Loading...
HomeMy Public PortalAbout06-0109 JacksonInspection Report City of Tybee Island 403 Butler Avenue P.Q. Box 2 749 Tybee Island, GA 31328 Phone: 786 -4573 extensions 104, 107, or 114 Fax: 786-9539 Permit No (Dto a 0 9 Date Requested: 03 - 9 - U to Owner's t4ame: 71 ct c k s 3 Date Needed: 0 3- 3 D- 0 c Gen. Contractor: Subcontractor: - 4 y- 44 Contact Number: I�O,Jt SO►-1 "7 i3- 2. Zs- JS r\ location: s i to ,�i-I �Y AJ V ; , t 'S Date of Inspection: 3 0 („ Type of I Comments: 0'5.09 . ection: Inspector: V Time of Inspection: DATE ISSUED: 02 -27 -2006 WORK DESCRIPTION: WORK LOCATION: OWNER NAME ADDRESS CITY, ST, ZIP CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEE'S CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPAIR/RENOVATE RESTAURANT 1516 BUTLER AVENUE PAUL JACKSON PO BOX 1690 TYBEE ISLAND GA 313281690 PAUL JACKSON PO BOX 1690 TYBEE ISLAND GA 313281690 P $ 95.00 $10,000.00 PERMIT #: 060109 TOTAL BALANCE DUE: $ 95.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org ()Co. Clog CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: /� /, 2 K Taw / r v,- . PIN # �/UN/ �l ,/ ZZ.d/ a -e✓ l3KrzGi -/7 /2tlri --.) NAME ADDRESS TELEPHONE Owner Pout - -�c/�o t) e 8€444, Cpl. %�D. �4,f' l T `10 � 3/1z d 9i2 7BG 80 .8 Architect or Engineer Building Contractor (Check all that apply) ❑ New Construction ❑ Duplex ❑ Residential ❑ Footprint Changes ❑ Other Estimated cost of Construction: $ Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: es....., 6 Q Renovation ❑ ingle Family Commercial - r Ps- -c• ° ^k [✓]' Repairs - /010 oo ❑ Minor Addition ❑ Substantial Addition ❑ Multi - Family ❑ Demolition (Enter appropriate number) (4) Masonry (6) Other (ple a speci (5) Steel & Masonry YTiu-u4P ,4 ) / L424s•z ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOTS and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front With culvert? Rear With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by at by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore dra. •.. _ ired by this permitted construction. Date: Z. Z1 • p Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL