HomeMy Public PortalAbout06-0101 Green_1of2Inspection Report
City of Tybee Island
403 Butler Avenue
P.O. Box 2 749
Tybee Island, GA 31328
Phone: 786-4573 extensions 104, 107, or 114
Fax: 786 -9539
Permit No.)(i: - Di 0I Date Requested: j. - 0 - 3 b
Owner's Name: q r Pit-x-1 Date Weeded:
Gen, Contractor: Subcontractor:
Contact Number: 6 `, (y vy) Gk ►''1
Location:
CAS _ c43Z
4 0
Date of Inspection: 3 /Fllo Type of Inspection: -I, e k
Comments: 7PAy-
Inspector:
Time of Inspection:
( SS S\
DATE ISSUED: 02 -24 -2006
WORK DESCRIPTION:
WORK LOCATION:
OWNER NAME
ADDRESS
CITY, ST, ZIP
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEE'S CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
ENLARGE DECK
4A CENTER TER
THOMAS GREEN
138 CARDINAL RD
SAVANNAH GA 31406
OMAN CONSTRUCTORS INC
918 ABERCORN
SAVANNAH GA 31401
P
$ 51.00
$6,086.00
PERMIT #: 060101
TOTAL BALANCE DUE: $ 51.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
Location:
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
A -fef,
NAME
ADDRESS
PIN #
TELEPHONE
Owner
,41 C'4-'inns M/y
-eeii ✓
y% c-- C'+1"rtr- 2,/'!'G'. c- t"-,
.41,7,4 64
3G-, 3 _ Xg 4/_3
Architect
or Engineer
Ad,,- / /,4q,,,
g YY7 G J
Building
Contractor
C),,, at n
CanSf-r�u -r%, 11)c-
9/(W rA ja-ere_o f /�
(611 -)(A �✓)p\��C- 1 3/1101
�j 6-‘G>a
(Check all that apply)
❑ New Construction
Et Duplex
Residential
❑ Footprint Changes
❑ Other
Estimated cost of Construction: $
❑ Renovation
❑ Single Family
❑ Commercial
❑ Repairs
. (J
Minor Addition
❑ Substantial Addition
❑ Multi- Family
❑ Demolition
Construction Type / (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks: f:n la ryl, r J /ocir oleo -k
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by c at t , by means of pi -4/ lc,
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore,drainage impaired by this
permitted construction.
Date: /
Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
NFIP Flood Zone
Existing
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signature
Date
Oa- iCo-04
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL J 1