Loading...
HomeMy Public PortalAbout07-27-95 TRAFFIC & PARKING COMMISSIONAGENDA ITEMS FOR CONSIDERATION AT THE REGULAR MEETING OF THE LYNWOOD TRAFFIC AND PARKING COMMISSION TO BE HELD ON JULY 27, 1995 AT 6:00 P.M. OPENING CEREMONIES 1. CALL FOR ORDER - CHAIRPERSON.MARGARET BRIGHT 1 2. PLEDGE OF ALLEGIANCE 3 4 ACKNOWLEDGEMENT OF POSTING ROLL CALL OF COMMISSIONERS MARGARET BRIGHT WILLIAM CUNNINGHAM EDWARD PACHECO RICK SANCHEZ RODNEY WHITE Gp APPROVAL OF MINUTES I B:C�I CITY OF LYNWOOD CITY CLERKS OFFICE JUL 2 4 i�S� �� PEA 718 I 9 I 10 Iu1 12 1 4 12i3j4I5i6 p x'z t' PUBLIC ORAL COMMUNICATIONS SCHEDULED MATTERS 6. 7. 8. 9. ST. FRANCIS MEDICAL CENTER, REQUEST FOR DRIVE APPROACHES ON CESAR CHAVEZ LANE. TRAFFIC SIGNAL INSTALLATION REQUEST BY ST. FRANCIS AT MARTIN LUTHER KING JR. BLVD. AND ARVAL AVENUE. HANDICAP PARKING SPACE REQUEST. INTERSECTION IMPROVEMENT - REVIEW OF NO RIGHT TURN ON RED AT NORTON /MARTIN LUTHER KING JR /SAN LUIS AVENUE. REVIEW OF UPCOMING ITEMS INFORMATIONAL ITEMS COMMISSION ORAL COMMUNICATIONS T95 -7A A REGULAR MEETING OF THE TRAFFIC AND PARKING OF THE 'CITY .OF 'LYNNOOD Minutes of the June .22,1995 Meeting CALL TO ORDER Chairperson Bright called the meeting to order at 6:00 p.m. . PLEDGE OF ALLEGIANCE Commissioner Rodney White led the Commission.in the pledge of allegiance. ACKNOWLEDGMENT OF POSTING Mr. Valtierra acknowledged posting of the Traffic and Parking Commission agenda on July 24, 1995. ROLL CALL Commissioners William Cunningham, Edward Pacheco, Rodney White, Margaret Bright answered roll call. Commissioner Rick Sanchez was excused. Also present was Christian Valtierra, Public Works Division Supervisor, Ted Semaan from the Public Works Department and Deputy Tim Bryant from the Sheriff's Department. APPROVAL OF MINUTES Chairperson Margaret Bright made a motion to accept the minutes as written, Commissioner Pacheco seconded motion and the minutes were accepted as written. PUBLIC ORAL COMMUNICATION Ms. Gamyonne Barnes, 3835 Platt Avenue, Lynwood, Ca. asked to speak to the commission regarding the discontinuation of Lynwood Interface Trolley Route, that runs from the Community Center to the Metro Blue Line Station. Ms. Barnes was aware that the Lynwood Interface Route had been extended an extra thirty days on July 31, 1995. She explained in detail to the Commission that she was a student on a fixed budget, and would incur a financial hardship with the ending of the Blue Line.Trolley Route. Ms. Barnes also delivered a list of signatures of Lynwood residents who would be willing to pay a twenty five cent fare to keep the trolley running. A Commissioner-Cunningham acknowledged.her request, and asked if she would like to at meeting as this will be - reviewed as Item No. 6. SCHEDULED MATTERS Item 6. Re -route of Lynwood Trolley routes to serve the Metro Green Line Scheduled to open August, 1995. The Commission was shown a maps of existing trolley - routes and maps showing the proposed modifications. Commissioner Cunningham - Agreed with Ms. Barnes, that Blue Line is a necessity, and she should attend the budget meetings, they are open to the public, and council makes those decisions. He also stated that the commission would make every effort to help her and the citizens of Lynwood to keep the line running. Commissioner Bright, stated that the commission would look in to the matter. Commissioner White, inquired if the twenty.five cent fare would cover the cost to continue the line. There being no further discussion, Commissioner Pacheco made a motion to accept staffs recommendations to make modifications on Trolley route A to connect to the Metro Green Line on Long Beach Boulevard /I -105 Freeway. Commissioner,Cunningham seconded the motion, item passed unanimously. Item 7. Los Angeles County Traffic Synchronization Project. Mr. Ted Semaan of the Public Works /Engineering Department made a presentation to the Commission on the Traffic Synchronization Project. The project consists of synchronization of traffic signals through eight cities on Imperial Highway starting at the 405 freeway to First Street in the City of La Mirada. The eight cities included are Hawthorne, Inglewood, La Mirada, Lynwood, South Gate, Downey, Norwalk,Santa Fe Springs and the County of Los Angeles. The Commission was informed of the program would reduce air pollution by 917,000 lbs /per year. The project will be funded 69% by MTA Grant, and 31% Los Angeles County Department of Public Works. Commissioner Cunningham stated that he would like a study done on Imperial Highway in front of the'of new high school, at Jackson Avenue and Cornish Avenue, to determine if it is necessary to have both signals. i `i 1 :Commissioner White, stated -that -he would like to ,reView comments made by the eight cities involved. There being no discussion, Commissioner Bright moved to accept staffs recommendations that Traffic and Parking Commission support the LACTSS Project, and recommend to.City Council to have staff proceed with project. Commissioner White seconded the motion, and the item passed unanimously. INFORMATIONAL ITEMS 41 The Commission was given a brief status of following CIP's: 1. Atlantic Avenue Reconstruction Project 2. Public Works Corporate .Yard 3. Imperial Highway Median Island 4. Bus Shelters 5. Beechwood Street Lighting Project 6. City Hall new -Wing 7. Virginia Street Reconstruction 8. City Hall South Exit Parking Lot A.D.A. Improvement 9. Storm Drain Improvement Project 10. Sandborn Avenue 11. Josephine Avenue 12. Thorson Avenue 13. Drop Off Box. The Traffic and Parking Commission was also given a copy of the Public Works Monthly Report for June 1995 for their review. It was brought to the attention of the Commission that was an accident involving a pedestrian in front of St. Francis Hospital, on Martin Luther king Jr. Boulevard east of Imperial Highway. Deputy Bryant explained to Commission that this was the first accident in atleast three years involving a,pedestrian at that location. He also stated that persons crossing seemed to have a false sense of security. It was brought to the attention of the Commission an item would be brought to the commission at its next meeting regarding this incident. The commission suggested that a Citizens awareness campaign should be instituted. Commissioner Bright, suggested a safety campaign between Sheriff's department and Commission. ITEMS FOR FUTURE CONSIDERATION The Traffic and Parking Commission reviewed items for future consideration. I COMMISSIONER ORALS Commissioner Cunningham requested that action be to slow down traffic at Louise and Wright Road, wants information as to status of proposed.improvements.. Commissioner Cunningham also stated that a sign should be installed on Atlantic Avenue and Martin Luther Ring Jr. Boulevard, stating an entrance to 710 freeway. 1. Commissioner Pacheco - none. Commissioner White commented on how well the Atlantic Median Island was coming along. Commissioner Bright None. ADJOURNMENT There being no further business, Commissioner Cunningham made a motion to adjourn the meeting, Commissioner Pacheco seconded-the motion, and the meeting was adjourned unanimously. The meeting was adjourned for June 22, 1995 at 7:25 P.M. T94 -6MTG I AGENDA ITEMS FOR FUTURE CONSIDERATION BY THE LYNWOOD TRAFFIC AND PARKING COMMISSION (List prepared 7- 17 -95) Presently Under Review 1. St. Francis Medical Center, request for drive'approaches on Cesar Chavez Lane. 2. Traffic Signal Installation request by St. Francis Medical Center at Martin Luther King Jr. Blvd. and Arval Avenue. 3. Handicap Parking request, Lynwood Resident. 4. Intersection Improvement - review of No Right Turn on Red at Norton /Martin Luther King Jr. /San Luis Avenue. 5. Traffic study for Long Beach Blvd, State Street and Tenaya Avenue. 6. One Way Street Survey results. 7. Review School Routes citywide. For Future Consideration A. Review Traffic Safety Evaluation, Enforcement and Engineering analysis by Institute of Transportation Studies. B. Review and ranking of signalized intersections by number of accidents. C. Proposed alley vacations. D. Review pedestrian /traffic safety on Long Beach Boulevard from Martin Luther King Boulevard to Tweedy Boulevard E. Review traffic safety on Long Beach Boulevard and Los Flores Boulevard. F. Review protected left turn phasing at traffic signals citywide. G. Parking restrictions on Mariposa Avenue, request by the City of South Gate Public Works Department. T95 -5F 0 MONTHLY STATUS REPORT Department of Public Works JUNE, 1995 Prepared by Emilio M. Murga Department of Public works Contents Monthly Report July Capital Improvements Projects . . . . . . . . . . . . . 1 - 5 Land Development Report . . . . . . . . . . . . . . . . 6 Public Works Administration . . . . . . . . . . . . . . 7 ComplaintSummary . . . . . . . . . . . . . . . . . . . 8 Management Information System (MIS) . . . . . . . . . . 9 - 10 Water Maintenance . . . . . . . . . . . . . . . . . . . 11 - 15 Traffic Signals /Street Lighting . . . . . . . . . . . . 16 - 17 Goals August, 1995 Public Works Administration . . . . . . . . . . . . . . 18 Management Information System . . . . . . . . . . . . . .19 Water Maintenance . . . . . . . . . . . . . . . . . . . 20 Traffic Signals /Street Lighting . . . . . . . . . . . . 21 V70 -907 i • 0 CAPITAL IMPROVEMENT PROJECT June, 1995 1. Atlantic Avenue Rec. Proj., Phase III, No. 5 -5147 Project Description: The work consists of the reconstruction of pavement, construction of landscaped median islands, and installation of new street lighting system and fire hydrants. The proj. limits are on Atlantic Avenue from McMillan Street to Fernwood Avenue. Budget: $ 973,000 Project Status: Installation of flower pots was completed. Approximately 6000 square feet of sod and 800 square feet of different plants were planted. 2. Public Works Corporate Yard Project Description: Construction of City facilities including Building "A" (Water Division), Building Warehouse), Building "C" (Lunch Room, Locker and construction of a portion of building "D enclosed, City Vehicle Parking) at the Corporate Yard at 11750 Alameda. Budget: $360,000 Project Status: completion of "B" (Office & Room, Restroom) (garage) , Public Works A card access system was established for security system for entry /exit gate and cards were issued to employees. Control system was completed. Landscaping, including irrigation was completed. Five (5) light fixtures were installed. Project was completed. 1 a C] 4 5. 0 • IMPERIAL HIGHWAY MEDIAN ISLAND PROJECT DESCRIPTION The Median Island is being modified, east of the City entry marker, starting from Duncan Avenue to the east City limit. The plans call for improving the esthetic appearance of Imperial Highway at the entrance of the City of Lynwood. Queen and Mexican Fan Palm trees will be planted. Ground covering will be planted and cobblestone paving and a wrought iron fence will also be installed. Budget: $ 67,000.00 PROJECT STATUS Installation of banners was completed. Project complete. BUS SHELTERS PROJECT DESCRIPTION The work consists of installation of bus shelters, benches and liter receptacles and brick pavers. Two trees to each shelter at various locations through the City. A total of 50 shelters will be installed. Work is being done by City crews hired as part of the Youth Training Program. Budget: $ 418,745.00 PROJECT STATUS Forty four (44) benches and, forty four (44) shelters have been installed, cutting of brick is in progress. BEECHWOOD STREET LIGHTING PROJECT PROJECT DESCRIPTION Project consists of installing one hundred and nine (109) marbelite poles, in an area bounded by Martin Luther King Jr. Boulevard and Atlantic Avenue to Beechwood Avenue. Budget: $282,003.00 PROJECT STATUS Fifty one (51) poles have been completed. Pull boxes have been is in progress. installed, conduit work was completed, pulling of wire 2 6. CITY HALL HEWING (OLD SHERIFF STATIOXEMODELING) PROJECT DESCRIPTION Old Sheriff's Station building will be remodeled as a new wing to the City Hall, to be used by Public works and Community Development Departments in the future. The work consists of architectural, mechanical, electrical, and structural design followed by related construction work. Budget: $ Under Review PROJECT STATUS Project is presently on hold. 7. VIRGINIA STREET RECONSTRUCTION Project Description: The work consists of the reconstruction of pavement, curb and gutter, sidewalk and driveway approach. The project limits are on Virginia Street from Long Beach Boulevard to School Street. Budget: $ 61,000 Project Status: Project is 100% completed. 8. CITY HALL SOUTH EXIT AND PARKING LOT A.D.A. IMPROVEMENT Proiect Description The work consists of construction of a wheel chair ramp for City Hall South exit and also stripping for reserved parking stalls as A.D.A. improvement to City Hall. Proiect Status A base for kiosk was constructed. Seven seats for seating area and four short walls were constructed. Approximately 400 square feet of pavers were installed. 9. STORM DRAIN IMPROVEMENT PROJECT Proiect Description 10 11 12 40 Water ponding on Long Beach Boulevard and Louise Street from extra flow on Long Beach Boulevard due to I -105 freeway construction. Caltrans agreed and designed storm drain system at their expense. They will be funding the construction of the project. Budget: $80,000.00 Project Status Project was awarded to Doty Brothers. Construction will begin July 10, 1995. SANDHORN AVENUE WIDENING The work consists of widening of Sanborn Avenue 5 feet between alley and Long Beach Boulevard, it consists of new sidewalk, curb and gutter, wheel chair ramp and pavement. PROJECT STATUS Project Completed. JOSEPHINE AVENUE PROJECT DESCRIPTION This project consists of installing curb, gutter and sidewalk between second Avenue and Third Avenue. Currently there is no curb gutter or sidewalk in this area. Budget: $40,000.00 PROJECT STATUS Working on plans for preparation for reconstruction of curb and gutter and sidewalk. THORSON AVENUE This project consists of installing two foot gutter, from Cul -de -sac to Josephine Street. Also installing a drive approaches. Budget: $15,000.00 4 I PROJECT STATU • Project will beginning first part of July. 13. DROP OFF BOB This project consists of installing a water and refuse drop off box facing Bullis Road, on curb edge that leads to entrance of City Hall. PROJECT STATUS Drop off box installed. Project Completed. V70-501a 5 i • Date: JUNE, 1995 Subject: ENGINEERING DIVISION, LAND DEVELOPMENT MONTHLY REPORT ❑ Permits: ❑ Inspections: • Grading Plans: • Site Plans: ❑ Planning Commission Meeting: ❑ Traffic and Parking Commission meeting: ❑ Underground Service Alert.Markings (USA): ❑ Flood Zone Information: ❑ Traffic Signals: V70 -402 12 Issued 31 Performed 1 Plan check processed 3 Reviewed 1 Tuesday, June 13, 1995 1 Thursday, June 22, 1995 350 Locations marked 5 Requests processed 52 Intersections inspected once each week 6 M E M O R A N D U M DATE: July 6, 1995 TO: Emilio M. Murga, Director of Public Works FROM: Christian Valtierra, PW Administration Supervisor�� SUBJECT: Public Works Administrative Activities for July, 1995. 1. General Administrative Projects: A. Submitted June, 1995 Complaint Summary. A total of seventeen (17) complaints were received for the Department of Public Works. All complaints were addressed and routed to the proper divisions for resolving. B. Continued to work with HUB Cities, the County of Los Angeles, and Downey Volunteer Center to provide work experience to three HUB Cities student worker and several General Relief Workers. C. Prepared agenda /items for and attended, Traffic and Parking Commission meeting held on June 22, 1995. D. Worked with the Engineering Division to continue the Youth Training Program that consists of the hiring of 25 local youth hired to work on Bus Shelters, Imperial Highway Median Island Project, and commercial and residential street lighting projects. E. Prepared and sent out Public Works Monthly Report for May, 1995. F. Assisted in preparation of various City Council Items. General Office tasks: The Public Works Administration Division is responsible for providing general support to all other Public Works Divisions. This includes complaint processing, time - sheets, mailing of parcel and utility maps; typing of Council Items and Resolutions, memos, filing and handling over the counter information. V70 -466 7 • 0 MONTHLY COMPLAINT STATUS REPORT MONTH: June DATE: July 11, 1995 YEAR: 1995 NUMBER OF COMPLAINTS: 5 Complaint Type Incomin ---------------------------- ------ - -- - -- OTHER COMPLAINTS 4 80.00 SCE STREET LIGHTS 1 20.00 ---------------------------------------- Total: 5 100.00 R 0 Memorandum Date: July 11, 1995 To Emilio M. Murga, Director of Public Works From: Frank Garcia, Civil Engineering Assistant Subject: Management Information Systems (M.I.S.) Monthly Report For June, 1995 0 1 Diagnose MIS Accounting Gateway Communication Server errors. 2. Continue Accounting mini- system data access and automatic update process directly from network system for City of Lynwood WAN. 3 Complete Cable Studio new computer system upgrade with new laser printer and Pagemaker software installation for City Manager 4 Resolve computer system error at Administrative Services Division workstation for Finance. 5 Diagnose Palandrome Backup System on network server due to server file corruption's for the City of Lynwood's WAN. 6. Resolve File Server System network adapter problem with City of Lynwood's WAN network server 7 Continue research on connectivity options to W WW interface for City of Lynwood WAN. Start Novell Certified Network File Server upgrade for City of Lynwood's WAN system. 9 Present LAN Users Group Meeting for Month of June - Topic: Mail Merge and Mailing Labels using Word for Windows. 10 Adapt operation procedures with new "SNAP" software which controls new gate system at Public Works Water Yard. ® • I 1 Install printer accelerator hardware device at Public Works central network printing station. 12. Replace print server computer system at Human Resources network printing station. 13 Diagnose Public Works computer system error at Water Yard workstation. 14 Setup new computer workstation connection to LAN at Code Enforcement Trailer 15 Replace serial bus mouse connection at Public Works workstation in Annex. 16 Install additional hard drive at Director of Finance computer system workstation. 17 Diagnose City of Lynwood dial -in and dial -out WAN central modem bank error 18 Diagnose and resolve memory management problem at Finance user workstation. 19 Continued maintenance and users support service. 20 System statistics, down -time for June 1995 Total: 4 0 Hr F. \WORDFILE\P W- ENGR\MIS\MIS-006. 10 MONTHLY PRODUCTION REPORT PUBLIC WORKS/WATER DIVISION NNE, 1995 TO EMILIO M. MURGA FROM. RAUL M. SAENZ Water Turn Ons 192 Water Turn Offs 187 Water Meter Read 2400 Water Meter Rereads 341 Sewer Backups 2 Pumps Checked 289 Leaks Checked 61 (Per Customer Complaint) Water Main Leaks 0 Locations: Red Tags Posted 71 Lock/Pull Meters 7 Water Meters Replaced 8 General Complaints 10 F' \WmdU .t* O 15Books 11 WATER PRODUCTION AND IMPORT SU MMARY FOR 1994 -1995 I-� N WELL 0 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL 5 39.69 53.09 52.90 12.44 1.11 2.37 15.69 0.95 0.53 0.51 89.77 73.50 342.55 6 38.93 53.25 58.68 150 0.23 0.09 0.00 0.00 0.02 0.36 49.39 48.14 250.59 8 13348 138.48 18095 140 1.03 1.34 1211 558 0.65 0.99 111.24 123.63 711.68 9 82.40 85.15 9929 1.22 0.26 086 1396 088 0.79 0.80 88.45 45.88 419.94 11 98.36 69.74 118.87 2.82 0.92 0.90 10.58 0.97 0.59 070 45.24 24.55 374.24 15 10.95 19.24 23.26 6.38 0.87 0.36 3.33 0.36 0.36 0.34 17.96 13 49 96.9 19 260.25 274.34 336.33 0.14 7.98 5.64 0.05 0.00 1.91 0.11 207.08 255.03 1348.86 LOCAL (1) 664.06 693.29 870.28 25.90 12.40 11.56 56.52 8.74 4.85 3.81 609.13 584.22 3544.76 M.W.O. (2) 230 0.00 5.90 496.00 513.00 $11.80 420.80 447.80 492.20 528.70 37.20 0.00 3455.7 TOTAL (1 +2) 668.36 693.29 876.18 521.90 525.40 523.36 477.32 456.54 497.05 532.51 646.33 584.22 700046 • MAY 1995 : WATER PRODUCTION ( WELLS & M. W. D. ) 300 250 200 r ACRE -FEET 150 100 50 C WELL ,0 0 6 8 9 11 15 . 19 M.W.O CONSERVATION FY 19941995 VS FY 1989 -19 r 4 0 1 0 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUNE LOCAL WATER FOR 19941995 (1A) 664.06 693.29 870.28 25.90 12.40 11.56 56.52 8.74 4.85 3.81 609.13 584.22 LOCAL WATER FOR 1989 -1990 (1B) 485.03 419.12 386.10 216.59 242.82 232.33 152.71 136.58 24114 534.93 48080 527.73. LOCAL DIFFERENCE (18 - 1A)% - 36.91 % - 65.42% - 125.40% 88.04% 94.89% 95.02% 62.99% 93.60% 97.99% 99.29% - 26.69% - 10.70 %WL MWD. WATER FOR 19941995 (2A) 2.30 0.00 5.90 496.00 51300 51180 42080 447.80 492.20 528.70 37.20 0.00 M.W.D. WATER FOR 1989- 1990(2B) 292.00 257.60 237.70 362.40 337.70 345.90 343.40 264.20 337.00 120.60 95.50 101.60 M.W.D. DIFFERENCE (2B -2A)% 9921% 10000% 97.52% - 36.87% - 51.91% 47.96% - 22.54 % - 69.49% - 46.05% - 338.39% 61.05% 100.00 %" TOTAL WATER FOR 1994- 1995(3A) 666.36 69129 876.18 521.90 525.40 523.36 477.32 456.54 497.05 53251 646.33 584.22 TOTAL WATER FOR 1989-1990(3B) 777 03 676.72 623.80 578.99 580.52 578.23 496.11 400.78 578.14 655.53 576.30 629.33 TOTAL DIFFERENCE (38 -3A)% 1424% -2.45% - 40.46% 9.86% 9.49% 949% 3.79% - 13.91% 14.03% 18.77% - 12.15% 717% TOTAL ACRE -FEET SAVED (3B -3A) 110.67 -16.57 - 252.38 57.09 55.12 5487 18.79 -55.76 81.09 12302 - 70.03 45.11 4 0 1 0 M E M O R A N D U M 0 Date: July 6, 1995 To: Emilio Murga - Director of Public Works From: John C. Leichty, Electrical Maintenance /Supervisor Subject: Major Activity of Traffic Signal and Street Lighting Division, Month of June, 1995. STREET LIGHTING 1. Repair and restore inoperative lighting circuit, Shirley & Pine area. 2. 3353 Seminole, remove abandoned light pole. 3. M.L.K. & Bullis, N /E, install a new fixture & lamp. 1. 4. Imperial & Long Beach, N /E, repair S/L control. 5. Long Beach (Norton to M.L.K.) repair lighting circuit, and two shot out lights. 6. 3566 Imperial- pole hit by automobile. Replace fixture and lamp. 7. Assist with new residential lighting, in the Lynwood & Lindberg area. Install three poles & fixtures, a meter, service cabinet, and additional wiring. TRAFFIC SIGNALS 1. Signal lamps replaced, from lists and other inspections = 16. 2. Long Beach & Norton, repair /replace, side mounted signals, damaged by truck. N /W. 3. Imperial & Long Beach , repair pedestrian crossing signal, S /W. 9 16 0 4. M.L.K. & Wright Rd., N /E, repair and replace side mount signals, hit by truck. OTHER 1. Install and remove three event banners over city streets. v70 -474 17 0 • DEPARTMENT OF PUBLIC WORKS Goals for AUGUST, 1995 V45 -690 E M E M O R A N D U M DATE: July 15, 1995 L To: Emilio M. Murga, Director of Public Works FROM: Christian Valtierra, PW Administration Supervisor SUBJECT: PUBLIC WORKS ADMINISTRATION GOALS AND PROPOSED ACTIVITIES FOR AUGUST, 1995. 1. Meet with Public Works Division heads to review approved FY 95 -96 Budget. 2. Working with Business Owners to help them to comply with the Cities encroachment permit on all private signs encroaching on public right -of -way. 3. Prepare and send out Public Works Monthly report and goals for month of July, 1995. 4. Respond to resident complaints, respond to work orders and urgent calls as they come in. 5. Prepare for and attend Traffic Parking Commission Meeting for August 24, 1995. 6. Prepare and submit prop A/C annual project submittals to LACMTA. 7. Continue to work with Downey Volunteer Center to take on volunteers who need to complete Community Service hours; work with HUB Cities to employ three (3) student workers and make available internship opportunities to anyone wishing to learn more about and volunteer in the Public Works Dept; work with the State Department to employ General Relief workers to work in the Department of Public Works. 8. Gather information, prepare and submit reimbursement request from the MTA for trolley services for April to June 30,1995. v70 -467 i ® • MEMORANDUM Date: July 11, 1995 To Emilio Murga, Director of Public Works From: Frank Garcia, Civil Engineering Assistant Subject: Management Information Systems (M.I.S.) Goals for August, 1995 Complete Accounting mini- system data access and manipulation process directly from network system for Public Works. Establish automatic information links necessary to manipulate data on LAN using Gateway Communication Server and Windows applications. Use special Windows programming software to create actual Client/Server link and to enhance Windows environment for better user friendly access. 2 Research connectivity options to World Wide Web interface for City of Lynwood WAN Continue with full maintenance process for all computer workstations on City of Lynwood WAN. Maintenance will include full hardware and software diagnostics, physical hardware cleaning, and detailed report on description of analysis. 4 Complete new file server installation with Novel 4 0 NOS upgrade for City of Lynwood's WAN. Resolve various computer system workstation upgrades and errors for following departments: Public Works, Code Enforcement, City Manager, Finance, and Recreation. F-\ W ORDFIr.E \PN <ENGR�MIS\MIS -106 19 L DATE. July 11, 1995 TO Emilio M. Murga, Director of Public Works 0 FROM. Raul M. Saenz, Civil Engineering Associate/Water SUBJECT MONTHLY GOALS FOR THE MONTH OF JUNE, 1995 1 Execute contract with Boyle Engineers for design and construction of new well. 2. Install bars and panels on wells to enhance security of chlorination systems. 3 Switch from single chlorination systems to double chlorination systems at wells 6, 8, and 19 4 Develop preliminary plans to conversion of Dymally Park irrigation system to reclaimed water 20 f:wateryrd \goals.doc M E M O R A N D U M Date: July 6, 1995 To: Emilio Murga, Director of Public Works From: John C. Leichty, Electrical Maintenance /Supervisor Subject: Traffic Signal and Street Lighting Division Goals, for August, 1995. TRAFFIC SIGNALS 1. Inspect all intersections for safe operations. List and perform preventative maintenance as required. STREET LIGHTING 1. Test and observe lighting operations. Repair and relamp as needed. V70 -396A 21