HomeMy Public PortalAbout2017-25 Authorizing a work order to EAC Consulting foe Engineering Services re to the Fernwood Road Lighting Improvements ProjecRESOLUTION NO. 2017-25
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA, AUTHORIZING
THE VILLAGE MANAGER TO ISSUE A WORK ORDER TO
EAC CONSULTING, INC. FOR ENGINEERING SERVICES
RELATING TO THE FERNWOOD ROAD LIGHTING
IMPROVEMENTS PROJECT; AND PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, the Village of Key Biscayne ("Village") issued Request for Qualifications No.
2016-02-09 ("RFQ") for continuing professional engineering services; and
WHEREAS, pursuant to the RFQ, the Village Council selected EAC Consulting, Inc.
("Consultant") as one of the consultants to provide continuing professional engineering services and
authorized the Village Manager to execute an agreement with Consultant; and
WHEREAS, Consultant has provided a proposal, attached as Exhibit "A," (the "Proposal")
for engineering services relating to the Fernwood Road Lighting Improvements Project (the
"Project"); and
WHEREAS, the Village Council desires to authorize the Village Manager to issue a work
order for the Project consistent with the proposal attached as Exhibit "A" and the professional
services agreement entered into between the Village and Consultant; and
WHEREAS, the Village Council finds that this Resolution is in the best interest and welfare
of the residents of the Village.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE VILLAGE
OF KEY BISCAYNE, FLORIDA, AS FOLLOWS:
Section 1. Recitals Adopted. That each of the recitals stated above is hereby adopted
and confirmed.
Section 2. Village Manager Authorized. The Village Manager is hereby authorized
to issue a work order to Consultant for the Project that is consistent with the Proposal attached hereto
as Exhibit "A" in an amount not to exceed 540,149.15.
Section 3. Effective Date. That this Resolution shall be effective immediately upon
adoption hereof.
PASSED and ADOPTED this 9th day of May, 2017.
l
MA RYRA PENAL SAY
ATTE
HITA H. ALVAREZ, MMC, VILLAGE CLE
APPROVED AS TO FORM AND
LEGAL SUFFICIENCY
VILLAGE ATTORNEY
giv
EAC Consulting, Inc.
E
EXHIBIT "A"
April 26, 2017
John C. Gilbert, igilbert@keybiscayne.fl.gov,
Village Manager
Village of Key Biscayne
88 W. McIntyre St, Suite 210
Key Biscayne, FL 33149
Re: Engineering Design Services for Fernwood Lighting Improvements
Dear Mr. Gilbert:
EAC Consulting, Inc., as part of its Continuing Services Contract with the Village, respectfully submits this fee
proposal to undertake the professional engineering services for developing plans and specifications for
implementing new lighting along Fernwood
Statement of Work
Generally, our scope of work includes the following tasks:
i. Development of an acceptable lighting level criteria, based on "night time" field investigation and
measurements along Fernwood Drive, considering the tree canopy and taller buildings shade
cover where applicable.
ii. The development of plans illustrating the anticipated layout of proposed lighting fixtures.
iii. A technical specifications package.
iv. Provision and incorporation of design support documents consisting of a topography and route
survey including subsurface utility engineering (SUE aka soft digs)
v. Development of Opinion of Probable Construction Costs — This includes the development of
construction costs based on recent historical cost trends. The prepared costs will include
appropriate contingencies.
vi. Procurement technical support including the Bid Package Compilation & Bid Assistance Services
such as responding to bid inquiries, issuing revisions/addenda, bid review, and verification of
bidders
vii. Limited Construction Phase visits.
Schedule
Our preliminary schedule for completion is estimated as follows:
Field work and Lighting Investigation
NTP + 12 Weeks
Village Review
2 weeks
100% Design Plans and Technical Specifications
20 weeks after NTP (projected)
Village Review
2 weeks
Final Design Plans and Technical Specifications
24 weeks after NTP
Bid & Award Phase
TBD
Construction Phase
TBD
Deliverables
• 100% Design Plans and Specifications
• Bid Documents — Final Design Plans and Technical Specifications
Assumptions:
The following assumptions were made with consideration to the tasks enumerated in this proposal:
a) Village staff will be available and present to discuss location of luminaires;
b) Nighttime illumination measurements will be made with ample notice to the Village staff to inform
residents and sidewalk users as to EAC's presence;
c) Plans will consist of a cover sheet; summary of items sheet, tabulation of quantities, general notes,
luminaire pole data, service point details, lighting layout plan sheet; special details, and restoration
815 NW 57 Avenue, Suite 402 !Miami, FL 33126 !Phone: 305-264-2557 !Fax: 305-264-8363 I www.eacconsult.com I CA # 7011
notes.
d) Cost estimate is limited to the new lighting installation.
e) The Village shall provide standard front-end documents for the Bid package.
f) It is anticipated that permitting will only be required by the Village Building Department.
g) It is assumed that construction completion will take place within 16 weeks after project bid award
with 4 site visits by EAC's electrical staff and civil staff to evaluate progress and conformity with the
plans and specifications.
Compensation
Compensation for the varying tasks is on a lump sum basis that based on the following breakdown and will be
invoiced on a percentage basis in accordance with the completion at the time of billing.
Task Area
Field work and Lighting Investigation
$2,025.00
100% Design Plans and Technical Specifications and Permitting
$21,270.00
Bid & Award Phase
$2,220.00
Limited Construction Support Services
$2,790.00
Sob'to{Qt
$28,305.00
Expenses (3%)
$849.15
Sub -Total (Salary Costs):
$29,154.15
Surveying Services
$9,000.00
Geotechnical Services
$1,995.00
Sub -Total (Technical Support Services):
$10,995.00
Total Compensation for this Work Order:
$40,149.15
It is our understanding that the statement of work will be undertaken under a work order to be issued subject
to the terms and conditions of the professional services agreement, dated May 20th, 2016 entered into between
the Village and EAC Consulting, Inc. We are ready to begin working on this assignment. If the above fee proposal
and the terms above are acceptable to you, please provide us with a Work Authorization/ Work Order. Please
feel free to contact me if any clarifications are required.
Thank you for the opportunity to be of service to the Village of Biscayne.
Sincerely,
ichael Adeife, P.E
Senior Vice President
cc: File
Todd Hofferberth (VKB),
Oscar Rubio (EAC) and Huntley Higgins (EAC)
By:
AGREED AND ACCEPTED
John Gilbert, Village Manager Date
Notice to Proceed Date
, 2017
Page 2
ESTIMATE OF WORK EFFORT AND COST
Client:
Name of Project:
County:
Village of Key Biscayne
Fernwood Lightinc
Miami -Dade
Consultant Name: EAC Consulting, Inc.
Consultant No.: 16008 SD01-06
Date: 4/26/2017
Project Tasks
Principal QA
QC
Civil EOR
Civil Design
Eng
Electrical EOR
Electrical
Design Eng
Hours by
Activity
Salary Cost by
Activity
$202.00
ii=i i �_0ci
$195.00
$105.00
Task 1:
Project General and Common Tasks
Lighting Analysis
5
10
15
$2,025.00
Lighting Plans and Permitting
8
12
30
120
170
$21,270.00
Bid & Award
4
2
10
16
$2,220.00
Task 2:
Limited Construction Site Visits
2
8
8
18
$2,790.00
Total Staff Hours
14
12
45
148
219
Total Staff Cost
$2,730.00
$1,260.00
$8,775.00
$15,540.00
$28,305.00
SALARY RELATED COSTS:
$28.305.00
EXPENSES (3%):
$849.15
SUBTOTAL ESTIMATED FEE:
$29,154.15
Longitude Surveying, LLC
$9,000.00
GCES Engineering Services, Inc. (Geotechnical)
$1,995.00
GRAND TOTAL ESTIMATED FEE:
$40,149.15
16008.MU01-06 Fee summary_OLR_4-11-17
Fee Sheet - Prime
Page 1 of 1
4/26/2017 10:07 AM
i
e
8
I ;
-IM
PROP PB WITH
50' LF OF (3)-#6
SLACK(TYP.)
PROP LP C-1
, I
PROP (3)46 IN
SCHED 40 PVC
24" BELOW
GRADE (TYP.)
-a a a a as -
PROP LP C-2
a
ac
FERNWOOD RD
a a a r a" ----a
----- a----- i-----
PROP PB WITH
50' LF OF (3)46
SLACK (TYP.)
PROP LP C-3
PROP (3)-#6 IN
SCHED 40 PVC
24" BELOW
GRADE (TYP.)
PROP LP C-4
r
I
—
— 1-- -- -• 5
. ----
FERNWOOD RD
�' ---_- �` a IS a-----a-----n- -a a i i-t'---�
a_____i-
✓ r O
0
0
— — , PROP LP C-6 h
— — PROP PF WITH It
CO
50' LF OF (3)-#6
SLACK (TYP.)
PROP LP C-5
i
a
PROP (3)46 IN
SCHED 40 PVC
24" BELOW
GRADE (TYP.)
SA- _-_-a-----a
E
6
iS
r ----- 5 ----- 5 -----
6
;R
---- • `.
PROP LP 8-18
----
PROP PB WITH
50' LF OF (3)-#6
5 SLACK (TYP.)
a•--_.--••
a
a
a
----- r
'-- PROP LP C-7 ___.
f
4r
_ PROP (3)-#6 IN
SCHED 40 PVC
24" BELOW
GRADE (TYP.)
• ----- • -----
-----
a -
a` —_
PROP LP C-8
5 ----- i
•
0
40
Feet
0
40
Feet
VILLAGE OF
KEY BISCAYNE
88 WEST McINTYRE STREET
KEY BISCAYNE. FL 33149
www.keylacene.t1.gov
CONSULTANT
EAC Consulting, Inc.
815 N.W. 57TH AVE, SUITE 402
MIAMI, FL 33126
PH 305.265.5400
CA 9 7011
EAC PROJECT No. 1580&5001-62
Sunshine8tl1 coin
PROJECT
PHASE V
VILLAGEWIDE
LIGHTING
IMPROVEMEMENTS
'<E" NIAP
REVISIONS.
NO.
DESCRIPTION
DATE
BY
DATE ISSUED: AUGUST 17. 2016
DESIGNED BY. RB
DRAWN BY SC
REVIEWED BY RB
SEAL:
RAMON BORGES, P.E.
FL LICENSE No. 61622
SHEET TITLE:
FERNWOOD BLVD
LIGHTING
PLANS
SHEET NO.
L-3.0
SHEET 12 OF 17
DESIGN CRITERIA P.I.D
VILLAGE OF
KEY BISCAYNE
88 WEST McINTYRE STREET
KEY BISCAYNE. FL 33145
www.keybiccane.II.gov
• . • .-_-_ •
1
K 1
R 1
1
1
1 R ----- 1 .. 9
1 1
• • •
•-----•e -----as
i
or 6e we w se w se 96
2 . R . _-_-
FERNWOOD RD
• r • • • • w
• • •
PROP LP C-9
PROP (3)46 1N
SCHED 40 PVC
24" BELOW
GRADE (TYP.)
PROP PB WITH
50' LF OF (3)46
SLACK (TYP.)
PROP LP C-10
PROP PB WITH
50' LF OF (3)-#6
SLACK (TYP.)
PROP LP C-11
4
1
1
••
•
•
r -
to
1111- -
•.
• • -
PROP (3)46 IN
SCHED 40 PVC PROP LP C-12
24" BELOW
GRADE (TYP.)
f
•
PROP PB WITH
50' LF OF (3)46
SLACK (TYP.)
FERNWOOD RD
----
----
5 • • r 7t-`-- -~�_-><
r ----- w -. _
EXIST
EXIST
LUMINAIRE
PROP (3)-#6 IN
SCHED 40 PVC
24" BELOW
GRADE (TYP.)
PROP PB WITH
50' LF OF (3)46
SLACK (TYP.)
PROP LP C-15
40
F CO:
0
40
Feet
0ONSULTANT
Art or •
EAC Consulting, Inc.
815 N.W. 57TH AVE. SUITE 402
MIAMI. FL 33126
PH: 305-265-5400
CA 7011
EAC PROJECT No. 15008.5001.02
Sunshine811 com
oEOJECT
PHASE V
VILLAGEWIDE
LIGHTING
IMPROVEMEMENTS
•(_., VA,.
REVISIONS.
NO.
DESCRIPTION
DATE
BY
DATE ISSUED: AUGUST 17, 2016
DESIGNED BY: RB
DRAWN BY. SC
REVIEWED BY: RB
SEAL'
RAMON BORGES, P.E.
FL LICENSE No. 61622
SHEET TITLE
FERNWOOD BLVD
LIGHTING
PLANS
SHEET NO.
L-3.1
SHEET 13 of 17
2016 10.0401 SCO06E
2621&OIP a.'t. 1.0.010912.1 1
1101 01 uw,e v vbgoo sae Ugh
DESIGN CRITERIA P.I.D
" " _ _ - . . . _ N s _ _ . . _ _ _ . - - _ _ ; . - - - - - " _ - _ _ . _ - _ _ -
" _ E - - - _ - 1 - - - - -
- - - - - s - - - -
` _ - - - - N i - - - - -
w
- - - - -
F E R N W O O D - - - - o r - D R D
" _ _
- - - - - - " 6 i -
P R O P L P C - 1 6
P R O P P 8 W I T H
5 0 '