Loading...
HomeMy Public PortalAbout01-26-95 TRAFFIC & PARKING COMMISSIONU 0 AGENDA ITEMS FOR CONSIDERATION AT THE REGULAR MEETING OF THE LYNWOOD TRAFFIC AND PARKING COMMISSION TO BE HELD ON JANUARY 26, 1995 AT 6:00 P.M. OPENING CEREMONIES 1. CALL FOR ORDER - CHAIRMAN MARGARET BRIGHT 2. PLEDGE OF ALLEGIANCE 3. ACKNOWLEDGEMENT OF POSTING 4. ROLL CALL OF COMMISSIONERS MARGARET BRIGHT WILLIAM CUNNINGHAM EDWARD PACHECO RICK SANCHEZ RODNEY WHITE 5. APPROVAL OF MINUTES PUBLIC ORAL COMMUNICATIONS SCHEDULED MATTERS REVIEW OF UPCOMING ITEM INFORMATIONAL ITEMS COMMISSION ORAL COMMUNICATIONS ADJOURNMENT T95 -1A R CEIVED CITY OF LYNWOOD CITY CLERKS OFFICE JAN 2 3 1995 AM PM 718e9iID111112111213AA6 gga �_ .. P 0 A REGULAR MEETING OF THE TRAFFIC PARKING COMMISSION OF THE IE CITY OF LYNWOOD Minutes of the December 22, 1994 Meeting Call To Order Chairman Bright called the meeting.to order at 6:00 p.m. Pledge of Allegiance Chairman Bright led the commission in the pledge. Acknowledgment of Posting Mr. Valtierra acknowledged posting of the Traffic and Parking Commission agenda on Monday December 19, 1994. Roll Call Chairman Bright, Commissioner Pacheco, William Cuningham, and Vice - Chairman Rodney White answered roll call. Commissioner Sanchez arrived at 6:20 p.m. Also, present was Mr. Valtierra, Public Works Division Supervisor, and Deputy Len Stanley from the Century Sheriff Station. Approval of Minutes Commissioner Bright requested changes to the November 17, 1994 Traffic and Parking Minutes. Under Commissioner Orals, for Commissioner White, she said that "on Carlin and Olanda" should be' changed to "on Carlin and Milrace ''. There being no other corrections, Commissioner Cunningham moved to accept the minutes as corrected. Pacheco seconded the motion and the minutes were approved as corrected. Public Oral Communications Resident Irene Garcia, who lives at 2737 E. 111th Street, addressed the Commission. She said that she wanted to attend the meeting to find.out what takes place at the monthly meetings and what she can do to help her residential area. Mrs. Garcia said she is involved with the Block Watch in her area. She also wanted to see if the Commission could do anything about a complaint she has about the 3100 block of Norton. She said too many vehicles park and block the driveway and sidewalk area. She said it happens mostly on weekends. She also said that near Alameda, trucks park on the residential side and cause problems. She has called Code Enforcement but nothing has been done. Mrs. Garcia also mentioned people cleaning their vehicles in their driveways and leaving their trash debris in the sidewalk she took some pictures which she will develop. Chairman Bright • asked the Deputy if he could see what enforcement could be suggested that she call Lorry Department and she would send Scheduled Matters 0 look at the area and he agreed to done. Commissioner Cunningham Torres, at the Parking Enforcement the officers out to cite. Review of City of Lynwood Code Book The City Code Book was reviewed with Mrs. Rita Manibusan, Deputy City Clerk from the City Clerks Office. She reviewed Code Book with the commission and pointed out the two chapters that would help the commission with their understanding of the city codes as they relate to Traffic and Parking, they being Chapter 7 Traffic and Parking, and Chapter 13 Streets and Sidewalks. She also suggested Public Safety and Public Sanitation. Mrs. Manibusan also stated that the City Clerk can be contacted if they have any questions or she will be glad to review any questions the commission might have once they have had a chance to review the Code Book. 2. Review of California Vehicle Code. An explanation of Commission by the explained how to the State Vehicle that when it come City Ordinance. the vehicle code book was given to the Century Sheriffs Deputy Len Stanley. He look up information in the book. He said that Code book is different than the City Code, but a to parking enforcement, this is regulated by Deputy Len Stanley recommended a book called the Quick Book Code which is more concise and easier to understand because it is in shorter,•simpler text. Bright requested that staff see if they can obtain copies for the commission. Review of Upcoming Items The Commission reviewed the list of the upcoming TPC related items for future consideration. Informational Items The commission was given a brief overview of the Public Works CIP Projects they include: 1. Atlantic Avenue Reconstruction. 2. New Public Works Yard. 3. City Hall Re -Roof. 4. Imperial Highway Median Island. 0 • 5. Bus Shelter. 6. Alameda Street Lighting Project. 7. Euclid Avenue Reconstruction. 8. Street Lighting Project various locations. 9. Sanborn Avenue Improvement. 10. City Hall New Wing. The Public Works monthly Report for November 94, was attached for the Commissions review. Commissioner Orals Pacheco - None Sanchez - None White - None, but would like to wish everyone a Merry Christmas and Happy New Year. Cunningham - He would like to suggest that we put together a quick memo to the City Manager, requesting that he loot/ at the possibility of seeing what he could do to help complete pending Traffic and Parking Commission recommendations. Chairman Bright - None, but wishes everyone a Merry Christmas and Happy New Year. Adjournment There being no further business, Pacheco made motion to adjourn the meeting. The motion was seconded by Commissioner Sanchez and the meeting was adjourned at 7:07 p.m. 3 J • AGENDA ITEMS FOR FUTURE CONSIDERATION BY THE LYNWOOD TRAFFIC AND PARKING COMMISSION (Prepared 1/18/95) I. Presently Under Review A. Traffic study for Long Beach Blvd, State Street and Tenaya Avenue. B. Traffic Safety /Parking - Wilson Elementary School. C. One Way Street Survey results. D. Review School Routes citywide. E. Traffic sign installation request, Lynwood Road and Long Beach Blvd. II. For Future Consideration A. Review Traffic Safety Evaluation, Enforcement and Engineering analysis by Institute of Transportation Studies. B. Review and ranking of signalized intersections by number of accidents. C. Proposed alley vacations. D. Review pedestrian /traffic safety on Long Boulevard from Martin Luther King Boulevard to Tweedy Boulevard. Beach E. Review traffic safety on Long Beach Boulevard and Los Flores Boulevard. F. Review protected left turn phasing at traffic signals citywide. t95 -1f I J a rI L E Monthly Status Report Department of Public Works DECEMBER,1994 Prepared Emilio M. Murga Department of Public Works a Contents Monthly Report December Capital Improvements Projects . . . . . . . . . . . . 1 -5 Land Development Report . . . . . . . . . . . . . . . . 6 Public Works Administration . . . . . . . . . . . . . . 7 Complaint Summary . . . . . . . . . . . . . . . . . . . 8 Management Information System (MIS) . . . . . . . . . . 9 -10 Water Maintenance . . . . . . . . . . . . . . . . . . . 11 -16 Traffic Signals /Street Lighting . . . . . . . . . . . . 17 -18 Goals February, 1995 Public Works Administration . . . . . . . . . . . . . . 19 Management Information System . . . . . . . . . . . . . .20 WaterMaintenance . . . . . . . . . . . . . . . . . . . 21 Traffic Signals /Street Lighting . . . . . . . . . . . . 22 V70 -107 11 0 CAPITAL IMPROVEMENT PROJECT December, 1994 1. Atlantic Avenue Rec. Proj., Phase III, No. 5 -5147 Project Description: The work consists of the reconstruction of pavement, construction of landscaped median islands, and installation of new street lighting system and fire hydrants. The proj. limits are on Atlantic Avenue from McMillan Street to Fernwood Avenue. Budget: $ 973,000 Project Status: Lighting and irrigation systems were completed and tested. Lights are operational and maintained by the city. Next phase of this project is landscaping of median islands, original design is currently being modified. 2. New Public Works Yard Project Description: Construction of City facilities including completion of Building "A" (Water Division), Building "B" (Office & Warehouse), Building "C" (Lunch Room, Locker Room, Restroom) and construction of a portion of Building "D" (Garage, enclosed storage, City Vehicle Parking) at the Public Works Corporate Yard at 11750 Alameda. Budget: $360,000 Project Status: Design of ,entrance gate to Corporate yard was finalized. Preliminary design for building "D" was completed. 1 3 4. 0 CITY HALL RE -ROOF, Project No. 5 -5148 Project Description: The work consist of re- roofing of City construction of A/C pads. Conduit and insulation. Built up roofing and Repair project has been scheduled to Budget: 100% General Fund Project Status r I Hall, welding pipe rack, tempered brick wall parapet. be completed October, 1994. Metal coping and A/C duct work are being painted. Design of cable system security cameras and monitoring system is under consideration. IMPERIAL HIGHWAY MEDIAN ISLAND PROJECT DESCRIPTION The Median Island is being modified, east of the City entry marker, starting from Duncan Avenue to the east City limit. The plans call for improving the esthetic appearance of Imperial Highway at the entrance of the City of Lynwood. Queen and Mexican Fan Palm trees will be planted. Ground covering will be planted and cobblestone paving and a wrought iron fence will also be installed. Budget: $ 67,000.00 PROJECT STATUS Council approved Caltrans relinquishment of Imperial Highway. The City to hold State harmless, and executed a maintenance agreement for Median island. Installed and enegerized street light bases and poles, poured the stamped concrete. All thirty three (33) Palms have been planted, and ground cover installation installed. Fifty percent of the irrigation system has been completed, drip irrigation will be completed upon completion of ground cover installation. 2 5. BUS SHELTERS ® • PROJECT DESCRIPTION The work consists of installation of bus shelters, benches and liter receptacles and brick pavers. Two trees to each shelter at various locations through the City. A total of 50 shelters will be installed. Work is being done by City crews hired as part of the Youth Training Program. Budget: $ 418,745.00 PROJECT STATUS Thirty three (33) sidewalk locations have been broken. Crews are in process of installing base material, pouring of foundations and laying of bricks at various sites. 6. ALAMEDA STREET LIGHTING PROJECT PROJECT DESCRIPTION Project consists of installing seventy one (71) marbelite poles, in area 1 located at 108th, 109th,110th, 111th, 112th, Norton, Grant, Lorraine from Martin Luther King to Santa Fe to Alameda. Budget: $282,003.00 PROJECT STATUS Project completed, street lights working. 7. EUCLID AVENUE RECONSTRUCTION PROJECT DESCRIPTION The work consists of reconstruction of Euclid Avenue from Long Beach Boulevard and Alpine, Oak Avenue to Orchard. Budget: $ 47,000.00 PROJECT STATUS Eighty per cent (80 %) of the designing work has been completed. 3 8. STREET LIGHTING PROJECT VARIOUS LOCATIONS No. 5 -5157 PROJECT DESCRIPTION Project consist of installing marbelite poles on Standard Avenue, Hulme Avenue, Cornish Avenue, Colyer Avenue, Sampson Avenue and Pendelton Avenue. Budget: $ 448,353.00 PROJECT STATUS Foundations have been poured by City of Lynwood Youth Workers on Standard, Hulme, Cornish, Colyer, Sampson, Jackson and Pendleton Avenue. Underground conduit work has been installed. All the street light poles have been erecteed. 9. SANBORN AVENUE IMPROVEMENT PROJECT DESCRIPTION The work consists of widening of Sanborn Avenue between California Avenue and Long Beach Boulevard. PROJECT STATUS New curb and gutter, drive way, sidewalk, wheel chair ramp and A/C pavement has been installed on south side of Sanborn Avenue. 10. CITY HALL NEW WING (OLD SHERIFF STATION REMODELING) PROJECT DESCRIPTION Old Sheriff's Station building will be remodeled as a new wing to the City Hall, to be used by Public Works and Community Development Departments in the future. The work consists of architectural, mechanical, electrical, and structural design followed by related construction work. Budget: $ Under Review PROJECT STATUS Antenna tower, back up power generation, and compressor were removed by county. Three primary architectural designs were prepared and cost estimate on these options are being done currently. 0 Continued to remove debris from building. Received estimates for removal of various items such as asbestos, jail ward etc. 11. VIRGINIA STREET RECONSTRUCTION Project Description: The work consists of the reconstruction of pavement, curb and gutter, sidewalk and driveway approach. The project limits are on Virginia Street from Long Beach Boulevard to School Street. Budget: $ 61,000 Project Status: Base plans were prepared. Elevation surveying check was completed. Different options are being considered for design and are under evaluation. V70 -501 5 0 E E Date: December, 1994 Subject: ENGINEERING DIVISION, LAND DEVELOPMENT MONTHLY REPORT ❑ Permits: ❑ Inspections: ❑ Grading Plans: ❑ Site Plans: ❑ Planning Commission Meeting: ❑ Traffic and Parking Commission meeting: ❑ Underground Service Alert Markings (USA): ❑ Flood Zone Information: ❑ Traffic Signals: V70 -402 16 Issued 125 Performed 5 Plan check processed 6 Reviewed 1 Tuesday, December 12, 1994 1 Thursday, December 22, 1994 350 Locations marked 12 Requests processed 52 Intersections inspected once each week L ® • M E M O R A N D U M DATE: January 18, 1995 TO: Emilio M. Murga, Director of Public Works FROM: Christian Valtierra, PW Administration Superviv.3;� SUBJECT: Public Works Administrative Activities for December,1994 1. General Administrative Projects: A. Submitted December, 1994 Complaint Summary. A total of seventeen (17) complaints were received for the Department of Public Works. All complaints were addressed and routed to the proper divisions for resolving. B. Continued to work with HUB Cities, the County of Los Angeles, and Downey Volunteer Center to provide work experience to two HUB Cities student worker and several General Relief Workers. C. Prepared agenda /items for and attended, Traffic and Parking Commission meeting be held on December 22, 1994. D. Worked with the Engineering Division to continue the Youth Training Program that consists of the hiring of 25 local youth hired to work on Bus Shelters, Imperial Highway Median Island Project, and commercial and residential street lighting projects. E. Prepared and sent out Public Works Monthly Report for October, 1994. F. Assisted in preparation of various City Council Items. G. Negotiated Five Year Contract for the continuation of the Lynwood Fixed Route Trolley Bus System. General Office tasks: The Public Works Administration Division is responsible for providing general support to all other Public Works Divisions. This includes complaint processing, time - sheets, mailing of parcel and utility maps; typing of Council Items and Resolutions, memos, filing and handling over the counter information. V70 -466 7 • 0 MONTHLY COMPLAINT STATUS REPORT MONTH: December DATE: January 18, 1995 YEAR: 1994 NUMBER OF COMPLAINTS: --------------------------------------- ------------- Complaint Type Incoming % ---------------------------------------- I CITY OWNED ST LIGHTS 3 17.65 1 OTHER COMPLAINTS 5 29.41 SCE STREET LIGHTS 2 11.76 SEWER PROBLEMS 6 35.29 TRAFFIC /PARKING 1 5.88 i -------------------------------------- Total: 17 100.00 - i 17 n L Memorandum Date: January 9, 1994 0 To: Emilio M. Murga, Director of Public Works From: Frank Garcia, Civil Engineering Assistant Subject: Management Information Systems (M.I.S.) Monthly Report For December, 1994 1. Start Accounting mini - system data access and automatic update process directly from network system for City of Lynwood LAN. 2. Install new backup power supply at LAN server system for Public Works. 3. Start additional Computer Aided Drafting workstation for Public Works. 4. Continue conducting special training for new MIS LAN administrator assistant for MIS Division. 5. Continue automation of Timesheet database for Public Works. 6. Continued with trial software metering program for network applications usage for MIS Division. 7. Setup temporary printer for Facilities Maintenance print station and send original Laser printer back to manufacturer for repair. 8. Diagnose and resolve connection problem with WAN at Public Works Corporate Yard. 9. Continue with central modem back system for City of Lynwood's LAN. 10. Repair Building's receptionist computer system hardware problem for Community Development. 11. Replace bad 11x17 laser printer with new 11x17 laser printer sent to us by Calcomp for Public Works. 12. Troubleshoot and maintain user assistance with new Imaging /Scanning and document managing system Server for Public Works. 01 13. Replace bad hard drive at Garage's computer system for Facilities Maintenance. 14. Continue research with new Network Operating System upgrade. 15. Research and purchased new backup power supply for LAN server computer system. 16. Upgrade Dail -A -Ride computer system with new hard drive, memory and software for Community Development. 17. Continue with LAN automatic inventory program for MIS division. 18. Continued maintenance and users support service. 19. Support Calls, from 12/1/94 - 12/31/94, 140 calls (9.23 hours). 20. System statistics, down -time for December 1994: Total: 15 min. V60 -054 a 0 0 MONTHLY PRODUCTION REPORT PUBLIC WORKS/WATER DIVISION DECEMBER, 1994 TO EMILIO M. MURGA FROM: RAUL M. SAENZ Water Turn Ons 185 Water Turn Offs 192 Water Meter Read 2800 Water Meter Rereads 343 Sewer Backups 0 Pumps Checked 217 Leaks Checked 48 (Per Customer Complaint) Water Main Leaks I Locations, 3622 Josephine Red Tags Posted 53 Lock/Pull Meters 2 Water Meters Replaced 8 General Complaints 5 14 Books 11 WATER PRODUCTION AND IMPORT SUMMARY FOR 1994 -1995 r N WELL i JULY AUGUST SEPTEMBEF OCTOBER NOVEMBER DECEMBER 5 39.69 53.09 52.90 12.44 111 2.37 6 38.93 5325 58.68 1.50 0.23 0.09 8 13348 138.48 180.95 140 1.03 1.34 9 82.40 85.15 99.29 1.22 0.26 0.86 11 98.36 69.74 118.87 2.82 0.92 0.90 15 10.95 19.24 2326 6.38 0.87 0.36 19 26025 274.34 336.33 0.14 7.98 5.64 LOCAL 1 664.06 69329 870.28 25.90 12.40 11.56 M.W.D 2 2.30 0.00 5.90 496110 513.00 511.80 TOTAL 1.2 666.36 693.29 876.18 521.90 525.40 523.36 • • DECEMBER 1994 WATER PRODUCTION ( WELLS & M.W.O. ) Boo soo 400 w ACRE -FEET 300 200 100 0 • • WELL 5 B 6 9 11 15 19 M.W,D. CONSERVATION . FY 1994 -1995 VS FY 1989 -1990 r • • JUL AUG SEP OCT NOV DEC LOCAL WATER FOR 1994- 1995(1A) 664.06 693.29 870.28 25.90 12.40 11.56 LOCAL WATER FOR 1989 -1990 (181 485.03 419,12 386.10 216.59 242.82 232.33 LOCAL DIFFERENCE (1B -1A)% -3691% - 65.42% - 125.40% 88.04% 94.89% 9502% M.W.D WATER FOR 1994.1995 (2A) 2.30 0.00 5.90 496.00 513.00 511.80 M.W.D. WATER FOR 1989- 1990(28) 292.00 25760 237.70 362.40 337.70 345.90 M.W.D DIFFERENCE (28 -2A)% 99.21% 100.00% 97.52% - 36.67% - 51.91% -47.96% TOTAL WATER FOR 1994.1995 (3A) 666.38 693.29 876.18 521.90 525.40 523.36 TOTAL WATER FOR 1989 -1990 (38) 777.03 678.72 623.80 578.99 580.52 578.23 TOTAL DIFFERENCE (38 -3A)% 14.24% -2.45% - 40.46% 9.86% 9.49% 949% TOTAL ACRE -FEET SAVED (313-3A) 11067 -16.57 -25238 57.09 55.12 54.87 • • CONSERVATION FY 1994 -1995 VS FY 1909 -1990 r Ln ACRE -FEET O FY issq -lass ®�v lass -isso i Qo1: 1L] JUL AUG SEP OCT NOV DEC WATER YEAR PROJECTION 1994 -1995 SEASONNAL STORAGE FROM OCTOBER 1, 1994 TO APRIL 30,1995 - ACTUAL wj� PROJECTED 1./ WATER: 0 GROUND WATER 3537.27 AF - $152.00tAF M.W.D. (NON - INTERRUPTIBL 3430.40 AF ' $429.00%F SHORT TERM S.S. CREDIT. (3430.40•.90)AF - $147.00 /AF LONG TERM S.S. CREDIT. (5337.00.3537.27)AF - $115.00/A _ $ 537.665.04 _ $ 1,471.641.60 =- $ 453,841.92 _- $ 206,966.95 SUB -TOTAL $1.348.495 77 2./ POWER: FOR WELLS. 3537.27 AF • $52.50AF FOR BOOSTERS 2419.51 AF' $210WAF = $ 185,706.68 = $ 55.848 73 SUB -TOTAL $ 241,355.41 r� �J Il GR MOL TOTAL $1,5499,495118 Jul -94 Au -94 Sep-94 Oct -94 Nov -94 Dec-94 Jan.95 Feb -95 Mar -95 Apr-95 May-95 Jun -95 TOTAL LOCAL 1 664.06 69329 870.28 25.30 12.40 11.56 10,00 10.00 10.00 10.00 599.31 620.47 353727 M.W,D.2 2.30 0.00 5.50 496.00 513A0 511.80 462,80 418.50 502.50 517.60 0.00 0.00 3430.40 TOTAL 1 +2 666.36 693.29 676.18 521.90 525.40 52336 1 472.80 428.50 51250 527.60 599.31 620.47 6967.67 1./ WATER: 0 GROUND WATER 3537.27 AF - $152.00tAF M.W.D. (NON - INTERRUPTIBL 3430.40 AF ' $429.00%F SHORT TERM S.S. CREDIT. (3430.40•.90)AF - $147.00 /AF LONG TERM S.S. CREDIT. (5337.00.3537.27)AF - $115.00/A _ $ 537.665.04 _ $ 1,471.641.60 =- $ 453,841.92 _- $ 206,966.95 SUB -TOTAL $1.348.495 77 2./ POWER: FOR WELLS. 3537.27 AF • $52.50AF FOR BOOSTERS 2419.51 AF' $210WAF = $ 185,706.68 = $ 55.848 73 SUB -TOTAL $ 241,355.41 r� �J Il GR MOL TOTAL $1,5499,495118 0 M E M O R A N D U M Date: January 17, 1995 To: Emilio Murga - Director of Public WOrks From: John C. Leichty, Electrical Maintenance /Supervisor Subject: Major Activity of Traffic Signal and Street Lighting Division, Month of December, 1994. TRAFFIC SIGNALS 1. Traffic signal lamps replaced = 24 2. Assist Cal -trans with completion operational testing, and inspection of Imperial and Alameda, signals and lighting. 3. Long Beach and Euclid - malfunctions, repaired. 4. Long Beach and Cedar - pedestrian signal repaired. 5. Alameda and Martin Luther King Jr. Boulevard - N/W traffic signal knock down by auto. Replace all. 6. State and Imperial - Replace damage illuminated street name sign. STREET LIGHTING 1. Street Lights repaired , replaced / relamped. a. 4333 Martin Luther King Jr. Boulevard. b. 3999 Martin Luther King Jr. Boulevard. C. 3637 Martin Luther King Jr. Boulevard. d. Martin Luther King Jr. Boulevard & Harris - area circuit control repairs. e. Imperial & Duncan - area circuit control repairs. f. Atlantic & Carlin - intersection lighting control repairs. g. 11152 Atlantic. h. 11557 Atlantic. i. 11638 Atlantic. j. 11030 Atlantic. k. 11409 Long Beach Boulevard. 1. 11421 Long Beach Boulevard. 17 • 0 2. On Martin Luther King Jr. Boulevard, California to Abbott, rebuild, repair overhead traffic sign lighting units. OTHER 1. Install banner cables, pole to pole, (3) locations on south Atlantic area. 2. Christmas decoration work, power, maintenance repair, etc. v70 -474 HE DEPARTMENT OF PUBLIC WORKS Goals for FEBRUARY, 1995 V45 -690 M E M O R A N D U M DATE: January 18, 1995 To: Emilio M. Murga, Director of Public Works FROM: Christian Valtierra, PW Administration Supervisor SUBJECT: PUBLIC WORKS ADMINISTRATION GOALS AND PROPOSED U^/ ACTIVITIES FOR FEBRUARY 1995. 1. Meet with Public Works Division heads to review expenditure for FY 94 -95. 2. Working with Business Owners to help them to comply with the Cities encroachment permit on all private signs encroaching on public right -of -way. 3. Revise survey to be used to find out if residents along streets proposed one -way and /or overnight parking restrictions are in support of the proposed street modifications. 4. Prepare and send out Public Works Monthly report and goals. For Month of January, 1995. 5. Prepare for and attend Traffic and Parking Commission meeting for February 23, 1995. 6. Prepare and submit U.S. Small Business Administration Tree Planting Grant Application. 7. Respond to resident complaints, respond to work orders and urgent calls as they come in. 8. Continue to work with Downey Volunteer Center to take on volunteers who need to complete Community Service hours; work with HUB Cities to employ student workers and make available internship opportunities to anyone wishing to learn more about and volunteer in the Public Works Dept; work with the State Department to employ General Relief workers to work in the Department of Public Works. V70 -467 19 MEMORANDUM Date: January 9, 1994 0 To: Emilio Murga, Director of Public Works From: Frank Garcia, Civil Engineering Assistant Subject: Management Information Systems (M.I.S.) Goals for February, 1994 1. Complete 4.0 Novell Operating System Upgrade on network server for City of Lynwood LAN. 2. Complete Accounting mini - system data access and manipulation process directly from network system for Public Works. 3. Complete new Sitemeter software Network Server installation with full operation and report capabilities which will meet requirements for Phase II of the City's Software License Inventory Report. 4. Start Dataquick CD -ROM system for LAN. 5. Complete central modem bank for City of Lynwood's LAN. 6. Complete Time Sheet database access along with new Time Card relational database for Public Works. 7. Purchase and install LAN inventory program for all network computer system monitoring. . e:. 20 ` 0 • DATE. JANUARY 15, 1995 TO: EMILIO M. MURGA, DIRECTOR OF PUBLIC WORKS FROM: RAUL M. SAENZ, CIVIL ENGINEERING ASSOCIATE/WATER SUBJECT MONTHLY GOALS FOR THE MONTH OF FEBRUARY, 1995 1. Complete bacldlowlcrossconnecdons field inspections and finalize program. 2. Finalize contract with Boyle Engneers to construct new well. 3 Upgrade telemetery capacity of Well No. 9 4. Install chlorination system at Well No. 11. 5. Complete city -wide fire hydrant field survey. fwammyrftoaltdoe 21 1 0 • , M E M O R A N D U M Date: January 18, 1995 To: Emilio M. Murga, Director of Public Works From: John Leichty, Electrical Maintenance Supervisor Subject: Traffic Signal and Street Lighting GOALS for February, 1995. TRAFFIC SIGNALS 1. Complete inspections for safe operations, preventive maintenance and documentation of traffic signals city wide. STREET LIGHTING 1. Testing and lighting of City lighting circuit's, replacements, repairs, and renewals as required. maasyi 22