.At I/\)
Pb. ox as4-z
ADDRESS: 3 C SJ ..
(Street)
COUNTY: CAN j 1•I(�ry�,
SUSAN SHIPMAN, DIRECTOR
Georgia Department of Natural Resources
Coastal Resources Division
One Conservation Way
Brunswick, Georgia 31520 -8687
Dear Ms. Shipman:
(City) (State) (Zip)
WATERWAY: JPKIA.N (21064._.
DATE: 6 l 22]
I am making application for a permit with the U.S. Department of the Army, Corps of Engineers, Savannah District. I
understand that the issuance of such a permit will not relieve me of the obligation to obtain authorization from the State of Georgia
since the proposed project would constitute an encroachment on the beds of tidewaters which are State -owned property. Accordingly,
I hereby request that I be granted a revocable license from the State of Georgia. Attached hereto and made a part of this request is a
copy of the plans and description of the project that will be the subject of such a license.
I understand that if permission from the State is granted, it will be a revocable license and will not constitute a license
coupled with an interest. I further acknowledge that such a license would relate only to the property interests of the State and would
not obviate the necessity of obtaining any other State license, permit or authorization required by State law.
I recognize that I waive my right of expectation of privacy and I do not have the permission of the State of Georgia to
proceed with such project until Commissioner Barrett has signed a copy of this request.
Attachment
By:
By:
Si ely,
(Applicant), title if a: pli ble
(Applicant), title if applicable
*********** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
The State of Georgia hereby grants you a revocable license not coupled with an interest as provided in your request. This area may
now or in the future be utilized by boats employing power drawn nets under the provisions for commercial or sport bait shrimping.
In its occupancy and use of the premises, licensee shall not discriminate against any person on the basis of race, gender, color, national
origin, religion, age, or disability. This covenant by licensee may be enforced by termination of this license, by injunction, and by any
other remedy available at law to the Department. The project proposed for this license must be completed within 5 years of the date of
issuance of the license. Otherwise, action will be initiated to revoke the license.
STATE OF GEORGIA
Office of the Governor
Date:
For: No 1 Holcomb
Commissioner -DNR
N l5 Z(9-0S�
Revised June 2003
1 JUN Z ;i 2005
BY:
PRIVACY
GATE
JLAG .#2 TOE SEAWARD D
---11 AT SEAWARD
ROD
STEPS TO END ,
,
20' ACCESS & UITILTY EASEMENT
12" CEDA
12" CEDAR
.6"
•6>C'EDAR
• 41.AG #2 SPA
OT 9—A
PRB 3-P 38
LOT 2
SMO 17-5 52
— 2OO5
N WALK
-------- ----------------- - ------ ---------------------------- -
OLD DECK OUTLINE'''. - — ---------------
EXIESTING WALK TO BE
INCREASED IN WITH TO
4'—O AND HAND RAILS ADDED
S 23°24'00nE 188.55'
4
LOT
524217-5 5i,,
•
'„,•bS3
32 •
4
170c9 1;"
„E35.
-,5!‘
t FLAG #1 TOE SEAWARD DUNE,
N 23°84'00.'W 178.:85'
.4°
..........
,FLAgio SPA
frFLAG #Z.-LANDWARD TOE DUNE
5/6" RBF
+ FLAG #1 TOE LANDWARD DUNE 5/8" RBF
01
OS LOT 2
SUE 17-S 52
OS
00
1,7
OS
c0Co
OS
a SITE LOCATION OF CROSSOVER
•—• SEALE
REPRODUCTION IN MOLE OR IN
P2155 15 PROMOTED %MOUE
MITTEN AUTHORIZAVON. ORAWNGS
ARE TFE PREPISRTY OF DIVERSIFIED
DESIGNS P.C.
i$01 A
rf"f. rt•
Georgia Shore Protection Committee
PERMIT
Issued Pursuant to 0.C.G.A. 12 -5 -230
To: Louis Kietzman, Elk Property Development, LLC
Location: A private 20' Access Utility Easement located on Lot 9 -A, a resubdivision of Lots 5, 7, 8, 9 of Beach Block #4, Sand
Point Run, Bay Ward, Atlantic Ocean, Tybee Island, Chatham County, Georgia.
For: Modification, construction and maintenance of an existing private dune crosswalk. Access to the permitted crosswalk will be
limited to property owners of Lots 5A, 5B, 7A, 8A, 8B and 9A including existing and future subdivisions of those parcels and
their guests. The construction and maintenance includes modifying the existing crosswalk by adding handrails, widening the
crosswalk to four feet and place a "Y ", or new arm, to be built within the access utility easement. The new section of crosswalk
will be approximately 50 feet long with stairs landing at the toe of the most seaward dune, five feet wide and elevated three feet
above the existing sand dunes, with handrails. Standard and Special Conditions apply to this permit.
Date: January 23, 2006
Expiration Date: January 23, 2011
Permit Number: 356
Authorized By:
For further information, please contact the DNR Coastal Resources Division at (912) 264 -7218
Gc'EQIA
Department of Natural Resources
Coastal Resources Division